CN106759908A - Pneumatic membrane building anchor - Google Patents
Pneumatic membrane building anchor Download PDFInfo
- Publication number
- CN106759908A CN106759908A CN201610696986.XA CN201610696986A CN106759908A CN 106759908 A CN106759908 A CN 106759908A CN 201610696986 A CN201610696986 A CN 201610696986A CN 106759908 A CN106759908 A CN 106759908A
- Authority
- CN
- China
- Prior art keywords
- anchor
- pneumatic membrane
- membrane building
- anchor plate
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Tents Or Canopies (AREA)
Abstract
It is to be related to a kind of pneumatic membrane building anchor specifically the present invention relates to pneumatic membrane building equipment technical field.The pneumatic membrane building anchor that the present invention is provided, including:Anchor plate and crimp;Anchor plate is used to be horizontally placed on ground, and crimp is connected on anchor plate, is used to fix air film film body between anchor plate and crimp.The critical piece of the pneumatic membrane building anchor that the present invention is provided is prefabrication, and work on the spot amount is few, and installation rate is fast, and duty cycle time is less;When pneumatic membrane building is migrated, pneumatic membrane building anchor can all tear shifting open, and can be used repeatedly, it is possible to decrease cost of relocating, and reduce building waste, more environmentally-friendly to environment without any harm;And the simple and reliable process, efficiency of construction is high;Anchor point accurate positioning, easily facilitates the connection of air film film body.
Description
Technical field
The present invention relates to pneumatic membrane building equipment technical field, more particularly, to a kind of pneumatic membrane building anchor.
Background technology
Pneumatic membrane building is a kind of novel building, when needing to build pneumatic membrane building, it is necessary to set pneumatic membrane building anchor at the scene
It is fixedly mounted with and puts.
Pneumatic membrane building anchor uses armored concrete grade beam in the prior art, and armored concrete grade beam needs existing
Construction, usually slots on ground, formwork supporting plate and is molded using finished product business concrete placings in groove.The general clear height 1.5-1.8 of grade beam
Rice, part of basseting is high 0.3-0.5 meters, and grade beam upper surface is connected by pre-embedding metal part with air film structure.Armored concrete
Grade beam top needs built-in metal component, construction period typically to take more than 30 days.
But, pneumatic membrane building anchor of the prior art when need migration pneumatic membrane building when, the film body of pneumatic membrane building
And equipment can be dismantled and transported to place of relocating, but because concrete ground beam cannot be realized dismantling and moving, not only cause
Very big waste, increases cost of relocating, and substantial amounts of building waste can be produced during relocating, and unfavorable shadow is produced to environment
Ring.
The content of the invention
It is an object of the invention to provide pneumatic membrane building anchor, cannot be removed with solving grade beam present in prior art
Caused by moving cannot quickly build pneumatic membrane building, high cost of relocating and unfriendly to environment, the technology for wasting not environmentally is asked
Topic.
The pneumatic membrane building anchor that the present invention is provided, including:Anchor plate and crimp;Anchor plate is used to be horizontally placed on
Ground, crimp is connected on anchor plate, is used to fix air film film body between anchor plate and crimp.
Further, anchor plate is detachably fixed with crimp and is connected.
Further, crimp is bolted to anchor plate.
Further, the pneumatic membrane building anchor that the present invention is provided also includes the drill rod for being fixed with ground;Anchoring
Plate is provided with multiple drill rod jacks, and drill rod is fixed by inserting drill rod jack with ground.
Further, anchor plate is set to multiple, and multiple anchor plates can be connected as one.
Further, the pneumatic membrane building anchor that the present invention is provided also includes connecting plate;Connecting plate is set to multiple;Phase
Adjacent anchor plate is fixedly connected by connecting plate.
Further, connecting plate is detachably fixed with anchor plate and is connected.
Further, crimp is set to angle steel.
Further, the pneumatic membrane building anchor that the present invention is provided also includes balancing weight;Balancing weight is arranged at anchor plate
On.
Further, anchor plate is set to steel plate;Anchor plate is shaped as rectangle or sector.
The pneumatic membrane building anchor that the present invention is provided, including:Anchor plate and crimp;Anchor plate is used to be horizontally placed on
Ground, crimp is connected on anchor plate, is used to fix air film film body between anchor plate and crimp.The air film that the present invention is provided
The critical piece for building anchor is prefabrication, and work on the spot amount is few, and installation rate is fast, and duty cycle time is less;
When pneumatic membrane building is migrated, pneumatic membrane building anchor can all tear shifting open, and can be used repeatedly, it is possible to decrease relocate into
This, and building waste is reduced, it is more environmentally-friendly to environment without any harm;And the simple and reliable process, efficiency of construction is high;Anchoring
Point location is accurate, easily facilitates the connection of air film film body.
Brief description of the drawings
In order to illustrate more clearly of the specific embodiment of the invention or technical scheme of the prior art, below will be to specific
The accompanying drawing to be used needed for implementation method or description of the prior art is briefly described, it should be apparent that, in describing below
Accompanying drawing is some embodiments of the present invention, for those of ordinary skill in the art, before creative work is not paid
Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is pneumatic membrane building anchor overall structure diagram provided in an embodiment of the present invention;
Fig. 2 is pneumatic membrane building anchor provided in an embodiment of the present invention without counter weight construction schematic diagram;
Fig. 3 is pneumatic membrane building anchor decomposing schematic representation provided in an embodiment of the present invention.
Reference:
601- connecting plates;602- anchor plates;603- crimps;
604- balancing weights;605- drill rods;120- air film film bodies;
607- ground.
Specific embodiment
Technical scheme is clearly and completely described below in conjunction with accompanying drawing, it is clear that described implementation
Example is a part of embodiment of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill
The every other embodiment that personnel are obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
In the description of the invention, it is necessary to explanation, term " " center ", " on ", D score, "left", "right", " vertical ",
The orientation or position relationship of the instruction such as " level ", " interior ", " outward " be based on orientation shown in the drawings or position relationship, merely to
Be easy to the description present invention and simplify describe, rather than indicate imply signified device or element must have specific orientation,
With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.Additionally, term " first ", " second ",
" the 3rd " is only used for describing purpose, and it is not intended that indicating or implying relative importance.
In the description of the invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " phase
Company ", " connection " should be interpreted broadly, for example, it may be being fixedly connected, or being detachably connected, or be integrally connected;Can
Being to mechanically connect, or electrically connect;Can be joined directly together, it is also possible to be indirectly connected to by intermediary, Ke Yishi
Two connections of element internal.For the ordinary skill in the art, with concrete condition above-mentioned term can be understood at this
Concrete meaning in invention.
The pneumatic membrane building anchor overall structure diagram that Fig. 1 is provided for the present embodiment;Fig. 2 is provided for the present embodiment
Pneumatic membrane building anchor is without counter weight construction schematic diagram;The pneumatic membrane building anchor exploded pictorial that Fig. 3 is provided for the present embodiment
Figure.Such as Fig. 1, Fig. 2, shown in Fig. 3, the pneumatic membrane building anchor that the present embodiment is provided, including:Anchor plate 602 and crimp
603;Anchor plate 602 be used for be horizontally placed on ground 607, crimp 603 is connected on anchor plate 602, anchor plate 602 with crimp
It is used to fix air film film body 120 between part 603.
Wherein, anchor plate 602 can be for various, such as:Steel plate, alloy sheets, stainless steel plate etc.;Based on cost-effective original
Cause, and under conditions of meeting the rigidity requirement of anchor, it is preferred that anchor plate 602 is steel plate.
The cross sectional shape of anchor plate 602 can be for various, such as:Rectangle, fan-shaped or polygon etc., when different
Performance environment, it may be desirable to anchor plate of different shapes 602, wherein, the need for typically performing environment, preferably, anchor plate
602 cross sectional shape is rectangle or sector.
Crimp 603 is mainly used in fixing air film film body 120 on anchor plate 602, and air film film body 120 is fixed on crimp
In 603 fixed space between anchor plate 602.
Crimp 603 can be for various, for example, angle steel, square steel tube, steel plate or folded plate etc., it is preferred that crimp 603
It is angle steel.
Angle steel is commonly called as angle bar, is both sides orthogonal into angular strip steel;Have equal leg angle and unequal angle it
Point.Angle steel can be needed to constitute a variety of primary structure members by the difference of structure, can also make the connector between component.Angle steel has
There are stronger thermoplasticity, and larger rigidity and intensity, and cost is relatively low.
Crimp 603 is set to angle steel, is anchored on anchor plate 601 by air film film body 120, in addition, because of air film film
Material is flexible material, and this kind of anchorage style has good air-tightness, water proofing property.
The pneumatic membrane building anchor that the present embodiment is provided, including:Anchor plate 602 and crimp 603;Anchor plate 602 is used
In ground 607 is horizontally placed on, crimp 603 is connected on anchor plate 602, is used between anchor plate 602 and crimp 603 solid
Determine air film film body 120.The critical piece of the pneumatic membrane building anchor that the present embodiment is provided is prefabrication, work on the spot amount
Few, installation rate is fast, and duty cycle time is less;When pneumatic membrane building is migrated, pneumatic membrane building anchor can all tear shifting open,
And can be used repeatedly, it is possible to decrease cost of relocating, and building waste is reduced, it is more environmentally-friendly to environment without any harm;And should
Simple and reliable process, efficiency of construction is high;In addition, the anchor point accurate positioning of anchor, easily facilitates the company of air film film body 120
Connect.
On the basis of above-described embodiment, pneumatic membrane building anchor anchor plate 602 and crimp that the present embodiment is provided
603 are detachably fixed connection.
Wherein, anchor plate 602 and crimp 603 are detachably fixed that be connected can be for various, such as:Crimp 603 leads to
Bolt connection is crossed in anchor plate 602.
And for example:Crimp 603 is provided with elastic bumps, anchor plate 602 with the coupling part of anchor plate 602 and is provided with card
Groove, when crimp 603 is connected with anchor plate 602, elastic bumps snap in draw-in groove, and formation is detachably fixed connection.
It is preferred that crimp 603 and anchor plate 602 are provided with screwed hole, in anchor plate 602 away from crimp 603
Nut is simultaneously welded with, the screwed hole that crimp 603 and anchor plate 602 are correspondingly arranged is bolted to connection.
Center line open screwed hole some, bottom surface weld bolt, the supporting bolt of top surface and the crimping along its length of anchor plate 602
Part 603, air film film body 120 by crimp 603 and bolt presses on anchor plate 602, so as to realize air film film body anchoring connect
Connect.
The pneumatic membrane building anchor that the present embodiment is provided, by crimp 603 and the company of being detachably fixed of anchor plate 602
Connect, analyze different connected modes, and by nut-welding and anchor plate 602 away from crimp 603 one end, it is possible to reduce
The activity of parts, can preferably carry and dismantle and use, and prevent from losing.
On the basis of above-described embodiment, further, the anchor plate of the pneumatic membrane building anchor that the present embodiment is provided
602 are set to multiple, and multiple anchor plates 602 can be connected to become an entirety.
Anchor plate 602 is the core component of the pneumatic membrane building anchor that the present embodiment is provided, because anchor plate 602 can be with
It is rectangle or sector, multiple rectangle anchor plates 602 constitute the anchor structure of a big rectangle or square pneumatic membrane building;It is many
The individual fan-shaped circular pneumatic membrane building anchor structure of anchor plate composition.
In addition, the pneumatic membrane building anchor that the present embodiment is provided also includes connecting plate 601;Connecting plate 601 is set to many
It is individual;Adjacent anchor plate 602 is fixedly connected by connecting plate 601;Connecting plate 601 is used for fixed multiple anchor plate 602.
Wherein, connecting plate 601 is detachably fixed with anchor plate and is connected.
Connecting plate 601 can be for various, such as:Steel plate, alloy sheets, hinge etc., due to needing to meet connection anchor plate 602
Rigid demand, and it is dismountable need, it is preferred that connecting plate 601 is steel plate.
Optionally, the short side in anchor plate 602 is provided with symmetrical screwed hole, respectively by connecting plate 601 and bolt phase
Adjacent anchor plate 602 is connected as an entirety, plays a part of to increase anchor intensity.
Wherein, the anchor plate 602 according to different sizes, the number that screwed hole is set can be 2,4,6 etc., root
According to symmetrically arranged principle, cause that adjacent anchor plate 602 is fixedly connected by connecting plate 601.
Nut is welded with screwed hole one end of anchor plate 602 so that nut is fixed on anchor plate 602, so as to reduce
The carrying of parts, facilitates dismounting anchor, prevents the loss of parts from bringing unnecessary loss.
The pneumatic membrane building anchor that the present embodiment is provided, by setting multiple anchor plates 602, multiple anchor plates 602 lead to
Cross connecting plate 601 and an entirety is connected into this, and adjacent anchor plate 602 and connecting plate 601 are provided with symmetrical bolt hole,
It is bolted to connection.The pneumatic membrane building anchor that the present embodiment is provided, can according to the size specification of pneumatic membrane building, from
And the anchor of different size is selected, and when pneumatic membrane building needs migration, be able to can be reused with integral demounting, just
In relocating for pneumatic membrane building;In addition, installation rate is fast, operating expenses is relatively low.
On the basis of above-described embodiment, further, the pneumatic membrane building anchor that the present embodiment is provided, also including being used for
The drill rod 605 fixed with ground 607;Anchor plate 602 is provided with multiple drill rod jacks, drill rod 605 by insert drill rod jack with
Ground 607 is fixed.
Drill rod 605, tip rod iron is a kind of conventional building implement, the more commonly used particularly in building constructions, this reality
The drill rod 605 for applying example offer sets one end for tip, and the other end is provided with annulus handle, and annulus handle top is provided with level
Face, when ground cannot be manually inserted into ground 607, ground 607 is inserted into by beating horizontal plane by drill rod 605.
Drill rod jack is set to multiple, wherein it is preferred that drill rod jack is set to four, near 602 4 jiaos of anchor plate
One drill rod jack of each setting in place, by the ground 607 that four drill rods 605 insert under anchor plate 602 from drill rod jack, you can
To prevent anchor plate 602 from moving horizontally, and to strengthen the stability of anchor.
The pneumatic membrane building anchor that the present embodiment is provided, drill rod jack is provided with anchor plate 602, and by by steel
Pricker 605 inserts drill rod jack, so that prevent anchor plate 602 from moving horizontally, and to strengthen the stability of anchor.Separately
Outward, the drill rod 605 that the present embodiment is provided, is set to taper tip, and the other end in tip is provided with annulus handle, works as drill rod
In by the drill rod jack insertion ground 607 of anchor plate 602, when reaching certain position, the diameter of drill rod 605 touches steel just
Pricker jack so that anchor plate 602 is more consolidated;Due to being provided with annulus handle, when needing to extract drill rod, more facilitate, and
It is laborsaving time saving.
On the basis of above-described embodiment, the pneumatic membrane building anchor that the present embodiment is provided also includes balancing weight 604;Match somebody with somebody
Pouring weight 604 is arranged on anchor plate 602.
Wherein, balancing weight 604 can be for various, such as:Balancing weight 604 can be metal derby, cement block, sandbag, Sand Bucket, stone
Block etc..Because metal derby has in bigger density and unit volume, the weight of metal derby is maximum, it is preferred that balancing weight 604
It is metal derby.
The shape of balancing weight 604 can be for various, such as:Cuboid, cylinder, triangle body etc., due to connecing for cuboid
Contacting surface product is bigger, and in unit volume, and the weight of cuboid is also than larger, it is preferred that balancing weight 604 is shaped as cuboid.
In specific operation process, the deadweight of anchor plate 602 and drill rod 605 can meet air film with the frictional force on ground 607
The general anchoring requirement of building;But when in the larger scale of construction or awful weather area, to ensure the safety of pneumatic membrane building, can be in anchor
Gu balancing weight 604 is set on plate 602, for increasing the deadweight of pneumatic membrane building anchor and its frictional force with ground 607, with
Bigger anchoring strength and tensile capacity is provided.
Balancing weight 604 is set to multiple, according to the pneumatic membrane building under different situations, can set many on anchor plate 602
Individual balancing weight 604, multiple balancing weights 604 are being arranged in order on anchor plate 602.
The pneumatic membrane building anchor that the present embodiment is provided, when larger in air film film body 120, or runs into awful weather
When regional, balancing weight 604 can be set in the gap of anchor plate 602, multiple balancing weights 604 are sequentially arranged in anchor plate 602
In, for increasing the deadweight of pneumatic membrane building anchor and its frictional force with ground 607, with provide bigger anchoring strength and
Tensile capacity, and when balancing weight 604 is not needed, can withdraw at any time, more facilitate, more meet detachable air film and build
Build the demand of anchor.
Specifically, armored concrete grade beam of the prior art needs site operation, and in ground fluting, formwork in groove
Plate is simultaneously used by burying and pouring shaping, and grade beam upper surface is connected by pre-embedding metal part with air film structure.But, this reality
The pneumatic membrane building anchor of example offer is provided, is arranged on ground, without the live civil engineering such as fluting, and pneumatic membrane building anchor
It is fixedly mounted with and puts composition component and be factory's manufacture, scene only has assembly working, and installation rate is fast, and operating expenses is low;In addition, air film is built
The whole components for building anchor can be dismantled, reusable, be easy to relocating for pneumatic membrane building.
It is preferred that be set to steel plate by anchor plate 602, and crimp 603 is set to angle steel, air film film body 120 along
Angle steel right-angle side is inserted into steel plate and angle steel attaching space, is bolted to connection, and right-angle side by angle steel has
Good auxiliary intermal force, and angle steel crimp has good sealing effectiveness.
Armored concrete grade beam construction of the prior art typically takes more than 30 days, and construction period is more long.But, this implementation
Whole components of the pneumatic membrane building anchor of offer, in factory, manufacture takes 7 days, in-site installation 3 days, all work 10 days
Complete, the duration is greatly shortened.
In addition, existing armored concrete grade beam top in the art needs built-in metal component, and hardware is direct
It is connected with air film film body 120, but, hardware has location difficulty, and is hit when pouring, and easily causes larger mistake
Difference, have impact on air film film body 120 and connects.The pneumatic membrane building anchor that the present embodiment is provided, by multiple anchor plates 602 successively
Spread configuration, and anchor plate 602 at adjacent is connected by screw bolts by connecting plate 601, simple and reliable process, efficiency of construction
It is high;And anchor point accurate positioning, it is easy to air film film body 120 to connect.
Finally it should be noted that:Various embodiments above is merely illustrative of the technical solution of the present invention, rather than its limitations;To the greatest extent
Pipe has been described in detail with reference to foregoing embodiments to the present invention, it will be understood by those within the art that:Its according to
The technical scheme described in foregoing embodiments can so be modified, or which part or all technical characteristic are entered
Row equivalent;And these modifications or replacement, the essence of appropriate technical solution is departed from various embodiments of the present invention technology
The scope of scheme.
Claims (10)
1. a kind of pneumatic membrane building anchor, it is characterised in that including:Anchor plate and crimp;
The anchor plate is used to be horizontally placed on ground, and the crimp is connected on the anchor plate, the anchor plate and institute
State between crimp for fixing air film film body.
2. pneumatic membrane building anchor according to claim 1, it is characterised in that the anchor plate can with the crimp
Dismounting is fixedly connected.
3. pneumatic membrane building anchor according to claim 2, it is characterised in that the crimp is bolted to
The anchor plate.
4. pneumatic membrane building anchor according to claim 1, it is characterised in that also including the steel for being fixed with ground
Pricker;
The anchor plate is provided with multiple drill rod jacks, and the drill rod is fixed by inserting the drill rod jack with the ground.
5. pneumatic membrane building anchor according to claim 1, it is characterised in that the anchor plate is set to multiple, many
The individual anchor plate can be connected as one.
6. pneumatic membrane building anchor according to claim 5, it is characterised in that also including connecting plate;
The connecting plate is set to multiple;The adjacent anchor plate is fixedly connected by the connecting plate.
7. pneumatic membrane building anchor according to claim 6, it is characterised in that the connecting plate can with the anchor plate
Dismounting is fixedly connected.
8. pneumatic membrane building anchor according to claim 1, it is characterised in that the crimp is set to angle steel.
9. the pneumatic membrane building anchor according to claim any one of 1-8, it is characterised in that also including balancing weight;
The balancing weight is arranged on the anchor plate.
10. pneumatic membrane building anchor according to claim 1, it is characterised in that the anchor plate is set to steel plate;Institute
That states anchor plate is shaped as rectangle or sector.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610696986.XA CN106759908A (en) | 2016-08-19 | 2016-08-19 | Pneumatic membrane building anchor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610696986.XA CN106759908A (en) | 2016-08-19 | 2016-08-19 | Pneumatic membrane building anchor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106759908A true CN106759908A (en) | 2017-05-31 |
Family
ID=58972012
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610696986.XA Pending CN106759908A (en) | 2016-08-19 | 2016-08-19 | Pneumatic membrane building anchor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106759908A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107254915A (en) * | 2017-08-01 | 2017-10-17 | 深圳市博德维环境技术股份有限公司 | Aerated film |
CN113605533A (en) * | 2021-08-10 | 2021-11-05 | 江苏科技大学 | Air film bottom boundary fixing device and fixing method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202009014547U1 (en) * | 2009-10-28 | 2010-02-25 | Seeger, Christian | silo closure |
CN202837013U (en) * | 2012-10-15 | 2013-03-27 | 西安建筑科技大学 | General base used for pneumatic membrane experimental study |
CN203222807U (en) * | 2013-01-18 | 2013-10-02 | 博德维奇(北京)科技有限公司 | Flat foundation specialized for gas film building |
CN205296421U (en) * | 2015-12-10 | 2016-06-08 | 北京中体善建建设工程有限公司 | Special seal structure system of air film building |
CN105780797A (en) * | 2014-12-26 | 2016-07-20 | 深圳市博德维环境技术有限公司 | Air film building and foundation thereof |
CN205935209U (en) * | 2016-08-19 | 2017-02-08 | 北京约顿气膜建筑技术股份有限公司 | Air film building anchor |
-
2016
- 2016-08-19 CN CN201610696986.XA patent/CN106759908A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202009014547U1 (en) * | 2009-10-28 | 2010-02-25 | Seeger, Christian | silo closure |
CN202837013U (en) * | 2012-10-15 | 2013-03-27 | 西安建筑科技大学 | General base used for pneumatic membrane experimental study |
CN203222807U (en) * | 2013-01-18 | 2013-10-02 | 博德维奇(北京)科技有限公司 | Flat foundation specialized for gas film building |
CN105780797A (en) * | 2014-12-26 | 2016-07-20 | 深圳市博德维环境技术有限公司 | Air film building and foundation thereof |
CN205296421U (en) * | 2015-12-10 | 2016-06-08 | 北京中体善建建设工程有限公司 | Special seal structure system of air film building |
CN205935209U (en) * | 2016-08-19 | 2017-02-08 | 北京约顿气膜建筑技术股份有限公司 | Air film building anchor |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107254915A (en) * | 2017-08-01 | 2017-10-17 | 深圳市博德维环境技术股份有限公司 | Aerated film |
CN113605533A (en) * | 2021-08-10 | 2021-11-05 | 江苏科技大学 | Air film bottom boundary fixing device and fixing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102912972B (en) | Multifunctional lifting steel platform switching jig and construction method | |
CN101818478A (en) | Connection structure for concrete-filled circular steel tubular pier column and concrete cover beam | |
CN103938663A (en) | Correction device of inclined power transmission tower made of signal-splicing steel angle principal material | |
CN106759908A (en) | Pneumatic membrane building anchor | |
CN206174487U (en) | Pre -cast screw fixing device | |
CN206784392U (en) | The horizontal inner supporting body system of deep basal pit assembled combination steel construction | |
CN206308988U (en) | Tool-type combination construction pylon | |
CN205935209U (en) | Air film building anchor | |
CN106368318A (en) | Column-column joint of assembly type frame structure and construction method | |
CN204139631U (en) | The guard rail of building site fast demountable | |
CN209323829U (en) | A kind of steel tube concrete column feet node | |
CN204139622U (en) | Adjustable segmented column steel bar positioning fixture | |
CN208201865U (en) | Column hammer and rammed bulb pile equipment | |
CN203594058U (en) | Inclined transmission tower rectification device with single-spliced angle steel as main material | |
CN202913677U (en) | Multifunctional conversion scaffold capable of lifting steel platform | |
CN208328941U (en) | A kind of novel foundation pit supporting pile | |
CN206570819U (en) | The arrangement form that the standard connecting key of assembling type steel structure support is connected with support beam | |
CN208088290U (en) | Organizational pile foundation structure | |
CN210439163U (en) | Diagonal joist supporting structure applicable to assembly and disassembly of continuous beam | |
CN201665872U (en) | Anchoring pile supporting structure for reinforced cement-soil | |
CN208668921U (en) | A kind of pre-buried wall attaching parts of postposition | |
CN207007022U (en) | For deep-foundation pit engineering support beam demolition blasting flyrock protection device | |
CN207093102U (en) | A kind of asymmetric trouble hole supporting construction | |
CN206635797U (en) | A kind of positioning absolute altitude frame structure for tower crane foundation | |
CN206736943U (en) | Temporary building assembling type base |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |