CN106835994B - Mobile construction hanging basket and excessively bridge pier method - Google Patents
Mobile construction hanging basket and excessively bridge pier method Download PDFInfo
- Publication number
- CN106835994B CN106835994B CN201710136440.3A CN201710136440A CN106835994B CN 106835994 B CN106835994 B CN 106835994B CN 201710136440 A CN201710136440 A CN 201710136440A CN 106835994 B CN106835994 B CN 106835994B
- Authority
- CN
- China
- Prior art keywords
- steel wire
- hanging basket
- guide rail
- wire ropes
- wire rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 23
- 238000000034 method Methods 0.000 title claims abstract description 12
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 86
- 239000010959 steel Substances 0.000 claims abstract description 86
- 230000000694 effects Effects 0.000 claims description 3
- 238000013329 compounding Methods 0.000 abstract 1
- 230000003044 adaptive effect Effects 0.000 description 5
- 230000006835 compression Effects 0.000 description 4
- 238000007906 compression Methods 0.000 description 4
- 238000001514 detection method Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000007689 inspection Methods 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710136440.3A CN106835994B (en) | 2017-03-08 | 2017-03-08 | Mobile construction hanging basket and excessively bridge pier method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710136440.3A CN106835994B (en) | 2017-03-08 | 2017-03-08 | Mobile construction hanging basket and excessively bridge pier method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106835994A CN106835994A (en) | 2017-06-13 |
CN106835994B true CN106835994B (en) | 2018-09-18 |
Family
ID=59144111
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710136440.3A Active CN106835994B (en) | 2017-03-08 | 2017-03-08 | Mobile construction hanging basket and excessively bridge pier method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106835994B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110886214B (en) * | 2019-12-05 | 2020-09-15 | 陈雨羲 | Mounting and dismounting method of maintenance platform for bridge maintenance vehicle |
CN110820555B (en) * | 2019-12-05 | 2020-09-29 | 陈雨羲 | Bridge maintenance vehicle and method for avoiding bridge pier by maintenance platform |
CN112049016B (en) * | 2020-09-03 | 2021-12-14 | 李云龙 | Highway bridge construction hanging flower basket |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3865578B2 (en) * | 2000-10-23 | 2007-01-10 | 鹿島建設株式会社 | Moving scaffold for bridge |
CN102797222B (en) * | 2012-07-24 | 2014-09-24 | 武汉武大巨成结构股份有限公司 | Hanging bracket hinge joint type bridge maintenance vehicle capable of avoiding bridge-side obstacles |
CN204212070U (en) * | 2014-10-16 | 2015-03-18 | 武汉二航路桥特种工程有限责任公司 | Can the inspection platform of way moving under uninterrupted traffic condition |
CN104358211B (en) * | 2014-10-16 | 2016-07-13 | 武汉二航路桥特种工程有限责任公司 | Inspection platform and using method thereof at the bottom of a kind of beam that may span across bridge pier and barrier post |
JP2016160697A (en) * | 2015-03-04 | 2016-09-05 | 株式会社ハイボット | Bridge inspection device and bridge inspection method |
CN204608600U (en) * | 2015-04-15 | 2015-09-02 | 华北水利水电大学 | A kind of across pier suspension bracket self-propelling device |
CN206625131U (en) * | 2017-03-08 | 2017-11-10 | 广州展亚土木工程技术有限公司 | Portable construction hanging basket |
-
2017
- 2017-03-08 CN CN201710136440.3A patent/CN106835994B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN106835994A (en) | 2017-06-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106835994B (en) | Mobile construction hanging basket and excessively bridge pier method | |
CN105401714B (en) | Attached lifting scaffold and lifting method | |
CN2887822Y (en) | Hanger brick basket clamp | |
CN206625131U (en) | Portable construction hanging basket | |
CN102433835A (en) | Bridge variable cross-section box girder surface operation trolley | |
CN109455626A (en) | It is a kind of to rise gantry type two-way lifter certainly | |
CN109468963A (en) | Bridge high altitude operation hanging basket and bridge high-altitude construction method | |
JP2008168979A (en) | Elevator device | |
CN114232488B (en) | Method for erecting main girder of large-span cable-stayed bridge | |
CN214269987U (en) | Hoisting device applied to high-rise building roof elevator shaft | |
CN106284961A (en) | Small-sized attachment type raise scaffold | |
CN109057305A (en) | A kind of segmented scaffold | |
CN209468698U (en) | Bridge high altitude operation hanging basket | |
CN111776926A (en) | Mine cradle replacing device and replacing method thereof | |
JP2006348576A (en) | Rail laying device in tunnel | |
CN209353738U (en) | A kind of prefabricated board fortune entrucking | |
CN106884543A (en) | A kind of curtain wall lifting and transporting device | |
CN208830946U (en) | Environment-friendly automatic institutional operation machine | |
CN206707248U (en) | A kind of hanging basket for overflow weir | |
CN220011043U (en) | Conveyer that hoist and mount were used | |
CN211283364U (en) | Novel three-door construction elevator cage | |
CN209369707U (en) | Folding ladder is used in a kind of detection of lift car | |
CN100343155C (en) | Overhead tower crane erecting arm disassembling process | |
CN109552985A (en) | A kind of Combined fixture and application method for being transported in narrow space | |
CN114197329B (en) | Main girder erection method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Mobile construction hanging basket and bridge pier crossing method Effective date of registration: 20220119 Granted publication date: 20180918 Pledgee: China Co. truction Bank Corp Guangzhou Tianhe subbranch Pledgor: GUANGZHOU ZHANYA CIVIL ENGINEERING TECHNOLOGY Co.,Ltd. Registration number: Y2022980000776 |
|
CP02 | Change in the address of a patent holder | ||
CP02 | Change in the address of a patent holder |
Address after: 510000 Room 501, No. 7, Kehui 1st Street, Huangpu District, Guangzhou City, Guangdong Province (office only) Patentee after: GUANGZHOU ZHANYA CIVIL ENGINEERING TECHNOLOGY Co.,Ltd. Address before: 510640 rooms 113 and 115 on the first and second floors of building 12, No. 88, Jinhui street, Wushan Road, Tianhe District, Guangzhou, Guangdong Province Patentee before: GUANGZHOU ZHANYA CIVIL ENGINEERING TECHNOLOGY Co.,Ltd. |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Granted publication date: 20180918 Pledgee: China Co. truction Bank Corp Guangzhou Tianhe subbranch Pledgor: GUANGZHOU ZHANYA CIVIL ENGINEERING TECHNOLOGY Co.,Ltd. Registration number: Y2022980000776 |