CN106758677A - The method of ice and snow area granulated crumb rubber asphalt mixture application technology - Google Patents
The method of ice and snow area granulated crumb rubber asphalt mixture application technology Download PDFInfo
- Publication number
- CN106758677A CN106758677A CN201611220406.6A CN201611220406A CN106758677A CN 106758677 A CN106758677 A CN 106758677A CN 201611220406 A CN201611220406 A CN 201611220406A CN 106758677 A CN106758677 A CN 106758677A
- Authority
- CN
- China
- Prior art keywords
- ice
- pitch
- snow
- asphalt mixture
- crumb rubber
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/24—Methods or arrangements for preventing slipperiness or protecting against influences of the weather
- E01C11/245—Methods or arrangements for preventing slipperiness or protecting against influences of the weather for preventing ice formation or for loosening ice, e.g. special additives to the paving material, resilient coatings
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/08—Coherent pavings made in situ made of road-metal and binders
- E01C7/18—Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
- E01C7/26—Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders mixed with other materials, e.g. cement, rubber, leather, fibre
- E01C7/265—Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders mixed with other materials, e.g. cement, rubber, leather, fibre with rubber or synthetic resin, e.g. with rubber aggregate, with synthetic resin binder
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
The present invention and granulated crumb rubber asphalt mixture technical field, are in particular the methods of ice and snow area granulated crumb rubber asphalt mixture application technology.This method is practical, in the case of ice and snow road, can effectively suppress road snow icing, so that for the suppression ice and snow on road surfaces problem of seasonal freezing region provides new solution.This method includes the mixing and stirring of compound, the compacting paved with pitch of compound.
Description
Technical field
In particular it is ice and snow area rubber grain asphalt the present invention relates to granulated crumb rubber asphalt mixture technical field
The method of compound application technology.
Background technology
In cold winter, many highways and urban roads frequently suffer from the harm of ice and snow, are substantially in ice when snowfall is larger
Snow pavement state, ice and snow substantially reduces coefficient of road adhesion, causes car skidding, braking distance significantly to extend, or even brake
Failure, direction out of control, cause serious traffic accident.These problems turn into traffic safety and people's life, property safety
Major hidden danger, therefore ice and snow road problem annoyings road maintenance department always.The most area of China belongs to ice-snow field
Area, road snow ice formation issues are relatively conventional.Especially early winter and season in the early spring, road snow is in temperature change and vehicular load
In the presence of, road surface easily forms thin ice, influences traffic safety.Because road snow freezes, tire and ground
Attachment coefficient is low, and ground can be supplied to the adhesive force of automobile accordingly to diminish.On general dry bituminous paving or concrete road surface,
Attachment coefficient is about 0.6, and the attachment coefficient for avenging road is 0.2, and the attachment coefficient on ice road is 0.15, respectively dried asphalt road
The 1/3 of attachment coefficient and 1/4.Therefore, the traffic safety of ice and snow road how is efficiently solved, it is to avoid traffic accident goes out to hand over less
Interpreter's event, improves road passage capability and operation benefits, forms good safety management mode, it has also become the area friendship of puzzlement ice and snow
One of major issue of logical administrative department.In order to eliminate the safety risks on road surface under icy conditions, road maintenance department is also normal
Often take measures to remove ice and snow on road surfaces.The method of conventional road surface deicing snow is to dispense alcohols or salt Snow Agent on road surface to make
Ice dissolution, but the deicing effect of alcohols Snow Agent is influenced by environmental temperature, and with anti-icing phenomenon, i.e., once
Environment temperature decline, the accumulated snow being melted can glaciation again, make road surface more sliding, road accident rate is higher.Most of salt
All there are corrosivity, perishable destruction road structure and motor vehicles in class Snow Agent product, can also be to soil, water body and air etc.
Pollute, destroy ecological environment.Rubber grain road surface is that waste and old rubber tyre is broken into definite shape and particle diameter
Particle, instead of part gather materials, the road surface of the making in asphalt is directly mixed in the form of aggregate.Due to rubber
Rubber grain in grain road surface has larger elastic deformability, can effectively improve the deformability on road surface, improves ice and snow
With the bond state on road surface, road snow icing can effectively be suppressed by seif-citing rate under Vehicle Load, therefore, will be useless
Old tire rubber grain is one of the effective way for solving current Problems for road construction.
The content of the invention
The present invention solves the technical problem of the side for providing ice and snow area granulated crumb rubber asphalt mixture application technology
Method, this method is practical, in the case of ice and snow road, can effectively suppress road snow icing, so as to be seasonal ice
The ice and snow on road surfaces problem that suppresses in frozen ground area provides new solution.
In order to solve the above technical problems, the present invention relates to granulated crumb rubber asphalt mixture technical field, being in particular
The method of ice and snow area granulated crumb rubber asphalt mixture application technology, described method is comprised the following steps:
(1)The pitch that used when mixing and stirring of compound is SBS modified pitch, TPS modified pitch, and heating-up temperature is 175 DEG C, scene
SBS modified pitch is heated to 175 DEG C during construction, and TPS modifying agent is manually delivered into cylinder is mixed, and matrix pitch heating-up temperature is no more than
165 DEG C, the heating and temperature control of building stones is mixed and stirred the building stones of heat with rubber grain more than 190 DEG C in advance, is then added again
Enter pitch and miberal powder is mixed and stirred, manually rubber grain is added while hot aggregate bin building stones enter and mix cylinder.
(2)The pollutant of sub-layer during mixture laying, is thoroughly cleaned, rinses, mortar and other scum silica frost application steel brushes are wiped
Clearly, if any water mark, then must not be paved in the case of wet road surface, the pit of sub-layer, loose and other diseases should be by
Specification regulation is repaired with asphalt, and absolute altitude, horizontal wall inscription, flatness to sub-layer will be detected, to influence quality and nothing
Method during the defect location that upper layer is eliminated carries out leveling, upper layer construction before, in the case of free of contamination, will spread adhesion coating
Pitch, sticking layer oil consumption presses specification spread, and answers spread uniform, and the local artificial benefit of location application spilt less or spill more is spilt or clearly
Remove, mixture laying temperature is strictly performed by code requirement, before paving every time, detects and adjust screed, it is ensured that straight, is started
Before paved mixture, screed is preheated, output condition when paving according to compound determines an appropriate speed, entirely paves
Continuously, at the uniform velocity, spreading quality is observed at any time, it is found that isolation and other abnormalities should in time analyze reason, processed, expect
Car is removed in time in the material that the area that paves is scattered.
(3)During compacting pitch, using double steel wheel formula vibrated rollers, every road roller forward-reverse is 1 time, adopts 1/2
Mistake wheel, road roller is first travelled opens vibration again, first closes vibration stagnation of movement again, and granulated crumb rubber asphalt mixture is adopted SMA-16 grades and matched somebody with somebody, rolls
When by driving wheel towards paver, the road roller of first pressing the online lap-joint that paves, two edge carry out roll one time, for rubber
The rebound characteristics of glue particle, the appropriate rolling layer for increasing final pressure, control rolls finishing temperature less than 70 DEG C.
As the further optimization of the technical program, ice and snow area of the present invention granulated crumb rubber asphalt mixture application technology
The temperature of being mixed and stirred when mixing and stirring of the compound described in method is 180 DEG C.
As the further optimization of the technical program, ice and snow area of the present invention granulated crumb rubber asphalt mixture application technology
The mixing time after pitch and miberal powder that added when mixing and stirring described in method is respectively 90 seconds.
The method of ice and snow of the present invention area granulated crumb rubber asphalt mixture application technology has the beneficial effect that:
The method of ice and snow area of the present invention granulated crumb rubber asphalt mixture application technology, this method is practical, in ice and snow road
In the case of, can effectively suppress road snow icing, so that for the suppression ice and snow on road surfaces problem of seasonal freezing region is provided
New solution.
Brief description of the drawings
The present invention will be further described in detail with specific implementation method below in conjunction with the accompanying drawings.
Fig. 1 is the flow chart of the method for ice and snow area granulated crumb rubber asphalt mixture application technology.
Specific embodiment
Specific embodiment one:
In particular it is the rubber grain asphalt mixing of ice and snow area the present invention relates to granulated crumb rubber asphalt mixture technical field
The method for expecting application technology, described method is comprised the following steps:
(1)The pitch that used when mixing and stirring of compound is SBS modified pitch, TPS modified pitch, and heating-up temperature is 175 DEG C, scene
SBS modified pitch is heated to 175 DEG C during construction, and TPS modifying agent is manually delivered into cylinder is mixed, and matrix pitch heating-up temperature is no more than
165 DEG C, the heating and temperature control of building stones is mixed and stirred the building stones of heat with rubber grain more than 190 DEG C in advance, is then added again
Enter pitch and miberal powder is mixed and stirred, manually rubber grain is added while hot aggregate bin building stones enter and mix cylinder.
(2)The pollutant of sub-layer during mixture laying, is thoroughly cleaned, rinses, mortar and other scum silica frost application steel brushes are wiped
Clearly, if any water mark, then must not be paved in the case of wet road surface, the pit of sub-layer, loose and other diseases should be by
Specification regulation is repaired with asphalt, and absolute altitude, horizontal wall inscription, flatness to sub-layer will be detected, to influence quality and nothing
Method during the defect location that upper layer is eliminated carries out leveling, upper layer construction before, in the case of free of contamination, will spread adhesion coating
Pitch, sticking layer oil consumption presses specification spread, and answers spread uniform, and the local artificial benefit of location application spilt less or spill more is spilt or clearly
Remove, mixture laying temperature is strictly performed by code requirement, before paving every time, detects and adjust screed, it is ensured that straight, is started
Before paved mixture, screed is preheated, output condition when paving according to compound determines an appropriate speed, entirely paves
Continuously, at the uniform velocity, spreading quality is observed at any time, it is found that isolation and other abnormalities should in time analyze reason, processed, expect
Car is removed in time in the material that the area that paves is scattered.
(3)During compacting pitch, using double steel wheel formula vibrated rollers, every road roller forward-reverse is 1 time, adopts 1/2
Mistake wheel, road roller is first travelled opens vibration again, first closes vibration stagnation of movement again, and granulated crumb rubber asphalt mixture is adopted SMA-16 grades and matched somebody with somebody, rolls
When by driving wheel towards paver, the road roller of first pressing the online lap-joint that paves, two edge carry out roll one time, for rubber
The rebound characteristics of glue particle, the appropriate rolling layer for increasing final pressure, control rolls finishing temperature less than 70 DEG C.
Specific embodiment two:
Present embodiment is illustrated with reference to Fig. 1, present embodiment is described further to implementation method one, described compound
Temperature is mixed and stirred when mixing and stirring for 180 DEG C.
Specific embodiment three:
Present embodiment is illustrated with reference to Fig. 1, present embodiment is described further to implementation method one, it is described when mixing and stirring
The mixing time after pitch and miberal powder is added to be respectively 90 seconds.
Certainly, described above not limitation of the present invention, the present invention is also not limited to the example above, the art
Change, remodeling, addition or replacement that those of ordinary skill is made in essential scope of the invention, fall within guarantor of the invention
Shield scope.
Claims (4)
1. the method for ice and snow area granulated crumb rubber asphalt mixture application technology, it is characterised in that:Described method includes following
Step:
The pitch that used when mixing and stirring of compound is SBS modified pitch, TPS modified pitch, and heating-up temperature is 175 DEG C, and scene is applied
Man-hour SBS modified pitch is heated to 175 DEG C, and TPS modifying agent is manually delivered into cylinder is mixed, and matrix pitch heating-up temperature is no more than 165
DEG C, the heating and temperature control of building stones is mixed and stirred the building stones of heat with rubber grain more than 190 DEG C in advance, is then added
Pitch and miberal powder are mixed and stirred, and manually rubber grain is added while hot aggregate bin building stones enter and mix cylinder.
2. the pollutant of sub-layer during mixture laying, is thoroughly cleaned, rinses, mortar and other scum silica frost application steel brushes wipe clear, such as
There is water mark, then must not be paved in the case of wet road surface, the pit of sub-layer, loose and other diseases should be advised by specification
Fixed asphalt is repaired, and absolute altitude, horizontal wall inscription, flatness to sub-layer will be detected, to influence quality and cannot be upper
During the defect location that surface layer is eliminated carries out leveling, before upper layer construction, in the case of free of contamination, will spread adhesion coating pitch,
Sticking layer oil consumption presses specification spread, and answers spread uniform, and the local artificial benefit of location application spilt less or spill more is spilt or removed, and is mixed
Material paving material is strictly performed by code requirement, before paving every time, detects and adjust screed, it is ensured that straight, starts to pave mixed
Before closing material, preheat screed, output condition when paving according to compound determines an appropriate speed, entirely pave it is continuous,
At the uniform velocity, spreading quality being observed at any time, it is found that isolation and other abnormalities should in time analyze reason, processed, truck exists
The material that area is scattered that paves is removed in time;
(3)During compacting pitch, using double steel wheel formula vibrated rollers, every road roller forward-reverse is 1 time, adopts 1/2 wrong wheel,
Road roller is first travelled opens vibration again, first closes vibration stagnation of movement again, and granulated crumb rubber asphalt mixture is adopted SMA-16 grades and matched somebody with somebody, and will be driven when rolling
Towards paver, the road roller of first pressing carries out rolling one time driving wheel more in the online lap-joint that paves, two edge, for rubber grain
Rebound characteristics, the appropriate rolling layer for increasing final pressure, control rolls finishing temperature less than 70 DEG C.
3. the method for ice and snow according to claim 1 area granulated crumb rubber asphalt mixture application technology, it is characterised in that:
The temperature of being mixed and stirred when mixing and stirring of described compound is 180 DEG C.
4. the method for ice and snow according to claim 1 area granulated crumb rubber asphalt mixture application technology, it is characterised in that:
The described mixing time after pitch and miberal powder that added when mixing and stirring is respectively 90 seconds.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611220406.6A CN106758677A (en) | 2016-12-26 | 2016-12-26 | The method of ice and snow area granulated crumb rubber asphalt mixture application technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611220406.6A CN106758677A (en) | 2016-12-26 | 2016-12-26 | The method of ice and snow area granulated crumb rubber asphalt mixture application technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106758677A true CN106758677A (en) | 2017-05-31 |
Family
ID=58926448
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611220406.6A Pending CN106758677A (en) | 2016-12-26 | 2016-12-26 | The method of ice and snow area granulated crumb rubber asphalt mixture application technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106758677A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108285648A (en) * | 2018-02-07 | 2018-07-17 | 华东交通大学 | A kind of pavement asphalt deicing antistripping additive and preparation method |
CN109056447A (en) * | 2018-09-13 | 2018-12-21 | 中交第公路勘察设计研究院有限公司 | From ice-breaking paving layer material and its construction method |
CN110055856A (en) * | 2019-04-03 | 2019-07-26 | 湖北工业大学 | Seif-citing rate road surface and heating cable mixing road surface ice melting system and its construction method |
CN110761236A (en) * | 2019-10-29 | 2020-02-07 | 沈阳建筑大学 | Equipment and method for paving and compacting ice surface of ski-jump slideway rail |
CN111236018A (en) * | 2020-02-29 | 2020-06-05 | 河南省光大路桥工程有限公司 | Super-thick paving compaction process |
-
2016
- 2016-12-26 CN CN201611220406.6A patent/CN106758677A/en active Pending
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108285648A (en) * | 2018-02-07 | 2018-07-17 | 华东交通大学 | A kind of pavement asphalt deicing antistripping additive and preparation method |
CN108285648B (en) * | 2018-02-07 | 2020-07-10 | 华东交通大学 | Pavement asphalt deicing anti-stripping additive and preparation method thereof |
CN109056447A (en) * | 2018-09-13 | 2018-12-21 | 中交第公路勘察设计研究院有限公司 | From ice-breaking paving layer material and its construction method |
CN109056447B (en) * | 2018-09-13 | 2021-05-25 | 中交第一公路勘察设计研究院有限公司 | Self-icebreaking pavement paving layer material and construction method thereof |
CN110055856A (en) * | 2019-04-03 | 2019-07-26 | 湖北工业大学 | Seif-citing rate road surface and heating cable mixing road surface ice melting system and its construction method |
CN110761236A (en) * | 2019-10-29 | 2020-02-07 | 沈阳建筑大学 | Equipment and method for paving and compacting ice surface of ski-jump slideway rail |
CN111236018A (en) * | 2020-02-29 | 2020-06-05 | 河南省光大路桥工程有限公司 | Super-thick paving compaction process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106758677A (en) | The method of ice and snow area granulated crumb rubber asphalt mixture application technology | |
CN100537898C (en) | The job practices of rubber grain asphalt concrete pavement | |
CN113338108A (en) | Anti-freezing wearing layer and maintenance construction method of asphalt pavement | |
KR102155570B1 (en) | Asphalt surface treatment composition for preventing freezing of road pavement and surface treatment method for preventing freezing of road pavement therewith | |
CN108753132A (en) | A kind of preparation method of the super-hydrophobic suppression ice coating of Novel road | |
Lawson et al. | Chip seal maintenance: solutions for bleeding and flushed pavement surfaces | |
CN115110371B (en) | Construction method of highway tunnel asphalt composite pavement | |
CN214613414U (en) | Long-life ice-melt snow removing pavement structure | |
US3797951A (en) | Wearing courses of stone and mastic on pavements | |
Onyango et al. | Analysis of the Utilization of Open-Graded Friction Course (OGFC) in the United States | |
CN103265228A (en) | Thin paste sealing material for anti-icing and skid-resistant asphalt pavement | |
Estakhri et al. | Guidelines on construction and maintenance of porous friction courses in Texas | |
CN105803937B (en) | A kind of AC and epoxy construction layer clad steel bridge floor pavement construction method | |
US2348365A (en) | Protective coating for concrete pavements | |
JP3243631B2 (en) | Pavement using artificial aggregate | |
CN103255697A (en) | Anti-icing anti-sliding asphalt pavement micro-surfacing material | |
CN211340403U (en) | Bridge deck asphalt pavement structure capable of actively resisting ice and snow | |
CN106854846A (en) | A kind of pavement structure and its process for constructing with automatic snow melting function | |
LT6799B (en) | Asphalt mixtures for aquaplaning and noise-reducing road surface and technological process of application | |
US8080597B2 (en) | Composition and a process thereof | |
Lawson | Maintenance solutions for bleeding and flushed pavements | |
CN114182597B (en) | High-skid-resistance wear-resistant surface layer and construction method thereof | |
CN217997695U (en) | Pouring type semi-flexible anti-rutting composite asphalt pavement | |
Takeichi et al. | Performance of various antifreezing pavements by field test | |
CN108999103B (en) | One-step formed asphalt concrete deceleration strip and construction process thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170531 |
|
WD01 | Invention patent application deemed withdrawn after publication |