[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN106759397A - Ecological lattice guest method to set up - Google Patents

Ecological lattice guest method to set up Download PDF

Info

Publication number
CN106759397A
CN106759397A CN201710009672.2A CN201710009672A CN106759397A CN 106759397 A CN106759397 A CN 106759397A CN 201710009672 A CN201710009672 A CN 201710009672A CN 106759397 A CN106759397 A CN 106759397A
Authority
CN
China
Prior art keywords
lattice guest
gabion
guest
lattice
ecological
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710009672.2A
Other languages
Chinese (zh)
Inventor
李萍
龚伟
沈颀
赵志华
虞丹
汪阳
沈志军
杨卫卫
殷奎剑
张海波
赵春锦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Industrial Park Garden Greening Engineering Co Ltd
Original Assignee
Suzhou Industrial Park Garden Greening Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Industrial Park Garden Greening Engineering Co Ltd filed Critical Suzhou Industrial Park Garden Greening Engineering Co Ltd
Priority to CN201710009672.2A priority Critical patent/CN106759397A/en
Publication of CN106759397A publication Critical patent/CN106759397A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/005Soil-conditioning by mixing with fibrous materials, filaments, open mesh or the like
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0084Geogrids

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Paleontology (AREA)
  • Ocean & Marine Engineering (AREA)
  • Soil Sciences (AREA)
  • Agronomy & Crop Science (AREA)
  • Mechanical Engineering (AREA)
  • Revetment (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The present invention is a kind of ecological lattice guest method to set up, and step is as follows:Underlying basis are set;Bottom lattice guest's gabion spread configuration;Bottom lattice guest's gabion main body is set;Filler:After bottom lattice guest's gabion all sets, building stones are filled in bottom lattice guest's gabion main body, multiple filler is used during filler, the floor height of each filler is not more than 30cm, until filling up, top layer filling building stones are higher than lattice guest's gabion main body, afterwards manually or mechanically to build base leveling, mutually overlapped between making filling building stones;Upper strata Ge Bin gabions are set;Enter the between-line spacing jackstone that bankets and dissipate and fill out throwing, compaction in layers of banketing, every layer of filled slope 20cm, jackstone is dissipated after wall must be layered throwing, per thickness degree 30cm;The peat of 10~15cm is filled out in lattice Bin Qiang tops paving.Ecological lattice guest method to set up of the invention, it can effectively prevent ramp soil erosion, and set convenient, long service life, go for more extreme region while being not easy to be destroyed in natural calamity.

Description

Ecological lattice guest method to set up
Technical field
The present invention relates to the anti-erosion setting technical field in anti-erosion engineering installation, particularly ramp, specifically, A kind of its ecological lattice guest method to set up of displaying.
Background technology
In anti-erosion engineering installation technical field, the waterproof soil erosion in ramp be more refractory reason problem it One;
At this stage barricade is piled up using stone or in direct Turf Culture after setting protection network on ramp to ensure anti-water and soil It is lost in, it has following defect:
1) barricade is piled up using stone, it is coarse that stone outside is handed over, and security incident is easily caused, simultaneously because stone appearance Face is exposed, and weathering, service life is low;
2) the direct Turf Culture after protection network is set on ramp, engineering cost is high, and in rainy season, and rainwater can be by Soil and turf are gone out, and engineering limitations are high;
3) when ground situation changes, such as there is differential settlement, earthquake, method to set up at this stage easily goes out Show the states such as stone falls or protection network integrally pushes away, cause ramp to be destroyed.
Therefore, it is necessary to provide a kind of ecological lattice guest method to set up to solve the above problems.
The content of the invention
It is an object of the invention to provide a kind of ecological lattice guest method to set up, it can effectively prevent ramp soil erosion, and set Put conveniently, long service life, go for more extreme region while being not easy to be destroyed in natural calamity.
The present invention is achieved through the following technical solutions above-mentioned purpose:
A kind of ecological lattice guest method to set up, comprises the following steps:
1) underlying basis are set:Clear base is carried out, hard, the sharp debris of all protrusions are removed, basis compacting is struck off, then Carry out casting concrete bed course;
2) bottom lattice guest gabion spread configuration:Mesh sheet is opened and is aligned, connected with line, a tying point is set at the 20cm of interval, One-shot forming forms lattice guest's gabion, then lattice guest's gabion is put into fixed position, and adjacent lattice guest gabion binding connects to form entirety;
3) bottom lattice guest gabion main body is set:The side of lattice guest gabion four is erected, with wiring by adjacent edge along locking;
4) filler:After bottom lattice guest's gabion all sets, building stones are filled in bottom lattice guest's gabion main body, used during filler Multiple filler, the floor height of each filler is not more than 30cm, until filling up, top layer filling building stones are higher than lattice guest's gabion main body, after with Manually or mechanically build and build leveling, mutually overlapped between making filling building stones;
5) Ge Bin gabions in upper strata are set:Upper strata Ge Bin gabions are fixed on along upper strata Ge Bin gabions bottom frame using wiring On lattice guest's gabion of bottom, the adjacent lattice guest gabion of same layer is also mutually fastened using wiring, lattice guest's gabion box is connected, After filling step 4 in the Ge Bin gabions of upper strata);
6) lattice guest's wall is formed after Multi-layer lattice guest gabion is set, throwing is filled out in lattice guest's laggard between-line spacing of wall wall jackstone that bankets and dissipate, Banket compaction in layers, every layer of filled slope 20cm, jackstone is dissipated after wall must be layered throwing, per thickness degree 30cm;
7) peat of 10~15cm is filled out in lattice Bin Qiang tops paving.
Further, step 1) in, basic plane position allowable error ± 30mm- ± 40mm;Elevation allowable error ± 30mm;Relative height differential allowed band ± the 30mm of domatic irregularity degree.
Further, step 2) in, lattice guest's gabion fissure of displacement ornaments are in place, it is to avoid longitudinally through seam occur;Lattice guest gabion resists Tensile strength is not less than 30MPa, and mesh is 100 × 120mm, and twine is not less than ¢ 2.5mm, and side silk is not less than ¢ 3.2mm.
Further, step 3) in, during suture arris, wiring is turned round around two double kink side helical forms of the wire of coincidence Tightly;During suture grid, the double kink side helical forms of wire and cylinder mould are tightened;The pitch of spiral is no more than 50mm simultaneously.
Further, step 4) in need to also be set in lattice guest's gabion eight wordline carry out lattice guest gabion sizing reinforce, eight words Line is set to:Rockfilled in each case and lacing wire is set after 1/3 height, be inwardly strained and fixed in splayed.
Further, step 4) in, when top layer filling building stones have space, it is filled with small crushed stone building stones;And filling Building stones are forbidden using rust stone, land waste, and filling building stones diameter is not less than 12cm, and quality should be not less than 1.70 not less than 5kg unit weights Ton/cubic meter.
Further, step 3) and step 5) be required to plaid matching guest's gabion and covered, closing step is:Top filled stone After material block base is smooth, under top cover lid, the wire helical forms bundle of two coincidences is tied up with wiring then and is tightened, pitch not should be greater than 50mm, after now needing first to determine often end neighborhood of nodes using capping is clamping, then is subject to colligation;Capping and net cage frame intersecting lens, should Often it is separated by 25cm colligations together.
Further, step 3) in, spacer web and the body of the lattice guest gabion answer it is in 90 ° intersect, it is banded to form length Square Net-cage group or net cage;Binding wire must be that colligation must be doublet cord and twist with the steel wire of netting twine same material and together with Tightly.
Further, constitute net cage group or the various mesh sheet junction colligation roads number of net cage is:Spacer web and the four of body Each colligation of place's angle of cut is together;Spacer web and body junction are at interval of together with 25cm colligations;Adjacent frame between spacer web and body Line, it is necessary to be coupled using combination line.Connect around-circle with binding wire-hole-hole perforates twisted connection in the shape of a spiral around two circles.
Further, colligation is connected between net cage group to be distributed as:Each colligation in corner up and down of adjacent net cage group is together;Adjacent net The wire up and down or broken line of case group, it is necessary at interval of 25cm colligations together;Then every square metre of the mesh sheet faying face of adjacent net cage group At colligation 2, it is necessary to by lower section net cage in the lump colligation, in the hope of being connected.
Wherein:
Objective case gabion have low cost, it is ecological it is good, share the features such as scope wide, plastic deformation;
The filling building stones of suitable particle diameter is inserted and reach certain porosity, successively build by laying bricks or stones in the objective case gabion for possessing flexibility Form a kind of i.e. ecological lattice guest barricade of new flexible soil-retaining structure;Ecological lattice guest barricade is shared in big by current scour Stormy waves is attacked and protection works underlying basis are not disposable or retaining wall, toe bottom local douche depth are excessive along the river along the river Embankment toe or shore protection;
Ecological lattice guest barricade has larger porosity (20%~30%), therefore need not set spilled water hole, expansion joint and heavy Drop seam also can simply be laid;And the ecological ecological good, low cost of lattice guest's barricade, be amenable to moderate finite deformation and the strong point such as will not crush;
Ecology lattice guest's barricade Ying Yu is implemented in the area that building stones enrich simultaneously, and building stones particle diameter, intensity, weathering water are same Etc. being both needed to suitable requirement;If being far spaced moving rock material, cost can be increased, under conditions of skill is feasible, should be with remaining layout The retaining wall of situation carries out economy specific force.
Ecological lattice guest barricade can be used for slope retaining, pattern foundation pit supporting structure, massif scar shotcrete with steel bar nets, side slope, plant raw (greening), Railway and expressway breaks off guardrail net, while ecological lattice guest gabion, ecological lattice guest's stone pad can also be made, for rivers, dykes and dams and The anti-flushing in seawall is safeguarded with reservoir.
Compared with prior art, ecological lattice guest method to set up of the invention, it can effectively prevent ramp soil erosion, and set Put conveniently, long service life, go for more extreme region while being not easy to be destroyed in natural calamity.
Specific embodiment
Embodiment:
The present embodiment shows a kind of ecological lattice guest method to set up, comprises the following steps:
1) underlying basis are set:Clear base is carried out, hard, the sharp debris of all protrusions are removed, basis compacting is struck off, then Carry out casting concrete bed course;
2) bottom lattice guest gabion spread configuration:Mesh sheet is opened and is aligned, connected with line, a tying point is set at the 20cm of interval, One-shot forming forms lattice guest's gabion, then lattice guest's gabion is put into fixed position, and adjacent lattice guest gabion binding connects to form entirety;
3) bottom lattice guest gabion main body is set:The side of lattice guest gabion four is erected, with wiring by adjacent edge along locking;
4) filler:After bottom lattice guest's gabion all sets, building stones are filled in bottom lattice guest's gabion main body, used during filler Multiple filler, the floor height of each filler is not more than 30cm, until filling up, top layer filling building stones are higher than lattice guest's gabion main body, after with Manually or mechanically build and build leveling, mutually overlapped between making filling building stones;
5) Ge Bin gabions in upper strata are set:Upper strata Ge Bin gabions are fixed on along upper strata Ge Bin gabions bottom frame using wiring On lattice guest's gabion of bottom, the adjacent lattice guest gabion of same layer is also mutually fastened using wiring, lattice guest's gabion box is connected, After filling step 4 in the Ge Bin gabions of upper strata);
6) lattice guest's wall is formed after Multi-layer lattice guest gabion is set, throwing is filled out in lattice guest's laggard between-line spacing of wall wall jackstone that bankets and dissipate, Banket compaction in layers, every layer of filled slope 20cm, jackstone is dissipated after wall must be layered throwing, per thickness degree 30cm;
7) peat of 10~15cm is filled out in lattice Bin Qiang tops paving.
Step 1) in, basic plane position allowable error ± 30mm- ± 40mm;Elevation allowable error ± 30mm;It is domatic not Relative height differential allowed band ± the 30mm of flatness.
Step 2) in, lattice guest's gabion fissure of displacement ornaments are in place, it is to avoid longitudinally through seam occur;Lattice guest's gabion tensile strength is not small In 30MPa, mesh is 100 × 120mm, and twine is not less than ¢ 2.5mm, and side silk is not less than ¢ 3.2mm.
Step 3) in, during suture arris, wiring is tightened around two double kink side helical forms of the wire of coincidence;Suture lattice During grid, the double kink side helical forms of wire and cylinder mould are tightened;The pitch of spiral is no more than 50mm simultaneously.
Step 4) in eight wordline need to be also set in lattice guest's gabion carry out the sizing of lattice guest gabion and reinforce, eight wordline are set to: Rockfilled in each case and lacing wire is set after 1/3 height, be inwardly strained and fixed in splayed.
Step 4) in, when top layer filling building stones have space, it is filled with small crushed stone building stones;And filling building stones are forbidden to make With rust stone, land waste, fill building stones diameter and be not less than 12cm, quality should be not less than 1.70 tons/cubic metre not less than 5kg unit weights.
Step 3) and step 5) be required to plaid matching guest's gabion and covered, closing step is:Top filling building stones are built and build flat After whole, under top cover lid, the wire helical forms bundle of two coincidences tied up with wiring then and is tightened, pitch not should be greater than 50mm, now After first often end neighborhood of nodes need to being determined using capping is clamping, then it is subject to colligation;Capping and net cage frame intersecting lens, should often be separated by 25cm Colligation is together.
Step 3) in, spacer web and the body of lattice guest's gabion answer it is in 90 ° intersect, it is banded to form rectangle net cage group or net Case;Binding wire must be that colligation must be doublet cord and wring with the steel wire of netting twine same material and together with.
The various mesh sheet junction colligation roads number for constituting net cage group or net cage is:Spacer web is respectively tied up with the angle of cut everywhere of body Prick together;Spacer web and body junction are at interval of together with 25cm colligations;Adjacent wire between spacer web and body, it is necessary to use Combination line is coupled.Connect around-circle with binding wire-hole-hole perforates twisted connection in the shape of a spiral around two circles.
Colligation is connected between net cage group to be distributed as:Each colligation in corner up and down of adjacent net cage group is together;Adjacent net cage group it is upper Lower wire or broken line, it is necessary at interval of 25cm colligations together;The mesh sheet faying face of adjacent net cage group is then at every square metre of colligation 2, Must be by lower section net cage in the lump colligation, in the hope of being connected.
Compared with prior art, the ecological lattice guest method to set up of the present embodiment, it can effectively prevent ramp soil erosion, and Set convenient, long service life goes for more extreme region while being not easy to be destroyed in natural calamity.
Above-described is only some embodiments of the present invention.For the person of ordinary skill of the art, not On the premise of departing from the invention design, various modifications and improvements can be made, these belong to protection model of the invention Enclose.

Claims (10)

1. a kind of ecological lattice guest method to set up, it is characterised in that:Comprise the following steps:
1) underlying basis are set:Clear base is carried out, hard, the sharp debris of all protrusions are removed, basis compacting is struck off, then carry out Casting concrete bed course;
2) bottom lattice guest gabion spread configuration:Mesh sheet is opened and is aligned, connected with line, set a tying point at the 20cm of interval, once Shaping forms lattice guest's gabion, then lattice guest's gabion is put into fixed position, and adjacent lattice guest gabion binding connects to form entirety;
3) bottom lattice guest gabion main body is set:The side of lattice guest gabion four is erected, with wiring by adjacent edge along locking;
4) filler:After bottom lattice guest's gabion all sets, building stones are filled in bottom lattice guest's gabion main body, using multiple during filler Filler, the floor height of each filler is not more than 30cm, until fill up, top layer filling building stones are higher than lattice guest's gabion main body, after with artificial Or machinery is built and builds leveling, is mutually overlapped between making filling building stones;
5) Ge Bin gabions in upper strata are set:Upper strata Ge Bin gabions are fixed on bottom along upper strata Ge Bin gabions bottom frame using wiring Lattice guest's gabion on, the adjacent lattice guest gabion of same layer is also mutually fastened using wiring, lattice guest's gabion box is connected, after Filling step 4 in the Ge Bin gabions of upper strata);
6) lattice guest's wall is formed after Multi-layer lattice guest gabion is set, throwing is filled out in lattice guest's laggard between-line spacing of wall wall jackstone that bankets and dissipate, banketed Compaction in layers, every layer of filled slope 20cm, jackstone is dissipated after wall must be layered throwing, per thickness degree 30cm;
7) peat of 10~15cm is filled out in lattice Bin Qiang tops paving.
2. a kind of ecological lattice guest method to set up according to claim 1, it is characterised in that:Step 1) in, basic plane position Put allowable error ± 30mm- ± 40mm;Elevation allowable error ± 30mm;The relative height differential allowed band of domatic irregularity degree ± 30mm。
3. a kind of ecological lattice guest method to set up according to claim 2, it is characterised in that:Step 2) in, lattice guest gabion is wrong Seam ornaments are in place, avoid the occurrence of longitudinally through seam;Lattice guest's gabion tensile strength is not less than 30MPa, and mesh is 100 × 120mm, net Silk is not less than ¢ 2.5mm, and side silk is not less than ¢ 3.2mm.
4. a kind of ecological lattice guest method to set up according to claim 3, it is characterised in that:Step 3) in, during suture arris, Wiring is tightened around two double kink side helical forms of the wire of coincidence;During suture grid, by wire and the double kink side spiral shells of cylinder mould Rotation shape is tightened;The pitch of spiral is no more than 50mm simultaneously.
5. a kind of ecological lattice guest method to set up according to claim 1-4 any one, it is characterised in that:Step 4) in also Eight wordline need to be set in lattice guest's gabion carries out the sizing reinforcing of lattice guest gabion, and eight wordline are set to:Rockfilled in each case after 1/3 height Lacing wire is set, is inwardly strained and fixed in splayed.
6. a kind of ecological lattice guest method to set up according to claim 5, it is characterised in that:Step 4) in, top layer filled stone When material has space, it is filled with small crushed stone building stones;And filling building stones are forbidden, using rust stone, land waste, to fill building stones diameter Not less than 12cm, quality should be not less than 1.70 tons/cubic metre not less than 5kg unit weights.
7. a kind of ecological lattice guest method to set up according to claim 6, it is characterised in that:Step 3) and step 5) be required to Plaid matching guest's gabion is covered, and closing step is:Top filling building stones build build it is smooth after, under top cover lid, then with wiring by two The wire helical form that bar overlaps is pricked to tie up and tightened, and pitch not should be greater than 50mm, now needs first to determine often to hold adjacent bonds using capping is clamping After point, then it is subject to colligation;Capping and net cage frame intersecting lens, should often be separated by 25cm colligations together.
8. a kind of ecological lattice guest method to set up according to claim 6 or 7, it is characterised in that:Step 3) in, the lattice guest The spacer web of gabion and body answer it is in 90 ° intersect, it is banded to form rectangle net cage group or net cage;Binding wire must be and netting twine The steel wire of same material and every one colligation must be doublet cord and wring.
9. a kind of ecological lattice guest method to set up according to claim 8, it is characterised in that:Constitute each of net cage group or net cage Planting mesh sheet junction colligation road number is:Spacer web is together with each colligation of the angle of cut everywhere of body;Spacer web is every with body junction It is spaced 25cm colligations together;Adjacent wire between spacer web and body, it is necessary to be coupled using combination line.Use binding wire-hole Connect around-circle-hole perforates twisted connection in the shape of a spiral around two circles.
10. a kind of ecological lattice guest method to set up according to claim 9, it is characterised in that:Colligation point is connected between net cage group Cloth is:Each colligation in corner up and down of adjacent net cage group is together;The wire up and down or broken line of adjacent net cage group, it is necessary at interval of 25cm Colligation is together;The mesh sheet faying face of adjacent net cage group is then at every square metre of colligation 2, it is necessary to by lower section net cage in the lump colligation, in the hope of It is connected.
CN201710009672.2A 2017-01-06 2017-01-06 Ecological lattice guest method to set up Pending CN106759397A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710009672.2A CN106759397A (en) 2017-01-06 2017-01-06 Ecological lattice guest method to set up

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710009672.2A CN106759397A (en) 2017-01-06 2017-01-06 Ecological lattice guest method to set up

Publications (1)

Publication Number Publication Date
CN106759397A true CN106759397A (en) 2017-05-31

Family

ID=58949891

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710009672.2A Pending CN106759397A (en) 2017-01-06 2017-01-06 Ecological lattice guest method to set up

Country Status (1)

Country Link
CN (1) CN106759397A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108824412A (en) * 2018-07-16 2018-11-16 湖北工业大学 Based on gabion wall reinforced earth and strong tamping combined soft base processing method
CN111347819A (en) * 2020-04-26 2020-06-30 岩土科技股份有限公司 Large-scale landscape rockery construction method
CN111395105A (en) * 2020-04-17 2020-07-10 重庆大学 Night-visit footpath structure for waterfront submerged area and construction method thereof
CN111749197A (en) * 2020-05-20 2020-10-09 中国一冶集团有限公司 Riverbank zone ecological restoration system and construction method thereof
US11434616B1 (en) 2019-12-19 2022-09-06 Robert Anderson Erosion block
RU2791062C1 (en) * 2021-11-22 2023-03-02 федеральное государственное бюджетное образовательное учреждение высшего образования "Уфимский университет науки и технологий" Method for applying gabion structures to increase the capacity of a man-made container
CN117027012A (en) * 2023-08-08 2023-11-10 福建省地质工程勘察院 High-polymer grouting rapid reinforced high-fill side slope and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11209988A (en) * 1998-01-22 1999-08-03 Setouchi Kanaami Shoko Kk Gabion
CN1512011A (en) * 2002-12-30 2004-07-14 中国科学院地质与地球物理研究所 Layered net type steel bar stone cage barricade for reinforcing slope
CN104328766A (en) * 2014-10-31 2015-02-04 杭州市市政工程集团有限公司 Ecological stone cage net box retaining wall and construction method
CN104612107A (en) * 2015-02-02 2015-05-13 成军 River channel reinforced gabion and water-permeable geotextile composite ecological slope protection retaining wall construction method
CN105064273A (en) * 2015-07-25 2015-11-18 山东农业大学 Constructing method for grass planting gabion ecological terrace ridge

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11209988A (en) * 1998-01-22 1999-08-03 Setouchi Kanaami Shoko Kk Gabion
CN1512011A (en) * 2002-12-30 2004-07-14 中国科学院地质与地球物理研究所 Layered net type steel bar stone cage barricade for reinforcing slope
CN104328766A (en) * 2014-10-31 2015-02-04 杭州市市政工程集团有限公司 Ecological stone cage net box retaining wall and construction method
CN104612107A (en) * 2015-02-02 2015-05-13 成军 River channel reinforced gabion and water-permeable geotextile composite ecological slope protection retaining wall construction method
CN105064273A (en) * 2015-07-25 2015-11-18 山东农业大学 Constructing method for grass planting gabion ecological terrace ridge

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108824412A (en) * 2018-07-16 2018-11-16 湖北工业大学 Based on gabion wall reinforced earth and strong tamping combined soft base processing method
US11434616B1 (en) 2019-12-19 2022-09-06 Robert Anderson Erosion block
CN111395105A (en) * 2020-04-17 2020-07-10 重庆大学 Night-visit footpath structure for waterfront submerged area and construction method thereof
CN111347819A (en) * 2020-04-26 2020-06-30 岩土科技股份有限公司 Large-scale landscape rockery construction method
CN111749197A (en) * 2020-05-20 2020-10-09 中国一冶集团有限公司 Riverbank zone ecological restoration system and construction method thereof
RU2791062C1 (en) * 2021-11-22 2023-03-02 федеральное государственное бюджетное образовательное учреждение высшего образования "Уфимский университет науки и технологий" Method for applying gabion structures to increase the capacity of a man-made container
CN117027012A (en) * 2023-08-08 2023-11-10 福建省地质工程勘察院 High-polymer grouting rapid reinforced high-fill side slope and construction method thereof

Similar Documents

Publication Publication Date Title
CN106759397A (en) Ecological lattice guest method to set up
CN104164851B (en) The construction method of the ecological flexible mud-rock flow blocking dam of gabion arch
CN107354911B (en) Construction method for ecological flexible geogrid reinforced wharf
CN105862710B (en) A kind of drain bar and construction method for Tidal Flat Inning Area processing
CN103669291B (en) The construction method of articulated revetment brick bank protection
CN103510441A (en) Three-dimensional-drainage roadbed structure for preventing water damage of road in cold region and construction method thereof
CN204849509U (en) Highway roadbed structure of antidetonation sand prevention
CN113774917B (en) Safe construction method for earth and rockfill excavation and side slope supporting engineering
CN107190602A (en) A kind of river degradation section pile formula foam concrete light road bank structure and construction method
CN105178125A (en) Lake region high filling road base sand blowing embankment construction method and embankment structure
RU2366782C1 (en) Method for erection of earthfill structure, of dam type with inspection path on soft ground
CN112921946A (en) Reinforcing system and reinforcing method for liquefiable site reinforced gravel pile composite foundation embankment
CN106192653A (en) A kind of Duo Xue district road crossing avalanche slide rock body subgrade drainage system and construction method
CN203498721U (en) Three-dimensional drainage roadbed structure preventing damage by water of road in cold region
CN110306565A (en) A kind of Road ecology slope protection system and construction method
CN114182745B (en) Ecological slope protection roadbed of high-liquid limit soil ecological retaining wall and construction method
CN111663389A (en) Drainage structure for soft rock filling roadbed and roadbed construction method
CN216514911U (en) High fill roadbed structure
CN212270826U (en) Check guest net cage
CN107700500B (en) Slope retaining structure and slope supporting drain integral system
CN219410355U (en) Flexible side-width structure of high-fill embankment of existing railway
JP2020070608A (en) Composite sheet and bag made of the composite sheet
CN111321700B (en) Overflowing energy dissipation type ecological bank protection method for anti-scouring and anti-landslide barrier plugs
RU34945U1 (en) Device for strengthening the slope of the soil structure
CN205062597U (en) Road bed embankment structure of blowing sand is filled out to lake region height

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531