CN106555499A - Existing single loop strain insulator steel tower cable draws lower beam - Google Patents
Existing single loop strain insulator steel tower cable draws lower beam Download PDFInfo
- Publication number
- CN106555499A CN106555499A CN201610851938.3A CN201610851938A CN106555499A CN 106555499 A CN106555499 A CN 106555499A CN 201610851938 A CN201610851938 A CN 201610851938A CN 106555499 A CN106555499 A CN 106555499A
- Authority
- CN
- China
- Prior art keywords
- arm
- cross
- upper strata
- single loop
- lower floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/24—Cross arms
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
- H02G7/20—Spatial arrangements or dispositions of lines or cables on poles, posts or towers
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Electric Cable Installation (AREA)
Abstract
Existing single loop strain insulator steel tower cable draws lower beam, including shaft, upper strata cross-arm and lower floor's cross-arm, and the upper strata cross-arm is placed in the top of shaft, arranges both sides cross-arm towards existing anchor support tower body, in V-shape;Lower floor's cross-arm is placed in the lower section of upper strata cross-arm, and lower floor's cross-arm arranges both sides cross-arm towards existing anchor support tower body, in V-shape;Double I type cable terminations are installed on the upper strata cross-arm, fore-telling font cable termination is installed between upper strata cross-arm and lower floor's cross-arm.Beneficial effects of the present invention:1)Existing single loop strain insulator steel tower cable draws lower beam, is adapted to be close to anchor support construction, only by drawing under at lower point, terminating wire draws;2)Realize that single loop T connects, cut-offs and the several functions such as reconfiguration;3)Do not change and draw downside anchor support stress, it is to avoid the dismounting of old tower is rebuild;4)Compared with newly-built straight line, anchor support, construction cost is greatly reduced, reduces floor space.
Description
Technical field
The present invention relates to ultra-high-tension power transmission line technical field, especially existing single loop strain insulator steel tower cable draw lower beam.
Background technology
Draw in lower engineering in existing overhead transmission line cable, when cable draws lower point is close to built anchor support, if passing through
Under newly-built anchor support realizes that cable draws, newly-built anchor support forms little isolated shelves with built anchor support, causes built anchor support side
Tension force reduces, both sides unbalanced tensile force increase, it is difficult to meet use condition, need to remove reconstruction;If being realized by newly-built tangent tower
Under cable draws, then newly-built steel tower utilization rate is not high, and serious waste of resources, land seizure are larger, and overall aesthetics is poor, therefore,
Propose to draw lower scheme using existing iron towers of overhead power transmission lines cable, reduce quantities, it is to avoid the wasting of resources.
It is therefore proposed that a kind of existing power line tension steel tower cable draws under type, wire is hung using built anchor support,
Newly-built base single loop cable draws lower beam and realizes target.
The content of the invention
In order to overcome the deficiencies in the prior art, the present invention to provide existing single loop strain insulator steel tower cable and draw lower beam, it is adapted to tight
Patch anchor support construction, draws the cable termination on lower beam by drawing wire at lower point and being connected to existing single loop strain insulator steel tower cable
Place, realizes that single loop T connects, cut-offs and reconfiguration, does not change and draws downside anchor support stress, it is to avoid the dismounting of old tower is rebuild, with new
Build straight line, anchor support to compare, construction cost is greatly reduced, reduce floor space.
The present invention solves the technical scheme that adopted of above-mentioned technical problem:
Existing single loop strain insulator steel tower cable draws lower beam, including shaft, upper strata cross-arm and lower floor's cross-arm, and the upper strata cross-arm is placed in
The top of shaft, arranges both sides cross-arm towards existing anchor support tower body, in V-shape;Lower floor's cross-arm is placed in upper strata cross-arm
Both sides cross-arm is arranged towards existing anchor support tower body in lower section, lower floor's cross-arm, in V-shape;Double I types are installed on the upper strata cross-arm
Cable termination, is provided with fore-telling font cable termination between upper strata cross-arm and lower floor's cross-arm.
Described pair of I types cable termination is made up of A seating end, A seating arrester and copper bar, and A seating end is placed in shaft
Top, A seating arrester is placed at the cross-arm of upper strata, and A seating end is connected using copper bar with A seating arrester.
The fore-telling font cable termination is made up of end, suspension insulator and arrester, end, suspension insulator
String and arrester cooperation are assemblied between upper strata cross-arm and lower floor's cross-arm ending.Suspension insulator is fixed on upper strata cross-arm slightly
Portion, arrester are fixed on lower floor's cross-arm ending, and end one end is fixed between suspension insulator and arrester, and one end is fixed
In the middle part of lower floor's cross-arm.
Beneficial effects of the present invention:1)Existing single loop strain insulator steel tower cable draws lower beam, is adapted to be close to anchor support construction, only
By drawing under at lower point, terminating wire draws;2)Realize that single loop T connects, cut-offs and the several functions such as reconfiguration;3)Do not change under drawing
Side anchor support stress, it is to avoid the dismounting of old tower is rebuild;4)Compared with newly-built straight line, anchor support, construction cost is greatly reduced, is subtracted
Small footprint size.
Description of the drawings
Further illustrate with reference to the accompanying drawings and examples.
Fig. 1 is the structural representation of the present invention;
Fig. 2 is of the invention to coordinate wiring schematic diagram with existing single loop strain insulator steel tower;
Fig. 3 be it is of the invention connect with existing single loop strain insulator steel tower single loop T, reconfiguration scheme wiring schematic diagram;
Fig. 4 is of the invention to cut-off scheme wiring schematic diagram with existing single loop strain insulator steel tower single loop.
Specific embodiment
Existing single loop strain insulator steel tower cable as Figure 1-Figure 2 draws lower beam, including shaft 1, upper strata cross-arm 2 and lower floor
Cross-arm 3, the upper strata cross-arm 2 are placed in the top of shaft 1, arrange both sides cross-arm towards 6 tower body of existing anchor support, in V-shape;Institute
The lower section that lower floor's cross-arm 3 is placed in upper strata cross-arm 2 is stated, lower floor's cross-arm 3 arranges both sides cross-arm towards 6 tower body of existing anchor support, in V words
Type;Double I types cable terminations 4 are installed on the upper strata cross-arm 2, fore-telling font electricity is installed between upper strata cross-arm 2 and lower floor's cross-arm 3
Cable terminal 5.
Described pair of I types cable termination 4 is made up of A seating end, A seating arrester and copper bar, and A seating end is placed in bar
The top of body 1, A seating arrester are placed on upper strata cross-arm 2, and A seating end is connected using copper bar with A seating arrester.
The fore-telling font cable termination 5 is made up of end, suspension insulator and arrester, end, suspension insulator
String and arrester cooperation are assemblied between 3 ending of upper strata cross-arm 2 and lower floor's cross-arm.
The fore-telling font cable termination 5 is made up of end, suspension insulator and arrester, end, suspension insulator
String and arrester cooperation are assemblied between 3 ending of upper strata cross-arm 2 and lower floor's cross-arm.Suspension insulator is fixed on upper strata cross-arm 2
Ending, arrester are fixed on 3 ending of lower floor's cross-arm, and end one end is fixed between suspension insulator and arrester, one end
It is fixed in the middle part of lower floor's cross-arm 3.
Shaft height, cross-arm length and cross-arm angle are by foretelling between font cable termination 5 electrical distance, cross-arm and hang on
The electrical distance between wire, 5 arrangement parameter of fore-telling font cable termination on existing steel tower 6 etc. are determined.
Embodiment 1
Cable lower beam 7 as shown in Figure 3 and existing 6 single loop T of single loop strain insulator steel tower connect, reconfiguration scheme wiring schematic diagram;
Between 6 one side phase line of single loop circuit anchor support, the existing single loop strain insulator steel tower cable of a newly-built base draws lower beam, middle mutually to lead
Line is connected at upper strata cross-arm 2 at double I type cable terminations, and side phase conductor is connected to the fore-telling font between upper strata cross-arm 2 and lower floor's cross-arm 3
At cable termination.
Embodiment 2
Cable lower beam 7 as shown in Figure 4 cut-offs scheme wiring schematic diagram with existing 6 single loop of single loop strain insulator steel tower;At single time
Between 6 liang of side phase lines of route road anchor support, the existing single loop strain insulator steel tower cable of a newly-built base draws lower beam, and middle phase conductor connects
To 2 cable termination of upper strata cross-arm, side phase conductor is connected at the cable termination between upper strata cross-arm 2 and lower floor's cross-arm 3, while will
6 wire jumper of anchor support is untied.
The present invention is illustrated by above-described embodiment, but it is to be understood that, above-described embodiment is only intended to
Citing and descriptive purpose, and be not intended to limit the invention in described scope of embodiments.In addition people in the art
Member is it is understood that the invention is not limited in above-described embodiment, teaching of the invention can also be made more kinds of
Variants and modifications, within these variants and modifications all fall within scope of the present invention.
Claims (4)
1. existing single loop strain insulator steel tower cable draws lower beam, it is characterised in that including shaft, upper strata cross-arm and lower floor's cross-arm, institute
The top that upper strata cross-arm is placed in shaft is stated, and both sides cross-arm is arranged towards existing anchor support tower body, in V-shape;Lower floor's cross-arm
The lower section of upper strata cross-arm is placed in, and both sides cross-arm is arranged towards existing anchor support tower body, in V-shape;Install on the upper strata cross-arm
There are double I types cable terminations, fore-telling font cable termination is installed between upper strata cross-arm and lower floor's cross-arm.
2. existing single loop strain insulator steel tower cable according to claim 1 draws lower beam, it is characterised in that described pair of I types electricity
Cable terminal is made up of A seating end, A seating arrester and copper bar, and A seating end is placed in the top of shaft, and A seating arrester is put
At the cross-arm of upper strata, A seating end is connected using copper bar with A seating arrester.
3. existing single loop strain insulator steel tower cable according to claim 1 draws lower beam, it is characterised in that the fore-telling font electricity
Cable terminal is made up of end, suspension insulator and arrester, and the cooperation of end, suspension insulator and arrester is assemblied in
Between upper strata cross-arm and lower floor's cross-arm ending.
4. existing single loop strain insulator steel tower cable according to claim 3 draws lower beam, it is characterised in that suspension insulator
Upper strata cross-arm ending is fixed on, arrester is fixed on lower floor's cross-arm ending, and end one end is fixed on suspension insulator and keeps away
Between thunder device, one end is fixed in the middle part of lower floor's cross-arm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610851938.3A CN106555499A (en) | 2016-09-26 | 2016-09-26 | Existing single loop strain insulator steel tower cable draws lower beam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610851938.3A CN106555499A (en) | 2016-09-26 | 2016-09-26 | Existing single loop strain insulator steel tower cable draws lower beam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106555499A true CN106555499A (en) | 2017-04-05 |
Family
ID=58418181
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610851938.3A Pending CN106555499A (en) | 2016-09-26 | 2016-09-26 | Existing single loop strain insulator steel tower cable draws lower beam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106555499A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108598888A (en) * | 2018-06-14 | 2018-09-28 | 安徽华电工程咨询设计有限公司 | A kind of single loop cable pivoted frame sky enters the station special pole |
CN108923319A (en) * | 2018-06-14 | 2018-11-30 | 安徽华电工程咨询设计有限公司 | A kind of transposition special pole suitable for existing single time anchor support |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2742417A1 (en) * | 1977-09-21 | 1979-03-29 | Benteler Werke Ag | Tubular electric steel cable mast - has pair of arms extending from two sides, with tubular, interfitting frusto-conical sections |
CN203596582U (en) * | 2013-12-18 | 2014-05-14 | 广州市电力工程设计院有限公司 | Power transmission equipment transiting overhead line into cable line |
CN204691371U (en) * | 2015-05-19 | 2015-10-07 | 国家电网公司 | A kind of 110kV cable double-circuit line terminal tower |
CN105178682A (en) * | 2015-09-10 | 2015-12-23 | 安徽华电工程咨询设计有限公司 | Two-circuit one-sided cut-off cable downlead tangent tower |
CN206091522U (en) * | 2016-09-26 | 2017-04-12 | 安徽华电工程咨询设计有限公司 | Existing single loop strain insulator iron tower cable draws lower beam |
-
2016
- 2016-09-26 CN CN201610851938.3A patent/CN106555499A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2742417A1 (en) * | 1977-09-21 | 1979-03-29 | Benteler Werke Ag | Tubular electric steel cable mast - has pair of arms extending from two sides, with tubular, interfitting frusto-conical sections |
CN203596582U (en) * | 2013-12-18 | 2014-05-14 | 广州市电力工程设计院有限公司 | Power transmission equipment transiting overhead line into cable line |
CN204691371U (en) * | 2015-05-19 | 2015-10-07 | 国家电网公司 | A kind of 110kV cable double-circuit line terminal tower |
CN105178682A (en) * | 2015-09-10 | 2015-12-23 | 安徽华电工程咨询设计有限公司 | Two-circuit one-sided cut-off cable downlead tangent tower |
CN206091522U (en) * | 2016-09-26 | 2017-04-12 | 安徽华电工程咨询设计有限公司 | Existing single loop strain insulator iron tower cable draws lower beam |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108598888A (en) * | 2018-06-14 | 2018-09-28 | 安徽华电工程咨询设计有限公司 | A kind of single loop cable pivoted frame sky enters the station special pole |
CN108923319A (en) * | 2018-06-14 | 2018-11-30 | 安徽华电工程咨询设计有限公司 | A kind of transposition special pole suitable for existing single time anchor support |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203412348U (en) | Double-circuit single circuit cutoff power transmission steel pipe pole in Y-shaped cross arm arrangement | |
CN204645808U (en) | Bar stepped on by cement pole cable | |
CN105178682A (en) | Two-circuit one-sided cut-off cable downlead tangent tower | |
CN105155908A (en) | Heavy icing area alternating current strain tower in shape like Chinese character 'gan' | |
CN103046791B (en) | Transmission line tangent tower guided by double-loop cable T | |
CN205025179U (en) | Single loop strain insulator tower | |
CN201953131U (en) | 220kV one-tower double-loop straight corner penetrating tower | |
CN104196301B (en) | A kind of coordinated transposition tower | |
CN206091522U (en) | Existing single loop strain insulator iron tower cable draws lower beam | |
CN105155914A (en) | Cut-off angle steel tower for single-loop power transmission line | |
CN106555499A (en) | Existing single loop strain insulator steel tower cable draws lower beam | |
CN202954612U (en) | Novel single-circuit tee-joint transmission tower | |
CN105257067A (en) | Double-circuit double-sided breaking steel-tube tower using V-shaped combined strings | |
CN206016391U (en) | A kind of double loop cydariform cable termination tower that is maked somebody a mere figurehead based on drain bus under drawing | |
CN205046917U (en) | Two return circuits unilateral cut -offs cable and draws tangent tower down | |
CN203412350U (en) | Cut-off power transmission steel pipe rod of double-loop unilateral loop cable manner | |
CN204370879U (en) | A kind of novel crossed transposition tower | |
CN205046915U (en) | Adopt two sides in two return circuits of V style of calligraphy combination cluster to cut -off steel pipe shaft tower | |
CN202711874U (en) | Suspended hard jumper insulator string for +/- 500kV double-circuit transmission lines on same tower | |
CN206220619U (en) | A kind of single time overhead transmission line cable T joint draws lower anchor support | |
CN103259234B (en) | Electric transmission line rigid jumper asymmetric V-shaped insulator chain setting structure | |
CN205046907U (en) | Four telegram in reply cables of two loop openings draw lower column | |
CN105155911B (en) | A kind of double loop bilateral using triangle cross-arm arrangement cut-offs steel pipe tower | |
CN205046931U (en) | Steel pipe shaft tower is cut -off to two sides in two return circuits that adopt triangle -shaped cross arm to arrange | |
CN206220622U (en) | A kind of single time overhead transmission line cable cut-offs and draws lower angle tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170405 |
|
WD01 | Invention patent application deemed withdrawn after publication |