CN106495324A - The multistage AO+SBR sewage disposal reaction tanks of high-efficient denitrification and dephosphorization and method - Google Patents
The multistage AO+SBR sewage disposal reaction tanks of high-efficient denitrification and dephosphorization and method Download PDFInfo
- Publication number
- CN106495324A CN106495324A CN201611024024.6A CN201611024024A CN106495324A CN 106495324 A CN106495324 A CN 106495324A CN 201611024024 A CN201611024024 A CN 201611024024A CN 106495324 A CN106495324 A CN 106495324A
- Authority
- CN
- China
- Prior art keywords
- pool
- anoxic
- tank
- sbr
- aerobic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F3/00—Biological treatment of water, waste water, or sewage
- C02F3/30—Aerobic and anaerobic processes
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F2101/00—Nature of the contaminant
- C02F2101/10—Inorganic compounds
- C02F2101/105—Phosphorus compounds
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F2101/00—Nature of the contaminant
- C02F2101/10—Inorganic compounds
- C02F2101/16—Nitrogen compounds, e.g. ammonia
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Biodiversity & Conservation Biology (AREA)
- Microbiology (AREA)
- Hydrology & Water Resources (AREA)
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Water Supply & Treatment (AREA)
- Chemical & Material Sciences (AREA)
- Organic Chemistry (AREA)
- Purification Treatments By Anaerobic Or Anaerobic And Aerobic Bacteria Or Animals (AREA)
Abstract
本发明公开了一种高效脱氮除磷多级AO+SBR污水处理反应池及方法,包括综合管廊间和泥水分离池,综合管廊间一侧设置第一好氧池、第一缺氧池、第二好氧池、第二缺氧池、第三好氧池、第三缺氧池和第一SBR池,第一好氧池左侧设置第一厌氧池和第一预缺氧池,综合管廊间另一侧设置第四好氧池、第四缺氧池、第五好氧池、第五缺氧池、第六好氧池、第六缺氧池和第二SBR池,第四好氧池左侧设置第二厌氧池和第二预缺氧池,泥水分离池连通第三缺氧池和第六缺氧池,泥水分离池连通第一预缺氧池和第二预缺氧池。本发明将多级AO与SBR工艺融合成为一种新型的组合式处理工艺,融合了多级AO工艺及MSBR工艺的原理及优点。
The invention discloses a multi-stage AO+SBR sewage treatment reaction pool and method for efficient denitrification and dephosphorization, including a comprehensive pipe gallery and a mud-water separation pool. pool, the second aerobic pool, the second anoxic pool, the third aerobic pool, the third anoxic pool and the first SBR pool, the first anaerobic pool and the first pre-anoxic pool are set on the left side of the first aerobic pool The fourth aerobic pool, the fourth anoxic pool, the fifth aerobic pool, the fifth anoxic pool, the sixth aerobic pool, the sixth anoxic pool and the second SBR pool are set on the other side of the integrated pipe gallery The second anaerobic tank and the second pre-anoxic tank are set on the left side of the fourth aerobic tank, the mud-water separation tank is connected to the third anoxic tank and the sixth anoxic tank, and the mud-water separation tank is connected to the first pre-anoxic tank and the second anoxic tank. Two pre-anoxic pools. The invention integrates multi-stage AO and SBR processes into a novel combined treatment process, which combines the principles and advantages of multi-stage AO processes and MSBR processes.
Description
技术领域technical field
本发明涉及一种水处理系统及方法,更具体的说,是涉及一种高效脱氮除磷多级AO+SBR污水处理反应池及方法。The invention relates to a water treatment system and method, more specifically, to a multi-stage AO+SBR sewage treatment reaction tank and method for efficient nitrogen and phosphorus removal.
背景技术Background technique
随着对出水水质要求的提高,污水处理已经由单独的去除SS、BOD、COD等污染物发展到脱氮除磷技术工艺。With the improvement of effluent water quality requirements, sewage treatment has developed from the separate removal of SS, BOD, COD and other pollutants to the technology of nitrogen and phosphorus removal.
A2O工艺及其变种尤其是分段进水多级A/O工艺通过厌氧、缺氧、好氧的交替及分点进水来实现脱氮除磷的功能。分段进水多级A/O工艺由于能够合理利用碳源,较好的解决了脱氮除磷对碳源需求的矛盾,目前已经逐步发展成脱氮除磷的主流处理工艺。The A 2 O process and its variants, especially the multi-stage A/O process with multi-stage water inflow, realize the function of denitrification and phosphorus removal through the alternation of anaerobic, anoxic, and aerobic, and point-by-point water inflow. The multi-stage A/O process with multi-stage water inflow can reasonably use carbon sources and better solve the contradiction between nitrogen and phosphorus removal on carbon sources. At present, it has gradually developed into the mainstream treatment process for nitrogen and phosphorus removal.
分段进水多级A/O工艺是由多个串联的A/O组成,回流污泥从首段进入,而污水按照一定比例从每个缺氧段进入。从形式上看,分段进水多级A/O工艺属于后置反硝化的范畴。在理想状态下,系统中每一段好氧区产生的硝化液直接进入下一段的缺氧区进行反硝化。因此,理论上不需要设置内回流设施。从脱氮方式上,除末端An段外,其他混合液均参与了反硝化过程。与传统A/O工艺相比,分段进水多级A/O工艺在节省能耗的同时可获得更高的反硝化率。但其主要存在三方面的缺点:一、由于在厌氧段无进水碳源的补充,因此除磷效率还有待进一步提高。二、进水碳源不足时,最末端An段只有好氧段,可能造成出水TN超标,解决这一办法的主要途径是最末段好氧设置污泥内回流,通过回流去除硝态氮或减少最末端缺氧段的进水比例。三、生物反应段与沉淀段分开,占地较大。The multi-stage A/O process of multi-stage water inflow is composed of multiple A/O in series. The return sludge enters from the first stage, and the sewage enters from each anoxic stage according to a certain proportion. From a formal point of view, the multi-stage A/O process with multi-stage water inflow belongs to the category of post-denitrification. In an ideal state, the nitrifying liquid produced in each aerobic zone of the system directly enters the anoxic zone of the next section for denitrification. Therefore, in theory, there is no need to set up internal backflow facilities. From the way of denitrification, except for the terminal An section, other mixed liquids are involved in the denitrification process. Compared with the traditional A/O process, the multi-stage A/O process with multi-stage water inflow can obtain a higher denitrification rate while saving energy. But it mainly has three shortcomings: 1. Since there is no supplement of influent carbon source in the anaerobic section, the phosphorus removal efficiency needs to be further improved. 2. When the influent carbon source is insufficient, there is only an aerobic section in the An section at the end, which may cause the TN of the effluent to exceed the standard. The main way to solve this problem is to set the sludge backflow in the aerobic section at the last section, and remove nitrate nitrogen or nitrate nitrogen through backflow. Reduce the proportion of water inflow in the most anoxic section. 3. The biological reaction section is separated from the sedimentation section and occupies a large area.
SBR工艺由于其固有的脱氮除磷效率较低下的原因,近年来通过研究已成功开发出MSBR工艺。MSBR的流程的实质与传统A2/O工艺一样,也是通过厌氧、缺氧、好氧的交替来实现脱氮除磷的功能。但由于MSBR工艺强化了各反应区的功能,为各优势菌种创造了更优越的环境和水力条件,无论从理论上分析,或者实际的运行结果看,MSBR工艺是生物除磷脱氮效果较为理想,同时,MSBR工艺的厌氧区还可作为系统的厌氧酸化段,对进水中的高分子难降解有机物起到厌氧水解作用,聚磷菌释磷过程中释放的能量,可供聚磷菌主动吸收乙酸、H+、和e-、使之以PHB形式贮存在菌体内,从而促进有机物的酸化过程,提高污水的可生化性和好氧过程的反应速率,厌氧、缺氧、好氧过程的交替进行使厌氧区同时起到优化选择器的作用。但MSBR工艺存在固有缺点,由于其进水全部通过厌氧段后至缺氧段,好氧段通过大量内回流至缺氧段进行反硝化,碳源利用效率低于分段进水多级A/O工艺、大量内回流不够节约能耗;另外MSBR池各SBR工艺段曝气不能再时序上衔接,造成鼓风机瞬时高峰供气,不利于鼓风机的运行。Due to the inherent low efficiency of nitrogen and phosphorus removal in the SBR process, the MSBR process has been successfully developed through research in recent years. The essence of the MSBR process is the same as the traditional A2/O process, which also achieves the function of nitrogen and phosphorus removal through the alternation of anaerobic, anoxic and aerobic. However, because the MSBR process strengthens the functions of each reaction zone and creates more superior environmental and hydraulic conditions for the dominant bacteria, no matter from theoretical analysis or actual operation results, the MSBR process is more effective in biological phosphorus and nitrogen removal. Ideally, at the same time, the anaerobic zone of the MSBR process can also be used as the anaerobic acidification section of the system, which can anaerobically hydrolyze the polymer refractory organic matter in the influent, and the energy released during the release of phosphorus by phosphorus-accumulating bacteria can be used for Phosphorus accumulating bacteria actively absorb acetic acid, H+, and e-, and store them in the form of PHB in the bacteria, thereby promoting the acidification process of organic matter, improving the biodegradability of sewage and the reaction rate of aerobic process, anaerobic, anoxic, The alternation of aerobic processes allows the anaerobic zone to act as an optimal selector at the same time. However, the MSBR process has inherent disadvantages. Because all the influent water passes through the anaerobic section and then goes to the anoxic section, and the aerobic section passes through a large amount of internal reflux to the anoxic section for denitrification, the carbon source utilization efficiency is lower than that of multi-stage A/O. Process and a large amount of internal reflux are not enough to save energy; in addition, the aeration of each SBR process section of the MSBR tank cannot be connected in sequence, resulting in instantaneous peak air supply of the blower, which is not conducive to the operation of the blower.
发明内容Contents of the invention
本发明的目的是为了克服现有技术中的不足,在目前脱氮除磷主要采用厌氧、缺氧、好氧的交替来实现脱氮除磷功能这一理论体系框架内,根据工艺流程,提供一种高效脱氮除磷多级AO+SBR污水处理反应池及方法,给出了巧妙的池型布置方式,将多级AO与SBR工艺融合成为一种新型的组合式处理工艺,融合了多级AO工艺及MSBR工艺的原理及优点。The purpose of the present invention is to overcome the deficiencies in the prior art. In the framework of the theoretical system for denitrification and phosphorus removal mainly using anaerobic, anoxic and aerobic alternation to realize the denitrification and phosphorus removal function, according to the process flow, Provide a multi-stage AO+SBR sewage treatment reaction tank and method for efficient denitrification and dephosphorization, provide an ingenious pool layout method, integrate multi-stage AO and SBR processes into a new type of combined treatment process, and integrate The principle and advantages of multi-stage AO process and MSBR process.
本发明的目的可通过以下技术方案实现。The purpose of the present invention can be achieved through the following technical solutions.
本发明的高效脱氮除磷多级AO+SBR污水处理反应池,包括并排设置的综合管廊间和泥水分离池,所述综合管廊间一侧由左至右依次设置有彼此间连通的第一好氧池、第一缺氧池、第二好氧池、第二缺氧池、第三好氧池、第三缺氧池和第一SBR池,所述第一好氧池左侧设置有第一厌氧池和第一预缺氧池,所述第一厌氧池分别连通第一预缺氧池和第一好氧池,The multi-stage AO+SBR sewage treatment reaction pool for high-efficiency denitrification and phosphorus removal of the present invention includes comprehensive pipe corridors and mud-water separation pools arranged side by side, and one side of the comprehensive pipe corridors is sequentially provided with interconnected pipes connected to each other from left to right. The first aerobic tank, the first anoxic tank, the second aerobic tank, the second anoxic tank, the third aerobic tank, the third anoxic tank and the first SBR tank, the left side of the first aerobic tank A first anaerobic tank and a first pre-anoxic tank are provided, and the first anaerobic tank communicates with the first pre-anoxic tank and the first aerobic tank respectively,
所述综合管廊间另一侧由左至右依次设置有彼此间连通的第四好氧池、第四缺氧池、第五好氧池、第五缺氧池、第六好氧池、第六缺氧池和第二SBR池,所述第四好氧池左侧设置有第二厌氧池和第二预缺氧池,所述第二厌氧池分别连通第二预缺氧池和第四好氧池,On the other side of the integrated pipe corridor, there are successively arranged the fourth aerobic pool, the fourth anoxic pool, the fifth aerobic pool, the fifth anoxic pool, the sixth aerobic pool, The sixth anoxic pool and the second SBR pool, the left side of the fourth aerobic pool is provided with a second anaerobic pool and a second pre-anoxic pool, and the second anaerobic pool is respectively connected to the second pre-anoxic pool and the fourth aerobic pool,
所述第一厌氧池、第一预缺氧池、第一缺氧池、第二缺氧池和第三缺氧池均连接有第一污水进水管,所述第二厌氧池、第二预缺氧池、第四缺氧池、第五缺氧池和第六缺氧池均连接有第二污水进水管,所述第一SBR池和第二SBR池分别连接有第一出水管和第二出水管,所述第一SBR池和第二SBR池均与泥水分离池连通,所述泥水分离池通过上清液管分别连通第三缺氧池和第六缺氧池,所述泥水分离池通过污泥管分别连通第一预缺氧池和第二预缺氧池。The first anaerobic pond, the first pre-anoxic pond, the first anoxic pond, the second anoxic pond and the third anoxic pond are all connected with a first sewage inlet pipe, and the second anaerobic pond, the The second pre-anoxic pool, the fourth anoxic pool, the fifth anoxic pool and the sixth anoxic pool are all connected to the second sewage inlet pipe, and the first SBR pool and the second SBR pool are respectively connected to the first water outlet pipe and the second outlet pipe, the first SBR pool and the second SBR pool are all communicated with the mud-water separation pool, and the mud-water separation pool is respectively connected to the third anoxic pool and the sixth anoxic pool through a supernatant liquid pipe, and the The mud-water separation tank is respectively connected to the first pre-anoxic tank and the second pre-anoxic tank through the sludge pipe.
所述第一SBR池和第二SBR池均通过回流泵与泥水分离池相连通。Both the first SBR tank and the second SBR tank are connected to the mud-water separation tank through a return pump.
所述第一好氧池、第二好氧池、第三好氧池、第四好氧池、第五好氧池、第六好氧池、第一缺氧池、第二缺氧池、第三缺氧池、第四缺氧池、第五缺氧池、第六缺氧池、第一SBR池、第二SBR池、第一厌氧池、第二厌氧池、第一预缺氧池和第二预缺氧池内均设置有与爆气系统联动的溶氧测定仪。The first aerobic pool, the second aerobic pool, the third aerobic pool, the fourth aerobic pool, the fifth aerobic pool, the sixth aerobic pool, the first anoxic pool, the second anoxic pool, The third anoxic pool, the fourth anoxic pool, the fifth anoxic pool, the sixth anoxic pool, the first SBR pool, the second SBR pool, the first anaerobic pool, the second anaerobic pool, the first pre-anoxic pool Both the oxygen tank and the second pre-anoxic tank are equipped with dissolved oxygen detectors linked with the explosion system.
所述第一厌氧池、第一预缺氧池、第一好氧池、第一缺氧池、第二好氧池、第二缺氧池、第三好氧池、第三缺氧池、第一SBR池构成第一个系列,所述第二厌氧池、第二预缺氧池、第四好氧池、第四缺氧池、第五好氧池、第五缺氧池、第六好氧池、第六缺氧池、第二SBR池构成第二个系列,两个系列同时连续进水,循环切换排水。The first anaerobic tank, the first pre-anoxic tank, the first aerobic tank, the first anoxic tank, the second aerobic tank, the second anoxic tank, the third aerobic tank, and the third anoxic tank , the first SBR pond constitutes the first series, the second anaerobic pond, the second pre-anoxic pond, the fourth aerobic pond, the fourth anoxic pond, the fifth aerobic pond, the fifth anoxic pond, The sixth aerobic pool, the sixth anoxic pool, and the second SBR pool constitute the second series, and the two series are continuously fed with water at the same time, and the water is cyclically switched and drained.
本发明的目的还可通过以下技术方案实现。The purpose of the present invention can also be achieved through the following technical solutions.
高效脱氮除磷的多级AO+SBR组合式污水处理方法,包括以下步骤:The multi-stage AO+SBR combined sewage treatment method for efficient nitrogen and phosphorus removal includes the following steps:
(1)进厂污水经预处理工序后分点进入第一预缺氧池、第二预缺氧池、第一厌氧池、第二厌氧池、第一缺氧池、第二缺氧池、第三缺氧池、第四缺氧池、第五缺氧池、第六缺氧池,经过硝化和反硝化作用后分别进入第一SBR池和第二SBR池,进入泥水分离池;(1) After the pretreatment process, the sewage entering the plant enters the first pre-anoxic pool, the second pre-anoxic pool, the first anaerobic pool, the second anaerobic pool, the first anoxic pool, and the second anoxic pool pool, the third anoxic pool, the fourth anoxic pool, the fifth anoxic pool, and the sixth anoxic pool, after nitrification and denitrification, respectively enter the first SBR pool and the second SBR pool, and then enter the mud-water separation pool;
(2)经泥水分离池分离出的上清液分别输送至第三缺氧池和第六缺氧池,经泥水分离池浓缩出的污泥通过提升分别进入第一预缺氧池和第二预缺氧池与部分污水混合,进行缺氧反硝化脱氮;(2) The supernatant separated from the mud-water separation tank is transported to the third anoxic tank and the sixth anoxic tank respectively, and the sludge concentrated from the mud-water separation tank enters the first pre-anoxic tank and the second pre-anoxic tank respectively through lifting. The pre-anoxic tank is mixed with part of the sewage for anoxic denitrification and denitrification;
(3)缺氧反硝化脱氮后的污泥混合液,分别进入第一厌氧池和第二厌氧池进行释磷,然后分别进入第一好氧池和第四好氧池进行硝化反应,进入第一缺氧池和第四缺氧池进行反硝化作用,经过后续重复的硝化、反硝化作用后分别进入第一SBR池和第二SBR池,进入泥水分离池,形成循环。(3) The sludge mixture after anoxic denitrification denitrification enters the first anaerobic tank and the second anaerobic tank for phosphorus release, and then enters the first aerobic tank and the fourth aerobic tank for nitrification , into the first anoxic pool and the fourth anoxic pool for denitrification, after subsequent repeated nitrification and denitrification, respectively enter the first SBR pool and the second SBR pool, and then enter the mud-water separation pool to form a cycle.
所述进厂污水通过第一污水进水管输送至第一预缺氧池、第一厌氧池、第一缺氧池、第二缺氧池、第三缺氧池,通过第二污水进水管输送至第二预缺氧池、第二厌氧池、第四缺氧池、第五缺氧池、第六缺氧池,且所述第一污水进水管和第二污水进水管同时连续进水。The sewage entering the plant is transported to the first pre-anoxic tank, the first anaerobic tank, the first anoxic tank, the second anoxic tank, and the third anoxic tank through the first sewage inlet pipe, and is transported through the second sewage inlet pipe transported to the second pre-anoxic tank, the second anoxic tank, the fourth anoxic tank, the fifth anoxic tank, and the sixth anoxic tank, and the first sewage inlet pipe and the second sewage inlet pipe are continuously fed into the water.
所述第一SBR池和第二SBR池循环切换出水,间歇排水。The first SBR pool and the second SBR pool are switched to circulate water and drain water intermittently.
与现有技术相比,本发明的技术方案所带来的有益效果是:Compared with the prior art, the beneficial effects brought by the technical solution of the present invention are:
(1)本发明在OA段和SBR段内均设置有与爆气系统联动的溶氧测定仪,使之能够自动调整鼓风量以节省能耗,运行周期的切换及各设备的时序操作均实行自动控制;(1) The present invention is equipped with a dissolved oxygen measuring instrument linked with the explosion system in the OA section and the SBR section, so that it can automatically adjust the blast volume to save energy consumption, and the switching of the operating cycle and the sequential operation of each equipment are all implemented automatic control;
(2)本发明采用集约型一体化设计及深池型结构,不单独设置二沉池和回流泵房,节省了工艺水头损失,提高了土地利用率;本发明为厌氧段保留进水口,对生物除磷来说,连续的厌氧池进水可大大提高厌氧区BOD5及VFA(挥发性脂肪酸)的浓度,从而改善除磷效果;(2) The present invention adopts an intensive integrated design and a deep pool structure, and does not separately set up a secondary settling tank and a return pump room, which saves process head loss and improves land utilization; the present invention reserves the water inlet for the anaerobic section, For biological phosphorus removal, continuous anaerobic tank water intake can greatly increase the concentration of BOD 5 and VFA (volatile fatty acids) in the anaerobic zone, thereby improving the phosphorus removal effect;
(3)本发明是由多级AO系统与SBR系统串联组成,集合了多级AO与MSBR的全部优势,出水水质稳定和高效,并且有较强的耐冲击负荷能力;多级AO与SBR工艺的融合更好的利用了碳源,其在多级AO段分点连续进水,将大部分好氧量从SBR池转移到连续运行的AO池中,解决了以往SBR反应池的设备利用率不高的问题;(3) The present invention is composed of a multi-stage AO system and an SBR system connected in series, which integrates all the advantages of the multi-stage AO and MSBR, the effluent quality is stable and efficient, and has strong impact load resistance; the multi-stage AO and SBR process The integration of the carbon source makes better use of the carbon source. It continuously feeds water at points in the multi-stage AO section, and transfers most of the aerobic capacity from the SBR pool to the continuously operating AO pool, which solves the equipment utilization of the previous SBR reaction pool. not high problem;
(4)本发明由于主反应段采用多级AO,因此本工艺与MSBR相比,减少了好氧污泥回流,提高了起端反应段的污泥浓度,提高了缺氧段反硝化反应速率,提高了好氧段硝化反应速率;大部分反应区域采用多级AO方式运行,避免了单纯采用SBR运行时不能适应水力冲击负荷的问题;(4) Since the present invention adopts multi-stage AO in the main reaction section, compared with MSBR, this process reduces aerobic sludge reflux, improves the sludge concentration in the initial reaction section, and improves the denitrification reaction rate in the anoxic section , which improves the nitrification reaction rate in the aerobic section; most of the reaction areas are operated in multi-stage AO mode, which avoids the problem of not being able to adapt to the hydraulic impact load when only using SBR;
(5)本发明延续了MSBR工艺中泥水分离池的设置,通过SBR池中沉淀段及泥水分离池的分离,进一步提高外回流的污泥浓度,提高了缺氧段、好氧段的反应速率。(5) The present invention continues the setting of the mud-water separation tank in the MSBR process, and through the separation of the sedimentation section and the mud-water separation tank in the SBR tank, the sludge concentration of the external backflow is further improved, and the reaction rate of the anoxic section and the aerobic section is improved .
附图说明Description of drawings
图1是本发明中反应池的平面布置图;Fig. 1 is the plane layout drawing of reaction pool among the present invention;
图2是本发明中生物反应段处理工艺流程图。Fig. 2 is a flow chart of the treatment process of the biological reaction section in the present invention.
附图标记:A1第一厌氧池;A2第一预缺氧池;A3第一好氧池;A4第一缺氧池;A5第二好氧池;A6第二缺氧池;A7第三好氧池;A8第三缺氧池;A9第一SBR池;A10第一出水管;A11第一污水进水管;B1第二厌氧池;B2第二预缺氧池;B3第四好氧池;B4第四缺氧池;B5第五好氧池;B6第五缺氧池;B7第六好氧池;B8第六缺氧池;B9第二SBR池;B10第二出水管;B11第二污水进水管;C1泥水分离池;C2上清液管;C3污泥管;D综合管廊间。Reference signs: the first anaerobic pool of A1; the first anoxic pool of A2; the first aerobic pool of A3; the first anoxic pool of A4; the second aerobic pool of A5; the second anoxic pool of A6; the third of A7 Aerobic pool; A8 third anoxic pool; A9 first SBR pool; A10 first outlet pipe; A11 first sewage inlet pipe; B1 second anaerobic pool; B2 second pre-anoxic pool; B3 fourth aerobic pool Pool; B4 the fourth anoxic pool; B5 the fifth aerobic pool; B6 the fifth anoxic pool; B7 the sixth aerobic pool; B8 the sixth anoxic pool; B9 the second SBR pool; B10 the second outlet pipe; B11 The second sewage inlet pipe; C1 mud-water separation tank; C2 supernatant liquid pipe; C3 sludge pipe; D integrated pipe gallery.
具体实施方式detailed description
下面结合附图对本发明作进一步的描述。The present invention will be further described below in conjunction with the accompanying drawings.
本发明的高效脱氮除磷多级AO+SBR污水处理反应池,如图1所示,包括并排设置的综合管廊间D和泥水分离池C1,所述综合管廊间D一侧由左至右依次设置有彼此间连通的第一好氧池A3、第一缺氧池A4、第二好氧池A5、第二缺氧池A6、第三好氧池A7、第三缺氧池A8和第一SBR池A9,所述第一好氧池A3左侧设置有第一厌氧池A1和第一预缺氧池A2,所述第一厌氧池A1分别连通第一预缺氧池A2和第一好氧池A3。The multi-stage AO+SBR sewage treatment reaction pool for high-efficiency denitrification and dephosphorization of the present invention, as shown in Figure 1, includes a comprehensive pipe gallery D and a mud-water separation pool C1 arranged side by side, and one side of the comprehensive pipe gallery D is from the left To the right, there are the first aerobic pool A3, the first anoxic pool A4, the second aerobic pool A5, the second anoxic pool A6, the third aerobic pool A7, and the third anoxic pool A8 which are connected to each other in sequence. and the first SBR pool A9, the left side of the first aerobic pool A3 is provided with the first anaerobic pool A1 and the first pre-anoxic pool A2, and the first anaerobic pool A1 communicates with the first pre-anoxic pool respectively A2 and the first aerobic pool A3.
所述综合管廊间D另一侧由左至右依次设置有彼此间连通的第四好氧池B3、第四缺氧池B4、第五好氧池B5、第五缺氧池B6、第六好氧池B7、第六缺氧池B8和第二SBR池B9,所述第四好氧池B3左侧设置有第二厌氧池B1和第二预缺氧池B2,所述第二厌氧池B1分别连通第二预缺氧池B2和第四好氧池B3。On the other side of the integrated utility corridor D, the fourth aerobic pool B3, the fourth anoxic pool B4, the fifth aerobic pool B5, the fifth anoxic pool B6, the Six aerobic pools B7, the sixth anoxic pool B8 and the second SBR pool B9, the left side of the fourth aerobic pool B3 is provided with a second anaerobic pool B1 and a second pre-anoxic pool B2, the second The anaerobic pool B1 communicates with the second pre-anoxic pool B2 and the fourth aerobic pool B3 respectively.
所述第一厌氧池A1、第一预缺氧池A2、第一缺氧池A4、第二缺氧池A6和第三缺氧池A8均连接有第一污水进水管A11。所述第二厌氧池B1、第二预缺氧池B2、第四缺氧池B4、第五缺氧池B6和第六缺氧池B8均连接有第二污水进水管B11。所述第一SBR池A9和第二SBR池B9分别连接有第一出水管A10和第二出水管B10,所述第一SBR池A9和第二SBR池B9均通过回流泵与外回流泥水分离池C1(污泥浓缩池)相连通。所述泥水分离池C1通过上清液管C2分别连通第三缺氧池A8和第六缺氧池B8,所述泥水分离池C1通过污泥管C3分别连通第一预缺氧池A2和第二预缺氧池B2。所述第一好氧池A3、第二好氧池A5、第三好氧池A7、第四好氧池B3、第五好氧池B5、第六好氧池B7、第一缺氧池A4、第二缺氧池A6、第三缺氧池A8、第四缺氧池B4、第五缺氧池B6、第六缺氧池B8、第一SBR池A9、第二SBR池B9、第一厌氧池A1、第二厌氧池B1、第一预缺氧池A2和第二预缺氧池B2内均设置有与爆气系统联动的溶氧测定仪,使之能够自动调整鼓风量以节省能耗,运行周期的切换及各设备的时序操作均实行自动控制。The first anoxic pool A1 , the first pre-anoxic pool A2 , the first anoxic pool A4 , the second anoxic pool A6 and the third anoxic pool A8 are all connected to a first sewage inlet pipe A11 . The second anoxic tank B1, the second pre-anoxic tank B2, the fourth anoxic tank B4, the fifth anoxic tank B6 and the sixth anoxic tank B8 are all connected to a second sewage inlet pipe B11. The first SBR pool A9 and the second SBR pool B9 are respectively connected with a first water outlet pipe A10 and a second water outlet pipe B10, and both the first SBR pool A9 and the second SBR pool B9 are separated from the external return muddy water by a return flow pump Pool C1 (sludge concentration pool) is connected. The mud-water separation pool C1 is respectively connected to the third anoxic pool A8 and the sixth anoxic pool B8 through the supernatant pipe C2, and the mud-water separation pool C1 is respectively connected to the first pre-anoxic pool A2 and the sixth anoxic pool B8 through the sludge pipe C3. Two pre-anoxic pools B2. The first aerobic pool A3, the second aerobic pool A5, the third aerobic pool A7, the fourth aerobic pool B3, the fifth aerobic pool B5, the sixth aerobic pool B7, and the first anoxic pool A4 , the second anoxic pool A6, the third anoxic pool A8, the fourth anoxic pool B4, the fifth anoxic pool B6, the sixth anoxic pool B8, the first SBR pool A9, the second SBR pool B9, the first The anaerobic pool A1, the second anaerobic pool B1, the first pre-anoxic pool A2 and the second pre-anoxic pool B2 are all equipped with a dissolved oxygen detector linked with the gas explosion system, so that it can automatically adjust the blast volume to Energy saving, switching of operating cycles and timing operations of each device are automatically controlled.
每座污水处理反应池分为两个系列,共十九单元格组成,其中,第一厌氧池A1、第一预缺氧池A2、第一好氧池A3、第一缺氧池A4、第二好氧池A5、第二缺氧池A6、第三好氧池A7、第三缺氧池A8、第一SBR池A9构成第一个系列;第二厌氧池B1、第二预缺氧池B2、第四好氧池B3、第四缺氧池B4、第五好氧池B5、第五缺氧池B6、第六好氧池B7、第六缺氧池B8、第二SBR池B9构成第二个系列;两个系列同时连续进水,两个系列间歇排水,排水时间不重叠。Each sewage treatment reaction pool is divided into two series, consisting of nineteen cells in total, among which, the first anaerobic pool A1, the first pre-anoxic pool A2, the first aerobic pool A3, the first anoxic pool A4, The second aerobic pool A5, the second anoxic pool A6, the third aerobic pool A7, the third anoxic pool A8, and the first SBR pool A9 constitute the first series; the second anaerobic pool B1, the second pre-anoxic pool Oxygen pool B2, fourth aerobic pool B3, fourth anoxic pool B4, fifth anoxic pool B5, fifth anoxic pool B6, sixth aerobic pool B7, sixth anoxic pool B8, second SBR pool B9 constitutes the second series; the two series are continuously fed at the same time, and the two series are intermittently drained, and the drainage time does not overlap.
最后一段缺氧段与SBR池之间设置保留了MSBR反应池的中间底部挡板,其可有效避免水力射流的影响,从而改善了水力运行状态。在SBR池切换为沉淀池出水前的预沉淀过程中,在它的下部形成了一个高浓度的污泥层。该池的进水由SBR池的底部配水槽进入,穿过污泥层,污泥层起着接触过滤的作用,也即在利用来自曝气池混合液中的硝酸盐作为氧源进行污泥自身消化稳定的同时将进水中的悬浮物滤除。The middle bottom baffle of the MSBR reaction tank is set between the last anoxic section and the SBR tank, which can effectively avoid the influence of the hydraulic jet, thereby improving the hydraulic operation state. In the pre-sedimentation process before the SBR tank is switched to the sedimentation tank, a high-concentration sludge layer is formed in its lower part. The influent water of the tank enters from the bottom water distribution tank of the SBR tank, passes through the sludge layer, and the sludge layer plays the role of contact filtration, that is, the nitrate from the mixed solution of the aeration tank is used as the oxygen source to remove the sludge. While self-digestion is stable, the suspended solids in the influent water are filtered out.
结合图2所示,本发明的高效脱氮除磷的多级AO+SBR组合式污水处理方法具体过程:As shown in Figure 2, the specific process of the multi-stage AO+SBR combined sewage treatment method for efficient nitrogen and phosphorus removal of the present invention:
首先,进厂污水经预处理工序后分点进入AO+SBR反应池的第一预缺氧池A2、第二预缺氧池B2、第一厌氧池A1、第二厌氧池B1、第一缺氧池A4、第二缺氧池A6、第三缺氧池A8、第四缺氧池B4、第五缺氧池B6、第六缺氧池B8,经过反复的硝化和反硝化作用后分别进入第一SBR池A9和第二SBR池B9,进入泥水分离池C1;所述进厂污水通过第一污水进水管A11输送至第一预缺氧池A2、第一厌氧池A1、第一缺氧池A4、第二缺氧池A6、第三缺氧池A8,通过第二污水进水管B11输送至第二预缺氧池B2、第二厌氧池B1、第四缺氧池B4、第五缺氧池B6、第六缺氧池B8,且所述第一污水进水管A11和第二污水进水管B11同时连续进水;First of all, after the pretreatment process, the sewage entering the plant enters the first pre-anoxic pool A2, the second pre-anoxic pool B2, the first anaerobic pool A1, the second anaerobic pool B1, and the second anaerobic pool of the AO+SBR reaction pool in points. The first anoxic pool A4, the second anoxic pool A6, the third anoxic pool A8, the fourth anoxic pool B4, the fifth anoxic pool B6, and the sixth anoxic pool B8, after repeated nitrification and denitrification Enter the first SBR pool A9 and the second SBR pool B9 respectively, and enter the mud-water separation pool C1; the sewage entering the plant is transported to the first pre-anoxic pool A2, the first anaerobic pool A1, and the first sewage water inlet pipe A11. The first anoxic pool A4, the second anoxic pool A6, and the third anoxic pool A8 are transported to the second pre-anoxic pool B2, the second anoxic pool B1, and the fourth anoxic pool B4 through the second sewage inlet pipe B11 , the fifth anoxic pool B6, the sixth anoxic pool B8, and the first sewage water inlet pipe A11 and the second sewage water inlet pipe B11 simultaneously and continuously feed water;
然后,经泥水分离池C1分离出的上清液分别输送至第三缺氧池A8和第六缺氧池B8,经泥水分离池C1浓缩出的污泥通过提升分别进入第一预缺氧池A2和第二预缺氧池B2,与部分污水混合,进行缺氧反硝化脱氮,回流的硝态氮充分反硝化;Then, the supernatant separated from the mud-water separation tank C1 is transported to the third anoxic tank A8 and the sixth anoxic tank B8 respectively, and the sludge concentrated from the mud-water separation tank C1 enters the first pre-anoxic tank respectively by lifting A2 and the second pre-anoxic pool B2 are mixed with part of the sewage to perform anoxic denitrification and denitrification, and the nitrate nitrogen returned is fully denitrified;
最后,缺氧反硝化脱氮后的污泥混合液,分别进入第一厌氧池A1和第二厌氧池B1,富含磷的污泥进行充分释磷,然后分别进入第一好氧池A3和第四好氧池B3,对污水中的氨氮进行充分的硝化反应,之后进入第一缺氧池A4和第四缺氧池B4进行充分反硝化作用,经过后续重复的硝化、反硝化作用后分别进入第一SBR池A9和第二SBR池B9,进入泥水分离池C1进行泥水分离,形成循环。Finally, the sludge mixture after anoxic denitrification and denitrification enters the first anaerobic pool A1 and the second anaerobic pool B1 respectively, and the phosphorus-rich sludge fully releases phosphorus, and then enters the first aerobic pool respectively A3 and the fourth aerobic pool B3 fully nitrify the ammonia nitrogen in the sewage, and then enter the first anoxic pool A4 and the fourth anoxic pool B4 for full denitrification, after subsequent repeated nitrification and denitrification Then enter the first SBR pool A9 and the second SBR pool B9 respectively, and enter the mud-water separation pool C1 for mud-water separation to form a cycle.
所述第一SBR池A9和第二SBR池B9交替作为沉淀池,循环切换出水,间歇排水。如果第一SBR池A9作为沉淀池出水,则第一SBR池A9首先进行缺氧反应,再进行好氧反应,或交替进行缺氧、好氧反应。在缺氧、好氧反应阶段,第一SBR池A9的混合液通过回流泵回流到泥水分离池C1,泥水分离池C1的上清液进入第三缺氧池A8,沉淀污泥经过提升进入第一预缺氧池A2,经缺氧反硝化脱氮后进入第一厌氧池A1与部分污水混合释磷,依次循环。如果第二SBR池B9作为沉淀池出水,循环原理同上。The first SBR pool A9 and the second SBR pool B9 are alternately used as sedimentation tanks, and the water is switched in circulation and drained intermittently. If the first SBR tank A9 serves as a sedimentation tank to discharge water, the first SBR tank A9 firstly performs anoxic reaction, then performs aerobic reaction, or alternately performs anoxic and aerobic reactions. In the stage of anoxic and aerobic reaction, the mixed solution of the first SBR tank A9 flows back to the mud-water separation tank C1 through the return pump, the supernatant of the mud-water separation tank C1 enters the third anoxic tank A8, and the sedimented sludge is lifted into the first A pre-anoxic pool A2, after anoxic denitrification and denitrification, enters the first anaerobic pool A1, mixes with some sewage to release phosphorus, and circulates in turn. If the second SBR tank B9 is used as a sedimentation tank to discharge water, the circulation principle is the same as above.
所述泥水分离池C1将从第一SBR池A9或第二SBR池B9回流的污泥作了2~3倍的浓缩,同时将进入第一预缺氧池A2及第一厌氧池A1(或第二预缺氧池B2及第二厌氧池B1)的回流量减少了70%以上,从而强化了系统的脱氮除磷效果。由于主反应段采用多级AO,所以本工艺无需设置内回流,第一SBR池A9或第二SBR池B9至泥水分离池C1的回流泵可进行变速调节,以保证整个系统的污泥平衡。The mud-water separation tank C1 concentrates the sludge returned from the first SBR tank A9 or the second SBR tank B9 by 2 to 3 times, and simultaneously enters the first pre-anoxic tank A2 and the first anaerobic tank A1 ( Or the reflux of the second pre-anoxic tank B2 and the second anaerobic tank B1) is reduced by more than 70%, thereby strengthening the nitrogen and phosphorus removal effect of the system. Since the main reaction section adopts multi-stage AO, this process does not need to set internal reflux, and the reflux pump from the first SBR tank A9 or the second SBR tank B9 to the mud-water separation tank C1 can be adjusted at variable speeds to ensure the sludge balance of the entire system.
与T型氧化沟、Unitank、MSBR等系统类似,多级AO+SBR也是将运行过程分为不同的时间段,在同一周期的不同时段内,一些单元采用不同的运转方式,以便完成不同的处理目的。MSBR系统是由传统A2/O系统与SBR系统串联组成,并集合了A2/O与SBR的全部优势。Similar to T-type oxidation ditch, Unitank, MSBR and other systems, multi-stage AO+SBR also divides the operation process into different time periods. In different periods of the same cycle, some units adopt different operation methods to complete different treatments. Purpose. MSBR system is composed of traditional A2/O system and SBR system in series, and combines all the advantages of A2/O and SBR.
典型AO+SBR工艺将一个运转周期分为六个时段(可自动设置调整),由三个时段组成一个半周期。在两个相邻的半周期内,除序批池的运转方式不同外,其余各单元的运转方式完全一样。一般各时段的持续时间如表1所示:A typical AO+SBR process divides an operation cycle into six periods (which can be automatically set and adjusted), and three periods form a half cycle. In two adjacent half-cycles, except for the different operating modes of the sequencing batch pool, the operating modes of the other units are exactly the same. Generally, the duration of each period is shown in Table 1:
表1 AO-SBR工艺运行时段表Table 1 AO-SBR process operation schedule
其中,时段1、2、3为第一个半周期,时段4、5、6为第二个半周期。出水在第一SBR池A9与第二SBR池B9循环切换,如表2所示。Among them, periods 1, 2, and 3 are the first half cycle, and periods 4, 5, and 6 are the second half cycle. The outlet water is cycled and switched between the first SBR pool A9 and the second SBR pool B9, as shown in Table 2.
表2 AO-SBR每周期出水Table 2 AO-SBR water output per cycle
在第一个半周期内,第二SBR池B9起的是沉淀池的作用,而在第二个半周期内单元第一SBR池A9起沉淀池的作用。In the first half cycle, the second SBR tank B9 acts as a sedimentation tank, and in the second half cycle, the unit first SBR tank A9 acts as a sedimentation tank.
AO-SBR工艺的回流仅有外回流,无污泥内回流。The reflux of the AO-SBR process only has external reflux and no sludge internal reflux.
AO-SBR工艺各池的工作状态根据各循环周期内的时段确定如表3所示:The working status of each pool in the AO-SBR process is determined according to the time period in each cycle as shown in Table 3:
表3 AO-SBR工艺循环周期内各单元功能表Table 3 Function table of each unit in AO-SBR process cycle
由于在SBR段前存在缺氧段,即时AO-SBR工艺的SBR池与MSBR工艺一样属于间歇曝气,但第一SBR池A9与第二SBR池B9曝气可在时序上完美衔接,可使鼓风机房的供气较为均匀,不存在瞬时高风量。Since there is an anoxic section before the SBR section, the SBR tank of the instant AO-SBR process is intermittent aeration like the MSBR process, but the aeration of the first SBR tank A9 and the second SBR tank B9 can be perfectly connected in time sequence, which can make The air supply in the blower room is relatively uniform, and there is no instantaneous high air volume.
尽管上面结合附图对本发明的功能及工作过程进行了描述,但本发明并不局限于上述的具体功能和工作过程,上述的具体实施方式仅仅是示意性的,而不是限制性的,本领域的普通技术人员在本发明的启示下,在不脱离本发明宗旨和权利要求所保护的范围情况下,还可以做出很多形式,这些均属于本发明的保护之内。Although the function and working process of the present invention have been described above in conjunction with the accompanying drawings, the present invention is not limited to the above-mentioned specific functions and working process, and the above-mentioned specific implementation is only illustrative, rather than limiting. Under the enlightenment of the present invention, those skilled in the art can also make many forms without departing from the spirit of the present invention and the scope protected by the claims, and these all belong to the protection of the present invention.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611024024.6A CN106495324B (en) | 2016-11-17 | 2016-11-17 | High-efficient denitrification and dephosphorization multistage AO+SBR sewage disposal reaction tank and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611024024.6A CN106495324B (en) | 2016-11-17 | 2016-11-17 | High-efficient denitrification and dephosphorization multistage AO+SBR sewage disposal reaction tank and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106495324A true CN106495324A (en) | 2017-03-15 |
CN106495324B CN106495324B (en) | 2019-08-16 |
Family
ID=58327245
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611024024.6A Active CN106495324B (en) | 2016-11-17 | 2016-11-17 | High-efficient denitrification and dephosphorization multistage AO+SBR sewage disposal reaction tank and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106495324B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111847784A (en) * | 2020-07-24 | 2020-10-30 | 山东明化新材料有限公司 | Combined type sewage treatment process |
CN112028413A (en) * | 2020-10-02 | 2020-12-04 | 杭州兴洋环保科技有限公司 | High total nitrogen effluent treatment plant |
CN115490329A (en) * | 2022-09-02 | 2022-12-20 | 上海凤举环境科技有限公司 | Novel biochemical sewage treatment system |
CN116589097A (en) * | 2023-07-03 | 2023-08-15 | 上海市城市建设设计研究总院(集团)有限公司 | Biological reaction tank with integrated pipe gallery structure layout |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2887857Y (en) * | 2006-04-13 | 2007-04-11 | 王宝贞 | Submerged bio-membrane and active sludge composite bio-treatment system |
CN101691268A (en) * | 2009-09-17 | 2010-04-07 | 上海市政工程设计研究总院 | Biochemical reaction tank and denitrification and dephosphorization process thereof |
CN101885559A (en) * | 2010-06-25 | 2010-11-17 | 可事托环保设备(上海)有限公司 | Multi-level biological nitrogen and phosphorus removal sewage treatment method and device |
CN101955308A (en) * | 2010-11-03 | 2011-01-26 | 上海泓济环保工程有限公司 | Combined SBR-Carrousel oxidation ditch high-efficiency denitrification process |
CN102502963A (en) * | 2011-11-04 | 2012-06-20 | 浦华环保有限公司 | Multi-mode sequencing batch active sludge sewage treatment method and system |
CN102690019A (en) * | 2012-05-08 | 2012-09-26 | 北京工业大学 | High-efficiency nitrogen and phosphorus synchronous removal method in treating low concentration wastewater |
CN102730833A (en) * | 2012-06-15 | 2012-10-17 | 浦华环保有限公司 | Constant water level sequencing batch type activated sludge treatment sewage system with characteristic of multi-stage A-O reinforced denitrogenation and phosphorus removing, and method thereof |
CN103145247A (en) * | 2013-04-02 | 2013-06-12 | 上海泓济环保工程有限公司 | Composite HBF (Honess Hybrid Biological&Fixed film Technology) module reactor and sewage treatment process |
CN103214142A (en) * | 2013-03-18 | 2013-07-24 | 国电银河水务股份有限公司 | Efficient synchronized biological nitrogen and phosphorus removal combined treatment device and method |
CN204111420U (en) * | 2014-10-16 | 2015-01-21 | 武汉都市环保工程技术股份有限公司 | Multipoint water feeding improvement sequencing batch activated sludge system |
CN204356197U (en) * | 2014-12-05 | 2015-05-27 | 浙江博华环境技术工程有限公司 | Modified form MSBR reactor |
CN104724825A (en) * | 2015-03-17 | 2015-06-24 | 东莞市智汇水务科技有限公司 | Sewage treatment method |
CN104761100A (en) * | 2015-03-17 | 2015-07-08 | 东莞市智汇水务科技有限公司 | Sewage treatment system |
CN204689819U (en) * | 2015-04-14 | 2015-10-07 | 济宁璟华环保科技有限公司 | Multistage A/O-IAT biological thickening reactor |
-
2016
- 2016-11-17 CN CN201611024024.6A patent/CN106495324B/en active Active
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2887857Y (en) * | 2006-04-13 | 2007-04-11 | 王宝贞 | Submerged bio-membrane and active sludge composite bio-treatment system |
CN101691268A (en) * | 2009-09-17 | 2010-04-07 | 上海市政工程设计研究总院 | Biochemical reaction tank and denitrification and dephosphorization process thereof |
CN101885559A (en) * | 2010-06-25 | 2010-11-17 | 可事托环保设备(上海)有限公司 | Multi-level biological nitrogen and phosphorus removal sewage treatment method and device |
CN101955308A (en) * | 2010-11-03 | 2011-01-26 | 上海泓济环保工程有限公司 | Combined SBR-Carrousel oxidation ditch high-efficiency denitrification process |
CN102502963A (en) * | 2011-11-04 | 2012-06-20 | 浦华环保有限公司 | Multi-mode sequencing batch active sludge sewage treatment method and system |
CN102690019A (en) * | 2012-05-08 | 2012-09-26 | 北京工业大学 | High-efficiency nitrogen and phosphorus synchronous removal method in treating low concentration wastewater |
CN102730833A (en) * | 2012-06-15 | 2012-10-17 | 浦华环保有限公司 | Constant water level sequencing batch type activated sludge treatment sewage system with characteristic of multi-stage A-O reinforced denitrogenation and phosphorus removing, and method thereof |
CN103214142A (en) * | 2013-03-18 | 2013-07-24 | 国电银河水务股份有限公司 | Efficient synchronized biological nitrogen and phosphorus removal combined treatment device and method |
CN103145247A (en) * | 2013-04-02 | 2013-06-12 | 上海泓济环保工程有限公司 | Composite HBF (Honess Hybrid Biological&Fixed film Technology) module reactor and sewage treatment process |
CN204111420U (en) * | 2014-10-16 | 2015-01-21 | 武汉都市环保工程技术股份有限公司 | Multipoint water feeding improvement sequencing batch activated sludge system |
CN204356197U (en) * | 2014-12-05 | 2015-05-27 | 浙江博华环境技术工程有限公司 | Modified form MSBR reactor |
CN104724825A (en) * | 2015-03-17 | 2015-06-24 | 东莞市智汇水务科技有限公司 | Sewage treatment method |
CN104761100A (en) * | 2015-03-17 | 2015-07-08 | 东莞市智汇水务科技有限公司 | Sewage treatment system |
CN204689819U (en) * | 2015-04-14 | 2015-10-07 | 济宁璟华环保科技有限公司 | Multistage A/O-IAT biological thickening reactor |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111847784A (en) * | 2020-07-24 | 2020-10-30 | 山东明化新材料有限公司 | Combined type sewage treatment process |
CN112028413A (en) * | 2020-10-02 | 2020-12-04 | 杭州兴洋环保科技有限公司 | High total nitrogen effluent treatment plant |
CN115490329A (en) * | 2022-09-02 | 2022-12-20 | 上海凤举环境科技有限公司 | Novel biochemical sewage treatment system |
CN116589097A (en) * | 2023-07-03 | 2023-08-15 | 上海市城市建设设计研究总院(集团)有限公司 | Biological reaction tank with integrated pipe gallery structure layout |
Also Published As
Publication number | Publication date |
---|---|
CN106495324B (en) | 2019-08-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100395196C (en) | Improved MUCT process and device | |
CN101880111B (en) | Real-time control device and method for deep nitrogen and phosphorus removal in A2/O-BAF process | |
CN102653423A (en) | Membrane bioreactor sewage treatment method and apparatus for enhancing denitrifying dephosphatation through mud-water separation and backflow | |
CN108996840B (en) | Sewage treatment equipment and method for strengthening combination of biological denitrification and flat ceramic membrane | |
CN104058555A (en) | Anaerobic ammonia oxidation-based low-carbon nitrogen ratio urban sewage denitrification system and treatment process | |
CN102786184A (en) | Two-stage A / O-MBR denitrification and dephosphorization apparatus | |
CN111646652B (en) | A high-efficiency biological denitrification device for low carbon-nitrogen ratio sewage | |
CN104512963A (en) | Integral multistage simultaneous nitrification and denitrification biological membrane system denitrification method and device | |
CN102344198B (en) | Aerobic biomembrane A for treating low C/N sewage2Real-time control device and method for O process | |
CN106495324B (en) | High-efficient denitrification and dephosphorization multistage AO+SBR sewage disposal reaction tank and method | |
CN104986854B (en) | Sludge reflux control system, method and sewage disposal system | |
CN104003522A (en) | Improved step-feed multi-section A/O denitrification process and design method thereof | |
CN202729946U (en) | Two-stage anoxic/oxic (A/O)-membrane biological reactor (MBR) nitrogen and phosphorus removal device | |
CN111099726A (en) | Synchronous denitrification and dephosphorization double-sludge sewage treatment system and treatment process thereof | |
CN103601296A (en) | A D-A2/O sewage treatment reactor with two-phase anaerobic and anoxic alternate operation | |
CN202688093U (en) | Improved A/O (anoxic/oxic) four-point section-water supply high-efficiency synchronous nitrogen and phosphorus removal device | |
CN203999266U (en) | Low ratio of carbon to ammonium municipal effluent denitrification system based on Anammox | |
CN210683343U (en) | A kind of rural domestic sewage MBR integrated treatment device | |
CN200940110Y (en) | Device for short-cut nitrification by improving MUCT process | |
CN103395882A (en) | Processing method and processing apparatus of high ammonia-nitrogen wastewater | |
CN202658008U (en) | Sewage denitrifying phosphorus and nitrogen removal device of combined bio-filter of membrane bioreactor | |
CN102153254B (en) | Anoxic and aerobic circulating activated sludge process | |
CN117886445A (en) | Advanced denitrification sewage treatment method and system for strengthening sludge pre-precipitation concentration | |
CN102249412B (en) | Multistage anoxic and anaerobic circulation tail section anoxic activated sludge treatment process and system | |
CN102276062A (en) | Multistage anaerobic and anoxic circulating final segment aerobic activated sludge process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 300051 No. 239, Yingkou Road, Heping District, Tianjin Patentee after: Tianjin municipal engineering design and Research Institute Co.,Ltd. Address before: 300051 No. 239, Yingkou Road, Heping District, Tianjin Patentee before: TIANJIN MUNICIPAL ENGINEERING DESIGN & Research Institute |
|