CN106845888A - A kind of Intelligent logistics allocator - Google Patents
A kind of Intelligent logistics allocator Download PDFInfo
- Publication number
- CN106845888A CN106845888A CN201611199581.1A CN201611199581A CN106845888A CN 106845888 A CN106845888 A CN 106845888A CN 201611199581 A CN201611199581 A CN 201611199581A CN 106845888 A CN106845888 A CN 106845888A
- Authority
- CN
- China
- Prior art keywords
- physical distribution
- distribution terminal
- information
- logistics
- terminal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/083—Shipping
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/083—Shipping
- G06Q10/0835—Relationships between shipper or supplier and carriers
- G06Q10/08355—Routing methods
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Quality & Reliability (AREA)
- Entrepreneurship & Innovation (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention proposes a kind of Intelligent logistics allocator, comprises the following steps:S1:The account information of default first physical distribution terminal and the second physical distribution terminal;S2:When first physical distribution terminal initiates logistics demand information, the real-time position information and loading information of the second physical distribution terminal are detected;S3:The logistics demand information of first physical distribution terminal is contrasted with the real-time position information and loading information of second physical distribution terminal, when being mutually matched, realize matching somebody with somebody goods, the present invention being capable of reasonable disposition logistics distribution resource, utilization ratio is improved, physicals distribution cost is saved.
Description
Technical field
The invention belongs to logistics management technical field, more particularly to a kind of Intelligent logistics allocator.
Background technology
At present, Intelligent logistics are, using integrated intelligent technology, to enable the apish intelligence of logistics system, with thinking,
Perceive, study, the ability of some problems in reasoning and judging and logistics of settling a dispute by the parties concerned themselves.The future development of Intelligent logistics will be embodied
Four features:Intellectuality, integration and stratification, flexibility and socialization.A large amount of during logistics operation planning strategies for and certainly
The intellectuality of plan;With logistics management as core, realize transporting in logistics progress, storage, packaging, the integration of link such as handling and
The stratification of intelligent logistics system;The development of Intelligent logistics can more protrude the theory of " customer-oriented ", according to consumer
Changes in demand carrys out flexible modulation production technology;The development of Intelligent logistics will promote the development of regional economy and world resource to optimize
Configuration, realizes socialization.By four intelligent mechanisms of intelligent logistics system, the i.e. intelligent acquiring technology of information, intelligence transmission
Technology, Intelligent treatment technology, intelligent application technology.But, although current Intelligent logistics have a great development and improve, but
Managerial confusion, the dispatching level of resources utilization of logistics is not high, there is very big wasting of resources phenomenon.
Therefore, a kind of Intelligent logistics allocator is needed badly now, being capable of reasonable disposition logistics distribution resource, raising utilization effect
Rate, saves physicals distribution cost.
The content of the invention
The present invention proposes a kind of Intelligent logistics allocator, and although solve Intelligent logistics current in the prior art has
Very big development and progress, but managerial confusion, the dispatching level of resources utilization of logistics is not high, there is the very big wasting of resources and shows
The problem of elephant.
The technical proposal of the invention is realized in this way:Intelligent logistics allocator, comprises the following steps:
S1:The account information of default first physical distribution terminal and the second physical distribution terminal;
S2:When first physical distribution terminal initiates logistics demand information, the real-time position information of the second physical distribution terminal is detected
And loading information;
S3:By the real-time position information of the logistics demand information of first physical distribution terminal and second physical distribution terminal and
Loading information is contrasted, and when being mutually matched, realizes matching somebody with somebody goods.
As one kind preferred embodiment, the loading information of the second physical distribution terminal includes destination, the way of stream line
Footpath ground information and the remaining space information of this physical distribution terminal loading, when the demand information and the second thing of first physical distribution terminal
During stream terminal coupling, realize matching somebody with somebody goods.
As one kind preferred embodiment, it is provided with step S4 after step S3 realizes with goods:By the second physical distribution terminal
Contact details, cost information and the estimated physical distribution terminal of time announcement first that reaches the destination, by the connection of the first physical distribution terminal
It is that information, cost information and demand information are sent to the second physical distribution terminal.
As one kind preferred embodiment, step S5 is provided with after step S4:Second physical distribution terminal reaches the first thing
When flowing the destination of terminal logistics demand, the information that the second physical distribution terminal reaches its logistics demand destination is sent to the first thing
Terminal is flowed, and provides the mode of the first physical distribution terminal goods delivery and selected, the goods delivery includes asking for or sending with charge free.
Preferred embodiment also include the account information of default third―party logistics terminal in the step S1 as a kind of,
The third―party logistics terminal be logistics site terminal, third―party logistics terminal be used for collect the first physical distribution terminal goods to be carried, temporarily
When storage goods to be carried and goods to be carried is gone into the second physical distribution terminal;And, after the third―party logistics terminal will complete to transport
Goods delivery to the demand destination of the first physical distribution terminal or purpose people.
As one kind preferred embodiment, it is additionally provided with step S6 in the step S5:Monitor in real time is completed with after goods
The second physical distribution terminal goods delivery situation, and the transport situation is sent to the first physical distribution terminal, or the first logistics end
End active inquiry dispenses the transport situation of goods.
As one kind preferred embodiment, after the stream line of the second physical distribution terminal of adjustment is completed in the step S6,
The stream line of second physical distribution terminal is reset, and preserves the historical record of original Flow Line, when original Flow Line is needed
When supporting, preferably choose and allocate second physical distribution terminal.
As it is a kind of preferred embodiment, detected in the step S2 the second physical distribution terminal real-time position information and
Loading information, the future weather information of the stream line also including the second physical distribution terminal of prediction, and the second logistics end that will be predicted
The future weather information of the stream line at end is sent to the second physical distribution terminal.
As one kind preferred embodiment, it is additionally provided with step S7 after the step S6:The in statistics different time sections
The stream line dispatching historical data of two physical distribution terminals, and the second logistics is permanently or temporarily adjusted according to the dispatching historical data
The stream line of terminal.
As it is a kind of preferred embodiment, in the step S3 by the logistics demand information of first physical distribution terminal with
The real-time position information and loading information of second physical distribution terminal are contrasted, when being mutually matched, by the first physical distribution terminal
Contact details, cost information and demand information be sent to the second physical distribution terminal, when the first physical distribution terminal confirms that selection pays
After mode, if selection pre-payment, treat that the first physical distribution terminal is completed to Third-party payment, after control unit confirms, to the second thing
Stream terminal and the first physical distribution terminal send and pay successful information;If choosing after paying, after goods delivery is completed, to goods mesh
People collect the charges, and send information to the second physical distribution terminal and the first physical distribution terminal after charge is completed, and complete goods and match somebody with somebody
Send flow.
After employing above-mentioned technical proposal, the beneficial effects of the invention are as follows:The goods that user terminal can in real time be received is matched somebody with somebody
Send demand, and real-time detection goods delivery equipment real time position and state, and dispatching demand is carried out according to position and state
Matching, then realize the dispatching of goods;Also, dispatching demander can independently select to send part mode and way of paying, in day
When gas is abnormal, and goods delivery terminal is reminded, it is ensured that the traveling of safety, some material flow lines within some time periods
When road causes logistics congestion because of busy, can accordingly be dispatched, and be paid the utmost attention to the goods of the logistics route experience
Thing dispatching terminal is supported, it is ensured that while goods is dispensed in time, can be avoided again because strange dispatching terminal is not yet done
Know delay caused by road conditions.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this
Some embodiments of invention, for those of ordinary skill in the art, without having to pay creative labor, may be used also
Other accompanying drawings are obtained with according to these accompanying drawings.
Fig. 1 is schematic flow sheet of the invention.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on
Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made
Embodiment, belongs to the scope of protection of the invention.
As shown in figure 1, this Intelligent logistics allocator, comprises the following steps:
S1:The account information of default first physical distribution terminal and the second physical distribution terminal;
S2:When first physical distribution terminal initiates logistics demand information, the real-time position information of the second physical distribution terminal is detected
And loading information;
S3:By the real-time position information of the logistics demand information of first physical distribution terminal and second physical distribution terminal and
Loading information is contrasted, and when being mutually matched, realizes matching somebody with somebody goods.
The loading information of the second physical distribution terminal includes that the destination of stream line, approach ground information and this physical distribution terminal are carried
The remaining space information of goods, when the demand information of first physical distribution terminal is matched with the second physical distribution terminal, realizes matching somebody with somebody goods.
Step S4 is provided with after step S3 realizes with goods:By the contact details of the second physical distribution terminal, cost information and
The estimated physical distribution terminal of time announcement first that reaches the destination, by the contact details of the first physical distribution terminal, cost information and demand
Information is sent to the second physical distribution terminal.
Step S5 is provided with after step S4:Second physical distribution terminal reaches the destination of the first physical distribution terminal logistics demand
When, the information that the second physical distribution terminal reaches its logistics demand destination is sent to the first physical distribution terminal, and provide the first logistics
The mode of terminal goods delivery is selected, and the goods delivery includes asking for or sending with charge free.
Also include the account information of default third―party logistics terminal in the step S1, the third―party logistics terminal is logistics station
Point terminal, third―party logistics terminal is used to collect the goods to be carried of the first physical distribution terminal, temporarily storage goods to be carried and will wait to freight
Thing goes to the second physical distribution terminal;And, the third―party logistics terminal will complete the goods delivery after transporting to the first physical distribution terminal
Demand destination or purpose people.
Step S6 is additionally provided with the step S5:Monitor in real time completes the goods delivery with the second physical distribution terminal after goods
Situation, and the transport situation is sent to the first physical distribution terminal, or the first physical distribution terminal active inquiry dispenses the transport of goods
Situation.
After the stream line of the second physical distribution terminal of adjustment is completed in the step S6, second physical distribution terminal is reset
Stream line, and preserve the historical record of original Flow Line, when original Flow Line needs to support, preferably choose allotment this
Two physical distribution terminals.
The real-time position information and loading information of the second physical distribution terminal are detected in the step S2, also including prediction second
The future weather information of the stream line of physical distribution terminal, and will predict the second physical distribution terminal stream line future weather letter
Breath is sent to the second physical distribution terminal.
Step S7 is additionally provided with after the step S6:The stream line dispatching of the second physical distribution terminal in statistics different time sections
Historical data, and the stream line of the second physical distribution terminal is permanently or temporarily adjusted according to the dispatching historical data.
It is in the step S3 that the logistics demand information of first physical distribution terminal is real-time with second physical distribution terminal
Positional information and loading information are contrasted, when being mutually matched, by the contact details of the first physical distribution terminal, cost information and
Demand information is sent to the second physical distribution terminal, after the first physical distribution terminal confirms the selection means of payment, if selection pre-payment, treats
First physical distribution terminal is completed to Third-party payment, after control unit confirms, is sent to the second physical distribution terminal and the first physical distribution terminal
Pay successful information;If choosing after paying, after goods delivery is completed, collected the charges to goods purpose people, and complete to receive
Information is sent to the second physical distribution terminal and the first physical distribution terminal after taking, and completes goods delivery flow.
The operation principle of the Intelligent logistics allocator is:The goods delivery demand of user terminal can be in real time received, and
And the real time position and state of real-time detection goods delivery equipment, and the matching of dispatching demand is carried out according to position and state, so
The dispatching of goods is realized afterwards;Also, dispatching demander can independently select to send part mode and way of paying, in weather anomaly,
And goods delivery terminal is reminded, it is ensured that the traveling of safety, some stream lines within some time periods are because numerous
When hurrying and causing logistics congestion, can be dispatched accordingly, and pay the utmost attention to the goods delivery end of the logistics route experience
End is supported, it is ensured that while goods is dispensed in time, can avoid again because strange dispatching terminal is unfamiliar with road conditions
Caused delay.
Presently preferred embodiments of the present invention is the foregoing is only, is not intended to limit the invention, it is all in essence of the invention
Within god and principle, any modification, equivalent substitution and improvements made etc. should be included within the scope of the present invention.
Claims (10)
1. a kind of Intelligent logistics allocator, it is characterised in that comprise the following steps:
S1:The account information of default first physical distribution terminal and the second physical distribution terminal;
S2:When first physical distribution terminal initiates logistics demand information, detect the second physical distribution terminal real-time position information and
Loading information;
S3:The real-time position information with second physical distribution terminal and loading by the logistics demand information of first physical distribution terminal
Information is contrasted, and when being mutually matched, realizes matching somebody with somebody goods.
2. Intelligent logistics allocator according to claim 1, it is characterised in that the loading packet of the second physical distribution terminal
The remaining space information of the destination, approach ground information and the loading of this physical distribution terminal of stream line is included, when first logistics
When the demand information of terminal is matched with the second physical distribution terminal, realize matching somebody with somebody goods.
3. Intelligent logistics allocator according to claim 2, it is characterised in that be provided with after step S3 realizes with goods
Step S4:By the contact details of the second physical distribution terminal, cost information and estimated reach the destination time announcement the first logistics end
End, the second physical distribution terminal is sent to by the contact details of the first physical distribution terminal, cost information and demand information.
4. Intelligent logistics allocator according to claim 3, it is characterised in that step S5 is provided with after step S4:
When second physical distribution terminal reaches the destination of the first physical distribution terminal logistics demand, the second physical distribution terminal is reached into its logistics demand mesh
The information on ground be sent to the first physical distribution terminal, and provide the mode of the first physical distribution terminal goods delivery and select, the goods is matched somebody with somebody
Send including asking for or sending with charge free.
5. Intelligent logistics allocator according to claim 4, it is characterised in that also include default the in the step S1
The account information of three physical distribution terminals, the third―party logistics terminal is logistics site terminal, and third―party logistics terminal is used to collect first
Goods to be carried is simultaneously gone to the second physical distribution terminal by the goods to be carried of physical distribution terminal, temporarily storage goods to be carried;And, the described 3rd
Physical distribution terminal will complete the goods delivery after transporting to the demand destination of the first physical distribution terminal or purpose people.
6. Intelligent logistics allocator according to claim 5, it is characterised in that be additionally provided with step in the step S5
S6:Monitor in real time completes the goods delivery situation with the second physical distribution terminal after goods, and the transport situation is sent into the first thing
Stream terminal, or the first physical distribution terminal active inquiry dispenses the transport situation of goods.
7. Intelligent logistics allocator according to claim 6, it is characterised in that adjustment second is completed in the step S6
After the stream line of physical distribution terminal, the stream line of second physical distribution terminal is reset, and preserve going through for original Flow Line
The Records of the Historian is recorded, and when original Flow Line needs to support, is preferably chosen and is allocated second physical distribution terminal.
8. Intelligent logistics allocator according to claim 7, it is characterised in that detect the second logistics in the step S2
The real-time position information and loading information of terminal, also believe including predicting the future weather of the stream line of the second physical distribution terminal
Breath, and the future weather information of the stream line of the second physical distribution terminal predicted is sent to the second physical distribution terminal.
9. Intelligent logistics allocator according to claim 8, it is characterised in that be additionally provided with step after the step S6
S7:The stream line dispatching historical data of the second physical distribution terminal in statistics different time sections, and according to the dispatching historical data
Permanently or temporarily adjust the stream line of the second physical distribution terminal.
10. Intelligent logistics allocator according to claim 9, it is characterised in that by described first in the step S3
The logistics demand information of physical distribution terminal is contrasted with the real-time position information and loading information of second physical distribution terminal, works as phase
Mutually during matching, the contact details of the first physical distribution terminal, cost information and demand information are sent to the second physical distribution terminal, when the
After one physical distribution terminal confirms the selection means of payment, if selection pre-payment, treat that the first physical distribution terminal is completed to Third-party payment, control
After unit processed confirms, sent to the second physical distribution terminal and the first physical distribution terminal and pay successful information;If choosing after paying, complete
Into after goods delivery, collected the charges to goods purpose people, and to the second physical distribution terminal and the first physical distribution terminal after charge is completed
Transmission information, and complete goods delivery flow.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611199581.1A CN106845888A (en) | 2016-12-22 | 2016-12-22 | A kind of Intelligent logistics allocator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611199581.1A CN106845888A (en) | 2016-12-22 | 2016-12-22 | A kind of Intelligent logistics allocator |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106845888A true CN106845888A (en) | 2017-06-13 |
Family
ID=59135323
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611199581.1A Pending CN106845888A (en) | 2016-12-22 | 2016-12-22 | A kind of Intelligent logistics allocator |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106845888A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107220796A (en) * | 2017-06-28 | 2017-09-29 | 北京惠赢天下网络技术有限公司 | A kind of kinds of goods transportation resources of distributors and device |
CN107844941A (en) * | 2017-12-04 | 2018-03-27 | 东莞市大易产业链服务有限公司 | A kind of Intelligent logistics allocator |
CN108108934A (en) * | 2017-12-05 | 2018-06-01 | 安徽蓝海供应链管理有限公司 | Goods delivery method based on mobile APP |
CN108229894A (en) * | 2018-02-11 | 2018-06-29 | 京东方科技集团股份有限公司 | Cargo configuration method, device, terminal and system based on vending machine |
CN111738517A (en) * | 2020-06-24 | 2020-10-02 | 詹晨 | E-commerce fresh commodity express delivery and distribution management system based on big data |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101930580A (en) * | 2010-08-19 | 2010-12-29 | 北京中交兴路信息科技有限公司 | Method and system for matching freight transaction |
CN102073941A (en) * | 2011-01-06 | 2011-05-25 | 北京物美商业集团股份有限公司 | Method and system for optimizing distributed collaborative loading |
CN102460534A (en) * | 2009-04-22 | 2012-05-16 | 因瑞克斯有限公司 | Predicting expected road traffic conditions based on historical and current data |
CN102467703A (en) * | 2010-11-10 | 2012-05-23 | 北京天德世通科技发展有限公司 | Logistics management method, device and system based on cloud computing |
CN102867244A (en) * | 2012-08-30 | 2013-01-09 | 江苏乐买到网络科技有限公司 | Logistics information system |
CN102999834A (en) * | 2012-12-18 | 2013-03-27 | 江苏乐买到网络科技有限公司 | Distributed logistics information management system |
CN103473659A (en) * | 2013-08-27 | 2013-12-25 | 西北工业大学 | Dynamic optimal distribution method for logistics tasks based on distribution vehicle end real-time state information drive |
CN103679405A (en) * | 2012-08-31 | 2014-03-26 | 成都海存艾匹科技有限公司 | Logistics distribution system and logistics distribution method |
CN106127660A (en) * | 2016-06-30 | 2016-11-16 | 成都我来啦网格信息技术有限公司 | A kind of relay delivery system and allocator thereof |
CN106225794A (en) * | 2016-06-30 | 2016-12-14 | 百度在线网络技术(北京)有限公司 | A kind of method and device for planning of navigation way |
-
2016
- 2016-12-22 CN CN201611199581.1A patent/CN106845888A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102460534A (en) * | 2009-04-22 | 2012-05-16 | 因瑞克斯有限公司 | Predicting expected road traffic conditions based on historical and current data |
CN101930580A (en) * | 2010-08-19 | 2010-12-29 | 北京中交兴路信息科技有限公司 | Method and system for matching freight transaction |
CN102467703A (en) * | 2010-11-10 | 2012-05-23 | 北京天德世通科技发展有限公司 | Logistics management method, device and system based on cloud computing |
CN102073941A (en) * | 2011-01-06 | 2011-05-25 | 北京物美商业集团股份有限公司 | Method and system for optimizing distributed collaborative loading |
CN102867244A (en) * | 2012-08-30 | 2013-01-09 | 江苏乐买到网络科技有限公司 | Logistics information system |
CN103679405A (en) * | 2012-08-31 | 2014-03-26 | 成都海存艾匹科技有限公司 | Logistics distribution system and logistics distribution method |
CN102999834A (en) * | 2012-12-18 | 2013-03-27 | 江苏乐买到网络科技有限公司 | Distributed logistics information management system |
CN103473659A (en) * | 2013-08-27 | 2013-12-25 | 西北工业大学 | Dynamic optimal distribution method for logistics tasks based on distribution vehicle end real-time state information drive |
CN106127660A (en) * | 2016-06-30 | 2016-11-16 | 成都我来啦网格信息技术有限公司 | A kind of relay delivery system and allocator thereof |
CN106225794A (en) * | 2016-06-30 | 2016-12-14 | 百度在线网络技术(北京)有限公司 | A kind of method and device for planning of navigation way |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107220796A (en) * | 2017-06-28 | 2017-09-29 | 北京惠赢天下网络技术有限公司 | A kind of kinds of goods transportation resources of distributors and device |
CN107844941A (en) * | 2017-12-04 | 2018-03-27 | 东莞市大易产业链服务有限公司 | A kind of Intelligent logistics allocator |
CN108108934A (en) * | 2017-12-05 | 2018-06-01 | 安徽蓝海供应链管理有限公司 | Goods delivery method based on mobile APP |
CN108229894A (en) * | 2018-02-11 | 2018-06-29 | 京东方科技集团股份有限公司 | Cargo configuration method, device, terminal and system based on vending machine |
CN111738517A (en) * | 2020-06-24 | 2020-10-02 | 詹晨 | E-commerce fresh commodity express delivery and distribution management system based on big data |
CN111738517B (en) * | 2020-06-24 | 2021-09-07 | 安得利(深圳)食品有限公司 | E-commerce fresh commodity express delivery and distribution management system based on big data |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106845888A (en) | A kind of Intelligent logistics allocator | |
US10769947B2 (en) | Mobile access point operable as a fixed access point in a network of moving things, for example including a network of autonomous vehicles | |
CN103164782B (en) | A kind of intelligent dispatching system and intelligent dispatching method of container trucks | |
CN103903455B (en) | Controlling Traffic Signals in Urban Roads optimization system | |
ES2703584T3 (en) | System, device and method for exchanging energy with an electric vehicle | |
CN110945493B (en) | System including server storing sensor data and related methods | |
CN108921362B (en) | Medicine trunk line optimization method, system, equipment and storage medium | |
US20090267792A1 (en) | Customer supported automatic meter reading method | |
CN106683474A (en) | Parking reservation system and method based on parking space self-control | |
Sarwat et al. | Toward a smart city of interdependent critical infrastructure networks | |
CN107452218A (en) | A kind of intersection centralized scheduling method that more unmanned vehicles are formed into columns | |
CN101383089A (en) | Vehicle matching scheduling system and method | |
CN103684940A (en) | TD-LTE (time division long term evolution) based power distribution and utilization network business management system | |
US20180255511A1 (en) | Systems and methods for utilizing mobile access points for multiple-path delay tolerant communication in a network of moving things, for example including a network of autonomous vehicles | |
CN104365061B (en) | A kind of dispatching method, apparatus and system | |
Lambrinos et al. | DisAssist: An internet of things and mobile communications platform for disabled parking space management | |
CN102710785A (en) | Cloud service node architecture in self-service tourism system, and service collaborating and balancing module and method among service nodes in self-service tourism system | |
Cogill et al. | Parked cars as a service delivery platform | |
US6459894B1 (en) | Method and apparatus for assisting a user to find a communication resource of sufficient capacity | |
CN111263959A (en) | System for managing an automated vehicle | |
CN105809960B (en) | A kind of urban transportation emergency resources layout method and device | |
CN104574524A (en) | Intelligent efficient lockage system | |
CN105184970A (en) | Public transportation IC card internet payment system and payment method thereof | |
CN106709685A (en) | Intelligent logistics management system | |
Sun et al. | Congestion-aware communication paradigm for sustainable dense mobile crowdsensing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170613 |
|
RJ01 | Rejection of invention patent application after publication |