CN106714238A - Uplink scheduling request configuration method and base station - Google Patents
Uplink scheduling request configuration method and base station Download PDFInfo
- Publication number
- CN106714238A CN106714238A CN201611019080.0A CN201611019080A CN106714238A CN 106714238 A CN106714238 A CN 106714238A CN 201611019080 A CN201611019080 A CN 201611019080A CN 106714238 A CN106714238 A CN 106714238A
- Authority
- CN
- China
- Prior art keywords
- uplink
- frame
- scheduling request
- sub
- base station
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W28/00—Network traffic management; Network resource management
- H04W28/02—Traffic management, e.g. flow control or congestion control
- H04W28/08—Load balancing or load distribution
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/12—Wireless traffic scheduling
- H04W72/1263—Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows
- H04W72/1268—Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows of uplink data flows
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/50—Allocation or scheduling criteria for wireless resources
- H04W72/52—Allocation or scheduling criteria for wireless resources based on load
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/50—Allocation or scheduling criteria for wireless resources
- H04W72/53—Allocation or scheduling criteria for wireless resources based on regulatory allocation policies
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The invention discloses an uplink scheduling request configuration method and a base station. The method comprises steps that uplink scheduling requests sent by terminals at one same time slot are received by the base station; a first downlink sub frame of a wireless frame corresponding to the time slot is determined by the base station, and a first uplink sub frame and a second uplink frame carrying out uplink association with the first downlink sub frame are determined from the wireless frame; available scheduling request resources of the first uplink sub frame and available scheduling request resources of the second uplink sub frame are determined by the base station; the available scheduling request resources of the first uplink sub frame and the available scheduling request resources of the second uplink sub frame are configured by base station to each uplink scheduling request according to the quantity of the uplink scheduling requests on the basis of set configuration rules, so an absolute value of a difference value between the available scheduling request resource quantities of the first uplink sub frame and the second uplink frame is made to smaller than a set threshold. The method is advantaged in that a problem of how to uniformly distribute the available scheduling request resources of the uplink sub frames according to the uplink scheduling requests of multiple users is solved.
Description
Technical field
The present invention relates to the communications field, more particularly to a kind of uplink scheduling request collocation method and base station.
Background technology
In Long Term Evolution (Long Term Evolution, LTE) system, after terminal access system, to initiate data
Transmission to base station, it is necessary to send a uplink scheduling request (Scheduling Request, SR), base station is received on this first
After row dispatch request, suitable resource can be just distributed to terminal, so that terminal carries out transmitting uplink data.
The information that uplink scheduling request is terminal application uplink transmission resource and sends, in order to instruction terminal is suitable at one
Dispatch request is sent in available resource, it is necessary to base station carries out the configuration of uplink scheduling request, the result of configuration for terminal in advance
It is the currently available scheduling request resources of terminal distribution to be, and the configuration result is sent into terminal.So, terminal just being capable of root
Determine that the scheduling request resources of itself are distributed in base station according to configuration result, such that it is able to when needing to carry out transmitting uplink data,
Uplink scheduling request is sent using the scheduling request resources of distribution.
Different from traditional 2G, 3G mobile communication technology, LTE system can support FDD (Frequency
Division Duplexing, FDD) and time division duplex (Timing Division Duplexing, TDD) two kinds of frame formats, mesh
Preceding tdd frame form includes seven kinds of ratio of uplink subframe to downlink subframe patterns, as shown in figure 1, can be according to different business during practical application
Demand, selects different ratio of uplink subframe to downlink subframe.In TDD-LTE agreements, the configuration of ratio of uplink subframe to downlink subframe 0 more adapts to private network city
The use of field, in TDD-LTE ratio of uplink subframe to downlink subframe 0 (according to 3GPP 36.211, during TDD-LTE proportionings 0,0-9 this 10
In system subframe:Subframe 0 and 5 is descending sub frame, subframe 1 and 6 is special subframe, other are sub-frame of uplink), due to being at one
In system frame, up (UL) subframe is more than descending (DL) subframe, so in 3GPP standard agreements, it is stipulated that for unique user equipment
For, a descending sub frame can carry out uplink authorization to two sub-frame of uplink simultaneously.However, for multiple user equipmenies
, in ratio of uplink subframe to downlink subframe 0, how balancedly to be assigned in sub-frame of uplink the uplink scheduling request of multiple users by speech, from
And it is available scheduling request resources in multiple user's mean allocation sub-frame of uplink, it is also to need emphasis to consider in system design
Problem, for this point, 3GPP standard agreements do not provide solution.
Therefore, need a kind of collocation method of uplink scheduling request badly, how be used to solve according to the up tune of multiple users
Degree request balancedly distributes the problem of available scheduling request resources in sub-frame of uplink.
The content of the invention
The embodiment of the present invention provides collocation method and the base station of a kind of uplink scheduling request, is used to how solve according to multiple
The uplink scheduling request of user balancedly distributes the problem of available scheduling request resources in sub-frame of uplink.
The inventive method includes a kind of collocation method of uplink scheduling request, and the method includes:Base station receives each terminal
In the uplink scheduling request that same time slot sends;
The base station determines the first descending sub frame of the corresponding radio frames of the time slot, and determine in the radio frames with
First descending sub frame carries out associated the first sub-frame of uplink and the second sub-frame of uplink of uplink authorization;
The base station determine first sub-frame of uplink available scheduling request resources and second sub-frame of uplink can
Use scheduling request resources;
The base station according to the number of the uplink scheduling request, according to setting configuration rule by first sub-frame of uplink
Available scheduling request resources and the available scheduling request resources of second sub-frame of uplink be allocated to each uplink scheduling request,
So that after being configured the available scheduling request resources number of first sub-frame of uplink and second sub-frame of uplink it is available
The absolute value of the difference between scheduling request resources number is less than given threshold.
Based on same inventive concept, the embodiment of the present invention further provides a kind of base station, and the base station includes:
Receiving unit, for receiving the uplink scheduling request that each terminal sends in same time slot;
Determining unit, the first descending sub frame for determining the corresponding radio frames of the time slot, and determine described wireless
The first sub-frame of uplink and the second sub-frame of uplink that uplink authorization is associated are carried out in frame with first descending sub frame;It is determined that described
The available scheduling request resources of the available scheduling request resources of the first sub-frame of uplink and second sub-frame of uplink;
Dispensing unit, for the number according to the uplink scheduling request, according to setting configuration rule by described first
The available scheduling request resources of the available scheduling request resources of row subframe and second sub-frame of uplink are allocated to each up tune
Degree request, so as to be configured the available scheduling request resources number and second sub-frame of uplink of first sub-frame of uplink afterwards
Available scheduling request resources number between difference absolute value be less than given threshold.
The embodiment of the present invention determines to be remained in two sub-frame of uplink to be configured before collocating uplink scheduling request resources, first
Remaining available scheduling request resources, then according to the number of uplink scheduling request, by the resources balance in two sub-frame of uplink
Each uplink scheduling request is distributed to, the available dispatch request of first sub-frame of uplink after being configured so is ensured that
Difference between resource number and the available scheduling request resources number of second sub-frame of uplink is almost nil, it is possible to improve
Success rate that uplink scheduling resource is configured, it is to avoid prior art because using the problem for being randomly assigned to cause distribution to fail, on
Row interface-free resources are fully utilized.
Brief description of the drawings
Technical scheme in order to illustrate more clearly the embodiments of the present invention, below will be to that will make needed for embodiment description
Accompanying drawing is briefly introduced, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for this
For the those of ordinary skill in field, on the premise of not paying creative work, other can also be obtained according to these accompanying drawings
Accompanying drawing.
Seven kinds of patterns of ratio of uplink subframe to downlink subframe in the TDD-LTE agreements that Fig. 1 is provided for prior art;
The uplink authorization mapping graph of the ratio of uplink subframe to downlink subframe 0 that Fig. 2 is provided for prior art;
A kind of collocation method schematic flow sheet of Fig. 3 uplink scheduling requests for the embodiment of the present invention is provided;
Fig. 4 interacts schematic diagram for the scheduling of resource that the embodiment of the present invention is provided between a kind of terminal and base station;
A kind of Fig. 5 architecture of base station schematic diagrames for the embodiment of the present invention is provided.
Specific embodiment
In order that the object, technical solutions and advantages of the present invention are clearer, below in conjunction with accompanying drawing the present invention is made into
One step ground is described in detail, it is clear that described embodiment is only some embodiments of the invention, rather than whole implementation
Example.Based on the embodiment in the present invention, what those of ordinary skill in the art were obtained under the premise of creative work is not made
All other embodiment, belongs to the scope of protection of the invention.
In the embodiment of the present application, terminal can be that wireless terminal can also be catv terminal, for example can for mobile phone,
Computer, panel computer, personal digital assistant's (English:Personal digital assistant, abbreviation:PDA it is), mobile mutual
Networked devices (English:Mobile Internet device, abbreviation:MID), wearable device and E-book reader (English:
E-book reader) etc..
In the embodiment of the present application, term " terminal " includes but is not limited to movement station, fixation or moving user unit, paging
Machine, cell phone, personal digital assistant (Personal Digital Assistant, abbreviation PDA), computer or any other
The user equipment that can be worked in wireless environments of type.Term " base station " include but is not limited to base station, node, station control,
The interface equipment that can be worked in wireless environments of access point (Access Point, abbreviation AP) or any other type.
In Fig. 1 during ratio of uplink subframe to downlink subframe 0, have in a radio frames two descending sub frames, two special subframes, six
Sub-frame of uplink, sub-frame of uplink is more than descending sub frame, wherein, because one can be selected in special subframe making as descending sub frame
With so, the ratio between sub-frame of uplink and descending sub frame is 2:1, so a descending sub frame, carrying out uplink authorization is associated
Sub-frame of uplink allowed two, its incidence relation is as shown in Figure 2.In fig. 2, it is associated with the uplink authorization of descending sub frame 0
It is sub-frame of uplink 4 and sub-frame of uplink 7, what is be associated with the uplink authorization of special subframe 1 is sub-frame of uplink 7 and sub-frame of uplink 8, with
The uplink authorization of row subframe 5 it is associated be sub-frame of uplink 9 and sub-frame of uplink 2, be associated with the uplink authorization of special subframe 6 be on
Row subframe 2 and sub-frame of uplink 3 (being shown in Table).
Descending sub frame and special subframe | The related sub-frame of uplink of uplink authorization |
Descending sub frame 0 | Sub-frame of uplink 4 and sub-frame of uplink 7 |
Special subframe 1 | Sub-frame of uplink 7 and sub-frame of uplink 8 |
Descending sub frame 5 | Sub-frame of uplink 9 and sub-frame of uplink 2 |
Special subframe 6 | Sub-frame of uplink 2 and sub-frame of uplink 3 |
Knowable to the association situation of above-mentioned uplink authorization, descending sub frame 0 and special subframe 1 can distribute sub-frame of uplink 7
On resource, the resource that descending sub frame 5 and special subframe 6 can be distributed on sub-frame of uplink 2.So being possible to exist descending
Part resource on sub-frame of uplink 7 is distributed to terminal 1 by subframe 0, and special subframe 1 is then again by the money on sub-frame of uplink 7
Terminal 2 is distributed in source, as a result the inadequate resource on sub-frame of uplink 7, the problem for causing distribution to fail.
In addition, a descending sub frame carries out the associated sub-frame of uplink of uplink authorization and has allowed two but it is also possible to be one
It is individual, such as the uplink scheduling request that terminal sends to base station, base station can be dispatched on one or more by a DCI0
Row subframe, one or more sub-frame of uplink mandate is indicated by the UL_INDEX combined fields in DCI0, if UL_INDEX is assigned
Value 3, it indicates that sub-frame of uplink 4 and sub-frame of uplink 7 are all authorized, if UL_INDEX assignment 2, it indicates that sub-frame of uplink 4 is authorized, if
UL_INDEX assignment 1, it indicates that sub-frame of uplink 7 is authorized.
Fail to solve the problems, such as that existing uplink authorization has distribution, the embodiment of the present invention provides a kind of uplink scheduling
The collocation method schematic flow sheet of request, shown in Figure 3, specifically implementation method includes:
Step S101, base station receives the uplink scheduling request that each terminal sends in same time slot.
Step S102, the base station determines the first descending sub frame of the corresponding radio frames of the time slot, and determines described
The first sub-frame of uplink and the second sub-frame of uplink that uplink authorization is associated are carried out in radio frames with first descending sub frame.
Step S103, the base station determines available scheduling request resources of first sub-frame of uplink and described second up
The available scheduling request resources of subframe.
Step S104, the base station according to the number of the uplink scheduling request, according to setting configuration rule by described the
The available scheduling request resources of the available scheduling request resources of one sub-frame of uplink and second sub-frame of uplink are allocated on each
Row dispatch request, so that the available scheduling request resources number of first sub-frame of uplink and described second up after being configured
The absolute value of the difference between the available scheduling request resources number of subframe is less than given threshold.
It should be noted that terminal to the process of base station requests ascending resource as shown in figure 4, i.e. terminal is according to certain week
Pass through PUCCH (Physical Uplink Control Channel, physical uplink control channel) on phase and subframe position
In control message transmission SR, i.e., when terminal have send data demand when, SR is just put 1 accordingly, when there is no resource request
SR is set to zero, SR to be only responsible for telling whether base station has resource requirement, and specifically needs signaling of how many resource then after to hand over
Mutually tell base station.After base station receives SR, UL grant (uplink scheduling authorization) are issued, first configure small part resource and used to terminal,
The enough terminals of this part resource upload BSR (buffer state report, caching report), and terminal sends to base station afterwards
BSR, i.e., tell the data volume size to be transmitted of base station oneself again, and base station is received after the BSR of terminal to report, according in the terminal
The comprehensive analysis such as the SRS (souding reference signal, detection reference signal) and base station existing resource of report are determined
It is no to give terminal distribution resource, if condition meets just allocates resources to terminal, if condition is unsatisfactory for just not allocating resources to terminal, when
After enough resources are distributed to terminal in base station, terminal just can send upstream data in these resources.
In order to solve the problems, such as that the resource that base station is randomly assigned in sub-frame of uplink in the prior art causes distribution to fail, this hair
Base station authorizes according to setting configuration rule to the resource in sub-frame of uplink in bright embodiment, with ensureing two sub-frame of uplink
Resource be uniformly distributed to terminal, the difference between remaining available resource in latter two sub-frame of uplink being configured
Meet certain span, such as, the difference of two resources of sub-frame of uplink is zero, or be 1 or minus 1 etc., that is,
The absolute value of difference is less than given threshold, and given threshold can be zero, 1 with value.Specifically, the base station is determined on described first
Between the number of the available scheduling request resources of the number of the available scheduling request resources of row subframe and second sub-frame of uplink
Initial difference;
If the absolute value of the initial difference is less than the given threshold, the configuration rule that sets is as by the first up son
The available scheduling request resources of frame are allocated toIndividual uplink scheduling request, by the available scheduling request resources of the second sub-frame of uplink
It is allocated to residueIndividual uplink scheduling request, wherein N are the up tune that each terminal that base station receives sends in same time slot
Degree request number.
If the absolute value of the initial difference is not less than the given threshold, the configuration rule that sets is as up by first
The available scheduling request resources of subframe are allocated to the uplink scheduling requestBy the second up son
The available scheduling request resources of frame are allocated to the uplink scheduling requestWherein, N is connect for base station
The uplink scheduling request number that each terminal received sends in same time slot, K1 is the remaining available tune of first sub-frame of uplink
Degree request resource number, K2 is the remaining available scheduling request resources number of second sub-frame of uplink,To round up,To round downwards, λ is configuration coefficients.
It should be noted that can be able to be PUSCH (Physical Uplink Shared with scheduling request resources
Channel, Physical Uplink Shared Channel) or RB (, Resource Block, Resource Block), a uplink scheduling for terminal please
Asking can correspond to configuration one PUSCH or multiple, or, a uplink scheduling request for terminal can correspond to configuration one
RB or multiple.So λ may value be 1,1/2 etc., the difference between K2 and K1 represents the second sub-frame of uplink and first up
The difference of the available scheduling request resources between subframe, may be for just, it is also possible to be negative, it is assumed that it is 4, explanation that K1 subtracts K2 differences
The remaining available scheduling request resources of first sub-frame of uplink are 4 more than the second sub-frame of uplink, it is assumed that the first sub-frame of uplink residue 19
Individual RB, the second sub-frame of uplink 15 RB of residue, in addition, λ is 10 equal to 1/2, N, then this time just distribute the first sub-frame of uplinkIndividual resource, that is, 7 uplink scheduling requests configuration resource of the first sub-frame of uplink is distributed, in addition,
Distribute the second sub-frame of uplinkIndividual resource, that is, distribute the second sub-frame of uplink 3 uplink schedulings please
Configuration resource is sought, after this sub-distribution, the second sub-frame of uplink 12 RB of residue, the first sub-frame of uplink also 12 RB of residue, therefore
The difference of the remaining available scheduling request resources between the second sub-frame of uplink and the first sub-frame of uplink is with regard to vanishing.
Specifically, base station receives eventually at the T0 moment by the PUCCH of descending sub frame 0 (Physical Downlink Control Channel)
The SR requests and BSR for sending are held, determines that current time user is terminal 1 according to SR requests.Because being carried out with descending sub frame 0 up
It is sub-frame of uplink 4 and sub-frame of uplink 7 to authorize associated, so base station is by a DCI0 dispatching uplinks subframe 7, indicates up son
Frame 7 is authorized, wherein, UL_INDEX in DCI0 is 1, and then base station is by the sequence number 7 of sub-frame of uplink and 50 PUSCH of distribution
Correspondence notifies that to the terminal 50 PUSCH that then terminal passes through on sub-frame of uplink 7 at the up moment send upstream data.
Then, base station is at T1 moment, the SR requests sent by the receiving terminal on the PUCCH of special subframe 1, according to SR
Request determines that current time number of users is 3 terminals (terminal 2, terminal 3 and terminal 4), because carrying out up awarding with special subframe 1
It is sub-frame of uplink 7 and sub-frame of uplink 8 that power is associated, so base station is by a DCI1 dispatching uplinks subframe 7 and sub-frame of uplink 8,
Sub-frame of uplink 7 and sub-frame of uplink 8 is indicated to authorize, wherein, the UL_INDEX in DCI1 is 3.Because 50 in sub-frame of uplink 7
PUSCH is configured at the T0 descending moment, according to setting rule, base station by the sequence number 7 of sub-frame of uplink and distribution 50
Individual PUSCH (assuming that total number of channels 100 of sub-frame of uplink) correspondence is notified to the terminal 2, by the sequence number 8 of sub-frame of uplink and distribution
50 PUSCH correspondences notify to the terminal 3, the sequence number 8 of sub-frame of uplink and 50 PUSCH of distribution correspondences are notified to should
Terminal 4, then, terminal 2, terminal 3 and terminal 4 send upward signal on the channel of respective distribution, after being configured so that, on
Resource in row subframe 7 and sub-frame of uplink 8 just can in a balanced way distribute to each terminal, latter two sub-frame of uplink being configured it
Between the difference of resource be zero, both ensure that the utilization rate of interface-free resources, also improve the success rate that base station is terminal distribution resource.
Certainly, it is assumed that at the T2 moment, it is 1 that base station receives dispatch request number, and counterpart terminal 5, base station passes through one
DCI0 dispatching uplinks subframe 4, indicates sub-frame of uplink 4 to authorize, wherein, UL_INDEX in DCI0 is 2, and then base station is by up son
The sequence number 4 of frame and 50 PUSCH of distribution correspond to notice to the terminal, and then terminal passes through sub-frame of uplink 4 at the up moment
On 50 PUSCH send upstream data, then, at the T3 moment, base station receives dispatch request number for 2, the He of counterpart terminal 6
Terminal 7, base station just can be by the sequence number 8 of sub-frame of uplink and 50 PUSCH of distribution correspondence notices to the terminal 6, will be up
The sequence number 7 of subframe and 50 PUSCH correspondences of distribution are notified to the terminal 7.
After the resource for being configured with sub-frame of uplink according to the method described above, base station updates the available scheduling of the first sub-frame of uplink
The available scheduling request resources number of request resource number and second sub-frame of uplink, that is to say, that base station record is configured it
The resource of current time remaining sub-frame of uplink afterwards, to carry out considering as reference value during uplink authorization next time.
Further, for each terminal, generate the terminal the corresponding scheduling request resources of uplink scheduling request and
The corresponding relation of the sequence number of the sub-frame of uplink where the corresponding scheduling request resources;The base station passes through the first descending sub frame
PDCCH (Physical Downlink Control Channel) corresponding relation is sent to each terminal so that the terminal utilize the tune
Degree request resource sends upstream data.
That is, base station will carry out the sequence number of the sub-frame of uplink of uplink authorization and the PUSCH of distribution is notified to terminal, than
The sequence number 8 of sub-frame of uplink and 50 PUSCH this corresponding relations of distribution are such as sent to terminal 6 by PDCCH, so end
End 6 can just send upstream data on the PUSCH of 50 on sub-frame of uplink 8.
Further, if being directed to a terminal, included in corresponding relation corresponding with the uplink scheduling request of the terminal
The scheduling request resources of different sub-frame of uplink, then the base station by a PDCCH of the first descending sub frame by the correspondence
Relation is sent to the terminal.Such as, 30 on 20 PUSCH and sub-frame of uplink 8 in base station on sub-frame of uplink 7
PUSCH configurations give terminal 6, then base station just only needs to be notified to terminal 6 with a PDCCH, thus, it is apparent that can just avoid
Using two PDCCH notify that the resource of PDCCH can be saved to terminal 6 respectively.
Based on identical technology design, the embodiment of the present invention also provides a kind of base station, the executable above method reality in the base station
Apply example.Base station provided in an embodiment of the present invention as shown in figure 5, including:Receiving unit 401, determining unit 402, dispensing unit
403, wherein:
Receiving unit 401, for receiving the uplink scheduling request that each terminal sends in same time slot;
Determining unit 402, the first descending sub frame for determining the corresponding radio frames of the time slot, and determine in the nothing
The first sub-frame of uplink and the second sub-frame of uplink that uplink authorization is associated are carried out in line frame with first descending sub frame;Determine institute
State the available scheduling request resources of the first sub-frame of uplink and the available scheduling request resources of second sub-frame of uplink;
Dispensing unit 403, for the number according to the uplink scheduling request, according to setting configuration rule by described first
It is up that the available scheduling request resources of the available scheduling request resources of sub-frame of uplink and second sub-frame of uplink are allocated to each
Dispatch request, so as to be configured the available scheduling request resources number and the second up son of first sub-frame of uplink afterwards
The absolute value of the difference between the available scheduling request resources number of frame is less than given threshold.
Further, the dispensing unit 403 specifically for:Determine the available dispatch request money of first sub-frame of uplink
Initial difference between the number of the available scheduling request resources of the number in source and second sub-frame of uplink;
If the absolute value of the initial difference is less than the given threshold, the configuration rule that sets is as by the first up son
The available scheduling request resources of frame are allocated toIndividual uplink scheduling request, by the available scheduling request resources of the second sub-frame of uplink
It is allocated to residueIndividual uplink scheduling request;
If the absolute value of the initial difference is not less than the given threshold, the configuration rule that sets is as up by first
The available scheduling request resources of subframe are allocated to the uplink scheduling requestBy the second up son
The available scheduling request resources of frame are allocated to the uplink scheduling requestWherein, N is connect for base station
The uplink scheduling request number that each terminal received sends in same time slot, K1 is the remaining available tune of first sub-frame of uplink
Degree request resource number, K2 is the remaining available scheduling request resources number of second sub-frame of uplink,To round up,To round downwards, λ is configuration coefficients.
Further, also include:Updating block 404, the available scheduling request resources for updating the first sub-frame of uplink
The available scheduling request resources number of number and second sub-frame of uplink.
Further, also include:Generation unit 405, for for each terminal, the uplink scheduling for generating the terminal please
The corresponding relation of the sequence number of the sub-frame of uplink where asking corresponding scheduling request resources and the corresponding scheduling request resources;
Transmitting element 406, for the physical downlink control channel PDCCH by the first descending sub frame by the corresponding relation
Each terminal is sent to, so that the terminal sends upstream data using the scheduling request resources.
Further, the transmitting element 406 specifically for:If being directed to a terminal, the uplink scheduling with the terminal
The scheduling request resources comprising different sub-frame of uplink in corresponding corresponding relation are asked, then by one of the first descending sub frame
The corresponding relation is sent to the terminal by PDCCH.
In sum, the embodiment of the present invention determines on to be configured two before collocating uplink scheduling request resources, first
Remaining available scheduling request resources in row subframe, then according to the number of uplink scheduling request, by two sub-frame of uplink
Resources balance distributes to each uplink scheduling request, and so ensure that first sub-frame of uplink after being configured can
It is almost nil with the difference between scheduling request resources number and the available scheduling request resources number of second sub-frame of uplink,
The success rate that uplink scheduling resource is configured can just be improved, it is to avoid prior art is because using being randomly assigned to cause distribution to fail
Problem.
The present invention is the flow with reference to method according to embodiments of the present invention, equipment (system) and computer program product
Figure and/or block diagram are described.It should be understood that every first-class during flow chart and/or block diagram can be realized by computer program instructions
The combination of flow and/or square frame in journey and/or square frame and flow chart and/or block diagram.These computer programs can be provided
The processor of all-purpose computer, special-purpose computer, Embedded Processor or other programmable data processing devices is instructed to produce
A raw machine so that produced for reality by the instruction of computer or the computing device of other programmable data processing devices
The device of the function of being specified in present one flow of flow chart or multiple one square frame of flow and/or block diagram or multiple square frames.
These computer program instructions may be alternatively stored in can guide computer or other programmable data processing devices with spy
In determining the computer-readable memory that mode works so that instruction of the storage in the computer-readable memory is produced and include finger
Make the manufacture of device, the command device realize in one flow of flow chart or multiple one square frame of flow and/or block diagram or
The function of being specified in multiple square frames.
These computer program instructions can be also loaded into computer or other programmable data processing devices so that in meter
Series of operation steps is performed on calculation machine or other programmable devices to produce computer implemented treatment, so as in computer or
The instruction performed on other programmable devices is provided for realizing in one flow of flow chart or multiple flows and/or block diagram one
The step of function of being specified in individual square frame or multiple square frames.
, but those skilled in the art once know basic creation although preferred embodiments of the present invention have been described
Property concept, then can make other change and modification to these embodiments.So, appended claims are intended to be construed to include excellent
Select embodiment and fall into having altered and changing for the scope of the invention.
Obviously, those skilled in the art can carry out various changes and modification without deviating from essence of the invention to the present invention
God and scope.So, if these modifications of the invention and modification belong to the scope of the claims in the present invention and its equivalent technologies
Within, then the present invention is also intended to comprising these changes and modification.
Claims (10)
1. a kind of collocation method of uplink scheduling request, it is characterised in that the method includes:
Base station receives the uplink scheduling request that each terminal sends in same time slot;
The base station determines the first descending sub frame of the corresponding radio frames of the time slot, and determine in the radio frames with it is described
First descending sub frame carries out associated the first sub-frame of uplink and the second sub-frame of uplink of uplink authorization;
The base station determines the available scheduling request resources of first sub-frame of uplink and the available tune of second sub-frame of uplink
Degree request resource;
The base station according to the number of the uplink scheduling request, according to setting configuration rule by first sub-frame of uplink can
Each uplink scheduling request is allocated to the available scheduling request resources of scheduling request resources and second sub-frame of uplink, so that
The available scheduling of the available scheduling request resources number and second sub-frame of uplink of first sub-frame of uplink after being configured
The absolute value of the difference between request resource number is less than given threshold.
2. the method for claim 1, it is characterised in that pressed according to the number of the uplink scheduling request base station
According to setting configuration rule by the available scheduling request resources of first sub-frame of uplink and the available tune of second sub-frame of uplink
Each uplink scheduling request is given in degree request resource distribution, including:
The base station determines the number and second sub-frame of uplink of the available scheduling request resources of first sub-frame of uplink
The initial difference between the number of scheduling request resources can be used;
If the absolute value of the initial difference is less than the given threshold, the configuration rule that sets is as can by the first sub-frame of uplink
Scheduling request resources are allocated toIndividual uplink scheduling request, by the available scheduling request resources configuration of the second sub-frame of uplink
To residueIndividual uplink scheduling request;
If the absolute value of the initial difference is not less than the given threshold, the configuration rule that sets is as by the first sub-frame of uplink
Available scheduling request resources are allocated to the uplink scheduling requestCan by the second sub-frame of uplink
Scheduling request resources are allocated to the uplink scheduling requestWherein, N is what base station received
The uplink scheduling request number that each terminal sends in same time slot, K1 is that the remaining available scheduling of first sub-frame of uplink please
Resource number is sought, K2 is the remaining available scheduling request resources number of second sub-frame of uplink,To round up,For
Round downwards, λ is configuration coefficients.
3. method as claimed in claim 1 or 2, it is characterised in that described up by described first according to setting configuration rule
Subframe and the remaining available scheduling request resources of the second sub-frame of uplink are allocated to after each uplink scheduling request, are also included:
Update the available scheduling request resources number of the first sub-frame of uplink and the available dispatch request money of second sub-frame of uplink
Source number.
4. method as claimed in claim 1 or 2, it is characterised in that described up by described first according to setting configuration rule
Subframe and the remaining available scheduling request resources of the second sub-frame of uplink are allocated to after each uplink scheduling request, are also included:
For each terminal, the corresponding scheduling request resources of uplink scheduling request of the terminal and the corresponding scheduling are generated
The corresponding relation of the sequence number of the sub-frame of uplink where request resource;The base station is controlled by the physical down of the first descending sub frame
The corresponding relation is sent to each terminal by channel PDCCH, so that the terminal is sent using the scheduling request resources
Row signal.
5. method as claimed in claim 4, it is characterised in that the base station will be described right by the first descending sub frame PDCCH
Should be related to and be sent to each terminal, including:
If being directed to a terminal, different sub-frame of uplink is included in corresponding relation corresponding from the uplink scheduling request of the terminal
Scheduling request resources, then the base station corresponding relation is sent to by a PDCCH of the first descending sub frame described
Terminal.
6. a kind of base station, it is characterised in that the base station includes:
Receiving unit, for receiving the uplink scheduling request that each terminal sends in same time slot;
Determining unit, the first descending sub frame for determining the corresponding radio frames of the time slot, and determine in the radio frames
The first sub-frame of uplink and the second sub-frame of uplink that uplink authorization is associated are carried out with first descending sub frame;Determine described first
The available scheduling request resources of the available scheduling request resources of sub-frame of uplink and second sub-frame of uplink;
Dispensing unit, for the number according to the uplink scheduling request, according to setting configuration rule by the described first up son
The available scheduling request resources of the available scheduling request resources of frame and second sub-frame of uplink are allocated to each uplink scheduling please
Ask so that after being configured the available scheduling request resources number of first sub-frame of uplink and second sub-frame of uplink can
Given threshold is less than with the absolute value of the difference between scheduling request resources number.
7. base station as claimed in claim 6, it is characterised in that the dispensing unit specifically for:
Determine the available scheduling of the number and second sub-frame of uplink of the available scheduling request resources of first sub-frame of uplink
Ask the initial difference between the number of resource;
If the absolute value of the initial difference is less than the given threshold, the configuration rule that sets is as can by the first sub-frame of uplink
Scheduling request resources are allocated toIndividual uplink scheduling request, by the available scheduling request resources configuration of the second sub-frame of uplink
To residueIndividual uplink scheduling request;
If the absolute value of the initial difference is not less than the given threshold, the configuration rule that sets is as by the first sub-frame of uplink
Available scheduling request resources are allocated to the uplink scheduling requestCan by the second sub-frame of uplink
Scheduling request resources are allocated to the uplink scheduling requestWherein, N is what base station received
The uplink scheduling request number that each terminal sends in same time slot, K1 is that the remaining available scheduling of first sub-frame of uplink please
Resource number is sought, K2 is the remaining available scheduling request resources number of second sub-frame of uplink,To round up,For
Round downwards, λ is configuration coefficients.
8. base station as claimed in claims 6 or 7, it is characterised in that also include:
Updating block, for update the first sub-frame of uplink available scheduling request resources number and second sub-frame of uplink can
Use scheduling request resources number.
9. base station as claimed in claims 6 or 7, it is characterised in that also include:
Generation unit, for for each terminal, generate the terminal the corresponding scheduling request resources of uplink scheduling request and
The corresponding relation of the sequence number of the sub-frame of uplink where the corresponding scheduling request resources;
, be sent to for the corresponding relation for the physical downlink control channel PDCCH by the first descending sub frame by transmitting element
Each terminal, so that the terminal sends upward signal using the scheduling request resources.
10. base station as claimed in claim 9, it is characterised in that the transmitting element specifically for:
If being directed to a terminal, different sub-frame of uplink is included in corresponding relation corresponding from the uplink scheduling request of the terminal
Scheduling request resources, then the corresponding relation is sent to by the terminal by a PDCCH of the first descending sub frame.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611019080.0A CN106714238B (en) | 2016-11-18 | 2016-11-18 | A kind of configuration method of uplink scheduling request and base station |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611019080.0A CN106714238B (en) | 2016-11-18 | 2016-11-18 | A kind of configuration method of uplink scheduling request and base station |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106714238A true CN106714238A (en) | 2017-05-24 |
CN106714238B CN106714238B (en) | 2019-11-19 |
Family
ID=58940986
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611019080.0A Active CN106714238B (en) | 2016-11-18 | 2016-11-18 | A kind of configuration method of uplink scheduling request and base station |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106714238B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020228034A1 (en) * | 2019-05-16 | 2020-11-19 | Oppo广东移动通信有限公司 | Resource management method, network device, and user equipment |
US20210235438A1 (en) * | 2018-08-10 | 2021-07-29 | Beijing Xiaomi Mobile Software Co., Ltd. | Uplink resource allocation method, apparatus and device, and storage medium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101640905B (en) * | 2008-07-31 | 2012-07-25 | 电信科学技术研究院 | Method for allocating uplink dispatch request |
US20140036842A1 (en) * | 2007-10-30 | 2014-02-06 | Nokia Solutions And Networks Oy | Providing Improved Scheduling Request Signaling With ACK/NACK Or CQI |
CN103873183A (en) * | 2012-12-07 | 2014-06-18 | 电信科学技术研究院 | Data transmission method and device |
CN103874206A (en) * | 2012-12-13 | 2014-06-18 | 中兴通讯股份有限公司 | Resource allocation method and device |
-
2016
- 2016-11-18 CN CN201611019080.0A patent/CN106714238B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140036842A1 (en) * | 2007-10-30 | 2014-02-06 | Nokia Solutions And Networks Oy | Providing Improved Scheduling Request Signaling With ACK/NACK Or CQI |
CN101640905B (en) * | 2008-07-31 | 2012-07-25 | 电信科学技术研究院 | Method for allocating uplink dispatch request |
CN103873183A (en) * | 2012-12-07 | 2014-06-18 | 电信科学技术研究院 | Data transmission method and device |
CN103874206A (en) * | 2012-12-13 | 2014-06-18 | 中兴通讯股份有限公司 | Resource allocation method and device |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20210235438A1 (en) * | 2018-08-10 | 2021-07-29 | Beijing Xiaomi Mobile Software Co., Ltd. | Uplink resource allocation method, apparatus and device, and storage medium |
US11690084B2 (en) * | 2018-08-10 | 2023-06-27 | Beijing Xiaomi Mobile Software Co., Ltd. | Uplink resource allocation method, apparatus and device, and storage medium |
WO2020228034A1 (en) * | 2019-05-16 | 2020-11-19 | Oppo广东移动通信有限公司 | Resource management method, network device, and user equipment |
Also Published As
Publication number | Publication date |
---|---|
CN106714238B (en) | 2019-11-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101388694B (en) | Apparatus and method for determining resources for peer to peer communication in a communication system | |
CN102215094B (en) | Method, system and equipment for sending and receiving uplink feedback information | |
CN102595612B (en) | A kind of resource allocation methods and device | |
CN103945540B (en) | A kind of priority of logical channels processing method and processing device | |
JP2012186842A (en) | Method, apparatus, system for assigning ack channel to user | |
CN108024345A (en) | A kind of transfer resource of ascending control information determines method and device | |
CN110138531A (en) | The transmission method and its device of hybrid automatic repeat-request response | |
CN113747588B (en) | Information transmission method and device | |
CN107889225A (en) | A kind of resource regulating method and equipment | |
US20170188357A1 (en) | Slot allocation in time division duplex systems | |
CN102026391B (en) | Method and device for implementing bandwidth-asymmetrical system | |
CN104602346B (en) | The distribution method of physical uplink control channel resource | |
CN110557840A (en) | method and equipment for activating semi-persistent scheduling hybrid automatic repeat request feedback | |
EP4037229A1 (en) | Communication method and apparatus, computer-readable medium and electronic device | |
CN107872892A (en) | A kind of wireless resource allocation methods and device | |
CN108650709A (en) | A kind of uplink power distribution method and mobile communication system | |
CN102668442A (en) | Resource allocation | |
CN106714238B (en) | A kind of configuration method of uplink scheduling request and base station | |
CN103222325B (en) | Descending and the implementation method of uplink baseband resource pool and base station | |
CN105163320A (en) | Interference coordination method and device | |
CN108834214B (en) | Time slot resource allocation method and device based on uplink and downlink queue balance | |
CN106413092A (en) | Uplink resource distribution method and device | |
CN104683087A (en) | Method and device for distributing channel selection resources based on PUCCH format 1B | |
CN108631833B (en) | Uplink precoding transmission method and device and user equipment | |
JP6475026B2 (en) | Base station, radio communication system, and communication control method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 510663 No. 10 Shenzhou Road, Science City, Luogang District, Guangzhou City, Guangdong Province Patentee after: Jingxin Network System Co.,Ltd. Address before: 510663 No. 10 Shenzhou Road, Science City, Luogang District, Guangzhou City, Guangdong Province Patentee before: Comba Telecom System (China) Ltd. |