CN106624614A - Manufacturing process for large-diameter thick-wall high-strength welded tube - Google Patents

Manufacturing process for large-diameter thick-wall high-strength welded tube Download PDF

Info

Publication number
CN106624614A
CN106624614A CN201610888849.6A CN201610888849A CN106624614A CN 106624614 A CN106624614 A CN 106624614A CN 201610888849 A CN201610888849 A CN 201610888849A CN 106624614 A CN106624614 A CN 106624614A
Authority
CN
China
Prior art keywords
welding
welded tube
manufacturing process
heavy caliber
submerged arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610888849.6A
Other languages
Chinese (zh)
Other versions
CN106624614B (en
Inventor
陈浮
刘占增
骆海贺
钟如涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Iron and Steel Co Ltd
Original Assignee
Wuhan Iron and Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Iron and Steel Corp filed Critical Wuhan Iron and Steel Corp
Priority to CN201610888849.6A priority Critical patent/CN106624614B/en
Publication of CN106624614A publication Critical patent/CN106624614A/en
Application granted granted Critical
Publication of CN106624614B publication Critical patent/CN106624614B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Arc Welding In General (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The invention discloses a manufacturing process for a large-diameter thick-wall high-strength welded tube. A high-quality hot-rolled steel plate is adopted as a tube manufacturing raw material. The manufacturing process includes the main steps of plate edge groove machining, forming, high-frequency welding, internal burr removing, submerged arc welding, on-line heat treatment of weld joints, diameter-fixing finishing, straightening, and mark spraying and warehousing. A plate edge groove is a Y-shaped welding groove with the groove angle of 50-60 degrees, and the length range of the blunted edge is 10-20 mm. By means of the adopted technical scheme, a seamless tube is replaced with the large-diameter thick-plate welded tube, and the maximum wall thickness can reach 40 mm; the weldable thickness is increased in the technical scheme compared with singular high-frequency welding, removing of outer burrs generated in high-frequency welding is omitted, and the tube manufacturing procedure is accelerated; and welding workload is lowered compared with singular submerged arc welding, welding efficiency is improved, welding material consumption is reduced, and the welding cost is reduced.

Description

A kind of manufacturing process of the high-strength welded tube of heavy caliber thick wall
Technical field
The technical program is related to welded tube manufacturing technology field, and in particular to a kind of manufacture work of the high-strength welded tube of heavy caliber thick wall Skill.
Background technology
Thick-walled pipe is also referred to as thick walled steel tube, the steel pipe that the ratio of outer diameter of steel pipes and wall thickness is less than 20 is called thick walled steel tube, mainly It is used as the structural tubes such as petroleum geology drill pipe, construction steel structure.At present, the more employing steel ingot of domestic and international large diameter thick wall steel pipe or Solid pipe billet perforated makes hollow billet, and then hot rolled, cold rolling or cold group is made.Welded tube mainly produces light-wall pipe, and seamless pipe is then Wall thickness there are certain requirements, but for seamless steel pipe, using welded still pipe most distinguishing feature be wall thickness dimension high precision, With high collapse-resistance, while manufacturing process is short, production efficiency is high, specification limit width, and also energy-conservation, low production cost, product Cost performance is high.Therefore, energy-saving, under the requirement of environmental protection, more applications using low-cost high-efficiency welded tube It is development trend to substitute high energy consumption, the seamless rolled pipe of high pollution.The fact is also really thus, the steel pipe manufacture such as American-European and Japan and Korea S is strong State has welded tube to replace the trend of seamless pipe.
Thick walled steel tube of the radius-thickness ratio less than 20 is manufactured with welded tube, Major Difficulties are:Such as adopt high-frequency welding, then caliber and Thickness is restricted, general thickness≤20mm;Submerged arc welding is such as adopted, bevel for welding processing capacity is big, it is more to consume wlding, welds Deformation is big, directly affects tubulation dimensional accuracy, due to multi-pass welding, weld defect probability occurs greatly, and weldquality cannot have Effect ensures.
The content of the invention
The technical problem to be solved is the deficiency and a kind of heavy caliber of offer existed for above-mentioned prior art The manufacturing process of the high-strength welded tube of heavy wall, realizes heavy caliber thick plates pipe and substitutes seamless pipe, and thickest, up to 40mm, is one Plant low cost, high-quality, efficient Welding Thick Pipe manufacturing process.
The present invention is to solve the problems, such as that adopted technical scheme set forth above is:
A kind of manufacturing process of the high-strength welded tube of heavy caliber thick wall, is high-quality hot rolled steel plate using tubulation raw material, key step It is as follows:Edges of boards retaining wall on slope, plate body flaw detection, shaping, high-frequency welding, Removing of inner burs, submerged arc welding, weld seam burning optimization on line, Sizing finishing, aligning, body nondestructive inspection, spray mark warehouse-in.
By such scheme, the high-quality hot rolled steel plate yield strength 235~750MPa of scope for being adopted, tensile strength 480~ 890MPa, thickness is less than 40mm.Wherein, thickness preferably 14~40mm.
By such scheme, the groove is Y type bevel for weldings, and bevel angle is 50 °~60 °, and root face length range is 10 ~20mm.Edges of boards retaining wall on slope form is as shown in Figure 1.
By such scheme, the high-frequency welding is that the root face to edges of boards groove is welded, 10~20mm of throat thickness;Institute It is that edges of boards groove is welded to state submerged arc welding, 4~20mm of throat thickness, can be selected according to actual welding thickness and bevel angle Select monofilament or multi-wire submerged-arc welding.Due to the high-frequency welding for first carrying out root face, after carry out groove submerged arc welding, so high-frequency welding The outer burr for producing can directly be melted into weld seam by submerged arc welding, save outer burr removing step.
By such scheme, the high-frequency welding FREQUENCY CONTROL is in 100~150KHz, 14≤v of speed of welding≤20m/min.
By such scheme, the submerged arc welding can be according to throat thickness using monofilament or multifibres Combination Welding, speed of welding 0.5~3.0m/min.
By such scheme, the welding material that the submerged-arc welding is adopted for 500~800MPa of tensile strength solid core welding wire Matching alkalescent sintered flux.
By such scheme, the weld seam can online carry out normalizing or modifier treatment, to obtain excellent obdurability matching.
By such scheme, each 25mm of pipe end pipe tail is cut off in the sizing finishing, to ensure weldquality stability, according to Caliber requires that submerged arc weld surface reinforcement is controlled within 1mm.
Specifically, the manufacturing process of the high-strength welded tube of above-mentioned heavy caliber thick wall, is high-quality hot rolled steel plate using tubulation raw material, main Step is wanted to be followed successively by:
(1) by the plate edge machined of high-quality hot rolled steel plate into Y type bevel for weldings;
(2) step (1) gained plate body is carried out into flaw detection zero defect, after shaping, high frequency is carried out to the root face of Y type bevel for weldings Welding, welding removes inner burr after finishing;Then submerged arc welding is carried out to the groove of Y type bevel for weldings;
(3) online modifier treatment is carried out to the weld seam of step (2) gained body;
(4) sizing finishing is carried out to step (3) gained body, submerged arc weld surface reinforcement is controlled within 1mm;
(5) to carrying out ultrasonic examination after step (4) gained body aligning, spray printing mark, packaging and warehousing after zero defect.
By such scheme, it is described be shaped to be pressed into it is O-shaped or square etc..
By such scheme, in the sizing finishing and each 25mm of pipe end pipe tail is cut off, to ensure weldquality stability.
The high-strength welded tube of of the invention gained heavy caliber thick wall is caliber 273~660mm of scope Φ, wall thickness range 14.0~ The pipe of 40.0mm, yield strength 235~750MPa of scope, 480~890MPa of tensile strength.
Compared with prior art, the invention has the beneficial effects as follows:
The technical solution adopted in the present invention realizes heavy caliber thick plates pipe and substitutes seamless pipe, and thickest is reachable 40mm, this technical scheme increased solderable thickness than single ratio-frequency welding, and need not remove outer burr produced by high-frequency welding, contracting Short tubulation operation;Welding job amount is reduced than single submerged-arc welding, welding efficiency is improved, welding material expenditure, reduction welding is reduced Cost.Meanwhile, the present invention has ratio-frequency welding and submerged-arc welding advantage concurrently, improves production efficiency, reduces production cost, it is ensured that weldering Seam quality, can realize caliber 273~660mm of scope Φ, the continuous and stable production of the pipe of 14.0~40.0mm of wall thickness range, energy Enough relatively low production costs produce qualified heavy caliber thick wall pipe and large scale heavy wall square tube, are adapted to Welding Thick Pipe Manufacture, with good application value.
Description of the drawings
Fig. 1 is the schematic diagram of the O-shaped cross section and Y type bevel for weldings for being pressed into O-shaped rear steel plate.
Specific embodiment
For a better understanding of the present invention, further of the invention is provided in technical scheme with reference to embodiment Key technology is further described, but the present invention is not limited solely to the following examples.
Embodiment 1
A kind of high-strength welded tube of heavy caliber thick wall, it is that 890MPa, thickness are to adopt yield strength for 750MPa, tensile strength The hot rolled steel plate of 14mm, welded tube specification is:Diameter 273mm, wall thickness 14mm, its manufacturing process is concretely comprised the following steps,
(1) by the plate edge machined of high-quality hot rolled steel plate into Y type bevel for weldings, 50 ° of bevel angle, root face length 10mm;
(2) step (1) gained plate body is carried out into flaw detection zero defect, shaping (is pressed into O-shaped rear steel plate and is as shaped to body) Afterwards, high-frequency welding, welding frequency 150KHz, speed of welding 20m/min, throat thickness are carried out to the root face of Y type bevel for weldings 10mm, welding removes inner burr after finishing;
Then submerged arc welding is carried out to the groove of Y type bevel for weldings, from 800Mpa reality core welding wire for submerged-arc welding matching SJ101 welderings Agent, monofilament DC reverse connection, speed of welding 0.5m/min, throat thickness 4mm;
(3) online modifier treatment is carried out to the weld seam of step (2) gained body, to obtain high-strength tenacity weld seam;
(4) sizing finishing is carried out to step (3) gained body, each 25mm of pipe end pipe tail is cut off in sizing finishing, to ensure Weldquality stability, submerged arc weld surface reinforcement is controlled within 1mm;
(5) to carrying out ultrasonic examination after step (4) gained body aligning, spray printing mark, packaging and warehousing after zero defect.
Embodiment 2
A kind of high-strength welded tube of heavy caliber thick wall, it is that 480MPa, thickness are to adopt yield strength for 235MPa, tensile strength The hot rolled steel plate of 40mm, welded tube specification is:Diameter 660mm, wall thickness 40mm, its manufacturing process is concretely comprised the following steps,
(1) by the plate edge machined of high-quality hot rolled steel plate into Y type bevel for weldings, 60 ° of bevel angle, root face length 20mm;
(2) step (1) gained plate body is carried out into flaw detection zero defect, after shaping, high frequency is carried out to the root face of Y type bevel for weldings Welding, welding frequency 100KHz, speed of welding 14m/min, throat thickness 20mm, welding removes inner burr after finishing;
Then, submerged arc welding is carried out to the groove of Y type bevel for weldings, from 500Mpa reality core welding wire for submerged-arc welding matching SJ101 Solder flux, 3 submerged arc weldings, welding wire current polarity adopt DC reverse connection+exchange+exchange combining form, speed of welding 3.0m/min, Throat thickness 20mm;
(3) online normalized treatment is carried out to the weld seam of step (2) gained body, to obtain high-strength tenacity weld seam;
(4) sizing finishing is carried out to step (3) gained body, each 25mm of pipe end pipe tail is cut off in sizing finishing, to ensure Weldquality stability, submerged arc weld surface reinforcement is controlled within 1mm;
(5) to carrying out ultrasonic examination after step (4) gained body aligning, spray printing mark, packaging and warehousing after zero defect.
The welded tube mechanical property of embodiment 1
The welded tube mechanical property of embodiment 2
The body of the high-strength welded tube of the gained heavy caliber thick wall of embodiment 1 and 2 and the performance parameter of weld seam as shown in Table 1 and Table 2, Good mechanical performance.It can thus be appreciated that:By technical scheme, it is possible to achieve prepare heavy caliber height using steel plate fierce Adapter, can realize caliber 273~660mm of scope Φ, the continuous-stable of the large-sized heavy-wall tube of 14.0~40.0mm of wall thickness range The various aspects of performance of production, body and weld seam is excellent, and seamless pipe can be substituted completely.
The above is only the preferred embodiment of the present invention, it is noted that for one of ordinary skill in the art comes Say, without departing from the concept of the premise of the invention, some modifications and variations can also be made, these belong to the present invention's Protection domain.

Claims (10)

1. the manufacturing process of the high-strength welded tube of a kind of heavy caliber thick wall, it is characterised in that it adopts tubulation raw material for high-quality hot-rolled steel Plate, mainly comprises the following steps:Edges of boards retaining wall on slope, shaping, high-frequency welding, Removing of inner burs, submerged arc welding, weld seam burning optimization on line, Sizing finishing, aligning, spray mark warehouse-in;The groove is Y type bevel for weldings, and bevel angle is 50 °~60 °, root face length range For 10~20mm.
2. the manufacturing process of the high-strength welded tube of a kind of heavy caliber thick wall according to claim 1, it is characterised in that adopted High-quality hot rolled steel plate yield strength 235~750MPa of scope, 480~890MPa of tensile strength, thickness is less than 40mm.
3. a kind of manufacturing process of the high-strength welded tube of heavy caliber thick wall according to claim 1, it is characterised in that the groove For Y type bevel for weldings, bevel angle is 50 °~60 °, and root face length range is 10~20mm.
4. a kind of manufacturing process of the high-strength welded tube of heavy caliber thick wall according to claim 1, it is characterised in that the high frequency Welding is that the root face to edges of boards groove is welded, 10~20mm of throat thickness;The submerged arc welding is that edges of boards groove is carried out Welding, 4~20mm of throat thickness.
5. a kind of manufacturing process of the high-strength welded tube of heavy caliber thick wall according to claim 1, it is characterised in that the high frequency Welding welding frequency is controlled in 100~150KHz, 14≤v of speed of welding≤20m/min.
6. a kind of manufacturing process of the high-strength welded tube of heavy caliber thick wall according to claim 1, it is characterised in that the submerged arc Welding is using monofilament or multifibres Combination Welding, 0.5~3.0m/min of speed of welding.
7. a kind of manufacturing process of the high-strength welded tube of heavy caliber thick wall according to claim 1, it is characterised in that the submerged arc The adopted welding material of weldering matches alkalescent sintered flux for the solid core welding wire of 500~800MPa of tensile strength.
8. a kind of manufacturing process of the high-strength welded tube of heavy caliber thick wall according to claim 1, it is characterised in that the sizing Pipe end pipe tail is cut off in finishing, submerged arc weld surface reinforcement is controlled within 1mm.
9. the manufacturing process of the high-strength welded tube of a kind of heavy caliber thick wall, it is characterised in that it is high-quality hot-rolled steel using tubulation raw material Plate, key step is followed successively by:
(1) by the plate edge machined of high-quality hot rolled steel plate into Y type bevel for weldings;
(2) step (1) gained plate body is carried out into flaw detection zero defect, after shaping, ratio-frequency welding is carried out to the root face of Y type bevel for weldings Connect, welding removes inner burr after finishing;Then submerged arc welding is carried out to the groove of Y type bevel for weldings;
(3) online modifier treatment is carried out to the weld seam of step (2) gained body;
(4) sizing finishing is carried out to step (3) gained body, submerged arc weld surface reinforcement is controlled within 1mm;
(5) to carrying out ultrasonic examination after step (4) gained body aligning, spray printing mark, packaging and warehousing after zero defect.
10. the high-strength welded tube of heavy caliber thick wall in claim 1~9 described in any one, it is characterised in that its caliber scope 273~660mm of Φ, 14.0~40.0mm of wall thickness range.
CN201610888849.6A 2016-10-11 2016-10-11 A kind of manufacturing process of the high-strength welded tube of heavy caliber thick wall Active CN106624614B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610888849.6A CN106624614B (en) 2016-10-11 2016-10-11 A kind of manufacturing process of the high-strength welded tube of heavy caliber thick wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610888849.6A CN106624614B (en) 2016-10-11 2016-10-11 A kind of manufacturing process of the high-strength welded tube of heavy caliber thick wall

Publications (2)

Publication Number Publication Date
CN106624614A true CN106624614A (en) 2017-05-10
CN106624614B CN106624614B (en) 2019-08-23

Family

ID=58855267

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610888849.6A Active CN106624614B (en) 2016-10-11 2016-10-11 A kind of manufacturing process of the high-strength welded tube of heavy caliber thick wall

Country Status (1)

Country Link
CN (1) CN106624614B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108202178A (en) * 2018-03-06 2018-06-26 陕西建工机械施工集团有限公司 A kind of seamless pipe bushing pipe working apparatus
CN109955038A (en) * 2017-12-26 2019-07-02 东莞市广信知识产权服务有限公司 A kind of manufacture craft of sealing pipeline
CN110640278A (en) * 2019-09-30 2020-01-03 广州黄船海洋工程有限公司 Terminal crack prevention process for Q420 high-strength steel flux copper liner method submerged-arc welding

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101214511A (en) * 2007-12-29 2008-07-09 番禺珠江钢管有限公司 Large straight-line joint submerged arc welding tube fast production process
US20120325786A1 (en) * 2009-12-16 2012-12-27 Esab Ab Welding process and a welding arrangement
CN103801809A (en) * 2013-12-05 2014-05-21 合肥紫金钢管有限公司 Large-diameter thick-wall multi-thread longitudinal submerged arc welding pipe made of No.35 steel and manufacturing technology thereof
CN104439672A (en) * 2014-11-14 2015-03-25 番禺珠江钢管(连云港)有限公司 High frequency prewelding technology of longitudinal submerged arc welded pipe
CN105880952A (en) * 2016-06-03 2016-08-24 合肥紫金钢管股份有限公司 Production process of longitudinal submerged arc welded pipe for oil and gas transmission

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101214511A (en) * 2007-12-29 2008-07-09 番禺珠江钢管有限公司 Large straight-line joint submerged arc welding tube fast production process
US20120325786A1 (en) * 2009-12-16 2012-12-27 Esab Ab Welding process and a welding arrangement
CN103801809A (en) * 2013-12-05 2014-05-21 合肥紫金钢管有限公司 Large-diameter thick-wall multi-thread longitudinal submerged arc welding pipe made of No.35 steel and manufacturing technology thereof
CN104439672A (en) * 2014-11-14 2015-03-25 番禺珠江钢管(连云港)有限公司 High frequency prewelding technology of longitudinal submerged arc welded pipe
CN105880952A (en) * 2016-06-03 2016-08-24 合肥紫金钢管股份有限公司 Production process of longitudinal submerged arc welded pipe for oil and gas transmission

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
毕宗岳: "《管线钢管焊接技术》", 31 December 2013 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109955038A (en) * 2017-12-26 2019-07-02 东莞市广信知识产权服务有限公司 A kind of manufacture craft of sealing pipeline
CN108202178A (en) * 2018-03-06 2018-06-26 陕西建工机械施工集团有限公司 A kind of seamless pipe bushing pipe working apparatus
CN110640278A (en) * 2019-09-30 2020-01-03 广州黄船海洋工程有限公司 Terminal crack prevention process for Q420 high-strength steel flux copper liner method submerged-arc welding

Also Published As

Publication number Publication date
CN106624614B (en) 2019-08-23

Similar Documents

Publication Publication Date Title
CN100515658C (en) Large straight-line joint submerged arc welding tube fast production process
CN100547103C (en) A kind of method for manufacturing high-strength X 80 steel spiral welded pipe
CN101886222B (en) Method for manufacturing high-strength X90 steel grade spiral submerged arc welded pipe
WO2008037145A1 (en) A manufacture method of high precision seamless steel pipes
CN106345814B (en) A kind of oblique tandem rolling magnesium alloy seamless pipe production method
WO2017215525A1 (en) Double-sided welding and double-sided shaping method for large-diameter aluminum alloy tube-making helical friction stir welding (fsw) equipment
CN107263031A (en) Cylinder is without pre-bending edge rolling moulding process
CN103341522A (en) Production method of thick-walled titanium welded pipe and forming machine
CN103008999B (en) Spiral seam submerged-arc welded pipe butt joint process
CN105478524B (en) A kind of manufacture method of two phase stainless steel coiled tubing
CN106624614B (en) A kind of manufacturing process of the high-strength welded tube of heavy caliber thick wall
CN103212952A (en) Manufacturing method of super-large-diameter large-wall thick longitudinal submerged arc welded pipe
CN105458633B (en) A kind of manufacture method of mild steel coiled tubing
CN103084427B (en) Manufacturing method of hardenability steel tube
CN102000906A (en) Longitudinal submerged arc welding production line for stainless steel tubes and carbon steel tubes
CN106624610A (en) Manufacturing method for stainless steel composite plates with spread edges being easily welded
CN105834697B (en) The manufacture method of X80 pipe line steel ERWs
CN1259158C (en) Spiral welding pipe welding method
CN113695417B (en) Preparation method of large-caliber high-performance titanium alloy pipe and product thereof
CN104439672A (en) High frequency prewelding technology of longitudinal submerged arc welded pipe
CN104249089B (en) Method for manufacturing rectangular laser welded pipe
CN201969996U (en) Longitudinal submerged-arc welding production line for stainless-steel pipe and carbon steel pipe
CN111112952A (en) Integral forming process for pipe seat of boiler header
CN105855671A (en) Butting process of large-diameter rolled steel pipe for building structure
CN111618122A (en) Production process of high-frequency straight-seam electric welding steel pipe

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170706

Address after: 430083, Gate No. 2, Qingshan District, Hubei, Wuhan

Applicant after: Wuhan iron and Steel Company Limited

Address before: 430083 Qingshan District, Hubei, Wuhan factory before the door No. 2

Applicant before: WUHAN IRON AND STEEL CORPORATION