CN106871479A - A kind of cold recovery formula varying capacity air source heat pump system - Google Patents

A kind of cold recovery formula varying capacity air source heat pump system Download PDF

Info

Publication number
CN106871479A
CN106871479A CN201710245733.5A CN201710245733A CN106871479A CN 106871479 A CN106871479 A CN 106871479A CN 201710245733 A CN201710245733 A CN 201710245733A CN 106871479 A CN106871479 A CN 106871479A
Authority
CN
China
Prior art keywords
valve
refrigerant
compressor
heat exchanger
heat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710245733.5A
Other languages
Chinese (zh)
Other versions
CN106871479B (en
Inventor
吴运运
王玉军
王颖
李俊红
杨奕
王天舒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Tianshu Electric Appliance Co Ltd
Original Assignee
Jiangsu Tianshu Electric Appliance Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Tianshu Electric Appliance Co Ltd filed Critical Jiangsu Tianshu Electric Appliance Co Ltd
Priority to CN201710245733.5A priority Critical patent/CN106871479B/en
Publication of CN106871479A publication Critical patent/CN106871479A/en
Priority to PCT/CN2017/102002 priority patent/WO2018188269A1/en
Priority to US16/604,943 priority patent/US11137178B2/en
Application granted granted Critical
Publication of CN106871479B publication Critical patent/CN106871479B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B13/00Compression machines, plants or systems, with reversible cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B29/00Combined heating and refrigeration systems, e.g. operating alternately or simultaneously
    • F25B29/003Combined heating and refrigeration systems, e.g. operating alternately or simultaneously of the compression type system
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B30/00Heat pumps
    • F25B30/06Heat pumps characterised by the source of low potential heat
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B41/00Fluid-circulation arrangements
    • F25B41/30Expansion means; Dispositions thereof
    • F25B41/31Expansion valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B43/00Arrangements for separating or purifying gases or liquids; Arrangements for vaporising the residuum of liquid refrigerant, e.g. by heat
    • F25B43/006Accumulators
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/52Heat recovery pumps, i.e. heat pump based systems or units able to transfer the thermal energy from one area of the premises or part of the facilities to a different one, improving the overall efficiency

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Power Engineering (AREA)
  • Compression-Type Refrigeration Machines With Reversible Cycles (AREA)

Abstract

A kind of cold recovery formula varying capacity air source heat pump system, is related to the heating for either alternatively or simultaneously operating and refrigeration combined system, and the first subsystem and the second subsystem share binary channels variable capacity heat exchanger;Heat exchanger main body includes two refrigerant tube side passages independent mutually, and two refrigerants of passage carry out heat exchange with the heat medium water of shell side passage simultaneously;Shell side passage sets up water-borne heating cycle by hot water circulating pipeline and hot water circulating pump;First subsystem and the second subsystem are connected to two refrigerant tube side passages by control valve group, set up the controllable refrigerant circulation loop of dynamic;Heat pump is by controlling the on off state of the control valve group of binary channels variable capacity heat exchanger, binary channels transfiguration pattern is realized by binary channels variable capacity heat exchanger, can effectively using the heat exchange area of shell and tube exchanger, it is thus able to meet the requirement that high load working condition stabilization is exerted oneself, unit overall operation efficiency is greatly promoted, so as to the high energy efficiency for realizing heat pump is run.

Description

A kind of cold recovery formula varying capacity air source heat pump system
Technical field
The present invention relates to the heating for either alternatively or simultaneously operating and refrigeration combined system, more particularly to one kind is based on heat supply, The heat-pump-type cold-hot combined supply system of cold supply is taken into account simultaneously.
Background technology
The proposition of intensive social construction slogan, promotes in structure trunk that function integration degree is higher, accomplishes maximum Change using energy source and have become current subject under discussion.Nowadays, commercially more and more higher is required with businessfice:Air side requirement control is suitable Humiture and air purity;It is annual suitable with the requirement of water side coolant-temperature gage.And the mode that traditional Cooling and Heat Source is supplied separately to exists Being misplaced for resource obviously is caused in Various Seasonal, at the same time investment of equipment cost is also greatly promoted.As shown in Figure 1 is skilful Gram force processing technology, chocolate product by raw material mixing thawing, fine grinding, refining, sieving, insulation, temperature adjustment, pour mold forming and cold But hardening is finally packaged into product, not only needs substantial amounts of heat and cold to supply, and each process procedure has to temperature Strict requirements.Traditional temperature control is typically heated by electrical heating, steam or burning boiler supplies heat, and to difference Temperature requirement obtains technique often by different heat-supplying modes to realize, this adds increased enterprise operation cost and reduce Operating efficiency, while Based Intelligent Control can not be realized, it is necessary to a large amount of human inputs.Accordingly, it would be desirable to original power consumption production technology Flow is transformed, and research and development disclosure satisfy that the heating of food processing technology requirement and the association system of refrigeration.Chinese invention patent " kitchen heat pump multi-mode operation control method and its control device behind restaurant " (patent of invention number:201410478406.0, award Power notification number:CN104197584B kitchen heat pump multi-mode operation control method and its control dress behind a kind of restaurant) are disclosed Put, be related to the control of the association system for heating and freezing, more particularly to a kind of hot water suitable for kitchen behind restaurant is supplied, cooling is removed The control method and equipment of the heat pump composite system of wet and cold storing and fresh-keeping, control device is by detection and compares operational mode parameter Measured value and setting value, control Multi-mode refrigeration agent circulation loop switching mechanism changes the circulating path of refrigerant, controls meal Kitchen heat pump runs according to default operational mode behind shop, realizes that automatic multi mode runs.
On the other hand, the existing heat pump with heat recovery function is generally only using an independent condenser and one Vertical heat regenerator connection composition heats heat exchanger, and not only take up room big but also high cost." package is changed Chinese utility model patent Hot device and air-conditioning " (utility model patent number:201420417296.2, Authorization Notice No.:CN204084963U one kind) is disclosed Case tube heat exchanger and the air-conditioning including the case tube heat exchanger, the case tube heat exchanger include condenser and heat regenerator, condenser one End is provided with coolant intake and cooling water outlet mouthful, and other end sealing is set;Heat regenerator one end is provided with hot water inlet and goes out with hot water Mouthful, one end that the other end is sealed with condenser is fixedly connected:Fix and connect by by condenser and the respective sealed end of heat regenerator Connect, and heat regenerator is coupled together with the refrigerant passage of condenser by connecting tube, both can guarantee that case tube heat exchanger is normal Condensation function and heat recovery function, moreover it is possible to make the compact conformation of case tube heat exchanger, save installing space, reduces cost.But, should Prior art substantially simply mechanically designs two independent functional parts and is integrated, and its respective function is still It is independent mutually, the overall heat exchange efficiency of heat exchanger can not be improved.
The content of the invention
It is cold for solving heat pump the invention aims to provide a kind of cold recovery formula varying capacity air source heat pump system Reduce equipment yardstick during hot co-feeding system substitution traditional heating mode, save equipment investment and operating cost, improve heat exchange The technical problem of efficiency and unit efficiency.
The present invention solves the technical scheme that is used of above-mentioned technical problem:
A kind of cold recovery formula varying capacity air source heat pump system, including the first compressor and cold recovery exchanger composition The first subsystem, the second compressor and finned heat exchanger composition the second subsystem, it is characterised in that;
Described the first subsystem and the second subsystem is used in conjunction with a binary channels variable capacity heat exchanger as water-cooled Condenser;Described binary channels variable capacity heat exchanger includes heat exchanger main body and one group of control being made up of magnetic valve and check valve Valve group processed;Heat exchanger main body includes being placed in two refrigerant tube side passages independent mutually of same shell side passage, two refrigeration Refrigerant in agent tube side passage carries out heat exchange with the water in shell side passage simultaneously;The shell side passage of heat exchanger main body is by warm Water circulation pipe and hot water circulating pump set up water-borne heating cycle;
First subsystem and the second subsystem are connected to two refrigerant tube side passages by described control valve group, set up The controllable refrigerant circulation loop of dynamic;Heat pump is by controlling the switch of the control valve group of binary channels variable capacity heat exchanger State, realizes the dynamic multi-mode operation of heat pump.
A kind of preferably technical scheme of cold recovery formula varying capacity air source heat pump system of the invention, it is characterised in that Described binary channels variable capacity heat exchanger is including the shell and tube exchanger as heat exchanger main body and is connected to case tube heat exchanger Refrigerant tube side passage control valve group;Two the first independent mutually coolant channels are provided with described heat exchanger main body With second refrigerant passage, two refrigerant tube side passages are placed in a shared shell side passage;Described control valve group bag Include three magnetic valves and two check valves for being connected to refrigerant tube side passage;Described magnetic valve includes being connected to the first refrigeration First magnetic valve of agent channel outlet, is connected between the outlet of the first coolant channel and second refrigerant feeder connection second Magnetic valve, and it is connected to the 3rd magnetic valve of second refrigerant channel outlet;Described check valve includes being connected to the second system First check valve of coolant channel entrance, and be connected in parallel between second refrigerant channel outlet and the first electromagnetic valve outlet The second check valve;The exhaust outlet of the first compressor is connected to the entrance of the first coolant channel by the first four-way valve;First After the outlet of magnetic valve and the outlet of the second check valve are connected in parallel, cold recovery exchanger is connected to by the first expansion valve Coolant channel, then the air inlet of the first compressor is connected to by the first four-way valve;The exhaust outlet of the second compressor is by the Two four-way valves are connected to the entrance of the first check valve;The outlet of the 3rd magnetic valve is connected to fin type heat exchange by the second expansion valve The coolant channel of device, then the air inlet of the second compressor is connected to by the second four-way valve.
A kind of preferred technical scheme of binary channels variable capacity heat exchanger of the invention, it is characterised in that described heat exchange The vertical structure that device main body is connected up and down using shell side passage, the first coolant channel is placed in the top of shell side passage, the second system Coolant channel is placed in the bottom of shell side passage;The high temperature sensible heat of refrigerant is passed on shell side passage in the first coolant channel The water in portion, forms high temperature sensible heat transfer area;The condensation latent heat of refrigerant is passed under shell side passage in second refrigerant passage The water in portion, forms condensation latent heat heat transfer zone.
A kind of superior technique scheme of cold recovery formula varying capacity air source heat pump system of the invention, it is characterised in that Be provided with the first reservoir on connecting line between the first coolant channel and the first expansion valve, second refrigerant passage with Connecting line between second expansion valve is provided with the second reservoir.
A kind of improved technical scheme of cold recovery formula varying capacity air source heat pump system of the invention, it is characterised in that Described dynamic multi-mode operation includes following four operational mode:
(1) the first cold and hot balanced mode of subsystem:First compressor start, the second compressor stops, and the first magnetic valve is beaten Open, the second closed electromagnetic valve, the refrigerant circulating path of this pattern is as follows:
First the-the first reservoir of compressor the-the first four-way valve the-the first magnetic valve of the-the first coolant channel-the first expands Valve-the four-way valve of cold recovery exchanger-the first the-the first compressor of-the first gas-liquid separator;
(2) second subsystem air source hot-water modes:First compressor stops, the second compressor start, the second magnetic valve Close, the 3rd magnetic valve is opened, the refrigerant circulating path of this pattern is as follows:
Second the-the first check valve of the-the second four-way valve of compressor-second refrigerant passage the-the second liquid storage of the-the three magnetic valve The expansion valve of device-the second-four-way valve of finned heat exchanger-the second the-the second compressor of-the second gas-liquid separator;
(3) the cold and hot aqueous mode of dual system constant volume:First compressor and the second compressor start simultaneously, and the first magnetic valve is beaten Open, the second closed electromagnetic valve, the 3rd magnetic valve is opened, the refrigerant circulating path of the first subsystem is as follows:
First the-the first reservoir of compressor the-the first four-way valve the-the first magnetic valve of the-the first coolant channel-the first expands Valve-the four-way valve of cold recovery exchanger-the first the-the first compressor of-the first gas-liquid separator;
The refrigerant circulating path of the second subsystem is as follows:
Second the-the first check valve of the-the second four-way valve of compressor-second refrigerant passage the-the second liquid storage of the-the three magnetic valve The expansion valve of device-the second-four-way valve of finned heat exchanger-the second the-the second compressor of-the second gas-liquid separator;
(4) binary channels transfiguration operational mode:First compressor start, the second compressor stops, the first closed electromagnetic valve, the Two magnetic valves are opened, and the 3rd closed electromagnetic valve, the refrigerant circulating path of this pattern is as follows:
First the-the second magnetic valve of compressor the-the first coolant channel of the-the first four-way valve-second refrigerant passage-the second is single Compressed to-the first expansion valve of the reservoir of valve-the first-- the first gas-liquid separator of the four-way valve of cold recovery exchanger-the first-the first Machine.
A kind of further improved technical scheme of cold recovery formula varying capacity air source heat pump system of the invention, it is special It is that described air source heat pump system reclaims the heat exchange area that cold changes finned heat exchanger according to refrigeration to levy, and is ensureing machine The entire system size of reduction heat pump while group heating capacity:
The excursion of the heat exchange area S of finned heat exchanger is 0~W2/ q,
The heat exchange area S of cold recovery exchanger1Excursion be 0~(W1-W2)/q1,
Wherein, unit heating capacity Q1=W1+Pi, kw;W1The refrigerating capacity of vaporizer side, kw during for system heating operation;PiFor System heating operation input power, kw;W2For refrigeration reclaims cold, kw;S=W2/ q is the heat exchange area of finned heat exchanger, m2;Q is evaporation side unit heat exchange area refrigerating capacity, kw/m under heating condition2;S1=(W1-W2)/q1It is cold recovery exchanger Heat exchange area, m2;q1It is cold recovery exchanger unit heat exchange area refrigerating capacity, kw/m2
The beneficial effects of the invention are as follows:
1st, cold recovery formula varying capacity air source heat pump system of the invention, is realized by binary channels variable capacity heat exchanger Binary channels transfiguration pattern, can effectively using the heat exchange area of shell and tube exchanger, it is thus possible to meet high load working condition stabilization The requirement exerted oneself, unit overall operation efficiency is greatly promoted, so as to the high energy efficiency for realizing heat pump is run.
2nd, cold recovery formula varying capacity air source heat pump system of the invention, can using the binary channels of varying capacity mode operation Varying capacity heat exchanger and cold recovery exchanger realize part cold recovery, can greatly promote the supercooling of refrigerant in subsystem Degree, so as to improve the refrigerating capacity of system.
3rd, cold recovery formula varying capacity air source heat pump system of the invention, a set of water-cooled is shared by two sets of refrigeration systems Condenser realizes coupling operation, using cold recovery exchanger to reduce finned evaporator size, so as to reach reduction system The purpose of size, makes cold-hot combined supply system low consumption stable operation under different cooling and heating loads, reaches the purpose of energy-efficient operation.
Brief description of the drawings
Fig. 1 is chocolate processing process figure;
Fig. 2 is the systematic schematic diagram of cold recovery formula varying capacity air source heat pump system of the invention;
Fig. 3 is the assembling structure schematic diagram of cold recovery formula varying capacity air source heat pump system of the invention;
Fig. 4 is the structural representation of binary channels variable capacity heat exchanger of the invention;
Fig. 5 is the operational mode schematic diagram of cold recovery formula varying capacity air source heat pump system of the invention.
The reference of each part in above figure:The subsystems of 1- first, the compressors of 10- first, the four-way valves of 11- first, 12- First expansion valve, 13- cold recovery exchangers, 14- circulating chilled water pipelines, the gas-liquid separators of 15- first, 16- the first temperature-sensitive bags, The reservoirs of 17- first, the defrosting Unidirectional solenoid valves of 18- first, the subsystems of 2- second, the compressors of 20- second, the four-way valves of 21- second, The expansion valves of 22- second, 23- finned heat exchangers, 24- blower fans, the gas-liquid separators of 25- second, 26- the second temperature-sensitive bags, 27- second Reservoir, the defrosting Unidirectional solenoid valves of 28- second, 3- binary channels variable capacity heat exchangers, 30- heat exchanger main bodys, 31- first freezes Agent passage, 32- second refrigerant passages, the magnetic valves of 33- first, the magnetic valves of 34- second, the magnetic valves of 35- the 3rd, 36- first is single To valve, the check valves of 37- second, 38- hot water circulating pipelines, 39- hot water circulating pumps.
Specific embodiment
For better understanding of above-mentioned technical proposal of the invention, carry out with reference to the accompanying drawings and examples further Describe in detail.Fig. 2 and Fig. 3 are one embodiment of cold recovery formula varying capacity air source heat pump system of the invention, including the 23 groups of first subsystem 1 of one compressor 10 and the composition of cold recovery exchanger 13, the second compressor 20 and finned heat exchanger Into the second subsystem 2, as shown in Fig. 2 the first described subsystem 1 and the second subsystem 2 be used in conjunction with a binary channels can Varying capacity heat exchanger 3 is used as water-cooled condenser;Described binary channels variable capacity heat exchanger 3 includes heat exchanger main body 30 and one group The control valve group being made up of magnetic valve and check valve;Heat exchanger main body 30 is independent mutually including being placed in two of same shell side passage Refrigerant tube side passage, refrigerant in two refrigerant tube side passages carries out heat exchange with the water in shell side passage simultaneously; The shell side passage of heat exchanger main body 30 sets up water-borne heating cycle by hot water circulating pipeline 38 and hot water circulating pump 39;First son The subsystem 2 of system 1 and second is connected to two refrigerant tube side passages by described control valve group, sets up the controllable system of dynamic Refrigerant cycle loop;Heat pump realizes heat by controlling the on off state of the control valve group of binary channels variable capacity heat exchanger 3 The dynamic multi-mode operation of pumping system.By taking certain chocolate processing producing line as an example, 1T raw materials are from being machined to finally be packaged into product Production process needs to stablize 100KW heats and 50KW refrigeration requirements.In the present embodiment, the first subsystem 1 is steamed using bushing type Hair device pours mold forming, hardening by cooling and packaging as cold recovery exchanger 13, recovery section cold for chocolate processing Supplied etc. the cold in technical process;Second subsystem 2 uses finned heat exchanger 23 from air-source draw heat, according to cold and hot The difference of amount demand increases the overall heating capacity of heat pump.
In the embodiment shown in fig. 4, described binary channels variable capacity heat exchanger 3 is included as heat exchanger main body 30 Shell and tube exchanger and be connected to case tube heat exchanger refrigerant tube side passage control valve group;In described heat exchanger main body 30 It is provided with two independent mutually the first coolant channels 31 and second refrigerant passage 32, two refrigerant tube side passages 31 and 32 It is placed in a shared shell side passage;Described control valve group include be connected to refrigerant tube side passage three magnetic valves and Two check valves;Described magnetic valve includes being connected to the first magnetic valve 33 of the outlet of the first coolant channel 31, is connected to the One coolant channel 31 exports the second magnetic valve 34 and entrance of second refrigerant passage 32 between, and is connected to the second refrigeration 3rd magnetic valve 35 of the outlet of agent passage 32;Described check valve includes that be connected to the entrance of second refrigerant passage 32 first is single To valve 36, and be connected in parallel second refrigerant passage 32 export and the first magnetic valve 33 export between the second check valve 37;The exhaust outlet of the first compressor 10 is connected to the entrance of the first coolant channel 31 by the first four-way valve 11;First electromagnetism After the outlet of valve 33 and the outlet of the second check valve 37 are connected in parallel, cold recovery exchanger is connected to by the first expansion valve 12 13 coolant channel, then the air inlet of the first compressor 10 is connected to by the first four-way valve 11;The row of the second compressor 20 Gas port is connected to the entrance of the first check valve 36 by the second four-way valve 21;The outlet of the 3rd magnetic valve 35 passes through the second expansion valve 22 coolant channels for being connected to finned heat exchanger 23, then the air inlet of the second compressor 20 is connected to by the second four-way valve 21 Mouthful.
One embodiment of binary channels variable capacity heat exchanger of the invention, described heat exchanger main body 30 uses shell The vertical structure that Cheng Tongdao is connected up and down, the first coolant channel 31 is placed in the top of shell side passage, second refrigerant passage 32 It is placed in the bottom of shell side passage;The high temperature sensible heat of refrigerant passes to shell side channel upper in the first coolant channel 31 Water, forms high temperature sensible heat transfer area;The condensation latent heat of refrigerant passes to shell side beneath galleries in second refrigerant passage 32 Water, form condensation latent heat heat transfer zone.
The embodiment of the cold recovery formula varying capacity air source heat pump system of the invention according to Fig. 2, in the first system Connecting line between the expansion valve 12 of coolant channel 31 and first is provided with the first reservoir 17, second refrigerant passage 32 with Connecting line between second expansion valve 22 is provided with the second reservoir 27.
The embodiment of the cold recovery formula varying capacity air source heat pump system of the invention according to Fig. 5, described is dynamic State multi-mode operation includes following four operational mode:
(1) the first cold and hot balanced mode of subsystem:First compressor 10 starts, and the second compressor 20 stops, the first electromagnetism Valve 33 is opened, and the second magnetic valve 34 is closed, and the refrigerant circulating path of this pattern is as follows:
First compressor 10- the first four-way valve 11- the first coolant channel 31- the first magnetic valve the first reservoirs of 33- 17- First the first compressors of expansion valve 12- cold recovery exchangers 13- the first four-way valve 11- the first gas-liquid separator 15- 10;
Under this pattern, the refrigerant in the first coolant channel 31 carries out heat exchange with the water in shell side passage, by first Subsystem 1 produces the heat energy that cold recovery exchanger 13 is reclaimed during cold water, in passing to the shell side passage of heat exchanger main body 30 The hot water produced.
(2) second subsystem air source hot-water modes:First compressor 10 stops, and the second compressor 20 starts, the second electricity Magnet valve 34 is closed, and the 3rd magnetic valve 35 is opened, and the refrigerant circulating path of this pattern is as follows:
The magnetic valve 35- of second compressor 20- the second four-way valve 21- the first check valve 36- second refrigerant passages 32- the 3rd Second reservoir 27- the second expansion valve 22- finned heat exchangers 23- the second four-way valve the second gas-liquid separators of 21- 25- second is pressed Contracting machine 20;
Under this pattern, the refrigerant in second refrigerant passage 32 carries out heat exchange with the water in shell side passage, by second The heat energy that the finned heat exchanger 23 of subsystem 2 absorbs from air-source, passes to what is produced in the shell side passage of heat exchanger main body 30 Hot water.
(3) the cold and hot aqueous mode of dual system constant volume:First compressor 10 and the second compressor 20 start simultaneously, the first magnetic valve 33 are opened, and the second magnetic valve 34 is closed, and the 3rd magnetic valve 35 is opened, and the refrigerant circulating path of the first subsystem 1 is as follows:
First compressor 10- the first four-way valve 11- the first coolant channel 31- the first magnetic valve the first reservoirs of 33- 17- First the first compressors of expansion valve 12- cold recovery exchangers 13- the first four-way valve 11- the first gas-liquid separator 15- 10;
The refrigerant circulating path of the second subsystem 2 is as follows:
The magnetic valve 35- of second compressor 20- the second four-way valve 21- the first check valve 36- second refrigerant passages 32- the 3rd Second reservoir 27- the second expansion valve 22- finned heat exchangers 23- the second four-way valve the second gas-liquid separators of 21- 25- second is pressed Contracting machine 20;
Under the cold and hot aqueous mode of dual system constant volume, the refrigerant in the first coolant channel 31 enters with the water in shell side passage Row heat exchange, the heat energy that cold recovery exchanger 13 in the cold water producing process of the first subsystem 1 is reclaimed, passes to heat exchanger master The hot water produced in the shell side passage of body 30;Meanwhile, the refrigerant in second refrigerant passage 32 is carried out with the water in shell side passage Heat exchange, the heat energy that the finned heat exchanger 23 of the second subsystem 2 is absorbed from air-source passes to the shell side of heat exchanger main body 30 The hot water produced in passage.
(4) binary channels transfiguration pattern:First compressor 10 starts, and the second compressor 20 stops, and the first magnetic valve 33 is closed, Second magnetic valve 34 is opened, and the 3rd magnetic valve 35 is closed, and the refrigerant circulating path of this pattern is as follows:
First compressor 10- the first four-way valve 11- the first coolant channel 31- the second magnetic valve 34- second refrigerants lead to Road 32- the second check valve 37- the first reservoir 17- the first expansion valve 12- cold recovery exchangers the first four-way valves of 13- 11- One the first compressors of gas-liquid separator 15- 10.
Under binary channels transfiguration pattern, the first compressor of cold recovery formula varying capacity air source heat pump system of the invention The high-temperature high-pressure refrigerant gas of 10 exhaust outlets discharge, enters in binary channels variable capacity heat exchanger 3 through the first four-way valve 11, stream After carrying out first paragraph heat exchange through the first coolant channel 31, form refrigerant air-liquid mixture and returned to by the second magnetic valve 34 In binary channels variable capacity heat exchanger 3, the water side again with heat exchanger main body 30 in second refrigerant passage 32 fully exchanges heat, The refrigerant liquid of normal pressure and temperature high is condensed into, the throttling action through the first expansion valve 12 after the second check valve 37 is flowed through, is changed into low Compression refrigerant liquid, into the bushing type evaporator as cold recovery exchanger 13, heat absorption is evaporated to low pressure refrigerant gas First gas-liquid separator 15 is entered by the first four-way valve 11, the air inlet of the first compressor 10 is eventually entered into, binary channels is formed and is become Hold the refrigerant circulating path of mode operation;Under this pattern, refrigerant passes through the first coolant channel 31 and second refrigerant Water in passage 32, with shell side passage carries out heat exchange twice, by cold recovery exchange in the cold water producing process of the first subsystem 1 The heat energy that device 13 is reclaimed, passes to the hot water produced in the shell side passage of heat exchanger main body 30.
Under binary channels transfiguration pattern, the first compressor of cold recovery formula varying capacity air source heat pump system of the invention The high-temperature high-pressure refrigerant gas of 10 exhaust outlets discharge, enters in binary channels variable capacity heat exchanger 3 through the first four-way valve 11, stream After carrying out first paragraph heat exchange through the first coolant channel 31, form refrigerant air-liquid mixture and returned to by the second magnetic valve 34 In binary channels variable capacity heat exchanger 3, the water side again with heat exchanger main body 30 in second refrigerant passage 32 fully exchanges heat, The refrigerant liquid of normal pressure and temperature high is condensed into, the throttling action through the first expansion valve 12 after the second check valve 37 is flowed through, is changed into low Compression refrigerant liquid, into the bushing type evaporator as cold recovery exchanger 13, heat absorption is evaporated to low pressure refrigerant gas First gas-liquid separator 15 is entered by the first four-way valve 11, the air inlet of the first compressor 10 is eventually entered into, binary channels is formed and is become Hold the refrigerant circulating path of mode operation.
Cold recovery formula varying capacity air source heat pump system of the invention, the binary channels using varying capacity mode operation is variable Capacity heat exchangers 3, can greatly promote the degree of supercooling of refrigerant in the first subsystem 1, so as to improve the refrigerating capacity of system. When two subsystem 2 is shut down, binary channels transfiguration pattern can effectively using the heat exchange area of shell and tube exchanger, it is thus possible to meets The requirement that high load working condition stabilization is exerted oneself, unit overall operation efficiency is greatly promoted, so as to the high energy efficiency for realizing heat pump is transported OK.
One embodiment of cold recovery formula varying capacity air source heat pump system of the invention, described air-source heat Pumping system reclaims the heat exchange area that cold changes finned heat exchanger according to refrigeration, reduction heat while unit heating capacity is ensured The entire system size of pumping system:
The excursion of the heat exchange area S of finned heat exchanger 23 is 0~W2/ q,
The heat exchange area S of cold recovery exchanger 131Excursion be 0~(W1-W2)/q1,
Wherein, unit heating capacity Q1=W1+Pi, kw;W1The refrigerating capacity of vaporizer side, kw during for system heating operation;PiFor System heating operation input power, kw;W2For refrigeration reclaims cold, kw;S=W2/ q is the heat exchange area of finned heat exchanger 23, m2;Q is evaporation side unit heat exchange area refrigerating capacity, kw/m under heating condition2;S1=(W1-W2)/q1It is cold recovery exchanger 13 Heat exchange area, m2;q1It is the unit heat exchange area refrigerating capacity of cold recovery exchanger 13, kw/m2
Those of ordinary skill in the art is it should be appreciated that the embodiment of the above is intended merely to illustrate of the invention Technical scheme, and be not used as being limitation of the invention, it is any based on connotation of the invention to embodiment described above Change, the modification made, will all fall in scope of the claims of the invention.

Claims (6)

1. what a kind of cold recovery formula varying capacity air source heat pump system, including the first compressor and cold recovery exchanger were constituted Second subsystem of the first subsystem, the second compressor and finned heat exchanger composition, it is characterised in that:
Described the first subsystem and the second subsystem is used in conjunction with a binary channels variable capacity heat exchanger and is condensed as water-cooled Device;Described binary channels variable capacity heat exchanger includes heat exchanger main body and one group of control valve being made up of magnetic valve and check valve Group;Heat exchanger main body includes being placed in two refrigerant tube side passages independent mutually of same shell side passage, two refrigerant pipes Refrigerant in Cheng Tongdao carries out heat exchange with the water in shell side passage simultaneously;The shell side passage of heat exchanger main body is followed by hot water Endless tube road and hot water circulating pump set up water-borne heating cycle;
First subsystem and the second subsystem are connected to two refrigerant tube side passages by described control valve group, set up dynamic Controllable refrigerant circulation loop;Heat pump is by controlling the switch shape of the control valve group of binary channels variable capacity heat exchanger State, realizes the dynamic multi-mode operation of heat pump.
2. cold recovery formula varying capacity air source heat pump system according to claim 1, it is characterised in that described bilateral Road variable capacity heat exchanger is included as the shell and tube exchanger and the refrigerant pipe for being connected to case tube heat exchanger of heat exchanger main body The control valve group of Cheng Tongdao;Two the first independent mutually coolant channels and the second refrigeration are provided with described heat exchanger main body Agent passage, two refrigerant tube side passages are placed in a shared shell side passage;Described control valve group includes being connected to system Three magnetic valves and two check valves of cryogen tube side passage;Described magnetic valve includes being connected to the outlet of the first coolant channel The first magnetic valve, be connected to the first coolant channel outlet and second refrigerant feeder connection between the second magnetic valve, with And it is connected to the 3rd magnetic valve of second refrigerant channel outlet;Described check valve includes that being connected to second refrigerant passage enters First check valve of mouth, and second be connected in parallel between second refrigerant channel outlet and the first electromagnetic valve outlet is unidirectional Valve;The exhaust outlet of the first compressor is connected to the entrance of the first coolant channel by the first four-way valve;First magnetic valve goes out After the outlet of mouth and the second check valve is connected in parallel, the refrigerant for being connected to cold recovery exchanger by the first expansion valve leads to Road, then the air inlet of the first compressor is connected to by the first four-way valve;The exhaust outlet of the second compressor passes through the second four-way valve It is connected to the entrance of the first check valve;The outlet of the 3rd magnetic valve is connected to the refrigeration of finned heat exchanger by the second expansion valve Agent passage, then the air inlet of the second compressor is connected to by the second four-way valve.
3. cold recovery formula varying capacity air source heat pump system according to claim 2, it is characterised in that in the first refrigeration Connecting line between agent passage and the first expansion valve is provided with the first reservoir, in second refrigerant passage and the second expansion valve Between connecting line be provided with the second reservoir.
4. cold recovery formula varying capacity air source heat pump system according to claim 2, it is characterised in that described heat exchange The vertical structure that device main body is connected up and down using shell side passage, the first coolant channel is placed in the top of shell side passage, the second system Coolant channel is placed in the bottom of shell side passage;The high temperature sensible heat of refrigerant is passed on shell side passage in the first coolant channel The water in portion, forms high temperature sensible heat transfer area;The condensation latent heat of refrigerant is passed under shell side passage in second refrigerant passage The water in portion, forms condensation latent heat heat transfer zone.
5. cold recovery formula varying capacity air source heat pump system according to claim 1, it is characterised in that described dynamic Multi-mode operation includes following four operational mode:
(1) the first cold and hot balanced mode of subsystem:First compressor start, the second compressor stops, and the first magnetic valve is opened, the Two closed electromagnetic valves, the refrigerant circulating path of this pattern is as follows:
First the-the first expansion valve of compressor the-the first four-way valve the-the first coolant channel the-the first reservoir of the-the first magnetic valve-cold Amount reclaims four-way valve the-the first compressor of the-the first gas-liquid separator of heat exchanger-the first;
(2) second subsystem air source hot-water modes:First compressor stops, the second compressor start, the second closed electromagnetic valve, 3rd magnetic valve is opened, and the refrigerant circulating path of this pattern is as follows:
Second the-the first check valve of the-the second four-way valve of compressor-second refrigerant passage the-the second reservoir-the of the-the three magnetic valve Two expansion valves-the four-way valve of finned heat exchanger-the second the-the second compressor of-the second gas-liquid separator;
(3) the cold and hot aqueous mode of dual system constant volume:First compressor and the second compressor start simultaneously, and the first magnetic valve is opened, the Two closed electromagnetic valves, the 3rd magnetic valve is opened, and the refrigerant circulating path of the first subsystem is as follows:
First the-the first expansion valve of compressor the-the first four-way valve the-the first coolant channel the-the first reservoir of the-the first magnetic valve-cold Amount reclaims four-way valve the-the first compressor of the-the first gas-liquid separator of heat exchanger-the first;
The refrigerant circulating path of the second subsystem is as follows:
Second the-the first check valve of the-the second four-way valve of compressor-second refrigerant passage the-the second reservoir-the of the-the three magnetic valve Two expansion valves-the four-way valve of finned heat exchanger-the second the-the second compressor of-the second gas-liquid separator;
(4) binary channels transfiguration operational mode:First compressor start, the second compressor stops, the first closed electromagnetic valve, the second electricity Magnet valve is opened, and the 3rd closed electromagnetic valve, the refrigerant circulating path of this pattern is as follows:
First the-the second magnetic valve of compressor the-the first coolant channel of the-the first four-way valve-second refrigerant passage-the second is unidirectional - the first expansion valve of the reservoir of valve-the first-four-way valve of cold recovery exchanger-the first the-the first compressor of-the first gas-liquid separator.
6. cold recovery formula varying capacity air source heat pump system according to claim 1, it is characterised in that described air Source heat pump system reclaims the heat exchange area that cold changes finned heat exchanger according to refrigeration, is contracted while unit heating capacity is ensured The entire system size of reduction of heat pumping system:
The excursion of the heat exchange area S of finned heat exchanger is 0~W2/ q,
The heat exchange area S of cold recovery exchanger1Excursion be 0~(W1-W2)/q1,
Wherein, unit heating capacity Q1=W1+Pi, kw;W1The refrigerating capacity of vaporizer side, kw during for system heating operation;PiIt is system Heating operation input power, kw;W2For refrigeration reclaims cold, kw;S=W2/ q is the heat exchange area of finned heat exchanger, m2;Q is Evaporation side unit heat exchange area refrigerating capacity, kw/m under heating condition2;S1=(W1-W2)/q1It is the heat-transfer surface of cold recovery exchanger Product, m2;q1It is cold recovery exchanger unit heat exchange area refrigerating capacity, kw/m2
CN201710245733.5A 2017-04-14 2017-04-14 Cold volume recovery type variable-capacity air source heat pump system Active CN106871479B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201710245733.5A CN106871479B (en) 2017-04-14 2017-04-14 Cold volume recovery type variable-capacity air source heat pump system
PCT/CN2017/102002 WO2018188269A1 (en) 2017-04-14 2017-09-18 Cold energy recovery-type variable-capacity air-source heat pump system
US16/604,943 US11137178B2 (en) 2017-04-14 2017-09-18 Cold energy recovery-type variable-capacity air-source heat pump system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710245733.5A CN106871479B (en) 2017-04-14 2017-04-14 Cold volume recovery type variable-capacity air source heat pump system

Publications (2)

Publication Number Publication Date
CN106871479A true CN106871479A (en) 2017-06-20
CN106871479B CN106871479B (en) 2020-01-10

Family

ID=59162666

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710245733.5A Active CN106871479B (en) 2017-04-14 2017-04-14 Cold volume recovery type variable-capacity air source heat pump system

Country Status (1)

Country Link
CN (1) CN106871479B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107763887A (en) * 2017-11-03 2018-03-06 广东芬尼能源技术有限公司 The control of Energy Level method and control device of a kind of dual system source pump
CN108534384A (en) * 2018-03-08 2018-09-14 约克广州空调冷冻设备有限公司 A kind of cooling by wind system and operating method
WO2018188269A1 (en) * 2017-04-14 2018-10-18 江苏天舒电器股份有限公司 Cold energy recovery-type variable-capacity air-source heat pump system
CN109357434A (en) * 2018-11-29 2019-02-19 四川长虹空调有限公司 It is a kind of based on the air-conditioning of double-compressor indoor temperature control system in parallel with heat transfer unit (HTU)
CN111750525A (en) * 2020-05-28 2020-10-09 河南省中能联建地热工程有限公司 Double-source hot water unit based on air source and water source double heat sources
WO2022007739A1 (en) * 2020-07-06 2022-01-13 约克广州空调冷冻设备有限公司 Heat pump system
CN114026373A (en) * 2019-07-03 2022-02-08 三菱电机株式会社 Refrigeration circuit device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7062930B2 (en) * 2002-11-08 2006-06-20 York International Corporation System and method for using hot gas re-heat for humidity control
CN2890744Y (en) * 2006-03-31 2007-04-18 孙应真 Double-linkage double-temperature balance type water cooling and heating device
CN101210748A (en) * 2006-12-28 2008-07-02 苏宇贵 Air-conditioner hot-water composite machine
CN104197449A (en) * 2014-09-18 2014-12-10 江苏天舒电器有限公司 Heat pump system for kitchen of restaurant and control method for heat pump system
CN206618147U (en) * 2017-04-14 2017-11-07 江苏天舒电器股份有限公司 A kind of cold recovery formula varying capacity air source heat pump system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7062930B2 (en) * 2002-11-08 2006-06-20 York International Corporation System and method for using hot gas re-heat for humidity control
CN2890744Y (en) * 2006-03-31 2007-04-18 孙应真 Double-linkage double-temperature balance type water cooling and heating device
CN101210748A (en) * 2006-12-28 2008-07-02 苏宇贵 Air-conditioner hot-water composite machine
CN104197449A (en) * 2014-09-18 2014-12-10 江苏天舒电器有限公司 Heat pump system for kitchen of restaurant and control method for heat pump system
CN206618147U (en) * 2017-04-14 2017-11-07 江苏天舒电器股份有限公司 A kind of cold recovery formula varying capacity air source heat pump system

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018188269A1 (en) * 2017-04-14 2018-10-18 江苏天舒电器股份有限公司 Cold energy recovery-type variable-capacity air-source heat pump system
CN107763887A (en) * 2017-11-03 2018-03-06 广东芬尼能源技术有限公司 The control of Energy Level method and control device of a kind of dual system source pump
CN107763887B (en) * 2017-11-03 2020-08-04 广东芬尼能源技术有限公司 Energy level control method and control device for dual-system heat pump unit
CN108534384A (en) * 2018-03-08 2018-09-14 约克广州空调冷冻设备有限公司 A kind of cooling by wind system and operating method
CN109357434A (en) * 2018-11-29 2019-02-19 四川长虹空调有限公司 It is a kind of based on the air-conditioning of double-compressor indoor temperature control system in parallel with heat transfer unit (HTU)
CN114026373A (en) * 2019-07-03 2022-02-08 三菱电机株式会社 Refrigeration circuit device
CN114026373B (en) * 2019-07-03 2023-01-10 三菱电机株式会社 Refrigeration circuit device
CN111750525A (en) * 2020-05-28 2020-10-09 河南省中能联建地热工程有限公司 Double-source hot water unit based on air source and water source double heat sources
WO2022007739A1 (en) * 2020-07-06 2022-01-13 约克广州空调冷冻设备有限公司 Heat pump system

Also Published As

Publication number Publication date
CN106871479B (en) 2020-01-10

Similar Documents

Publication Publication Date Title
CN106871479A (en) A kind of cold recovery formula varying capacity air source heat pump system
WO2018188269A1 (en) Cold energy recovery-type variable-capacity air-source heat pump system
CN107327997A (en) Air-conditioning system
CN109579299A (en) A kind of hot water multi system and its control method
CN107327994A (en) A kind of heat pipe air conditioner unit of Wind-cooling type with evaporation cooling function
CN201740300U (en) Secondary compression heat pump system with intermediate cooler
CN206618147U (en) A kind of cold recovery formula varying capacity air source heat pump system
CN209484880U (en) One kind is risen again formula heat pump system
CN102252412A (en) Freon-free frequency-conversion air conditioner system
CN201138100Y (en) Central air-conditioner integrating earth warming, and hot water preparing
CN103335440A (en) Secondary throttling middle complete cooling double-working-condition refrigeration system
CN109489290A (en) A kind of twin-stage self-cascade heat pump system and its application method
CN208579446U (en) A kind of multifunctional efficient air-conditioning system
CN108167184B (en) Scroll compressor wide area adaptive system
CN201503170U (en) Ground-source heat pump unit capable of providing full heat recovery
CN107062670A (en) A kind of binary channels variable capacity heat exchanger
CN206787108U (en) Air conditioner for both cooling and heating system with hot water function
CN206890903U (en) A kind of binary channels variable capacity heat exchanger
CN205939504U (en) Power heat pipe all -in -one air conditioning system
CN100592018C (en) Hot water heat converter and central air conditioner using the same
CN104990169B (en) A kind of Trans-critical cycle CO2Heat pump air conditioning system
CN202216449U (en) Small water source heat pump all-in-one machine with hot water supply function
CN207146749U (en) Air-conditioning system
CN208012143U (en) The intermediate not exclusively chiller-heat pump system of the primary throttling of second vapor injection
CN101592417A (en) The refrigerating and heating systems of band Cooling and Heat Source complementor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 221600 20 blocks, 1692 Xinghu Avenue, Nantong Development Zone, Nantong City, Jiangsu Province

Applicant after: Jiangsu Tianshu Electrical Appliance Co., Ltd.

Address before: 221600 20 blocks, 1692 Xinghu Avenue, Nantong Development Zone, Nantong City, Jiangsu Province

Applicant before: Jiangsu Tianshu electrical Limited by Share Ltd

GR01 Patent grant
GR01 Patent grant