CN106624554B - Welding tooling - Google Patents
Welding tooling Download PDFInfo
- Publication number
- CN106624554B CN106624554B CN201611192374.3A CN201611192374A CN106624554B CN 106624554 B CN106624554 B CN 106624554B CN 201611192374 A CN201611192374 A CN 201611192374A CN 106624554 B CN106624554 B CN 106624554B
- Authority
- CN
- China
- Prior art keywords
- block
- supporting block
- fixture
- fixture block
- supporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/04—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
- B23K37/0426—Fixtures for other work
- B23K37/0435—Clamps
- B23K37/0443—Jigs
Landscapes
- Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Butt Welding And Welding Of Specific Article (AREA)
- Prostheses (AREA)
Abstract
The present invention relates to welding technology field, more particularly to a kind of welding tooling, including:First part clamp assemblies, including pedestal, two the first fixture blocks, the second fixture block below two the first fixture blocks and the first supporting block, two the 3rd fixture blocks above two the first fixture blocks and two the second supporting blocks;Second part clamp assemblies, including support base, the 3rd supporting block, the 4th supporting block in the 3rd supporting block, the 4th fixture block in the 4th supporting block, the 5th fixture block being oppositely arranged with the 4th fixture block, the 5th supporting block being connected with the 5th fixture block on support base;The adjustable gap of size is respectively provided between first supporting block and pedestal, the second fixture block and the first supporting block, the first fixture block and pedestal, the 3rd fixture block and the second supporting block, the 3rd supporting block and support base, the 4th supporting block and the 3rd supporting block, the 4th fixture block and the 4th supporting block, the 5th fixture block and the 5th supporting block.Part is realized to adjust in position upward X, Y, Z tri-.
Description
Technical field
The present invention relates to welding technology field, more particularly to a kind of welding tooling.
Background technology
In structure design of automobile, welding handling arm support on the sub-stent of instrument panel bracket end, loading and unloading arm support is
The auxiliary base of vehicle body is connected, the integral installation position of instrument panel bracket vehicle body connection is influenced, belongs to important feature part.Handling
The hole position of arm support and face size directly affect position and the stability of steering wheel, meanwhile, handling arm support and instrument board branch
Weldquality and the intensity of handling arm support and service life between two parts of sub-stent in frame end portion is closely related.Therefore, control
The welding position size and weldquality of system handling arm support are very important.
During the sub-stent welding of handling arm support with instrument panel bracket end, thermal weld stress amount is relatively concentrated,
If loaded and unloaded between arm support and sub-stent there are the undesirable situation of fit clearance, welding deformation amount increase, weld seam matter will be caused
Quantitative change is poor, and later stage needs are made up by manual repair welding, and manual repair welding there are stability it is poor, of high cost the drawbacks of, be not one
A permanently effective scheme.Therefore, being mutually matched when handling arm support is welded with sub-stent is most important.
In general, handling arm support and the sub-stent of instrument panel bracket end pass through welding tooling positioning welding.The prior art
In welding tooling in positioning can only to handling arm support and sub-stent X to and Y-direction on position be adjusted, in Z-direction
Then it is bonded naturally.Can there are certain size in fact, the two parts are all stamping forming, between different production batch
Tolerance variable, therefore be adjusted merely by X to the position with Y-direction in welding, can not effectively adjust the opposite of two parts
Position is to ensure both no-floats, so as to influence product quality.
The content of the invention
The technical problem to be solved in the present invention is to provide it is a kind of can treat soldering part X to, Y-direction, Z-direction three it is upward
The welding tooling that position is adjusted, to overcome the drawbacks described above of the prior art.
In order to solve the above-mentioned technical problem, the present invention adopts the following technical scheme that:A kind of welding tooling, for positioning first
Part and the second part, including:First part clamp assemblies, including pedestal, along X to opposite two first folders on pedestal
Block, the second fixture block between two the first fixture blocks and below two the first fixture blocks, press from both sides on pedestal and with second
First supporting block of block connection, two the 3rd fixture blocks being respectively arranged on above two the first fixture blocks and respectively with two the 3rd
Two the second supporting blocks of fixture block connection, have between the first supporting block and pedestal along the adjustable gap of Y-direction size, the second folder
Have between block and the first supporting block along X to the adjustable gap of size, between two the first fixture blocks and pedestal, two the 3rd folders
It is respectively provided between block and two the second supporting blocks along the adjustable gap of Z-direction size, the first part is held on two the first fixture blocks
Between two the 3rd fixture blocks, and the bottom of the first part is connected with the second fixture block;Second part clamp assemblies, including arranged on base
Support base on seat, the 3rd supporting block on support base, the 4th supporting block in the 3rd supporting block, arranged on the 4th
The 4th fixture block, the 5th fixture block being oppositely arranged along Y-direction with the 4th fixture block on bracer and the 5th be connected with the 5th fixture block
Bracer, has between the 3rd supporting block and support base along X to the adjustable gap of size, the 4th supporting block and the 3rd supporting block it
Between have along the adjustable gap of Z-direction size, between the 4th fixture block and the 4th supporting block, between the 5th fixture block and the 5th supporting block
It is respectively provided with along the adjustable gap of Y-direction size, the second part is held between the 4th fixture block and the 5th fixture block and positioned at the 1st
The top of part.
Preferably, the gap between the gap between the first supporting block and pedestal, the second fixture block and the first supporting block, two
Gap between first fixture block and pedestal, two gaps between the 3rd fixture block and two the second supporting blocks, the 3rd supporting block with
Between the gap between gap, the 4th supporting block and the 3rd supporting block, the 4th fixture block and the 4th supporting block between support base
Several adjusting gaskets are filled with gap between gap and the 5th fixture block and the 5th supporting block.
Preferably, the first supporting block and pedestal, the second fixture block and the first supporting block, two the first fixture blocks and pedestal, two
3rd fixture block and two the second supporting blocks, the 3rd supporting block and support base, the 4th supporting block and the 3rd supporting block, the 4th fixture block with
4th supporting block and the 5th fixture block are connected by screw with the 5th supporting block.
Preferably, the first part clamp assemblies further include can slide up and down to along Z-direction the first slide plate on pedestal and
The first actuator of the first slide plate slides is driven, the first supporting block is arranged on the first slide plate.
Preferably, the second part clamp assemblies further include can slidably reciprocate along Y-direction be arranged on pedestal on the second slide plate and
The second actuator of the second slide plate slides is driven, support base is arranged on the second slide plate.
Preferably, the first actuator or the second actuator are telescopic rod or screw nut driving part.
Preferably, the first part clamp assemblies further include two bearings and be respectively arranged on two bearings two first stretch
Contracting bar, two the first telescopic rods are connected with two the second supporting blocks respectively.
Preferably, the second part clamp assemblies further include the second telescopic rod on support base, the second telescopic rod and
Five supporting blocks connect.
Preferably, the second fixture block is equipped with the pin hole penetrated through along Z-direction, and the lower surface of the first part is equipped with latch, and latch is inserted
In pin hole.
Preferably, the one side of the 4th fixture block towards the 5th fixture block is equipped with positioning pin, and the second part is equipped with and is penetrated through along Y-direction
Through hole, positioning pin is inserted in through hole.
Compared with prior art, the present invention has significant progress:By the mutual cooperation of each fixture block, first is realized
Part and the second part are adjusted in X to the upward position of, Y-direction, Z-direction three, can effectively adjust the first part and the second part
Relative position, preferably adapt to dimensional tolerance variable existing for the part of different production batch so that the first part and second
Part match is good, so as to improve weldquality, reduces artificial repair welding.During the adjustment, single-piece schedulable greatly improves, drop
The low skill set requirements for exchanging the person of giving sb. a hard time, reduce the time needed for adjustment.The degree of dependence of accessory size is greatly reduced,
So as to improve the service life of mould.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the welding tooling of the embodiment of the present invention.
Fig. 2 is the first part and the matched schematic diagram of the second part after the welding tooling positioning of the embodiment of the present invention.
Fig. 3 is the schematic front view of the first part clamp assemblies of the welding tooling of the embodiment of the present invention.
Fig. 4 is the left view schematic diagram of the first part clamp assemblies of the welding tooling of the embodiment of the present invention.
Fig. 5 is that the right side of the second part clamp assemblies of the welding tooling of the embodiment of the present invention regards schematic diagram.
Fig. 6 is the schematic rear view of the second part clamp assemblies of the welding tooling of the embodiment of the present invention.
In figure:
A, the first part A1, latch B, the second part B1, through hole
1st, pedestal 2, the first fixture block A 3, the first fixture block B 4, the second fixture block
40th, pin hole 5, the first supporting block 6, the 3rd fixture block A 7, the 3rd fixture block B
8th, the second supporting block A 9, the second supporting block B 10, support base 11, the 3rd supporting block
12nd, the 4th supporting block 13, the 4th fixture block 130, positioning pin 14, the 5th fixture block
15th, the 5th supporting block 16, bearing A 17, bearing B 18, the first telescopic rod A
19th, the first telescopic rod B 20, the first slide plate 21, the first actuator 22, the second telescopic rod
23rd, the second slide plate 24, the second actuator
The gap between gap H2, the first fixture block B and pedestal between H1, the first fixture block A and pedestal
Between gap H4, the 3rd fixture block B and the second supporting block B between H3, the 3rd fixture block A and the second supporting block A
Gap
The gap between gap H6, the first supporting block and pedestal between H5, the second fixture block and the first supporting block
Between between gap H8, the 4th fixture block and the 4th supporting block between H7, the 5th fixture block and the 5th supporting block
Gap
The gap between gap H10, the 3rd supporting block and support base between H9, the 4th supporting block and the 3rd supporting block
Embodiment
The embodiment of the present invention is described in further detail below in conjunction with the accompanying drawings.These embodiments are only used for
Illustrate the present invention, and not limitation of the present invention.
In the description of the present invention, it is necessary to explanation, term " X to ", " Y-direction ", " Z-direction ", "front", "rear", " left side ",
The orientation or position relationship of the instruction such as " right side ", " on ", " under ", " top ", " bottom ", " interior ", " outer " are based on orientation shown in the drawings
Or position relationship, it is for only for ease of the description present invention and simplifies description, rather than instruction or the device or element that imply meaning
There must be specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.In addition,
Term " first ", " second ", " the 3rd ", " the 4th ", " the 5th " are only used for description purpose, and it is not intended that instruction or hint phase
To importance.
In the description of the present invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " phase
Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can
To be mechanical connection or be electrically connected;It can be directly connected, can also be indirectly connected by intermediary, Ke Yishi
Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood as the case may be
Concrete meaning in the present invention.
As shown in Figures 1 to 6, a kind of embodiment of welding tooling of the invention.As shown in Figure 1, the welding of the present embodiment
Frock includes the first part clamp assemblies and the second part clamp assemblies, and the first part clamp assemblies are used for clamping position the 1st
Part A, the second part clamp assemblies are used for the second part of clamping position B.Clamped by the first part clamp assemblies and the second part
The cooperation of component can be accurately positioned the relative position of the first part A and the second part B, in order to complete the first part
The welding of A and the second part B, ensure the weldquality between the first part A and the second part B.The welding tooling of the present embodiment
Welding suitable for various parts positions, and is particularly suitable for the welding of handling arm support and the sub-stent of instrument panel bracket end.
Below by taking the first part A is the sub-stent of instrument panel bracket end, the second part B is handling arm support as an example.As shown in Fig. 2,
The lower surface of first part A is equipped with latch A1, the second part B and is equipped with the through hole B1 penetrated through along Y-direction.
As shown in figures 1 and 3, the first part clamp assemblies of the present embodiment include pedestal 1, the first fixture block A2, the first folder
Block B3, the second fixture block 4, the first supporting block 5, the 3rd fixture block A6, the 3rd fixture block B7, the second supporting block A8, the second supporting block B9.Its
In, the first fixture block A2 and the first fixture block B3 are arranged on pedestal 1 along X to opposite and compartment of terrain.First supporting block 5 is arranged on pedestal 1,
Second fixture block 4 is arranged in the first supporting block 5, and the second fixture block 4 is located at first between the first fixture block A2 and the first fixture block B3
The lower section of fixture block A2 and the first fixture block B3.3rd fixture block A6 arranged on the first fixture block A2 top and it is opposite with the first fixture block A2 and
Set every ground, the 3rd fixture block A6 is connected with the second supporting block A8.3rd fixture block B7 is arranged on the top of the first fixture block B3 and with first
Fixture block B3 is opposite and is positioned apart from, and the 3rd fixture block B7 is connected with the second supporting block B9.First part A along X to one end clamp
Between the first fixture block A2 and the 3rd fixture block A6, the first part A along X to the other end be held on the first fixture block B3 and the 3rd fixture block
Between B7, and the bottom of the first part A is connected with the second fixture block 4.In the present embodiment, the second fixture block 4 is equipped with along Z-direction perforation
Pin hole 40, the latch A1 of the first part A bottoms are inserted in the pin hole 40 of the second fixture block 4 so that the first part A and the second fixture block
4 are relatively fixed.
As shown in figure 3, have between the first fixture block A2 and pedestal 1 along the adjustable gap H1 of Z-direction size, the first fixture block B3
Have between pedestal 1 along the adjustable gap H2 of Z-direction size, have between the 3rd fixture block A6 and the second supporting block A8 along Z-direction
The adjustable gap H3 of size, has along the adjustable gap H4 of Z-direction size between the 3rd fixture block B7 and the second supporting block B9, leads to
The size of gap H1, gap H2, gap H3 and gap H4 are overregulated, the first fixture block A2, the first fixture block B3, the 3rd folder can be adjusted
The position of block A6 and the 3rd fixture block B7 in Z-direction, so as to fulfill the adjustment of first part A positions in Z-direction.Second fixture block 4 with
Have between first supporting block 5 along X to the adjustable gap H5 of size, by adjusting the size of gap H5, second can be adjusted
Fixture block 4 is in position upward X, so as to fulfill adjustment of the first part A in the upward positions of X.As shown in figure 4, the first supporting block 5 with
Have between pedestal 1 along the adjustable gap H6 of Y-direction size, by adjusting the size of gap H6, the first supporting block 5 can be adjusted
With position of second fixture block 4 in Y-direction, so as to fulfill the adjustment of first part A positions in Y-direction.
As shown in Figure 1 and Figure 5, the second part clamp assemblies of the present embodiment include be arranged on pedestal 1 on support base 10, set
In the 3rd supporting block 11 on support base 10, the 4th supporting block 12 in the 3rd supporting block 11, arranged on the 4th supporting block 12
On the 4th fixture block 13, the 5th fixture block 14 being oppositely arranged along Y-direction with the 4th fixture block 13 and be connected with the 5th fixture block 14
Five supporting blocks 15.Second part B is held between the 4th fixture block 13 and the 5th fixture block 14, and the second part B is located at the first part A
Top.In the present embodiment, the one side of the 4th fixture block 13 towards the 5th fixture block 14 is equipped with positioning pin 130, and positioning pin 130 is inserted
In the through hole B1 on the second part B, the second part B is fixed on the 4th fixture block 13.
As shown in figure 5, have between the 5th fixture block 14 and the 5th supporting block 15 along the adjustable gap H7 of Y-direction size, the
Have between four fixture blocks 13 and the 4th supporting block 12 along the adjustable gap H8 of Y-direction size, by adjusting gap H7 and gap H8
Size, the position of the 5th fixture block 14 and the 4th fixture block 13 in Y-direction can be adjusted, it is upper in Y-direction so as to fulfill the second part B
The adjustment put.Have between 4th supporting block 12 and the 3rd supporting block 11 along the adjustable gap H9 of Z-direction size, by between adjusting
The size of gap H9, can adjust the position of the 4th supporting block 12 and the 4th fixture block 13 in Z-direction, so as to fulfill the second part B in Z
The adjustment of upward position.As shown in fig. 6, have between the 3rd supporting block 11 and support base 10 along X to the adjustable gap of size
H10, by adjusting the size of gap H10, can adjust the 3rd supporting block 11, the 4th supporting block 12 and the 4th fixture block 13 X to
On position, so as to fulfill adjustment of the second part B in the upward positions of X.
Further, in the present embodiment, the gap H1 between the first fixture block A2 and pedestal 1, the first fixture block B3 and pedestal 1 it
Between gap H2, the 3rd fixture block A6 and the second supporting block A8 between gap H3, the 3rd fixture block B7 and the second supporting block B9 between
Gap H4, the gap H5 between the second fixture block 4 and the first supporting block 5, the gap H6 between the first supporting block 5 and pedestal 1,
The gap H8 between gap H7, the 4th fixture block 13 and the 4th supporting block 12 between five fixture blocks 14 and the 5th supporting block 15, the 4th
In the gap H10 between gap H9 and the 3rd supporting block 11 and support base 10 between 12 and the 3rd supporting block 11 of supporting block
Filled with several adjusting gasket (not shown)s.By increase and decrease gap H1, gap H2, gap H3, gap H4, gap H5,
Gap H6, gap H7, gap H8, the quantity of gap H9 and the adjusting gasket in the H10 of gap, it is possible to achieve the size of respective clearance
Adjusting.
Further, in the present embodiment, the between the first fixture block A2 and pedestal 1, between the first fixture block B3 and pedestal 1, the 3rd
Between fixture block A6 and the second supporting block A8, between the 3rd fixture block B7 and the second supporting block B9, the second fixture block 4 and the first supporting block 5
Between, between the first supporting block 5 and pedestal 1, between the 5th fixture block 14 and the 5th supporting block 15, the 4th fixture block 13 and the 4th support
Pass through spiral shell between block 12, between the 4th supporting block 12 and the 3rd supporting block 11 and between the 3rd supporting block 11 and support base 10
Nail connection.By loosening or tightening screw, adjusting gasket can be conveniently inserted or extracted out, realizes the increase and decrease of adjusting gasket.
Further, as shown in figures 1 and 3, in the present embodiment, the first part clamp assemblies are further included along X to setting respectively
Bearing A16 and bearing B17 in 1 both sides of pedestal.Bearing A16 is equipped with the first telescopic rod A18, the first telescopic rod A18 and second
Supporting block A8 connections, to realize the positioning of the second supporting block A8 and the 3rd fixture block A6.Also, pass through stretching for the first telescopic rod A18
Contracting, the second supporting block A8 and the 3rd fixture block A6 can be moved, so as to fulfill the 3rd fixture block A6 and the first part A cooperation with take off
From.Bearing B17 is equipped with the first telescopic rod B19, and the first telescopic rod B19 is connected with the second supporting block B9, to realize the second support
The positioning of block B9 and the 3rd fixture block B7.Also, by the flexible of the first telescopic rod B19, the second supporting block B9 and the can be moved
Three fixture block B7, so as to fulfill the cooperation and disengaging of the 3rd fixture block B7 and the first part A.The first telescopic rod A18 in the present embodiment
Can be cylinder or hydraulic cylinder or electric pushrod with the first telescopic rod B19.
Further, the first part clamp assemblies in the present embodiment are further included and can slided up and down to along Z-direction on pedestal 1
The first slide plate 20 and the first actuator 21 for sliding of the first slide plate 20 of driving, the first supporting block 5 be arranged on the first slide plate 20.It is logical
Crossing the first actuator 21 drives the first slide plate 20 to be slided up and down on pedestal 1 along Z-direction, can drive the first supporting block 5 and second
Fixture block 4 is slided up and down along Z-direction, so as to fulfill the cooperation and disengaging of the second fixture block 4 and the first part A.First slides in the present embodiment
The mode that plate 20 is slidingly disposed on pedestal 1 is not limited to, and can be realized by way of sliding block cooperates with slide,
It can be realized by sliding pin and the matched mode of sliding slot or other manner.The form of first actuator 21 is not also limited to, can
With using telescopic rod, such as cylinder or hydraulic cylinder or electric pushrod, screw nut driving part or other forms can also be used
Actuator, as long as can realize that the first slide plate 20 of driving slides on pedestal 1.
Further, as shown in Figure 1 and Figure 5, in the present embodiment, the second part clamp assemblies are further included arranged on support base 10
On the second telescopic rod 22, the second telescopic rod 22 is connected with the 5th supporting block 15, to realize the 5th supporting block 15 and the 5th fixture block
14 positioning.Also, by the flexible of the second telescopic rod 22, the 5th supporting block 15 and the 5th fixture block 14 can be moved, so that real
The cooperation and disengaging of existing 5th fixture block 14 and the second part B.The second telescopic rod 22 in the present embodiment can be cylinder or hydraulic pressure
Cylinder or electric pushrod.
Further, the second part clamp assemblies in the present embodiment further include is arranged on pedestal 1 in which can slidably reciprocate along Y-direction
The second slide plate 23 and the second actuator 24 for sliding of the second slide plate 23 of driving, support base 10 be arranged on the second slide plate 23.Pass through
Second actuator 24 drives the second slide plate 23 to slidably reciprocate on pedestal 1 along Y-direction, and the second part clamping group can be moved along Y-direction
Part, so as to fulfill cooperation and disengaging of the second part clamp assemblies along Y-direction and the second part B.The second part clamp assemblies in
When second part B departs from, first the 5th supporting block 15 and the 5th fixture block 14 are departed from and are flipped up with the second part B, Ran Houyou
Second actuator 24 drives the second slide plate 23 to be slided in pedestal 1, drives the second part clamp assemblies integrally to depart from the second part B.
The mode that the second slide plate 23 is slidingly disposed on pedestal 1 in the present embodiment is not limited to, can be mutual with slide by sliding block
The mode of cooperation is realized, can also be realized by sliding pin and the matched mode of sliding slot or other manner.Second actuator 24
Form also do not limit to, telescopic rod can be used, such as cylinder or hydraulic cylinder or electric pushrod, screw nut driving can also be used
The actuator of part or other forms, as long as can realize that the second slide plate 23 of driving slides on pedestal 1.
In conclusion mutual cooperation of the welding tooling of the present embodiment by each fixture block, realizes the first part A and
Two part B are adjusted in X to the upward position of, Y-direction, Z-direction three, can effectively adjust the opposite of the first part A and the second part B
Position, preferably adapts to dimensional tolerance variable existing for the part of different production batch so that the first part A and the second part B
Matching is good, so as to improve weldquality, reduces artificial repair welding.During the adjustment, single-piece schedulable greatly improves, and reduces
The skill set requirements for the person of giving sb. a hard time are exchanged, reduce the time needed for adjustment.The degree of dependence of accessory size is greatly reduced, so that
Improve the service life of mould.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, without departing from the technical principles of the invention, some improvement and replacement can also be made, these improve and replace
Also it should be regarded as protection scope of the present invention.
Claims (11)
- A kind of 1. welding tooling, for positioning the first part (A) and the second part (B), it is characterised in that including:First part Clamp assemblies, including pedestal (1), along X to opposite two the first fixture blocks (2,3) on the pedestal (1), arranged on described two The second fixture block (4) between a first fixture block (2,3) and below described two first fixture blocks (2,3), arranged on the pedestal (1) the first supporting block (5) for being connected on and with second fixture block (4), be respectively arranged on above described two first fixture blocks (2,3) Two the 3rd fixture blocks (6,7) and respectively with described two 3rd fixture blocks (6,7) connection two the second supporting blocks (8,9), Have between first supporting block (5) and the pedestal (1) along the adjustable gap of Y-direction size (H6), second fixture block (4) have between first supporting block (5) along X to the adjustable gap of size (H5), described two first fixture blocks (2,3) It is respectively provided between the pedestal (1), between described two 3rd fixture blocks (6,7) and described two second supporting blocks (8,9) along Z To the adjustable gap of size (H1, H2, H3, H4), first part (A) be held on described two first fixture blocks (2,3) and Between described two 3rd fixture blocks (6,7), and the bottom of first part (A) is connected with second fixture block (4);Second part clamp assemblies, including support base (10) on the pedestal (1), on the support base (10) 3rd supporting block (11), the 4th supporting block (12) on the 3rd supporting block (11), arranged on the 4th supporting block (12) the 4th fixture block (13) on, the 5th fixture block (14) being oppositely arranged along Y-direction with the 4th fixture block (13) and with it is described 5th supporting block (15) of the 5th fixture block (14) connection, has edge between the 3rd supporting block (11) and the support base (10) X has along Z-direction to the adjustable gap of size (H10) between the 4th supporting block (12) and the 3rd supporting block (11) The adjustable gap of size (H9), between the 4th fixture block (13) and the 4th supporting block (12), the 5th fixture block (14) it is respectively provided between the 5th supporting block (15) along the adjustable gap of Y-direction size (H8, H7), second part (B) it is held between the 4th fixture block (13) and the 5th fixture block (14) and positioned at the top of first part (A).
- 2. welding tooling according to claim 1, it is characterised in that first supporting block (5) and the pedestal (1) it Between gap (H6), the gap (H5) between second fixture block (4) and first supporting block (5), described two first folders Gap (H1, H2), described two 3rd fixture blocks (6,7) and the described two second supports between block (2,3) and the pedestal (1) The gap (H10) between gap (H3, H4), the 3rd supporting block (11) and the support base (10) between block (8,9), institute State gap (H9) between the 4th supporting block (12) and the 3rd supporting block (11), the 4th fixture block (13) and the described 4th The gap between gap (H8) and the 5th fixture block (14) and the 5th supporting block (15) between supporting block (12) (H7) several adjusting gaskets are filled with.
- 3. welding tooling according to claim 1, it is characterised in that first supporting block (5) and the pedestal (1), Second fixture block (4) and first supporting block (5), described two first fixture blocks (2,3) and the pedestal (1), described two A 3rd fixture block (6,7) and described two second supporting blocks (8,9), the 3rd supporting block (11) and the support base (10), 4th supporting block (12) and the 3rd supporting block (11), the 4th fixture block (13) and the 4th supporting block (12) with And the 5th fixture block (14) is connected by screw with the 5th supporting block (15).
- 4. welding tooling according to claim 1, it is characterised in that the first part clamp assemblies further include can be along Z Driven to the first slide plate (20) and driving first slide plate (20) slided up and down on the pedestal (1) slides first Moving part (21), first supporting block (5) are arranged on first slide plate (20).
- 5. welding tooling according to claim 1, it is characterised in that the second part clamp assemblies further include can be along Y Driven to the second slide plate (23) and driving second slide plate (23) being slidably arranged on the pedestal (1) back and forth slide second Moving part (24), the support base (10) are arranged on second slide plate (23).
- 6. welding tooling according to claim 4, it is characterised in that first actuator (21) is telescopic rod or screw Nut driving member.
- 7. welding tooling according to claim 5, it is characterised in that second actuator (24) is telescopic rod or screw Nut driving member.
- 8. welding tooling according to claim 1, it is characterised in that the first part clamp assemblies further include two branch Seat (16,17) and two the first telescopic rods (18,19) being respectively arranged on described two bearings (16,17), described two first Telescopic rod (18,19) is connected with described two second supporting blocks (8,9) respectively.
- 9. welding tooling according to claim 1, it is characterised in that the second part clamp assemblies are further included arranged on institute The second telescopic rod (22) on support base (10) is stated, second telescopic rod (22) is connected with the 5th supporting block (15).
- 10. welding tooling according to claim 1, it is characterised in that second fixture block (4) is equipped with and is penetrated through along Z-direction Pin hole (40), the lower surface of first part (A) is equipped with latch (A1), and the latch (A1) is inserted in the pin hole (40) It is interior.
- 11. welding tooling according to claim 1, it is characterised in that the 4th fixture block (13) is pressed from both sides towards the described 5th The one side of block (14) is equipped with positioning pin (130), and second part (B) is equipped with the through hole (B1) penetrated through along Y-direction, described fixed Position pin (130) is inserted in the through hole (B1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611192374.3A CN106624554B (en) | 2016-12-21 | 2016-12-21 | Welding tooling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611192374.3A CN106624554B (en) | 2016-12-21 | 2016-12-21 | Welding tooling |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106624554A CN106624554A (en) | 2017-05-10 |
CN106624554B true CN106624554B (en) | 2018-05-15 |
Family
ID=58833434
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611192374.3A Active CN106624554B (en) | 2016-12-21 | 2016-12-21 | Welding tooling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106624554B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107838618B (en) * | 2017-12-15 | 2024-08-09 | 上海交运汽车精密冲压件有限公司 | Welding tool for panel positioning support in instrument panel support |
CN107984151A (en) * | 2017-12-29 | 2018-05-04 | 湖南长丰汽车零部件有限责任公司 | A kind of gauge pipe beam welding fixture and adjustment method |
CN110118333B (en) * | 2019-05-29 | 2024-09-17 | 浙江嘉利(丽水)工业股份有限公司 | Car lamp and light adjusting mechanism thereof |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2574169B2 (en) * | 1988-05-25 | 1997-01-22 | 本田技研工業株式会社 | Welding device for two-piece work and assembling device for vehicle front fork using the same |
CN201799822U (en) * | 2010-09-20 | 2011-04-20 | 上海德真工贸有限公司 | Automatic welding fixture for wiring harness fixed support of crossbeam assembly of large-sized truck instrument panel |
CN102419144B (en) * | 2011-11-28 | 2013-10-30 | 奇昊汽车系统(苏州)有限公司 | Inspection tool for automobile instrument panel support |
CN103157940A (en) * | 2011-12-13 | 2013-06-19 | 奇昊汽车系统(苏州)有限公司 | Positioning tool capable of preventing welding deformation of automotive instrument panel support |
CN103157938A (en) * | 2011-12-13 | 2013-06-19 | 奇昊汽车系统(苏州)有限公司 | Locating tool assembly for welding of automobile instrument panel support |
CN202763376U (en) * | 2012-09-20 | 2013-03-06 | 重庆延锋江森汽车部件系统有限公司 | Welding fixture of left air conditioner support assembly left horizontal pipe and right horizontal pipe |
CN203156266U (en) * | 2013-01-31 | 2013-08-28 | 湖南元创精密科技有限公司 | Welding jig device for automobile boundary beam inner plates |
CN206550546U (en) * | 2016-12-21 | 2017-10-13 | 上海交运汽车精密冲压件有限公司 | Welding tooling |
-
2016
- 2016-12-21 CN CN201611192374.3A patent/CN106624554B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN106624554A (en) | 2017-05-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106624554B (en) | Welding tooling | |
CN202461856U (en) | Positioning clamp for lower edge beam reinforcing plate of automobile door frame | |
CN204053461U (en) | A kind of assembled camshaft suit frock | |
CN111774787A (en) | Welding tool for front lower structural rod of automobile | |
CN103567689A (en) | Welding fixture for handcart frame for high-voltage power distribution cabinet | |
CN110293390A (en) | A kind of overturning air-breathing tool for stitching | |
CN207205685U (en) | Adjustable lithium battery cover plate welding clamp | |
CN110341836B (en) | Auxiliary clamp for integrally assembling automobile front end module | |
CN206550546U (en) | Welding tooling | |
CN206153814U (en) | Automobile welding jig that area swing was supported | |
CN208961330U (en) | A kind of lift car welding tooling | |
CN107214458A (en) | A kind of Cab Welding Jig frock | |
CN207930232U (en) | A kind of battery case welder | |
CN205129225U (en) | Robot automobile electric welding anchor clamps | |
CN211162567U (en) | Welding device without moving automobile parts | |
CN207771172U (en) | A kind of automobile front hood hinge mounting plate welding assembly fixture | |
CN110508959A (en) | A kind of steering pontic welding equipment | |
CN109759764A (en) | A kind of two-way movable clamp plate of automobile welding robot | |
CN201645087U (en) | Headset jig of scooter | |
CN208644344U (en) | A kind of welding clamping device on refrigerator door panel articulation piece | |
CN207953044U (en) | Frock clamp and fixture system | |
CN208811396U (en) | A kind of welding tool setup suitable for more size frame sheet metal components | |
CN218556764U (en) | High-power engine cylinder body chaplet surface finishing device | |
CN110480550B (en) | Supporting and compressing device, assembling equipment and automobile steering gear assembling machine | |
CN209935800U (en) | Forging equipment for crank arm of automobile chassis |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |