CN106835994B - Mobile construction hanging basket and excessively bridge pier method - Google Patents

Mobile construction hanging basket and excessively bridge pier method Download PDF

Info

Publication number
CN106835994B
CN106835994B CN201710136440.3A CN201710136440A CN106835994B CN 106835994 B CN106835994 B CN 106835994B CN 201710136440 A CN201710136440 A CN 201710136440A CN 106835994 B CN106835994 B CN 106835994B
Authority
CN
China
Prior art keywords
steel wire
hanging basket
guide rail
wire ropes
wire rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710136440.3A
Other languages
Chinese (zh)
Other versions
CN106835994A (en
Inventor
刘灿锋
晏鹏翔
钟省平
梁忠平
王渭锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU ZHANYA CIVIL ENGINEERING TECHNOLOGY Co Ltd
Original Assignee
GUANGZHOU ZHANYA CIVIL ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU ZHANYA CIVIL ENGINEERING TECHNOLOGY Co Ltd filed Critical GUANGZHOU ZHANYA CIVIL ENGINEERING TECHNOLOGY Co Ltd
Priority to CN201710136440.3A priority Critical patent/CN106835994B/en
Publication of CN106835994A publication Critical patent/CN106835994A/en
Application granted granted Critical
Publication of CN106835994B publication Critical patent/CN106835994B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of mobile construction hanging basket and cross bridge pier method, include three guide rail cars on the parallel anti-collision wall in building body two sides, No.1 guide rail car is mounted on the anti-collision wall of side, and No. two guide rail cars and No. three guide rail cars are linked together by connecting rod and are mounted on the anti-collision wall of the other side;It further include the Hanging Basket being located at below building body, one end of the Hanging Basket is located at below the No.1 guide rail car and is connect respectively with the No.1 guide rail car and No. three guide rail cars by No.1 steel wire rope and No. three steel wire ropes respectively, and the other end of the Hanging Basket is located at the lower section of No. two guide rail cars and is connect with No. two guide rail cars by No. two steel wire ropes;The configuration of the present invention is simple is easily assembled and dismantles, easy to use in the case where not dismantling easily by buildings such as bridge piers by the compounding practice of three guide rail cars and three steel wire ropes.

Description

Mobile construction hanging basket and excessively bridge pier method
Technical field
The present invention relates to a kind of architectural furniture more particularly to a kind of construction hanging baskets, further relate to the construction hanging basket and pass through The method of bridge pier.
Background technology
Bridge strengthening is constructed and detection is often related to beam bottom operation, must set up holder or utilization in beam bottom at this time Bridge inspection vehicle assists completing work, but sets up holder there are task difficulties that big, the time is long, inconvenient dismounting and movement The puzzlements such as difficulty, it is although easy to remove and easy to operate using bridge-checking vehicle, but machine-team take it is prohibitively expensive, cause construction detection at This is excessively high.
Invention content
A technical problem to be solved by this invention be to provide a kind of portable, removable, low cost, it is reusable and Set up convenient mobile construction hanging basket.
In order to solve the above technical problems, the technical scheme is that:Mobile construction hanging basket, including it is mounted on building body Three guide rail cars on the parallel anti-collision wall in two sides, No.1 guide rail car are mounted on the anti-collision wall of side, and No. two guide rail cars and No. three are led Rail vehicle is linked together by connecting rod and is mounted on the anti-collision wall of the other side;Further include the Hanging Basket being located at below building body, institute The one end for stating Hanging Basket be located at below the No.1 guide rail car and respectively by No.1 steel wire rope and No. three steel wire ropes respectively with it is described No.1 guide rail car is connected with No. three guide rail cars, and the other end of the Hanging Basket is located at the lower section of No. two guide rail cars and passes through No. two steel wire ropes are connect with No. two guide rail cars.
As a kind of perferred technical scheme, the connecting rod is telescopic rod, and the Hanging Basket is collapsible expansible Hanging Basket, The length of the connecting rod is matched with the length of the Hanging Basket.
As a kind of perferred technical scheme, the No.1 guide rail car includes vehicle frame, be equipped on the vehicle frame with it is described The U-type groove of anti-collision wall compression fit is separately installed with one in the two side walls in the U-type groove and is resisted against the anti-collision wall side Sliding wheel on face is equipped at least one sliding wheel on the bottom wall of the U-type groove;
The U-type groove is spliced to form by two L-type frame bodies, is equipped between two L-type frame bodies and is compressed adaptive bullet Spring;
Hoist engine is installed, the hoist engine connects the No.1 steel wire rope, described in the vehicle frame upper edge on the vehicle frame Deflecting support pulley and drawing support pulley are disposed on the path of No.1 steel wire rope.
As a kind of perferred technical scheme, there are two the sliding wheels for installation on the bottom wall of the U-type groove, described in two Sliding wheel is located at the adaptive spring both sides of compression.
By adopting the above-described technical solution, mobile construction hanging basket, including it is mounted on the parallel anti-collision wall in building body two sides On three guide rail cars, No.1 guide rail car be mounted on side anti-collision wall on, No. two guide rail cars and No. three guide rail cars pass through connecting rod It links together and is mounted on the anti-collision wall of the other side;Further include the Hanging Basket being located at below building body, one end position of the Hanging Basket Below the No.1 guide rail car and respectively by No.1 steel wire rope and No. three steel wire ropes respectively with the No.1 guide rail car and institute No. three guide rail car connections are stated, the other end of the Hanging Basket is located at the lower section of No. two guide rail cars and passes through No. two steel wire ropes and institute State No. two guide rail car connections;The configuration of the present invention is simple is easily assembled and dismantles, and passes through the cooperation of three guide rail cars and three steel wire ropes Operation, it is easy to use in the case where not dismantling easily by buildings such as bridge piers.
Another technical problem to be solved by this invention is to provide a kind of gap bridge based on above-mentioned mobile construction hanging basket Pier method.
In order to solve the above technical problems, the technical scheme is that:The bridge pier method excessively of mobile construction hanging basket, including Following step:
The Hanging Basket is risen to top, loosens the No.1 by step 1 when the Hanging Basket is moved adjacent to bridge pier Steel wire rope and No. two steel wire ropes, while No. three steel wire ropes are tightened, the Hanging Basket is in No. three steel wire ropes at this time It under pulling force, rotates, No. two steel wire ropes are loosened in stopping, continuing to loosen the No.1 steel wire rope, while continuing to tighten institute State No. three steel wire ropes;
Step 2 when the Hanging Basket is fully rotated into the side of bridge, while tightening No. two steel wire ropes and described three Number steel wire rope, the Hanging Basket is increased, the secure latch of the No.1 steel wire rope and the Hanging Basket is unlocked;
Step 3 is carried out forward the No.1 guide rail car, No. two guide rail cars and No. three guide rail cars, Zhi Daosuo State Hanging Basket completely by bridge pier after, using No.1 steel wire rope described in unmanned machine travel, by unmanned plane by bridge bottom by described one The No.1 steel wire rope is connected by number rope traction to the Hanging Basket side with the Hanging Basket;
Step 4, while loosening No. two steel wire ropes and No. three steel wire ropes, when the Hanging Basket declines 0.5 to 1 meter Afterwards, stop loosening No. two steel wire ropes, continue to loosen No. three steel wire ropes, while tightening the No.1 steel wire rope, it is described Hanging Basket rotates under the pulling force effect of the No.1 steel wire rope, until the Hanging Basket is ajusted;The Hanging Basket just passes through at this time Bridge pier.
It, can be under the premise of dismantling guardrail using the above method so that guardrail easily by the bridge pier under bridge, is saved Detection time.
Description of the drawings
Fig. 1 is the structural schematic diagram of the embodiment of the present invention;
Fig. 2 is the structural schematic diagram of guide rail car of the embodiment of the present invention;
Fig. 3 is installation condition structural schematic diagram of the embodiment of the present invention;
Fig. 4 is that the embodiment of the present invention crosses bridge pier procedure chart one;
Fig. 5 is that the embodiment of the present invention crosses bridge pier procedure chart two;
In figure:1- anti-collision walls;21- No.1 guide rail cars;22- No.1 steel wire ropes;No. bis- guide rail cars of 31-;No. bis- steel wires of 32- Rope;No. tri- guide rail cars of 41-;No. tri- steel wire ropes of 42-;5- connecting rods;61- vehicle frames;62- sliding wheels;63-L type frame bodies;64- is compressed Adaptive spring;65- hoist engines;66- deflectings support pulley;67- drawing support pulleys;7- Hanging Baskets;8- bridge piers.
Specific implementation mode
With reference to the accompanying drawings and examples, the present invention is further explained.In the following detailed description, only pass through explanation Mode describes certain exemplary embodiments of the present invention.Undoubtedly, those skilled in the art will recognize, In the case of without departing from the spirit and scope of the present invention, described embodiment can be repaiied with a variety of different modes Just.Therefore, attached drawing and description are regarded as illustrative in nature, and are not intended to limit the scope of the claims.
As shown in figures 1 and 3, mobile construction hanging basket includes three on the parallel anti-collision wall in building body two sides 1 Guide rail car, No.1 guide rail car 21 are mounted on side anti-collision wall 1, and No. two guide rail cars 31 and No. three guide rail cars 41 pass through connecting rod 5 It links together and is mounted on other side anti-collision wall 1, the connecting rod 5 is telescopic rod, further includes being located at below building body Hanging Basket 7, the Hanging Basket 7 are collapsible expansible Hanging Basket 7, and the length of the connecting rod is matched with the length of the Hanging Basket 7.It is described One end of Hanging Basket 7 be located at the lower section of the No.1 guide rail car 21 and respectively by No.1 steel wire rope 22 and No. three steel wire ropes 42 respectively with The No.1 guide rail car 21 and No. three guide rail cars 41 connection, the other end of the Hanging Basket 7 are located at No. two guide rail cars 31 Lower section and connect with No. two guide rail cars 31 by No. two steel wire ropes 32.
As shown in Fig. 2, the No.1 guide rail car 21 includes vehicle frame 61, it is equipped with and the anti-collision wall 1 on the vehicle frame 61 The U-type groove of compression fit is separately installed with one in the two side walls in the U-type groove and is resisted against on 1 side of the anti-collision wall Sliding wheel 62, at least one sliding wheel 62 is installed on the bottom wall of the U-type groove;The U-type groove is spelled by two L-type frame bodies 63 It connects to be formed, is equipped between two L-type frame bodies 63 and compresses adaptive spring 64, two are equipped on the bottom wall of the U-type groove A sliding wheel 62, two sliding wheels 62 are located at adaptive 64 both sides of spring of compression;On the vehicle frame 61 Hoist engine 65 is installed, the hoist engine 65 connects the No.1 steel wire rope 22, No.1 steel wire rope described in 61 upper edge of the vehicle frame Deflecting support pulley 66 and drawing support pulley 67 are disposed on 22 path.No. two guide rail cars 31 and No. three described Guide rail car 41 is identical as the structure of the No.1 guide rail car 21, and which is not described herein again.
When work:
1, on the anti-collision wall 1 at left and right sides of bridge, corresponding guide rail car is respectively loaded onto.Steel wire rope on guide rail car is declined To ground (or water surface)
2, construction hanging basket 7 is assembled, after transporting to corresponding position, the steel wire rope on guide rail car is buckled in by secure latch On Hanging Basket 7.
4, it is synchronized with the hoist engine 65 on guide rail car after hanging liter Hanging Basket 7 to proper height, construction personnel can be on bridge floor It is gone to by auxiliary stairs and carries out construction operation on Hanging Basket 7.It can carry out guide rail car is front and back on anti-collision wall 1, facilitate construction personnel Operation.
Load and unload the process of Hanging Basket 7:Construction hanging basket 7 includes bearing plate and guardrail, is all made of foldable structure, and when use only needs It opens and folds bearing plate, foldable guardrail is opened, is sleeved on the preformed hole of bearing plate, being tightened with bolt can fix;In bridge 1 upper mounting rail vehicle of face anti-collision wall, side install one, and the other side installs two, and a side rail of installation two uses connecting rod 5 connections, 5 length of connecting rod are identical as 7 length of Hanging Basket;Steel wire rope on guide rail car is relaxed to ground, steel wire rope and Hanging Basket 7 It is connected with secure latch, both sides guide rail car hoist engine 65 is opened simultaneously after fixed and promotes Hanging Basket 7.(remain 1# steel wire ropes, 2# Steel wire rope synchronizes take-up), after Hanging Basket 7 is promoted in place, construction personnel can enter Hanging Basket 7 and carry out operation.
It is of the present invention movable type construction hanging basket 7 it is light-duty it is portable, easy to install, construction hanging basket 7 is foldable, single unit system can It is moved forward and backward along bridge floor anti-collision wall 1.
Mobile construction hanging basket 7 crosses 8 method of bridge pier, includes the following steps:
The Hanging Basket 7 is risen to top, personnel are by just by step 1 when the Hanging Basket 7 is moved adjacent to bridge pier 8 After ladder climbs to bridge floor, loosen the No.1 steel wire rope 22 and No. two steel wire ropes 32, while tightening No. three steel wire ropes 42, The Hanging Basket 7 rotates under the pulling force of No. three steel wire ropes 42 at this time, and No. two steel wire ropes 32 are loosened in stopping, after It is continuous to loosen the No.1 steel wire rope 22, while continuing to tighten No. three steel wire ropes 42;
Step 2, as shown in figure 4, when the Hanging Basket 7 is fully rotated into the side of bridge, while tightening No. two steel wires Rope 32 and No. three steel wire ropes 42, the Hanging Basket 7 are increased, personnel under auxiliary stairs by, to Hanging Basket 7, unlocking the No.1 steel wire rope 22 with the secure latch of the Hanging Basket 7;
Step 3 carries out forward the No.1 guide rail car 21, No. two guide rail cars 31 and No. three guide rail cars 41, Until the Hanging Basket 7 completely by bridge pier 8 after, using No.1 steel wire rope 22 described in unmanned machine travel, bridge is passed through by unmanned plane Bottom draws the No.1 steel wire rope 22 to 7 side of the Hanging Basket, and operating personnel is again by the No.1 steel wire rope 22 and the Hanging Basket 7 It is connected;
Step 4, while loosening No. two steel wire ropes 32 and No. three steel wire ropes 42, when the Hanging Basket 7 declines 0.5 To after 1 meter, No. two steel wire ropes 32 are loosened in stopping, continuing to loosen No. three steel wire ropes 42, while tightening the No.1 steel Cord 22, the Hanging Basket 7 rotate under the pulling force effect of the No.1 steel wire rope 22, until the Hanging Basket 7 is ajusted;Such as figure Shown in 5, the Hanging Basket 7 just passes through bridge pier 8 at this time.
The basic principles and main features and advantages of the present invention of the present invention have been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent thereof.

Claims (1)

1. mobile construction hanging basket crosses bridge pier method, mobile construction hanging basket includes being mounted on the parallel anti-collision wall in building body two sides On three guide rail cars, No.1 guide rail car be mounted on side anti-collision wall on, No. two guide rail cars and No. three guide rail cars pass through connecting rod It links together and is mounted on the anti-collision wall of the other side;Further include the Hanging Basket being located at below building body, one end position of the Hanging Basket Below the No.1 guide rail car and respectively by No.1 steel wire rope and No. three steel wire ropes respectively with the No.1 guide rail car and institute No. three guide rail car connections are stated, the other end of the Hanging Basket is located at the lower section of No. two guide rail cars and passes through No. two steel wire ropes and institute State No. two guide rail car connections;
It is characterised in that it includes following step:
The Hanging Basket is risen to top by step 1 when the Hanging Basket is moved adjacent to bridge pier, loosens the No.1 steel wire It restricts and No. two steel wire ropes, while tightening No. three steel wire ropes, at this time pulling force of the Hanging Basket in No. three steel wire ropes Under, it rotates, No. two steel wire ropes are loosened in stopping, continuing to loosen the No.1 steel wire rope, while continuing to tighten described three Number steel wire rope;
Step 2 when the Hanging Basket is fully rotated into the side of bridge, while tightening No. two steel wire ropes and No. three steel Cord increases the Hanging Basket, unlocks the secure latch of the No.1 steel wire rope and the Hanging Basket;
Step 3 is carried out forward the No.1 guide rail car, No. two guide rail cars and No. three guide rail cars, until the extension Basket completely by bridge pier after, using No.1 steel wire rope described in unmanned machine travel, by unmanned plane by bridge bottom by the No.1 steel Cord is drawn to the Hanging Basket side, and the No.1 steel wire rope is connected with the Hanging Basket;
Step 4, while loosening No. two steel wire ropes and No. three steel wire ropes, after the Hanging Basket declines 0.5 to 1 meter, stop Only loosen No. two steel wire ropes, continues to loosen No. three steel wire ropes, while tightening the No.1 steel wire rope, the Hanging Basket exists It is rotated under the pulling force effect of the No.1 steel wire rope, until the Hanging Basket is ajusted;The Hanging Basket just passes through bridge pier at this time.
CN201710136440.3A 2017-03-08 2017-03-08 Mobile construction hanging basket and excessively bridge pier method Active CN106835994B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710136440.3A CN106835994B (en) 2017-03-08 2017-03-08 Mobile construction hanging basket and excessively bridge pier method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710136440.3A CN106835994B (en) 2017-03-08 2017-03-08 Mobile construction hanging basket and excessively bridge pier method

Publications (2)

Publication Number Publication Date
CN106835994A CN106835994A (en) 2017-06-13
CN106835994B true CN106835994B (en) 2018-09-18

Family

ID=59144111

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710136440.3A Active CN106835994B (en) 2017-03-08 2017-03-08 Mobile construction hanging basket and excessively bridge pier method

Country Status (1)

Country Link
CN (1) CN106835994B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110886214B (en) * 2019-12-05 2020-09-15 陈雨羲 Mounting and dismounting method of maintenance platform for bridge maintenance vehicle
CN110820555B (en) * 2019-12-05 2020-09-29 陈雨羲 Bridge maintenance vehicle and method for avoiding bridge pier by maintenance platform
CN112049016B (en) * 2020-09-03 2021-12-14 李云龙 Highway bridge construction hanging flower basket

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3865578B2 (en) * 2000-10-23 2007-01-10 鹿島建設株式会社 Moving scaffold for bridge
CN102797222B (en) * 2012-07-24 2014-09-24 武汉武大巨成结构股份有限公司 Hanging bracket hinge joint type bridge maintenance vehicle capable of avoiding bridge-side obstacles
CN204212070U (en) * 2014-10-16 2015-03-18 武汉二航路桥特种工程有限责任公司 Can the inspection platform of way moving under uninterrupted traffic condition
CN104358211B (en) * 2014-10-16 2016-07-13 武汉二航路桥特种工程有限责任公司 Inspection platform and using method thereof at the bottom of a kind of beam that may span across bridge pier and barrier post
JP2016160697A (en) * 2015-03-04 2016-09-05 株式会社ハイボット Bridge inspection device and bridge inspection method
CN204608600U (en) * 2015-04-15 2015-09-02 华北水利水电大学 A kind of across pier suspension bracket self-propelling device
CN206625131U (en) * 2017-03-08 2017-11-10 广州展亚土木工程技术有限公司 Portable construction hanging basket

Also Published As

Publication number Publication date
CN106835994A (en) 2017-06-13

Similar Documents

Publication Publication Date Title
CN106835994B (en) Mobile construction hanging basket and excessively bridge pier method
CN105401714B (en) Attached lifting scaffold and lifting method
CN2887822Y (en) Hanger brick basket clamp
CN206625131U (en) Portable construction hanging basket
CN102433835A (en) Bridge variable cross-section box girder surface operation trolley
CN109455626A (en) It is a kind of to rise gantry type two-way lifter certainly
CN109468963A (en) Bridge high altitude operation hanging basket and bridge high-altitude construction method
JP2008168979A (en) Elevator device
CN114232488B (en) Method for erecting main girder of large-span cable-stayed bridge
CN214269987U (en) Hoisting device applied to high-rise building roof elevator shaft
CN106284961A (en) Small-sized attachment type raise scaffold
CN109057305A (en) A kind of segmented scaffold
CN209468698U (en) Bridge high altitude operation hanging basket
CN111776926A (en) Mine cradle replacing device and replacing method thereof
JP2006348576A (en) Rail laying device in tunnel
CN209353738U (en) A kind of prefabricated board fortune entrucking
CN106884543A (en) A kind of curtain wall lifting and transporting device
CN208830946U (en) Environment-friendly automatic institutional operation machine
CN206707248U (en) A kind of hanging basket for overflow weir
CN220011043U (en) Conveyer that hoist and mount were used
CN211283364U (en) Novel three-door construction elevator cage
CN209369707U (en) Folding ladder is used in a kind of detection of lift car
CN100343155C (en) Overhead tower crane erecting arm disassembling process
CN109552985A (en) A kind of Combined fixture and application method for being transported in narrow space
CN114197329B (en) Main girder erection method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Mobile construction hanging basket and bridge pier crossing method

Effective date of registration: 20220119

Granted publication date: 20180918

Pledgee: China Co. truction Bank Corp Guangzhou Tianhe subbranch

Pledgor: GUANGZHOU ZHANYA CIVIL ENGINEERING TECHNOLOGY Co.,Ltd.

Registration number: Y2022980000776

CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 510000 Room 501, No. 7, Kehui 1st Street, Huangpu District, Guangzhou City, Guangdong Province (office only)

Patentee after: GUANGZHOU ZHANYA CIVIL ENGINEERING TECHNOLOGY Co.,Ltd.

Address before: 510640 rooms 113 and 115 on the first and second floors of building 12, No. 88, Jinhui street, Wushan Road, Tianhe District, Guangzhou, Guangdong Province

Patentee before: GUANGZHOU ZHANYA CIVIL ENGINEERING TECHNOLOGY Co.,Ltd.

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20180918

Pledgee: China Co. truction Bank Corp Guangzhou Tianhe subbranch

Pledgor: GUANGZHOU ZHANYA CIVIL ENGINEERING TECHNOLOGY Co.,Ltd.

Registration number: Y2022980000776