CN106836807A - It is a kind of can quick-assembling and mobile modular rack application method - Google Patents
It is a kind of can quick-assembling and mobile modular rack application method Download PDFInfo
- Publication number
- CN106836807A CN106836807A CN201710060587.9A CN201710060587A CN106836807A CN 106836807 A CN106836807 A CN 106836807A CN 201710060587 A CN201710060587 A CN 201710060587A CN 106836807 A CN106836807 A CN 106836807A
- Authority
- CN
- China
- Prior art keywords
- scaffold
- dolly
- sub
- bar
- assembling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Movable Scaffolding (AREA)
Abstract
The present invention relates to it is a kind of can quick-assembling and mobile modular rack application method, full hall scaffold is divided into some sub- scaffolds by it, and in sub- scaffold lower disposed dolly, hoist engine is connected with dolly by steel wire rope then, elevator machine travel scaffold advances.Construction method of the present invention need not all remove full hall scaffold, only need dismounting part of horizontal bar that scaffold is split as into several units, and a dolly for provided with wheels is respectively arranged in the case where bar is swept the floor in the front and back end of each sub- scaffold, dolly is connected and fixed by fastener with the vertical rod of full hall scaffold or horizon bar;Full hall scaffold is connected with hoist engine with steel wire rope afterwards, pulls scaffold to move by hoist engine.This form of construction work reduces the time that scaffold is removed and installed, while scaffold bottom arrangement dolly so that scaffold conveniently moving, with great convenience for construction.
Description
【Technical field】
The present invention relates to it is a kind of can quick-assembling and mobile modular rack application method, belong to building scaffold skill
Art field.
【Background technology】
It is frequently necessary to carry out casting of concrete in mass during modern construction engineering, bridge, Tunnel Engineering, template
Setting up needs using full hall formula scaffold, and this carries out auxiliary construction with regard to inevitably building scaffold, the process built at present
Mainly manually operate, the build process time is long, costly, risk big, and influenceed whole because build process is more long sometimes
The duration of individual engineering, occupancy substantial contribution expense, and the fine of great number is likely to cause, cause larger economic loss.
Therefore, in order to solve the above technical problems, can quick-assembling and mobile module it is necessory to provide a kind of innovation
Change the application method of support, to overcome the defect of the prior art.
【The content of the invention】
It is an object of the invention to provide it is a kind of can quick-assembling and mobile modular rack application method, its construction
Simplicity, substantially reduce scaffold sets up the time, with convenience for construction and economic rationality.
To achieve the above object, the technical scheme taken of the present invention is:It is a kind of can quick-assembling and mobile modularization branch
The application method of frame, it comprises the following steps:
1), part of horizontal bar is removed, full hall scaffold some sub- scaffolds is split into, while in dolly to be connected
Sweep the floor bar inner side add a row of horizontal bar;
2), with jack by scaffold front-end and back-end jack-up, a dolly is arranged in the case where scaffold sweeps the floor bar;
3) dolly is connected with sub- scaffold with fastener, dolly passes through fastener with the horizon bar of sub- scaffold or vertical rod
Connection, and dolly and sub- scaffold are carried out into colligation reinforcing with iron wire;
4), one connexon scaffold of steel wire rope, other end connection hoist engine, by the sub- scaffold of hoist engine horizontal drag
It is mobile, in moving process, send 4 people to help scaffold to control the balance of scaffold in sub- scaffold corner;
5) 1)~4) step more than repeating, carries out the next construction of sub- scaffold.
It is of the invention can the application method of quick-assembling and mobile modular rack be further:Full hall scaffold is divided into
Some subelements, the average-size of subelement is between 3m × 3m~10m × 10m.
It is of the invention can the application method of quick-assembling and mobile modular rack be further:The dolly is 4 wheels
Dolly, small height sets a vertical or oblique steel pipe, vertical steel pipe or oblique more than bar height from the ground of sweeping the floor in dolly
It is connected by fastener with dolly vertical rod or bar of sweeping the floor to steel pipe.
It is of the invention can the application method of quick-assembling and mobile modular rack be also:Steel wire rope connects with sub- scaffold
When connecing, steel wire rope is connected with sub- scaffold bottom.
Compared with prior art, the present invention has the advantages that:It is of the invention can quick-assembling and mobile module
Change support application method split into each subelement module by by full hall scaffold, sub- scaffold bottom arrange dolly with
Reduce frictional force, then pulling dolly with hoist engine advances this form of construction work, saves time and fund, with greatly applying
Work convenience and economic rationality.
【Brief description of the drawings】
Fig. 1 is a kind of stereogram of the sub- scaffold of full hall scaffold.
Fig. 2-1~Fig. 2-3 is three kinds of fasteners of joint steel pipe.
Fig. 3 is the front elevation view that dolly is connected with the horizon bar of scaffold.
Fig. 4 is the side elevational view that dolly is connected with the horizon bar of scaffold.
Fig. 5 is the top view that dolly is connected with the horizon bar of scaffold.
【Specific embodiment】
The invention will be further described for 1-5 and specific embodiment below in conjunction with the accompanying drawings.
The present invention relates to it is a kind of can quick-assembling and mobile modular rack application method, it comprises the following steps:
1), part of horizontal bar 1 is removed, full hall scaffold is split into some sub- scaffolds, while in dolly to be connected 2
Sweep the floor bar inner side add a row of horizontal bar 1;Specifically, full hall scaffold is divided into some subelements, subelement it is average
Size is between 3m × 3m~10m × 10m, but flat shape is not limited to square, and flat shape is alternatively rectangle.
2), with jack by scaffold front-end and back-end jack-up, a dolly is arranged in the case where scaffold sweeps the floor bar;It is described small
Car is 4 wheel dollies, and small height is more than bar height from the ground of sweeping the floor.
3) dolly 2 is connected with sub- scaffold with fastener, dolly 2 is with the horizon bar 1 of sub- scaffold or vertical rod by button
Part 3 is connected, and dolly 2 and sub- scaffold are carried out into colligation reinforcing with iron wire.Specifically, dolly 2 it is inner set one it is vertical or
Oblique steel pipe, vertical steel pipe or oblique steel pipe are connected with dolly vertical rod or bar of sweeping the floor by fastener 3.
4), one connexon scaffold of steel wire rope, other end connection hoist engine, by the sub- scaffold of hoist engine horizontal drag
It is mobile, in moving process, send 4 people to help scaffold to control the balance of scaffold in sub- scaffold corner;Wherein, steel wire
When rope is connected with sub- scaffold, steel wire rope is connected with sub- scaffold bottom, connecting place should meet force request.
5) 1)~4) step more than repeating, carries out the next construction of sub- scaffold.
Found out by examples detailed above, present invention spirit and its essence are characterized in:Full hall scaffold is divided into some sub- pin hands
Frame, and in sub- scaffold lower disposed dolly, hoist engine is connected with dolly by steel wire rope then, elevator machine travel scaffold
Advance.
Specific embodiment above is only the preferred embodiment of this creation, is not used to limit this creation, all in this wound
Any modification, equivalent substitution and improvements for being done etc. within the spirit and principle of work, should be included in this creation protection domain it
It is interior.
Claims (4)
1. it is a kind of can quick-assembling and mobile modular rack application method, it is characterised in that:Comprise the following steps:
1), part of horizontal bar is removed, full hall scaffold some sub- scaffolds is split into, while sweeping the floor in dolly to be connected
Bar inner side adds a row of horizontal bar;
2), with jack by scaffold front-end and back-end jack-up, a dolly is arranged in the case where scaffold sweeps the floor bar;
3) dolly is connected with sub- scaffold with fastener, dolly is connected with the horizon bar of sub- scaffold or vertical rod by fastener,
And dolly and sub- scaffold are carried out into colligation reinforcing with iron wire;
4), one connexon scaffold of steel wire rope, other end connection hoist engine, is moved by the sub- scaffold of hoist engine horizontal drag
It is dynamic, in moving process, send 4 people to help scaffold to control the balance of scaffold in sub- scaffold corner;
5) 1)~4) step more than repeating, carries out the next construction of sub- scaffold.
2. as claimed in claim 1 can quick-assembling and mobile modular rack application method, it is characterised in that:Full hall
Scaffold is divided into some subelements, and the average-size of subelement is between 3m × 3m~10m × 10m.
3. as claimed in claim 1 can quick-assembling and mobile modular rack application method, it is characterised in that:It is described
Dolly is 4 wheel dollies, and small height sets a vertical or oblique steel pipe, erects more than bar height from the ground of sweeping the floor in dolly
It is connected by fastener with dolly vertical rod or bar of sweeping the floor to steel pipe or oblique steel pipe.
4. as claimed in claim 1 can quick-assembling and mobile modular rack application method, it is characterised in that:Steel wire
When rope is connected with sub- scaffold, steel wire rope is connected with sub- scaffold bottom.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710060587.9A CN106836807A (en) | 2017-01-25 | 2017-01-25 | It is a kind of can quick-assembling and mobile modular rack application method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710060587.9A CN106836807A (en) | 2017-01-25 | 2017-01-25 | It is a kind of can quick-assembling and mobile modular rack application method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106836807A true CN106836807A (en) | 2017-06-13 |
Family
ID=59121235
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710060587.9A Pending CN106836807A (en) | 2017-01-25 | 2017-01-25 | It is a kind of can quick-assembling and mobile modular rack application method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106836807A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108867418A (en) * | 2018-07-23 | 2018-11-23 | 重庆建工市政交通工程有限责任公司 | A kind of movable units support frame and the construction method for box-structure |
CN111425058A (en) * | 2020-04-14 | 2020-07-17 | 中生源(海南)生态环境发展有限公司 | Cellular enclosure device that modularization can be assembled fast |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB190429533A (en) * | 1904-05-03 | 1905-05-18 | George Washington Sanders | Improvements relating to Cable Traction Systems |
DE3818856A1 (en) * | 1988-06-03 | 1989-12-07 | Francois Remlinger | Passenger lift for two-storey dwelling houses |
CN201232342Y (en) * | 2008-07-29 | 2009-05-06 | 天津电力建设公司 | Combined door type steel pipe scaffold gliding platform |
CN203669884U (en) * | 2014-01-15 | 2014-06-25 | 中国水利水电第五工程局有限公司 | Movable all-round steel pipe scaffold for tunnel lining construction |
CN105803947A (en) * | 2016-05-13 | 2016-07-27 | 浙江大学城市学院 | Integral traversing system and method for portal-type full space support of cast-in-situ box girder |
CN105888242A (en) * | 2014-12-15 | 2016-08-24 | 上海电力建筑工程公司 | Concrete-column cast-in-place structure movable-formwork supporting system and construction method |
-
2017
- 2017-01-25 CN CN201710060587.9A patent/CN106836807A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB190429533A (en) * | 1904-05-03 | 1905-05-18 | George Washington Sanders | Improvements relating to Cable Traction Systems |
DE3818856A1 (en) * | 1988-06-03 | 1989-12-07 | Francois Remlinger | Passenger lift for two-storey dwelling houses |
CN201232342Y (en) * | 2008-07-29 | 2009-05-06 | 天津电力建设公司 | Combined door type steel pipe scaffold gliding platform |
CN203669884U (en) * | 2014-01-15 | 2014-06-25 | 中国水利水电第五工程局有限公司 | Movable all-round steel pipe scaffold for tunnel lining construction |
CN105888242A (en) * | 2014-12-15 | 2016-08-24 | 上海电力建筑工程公司 | Concrete-column cast-in-place structure movable-formwork supporting system and construction method |
CN105803947A (en) * | 2016-05-13 | 2016-07-27 | 浙江大学城市学院 | Integral traversing system and method for portal-type full space support of cast-in-situ box girder |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108867418A (en) * | 2018-07-23 | 2018-11-23 | 重庆建工市政交通工程有限责任公司 | A kind of movable units support frame and the construction method for box-structure |
CN111425058A (en) * | 2020-04-14 | 2020-07-17 | 中生源(海南)生态环境发展有限公司 | Cellular enclosure device that modularization can be assembled fast |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105649654B (en) | Automatic hydraulic inverted arch trestle chassis and its construction method | |
CN203007849U (en) | Movable construction device for cast-in-place concrete crash barriers with hanging eaves | |
CN101922143A (en) | Construction method of bent cap | |
CN208995928U (en) | A kind of multi-functional erection crane suitable for composite beam construction | |
CN103015325A (en) | Construction method of cast-in-place concrete crash barrier with eaves | |
CN111022079A (en) | Trestle type full-section inverted arch two-lining trolley equipment and construction method thereof | |
CN107974944A (en) | A kind of Y types road-cum-rail bridge floorings hanging apparatus and hanging method | |
CN108004929A (en) | A kind of H-type road-cum-rail bridge floorings hanging apparatus and hanging method | |
CN205778918U (en) | Loess tunnel excavation and just formwork build concrete construction combined type chassis | |
CN106836807A (en) | It is a kind of can quick-assembling and mobile modular rack application method | |
CN210659228U (en) | Movable single-side formwork system for subway construction | |
CN104973517A (en) | Electric gantry platform for installing sintering machine head equipment and application method thereof | |
CN201228440Y (en) | Horizontal moving device for large steel formwork system | |
CN103669882A (en) | Method for conducting component installation with steel wire ropes serving as rails in industrial factory building | |
CN107642089B (en) | Narrow space concrete pouring method | |
CN212769508U (en) | Novel hoisting equipment is transported to moving die carrier dolly and bracket | |
CN211342938U (en) | Trestle type full-section inverted arch two-lining trolley equipment | |
CN204525407U (en) | Replacing vehicle is to overturn platform | |
CN202390106U (en) | Lifting hook portal crane easy to maintain | |
CN215978530U (en) | Steel beam sliding installation device | |
CN202730709U (en) | Movable formwork for construction of dock wall | |
CN210195198U (en) | Elevartor shaft moving platform | |
CN202465110U (en) | Shipbuilding portal crane with rail clamping device | |
CN206843953U (en) | Sizing auxiliary construction platform in a kind of high-speed railway pier | |
CN206338077U (en) | The variable chassis of supporting construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170613 |