CN106340963A - Electric power distribution room intelligent commission maintenance monitoring system - Google Patents
Electric power distribution room intelligent commission maintenance monitoring system Download PDFInfo
- Publication number
- CN106340963A CN106340963A CN201610835357.0A CN201610835357A CN106340963A CN 106340963 A CN106340963 A CN 106340963A CN 201610835357 A CN201610835357 A CN 201610835357A CN 106340963 A CN106340963 A CN 106340963A
- Authority
- CN
- China
- Prior art keywords
- module
- cabinet
- monitoring
- power distribution
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00001—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B1/00—Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
- H02B1/20—Bus-bar or other wiring layouts, e.g. in cubicles, in switchyards
- H02B1/202—Cable lay-outs
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B1/00—Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
- H02B1/26—Casings; Parts thereof or accessories therefor
- H02B1/30—Cabinet-type casings; Parts thereof or accessories therefor
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Human Computer Interaction (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The invention discloses an electric power distribution room intelligent commission maintenance monitoring system, belonging to the technical field of electric power monitoring. The system comprises an online service system, an intelligent monitoring system, an offline repair system, and a software upgrade system. The online service system comprises a telemetry module, a remote communication module, a remote analysis module, and a remote storage module. The intelligent monitoring system comprises a high voltage distribution monitoring module, a low voltage distribution monitoring module, a power use curve module, a data recording module, a real-time alarm module, a historical alarm module, and a report management module. According to the system, the safety level is improved, the means of power safety are increased, the problem which can not be solved by man on duty is solved, the problem of low efficiency of the man on duty is solved, the technical level of power safety is improved, the safety of a main network is improved while the safety level of equipment is improved, the accident rate is reduced greatly, with the maintenance inspection of a professional team, the failure repair efficiency is improved, the accident rate is reduced, the operation and maintenance expenses of a distribution room are saved, and the cost of operation and maintenance is saved greatly.
Description
Technical field
The present invention relates to a kind of electric power monitoring system, more particularly to a kind of power distribution room intelligently generation dimension monitoring system,
Belong to power monitoring technical field.
Background technology
Electric power supervisory control technology has had the history of more than 50 year in the research of China and application.The 1950's, right
The monitoring of power system is mainly analog monitoring, and telemetering equipment is separated with remote signalling, remote control, the components and parts master that telemechanical apparatus uses
If electron tube, electromagnetic relay and continuation formula stepping select switch etc., operating rate is low, capacity is little, maintenance workload is big, reliable
Property poor, sixties in 20th century, China have developed the telemechanical apparatus of the non-contact type based on semiconductor components and devices, using digital
Remote measurement, remote signalling, remote control and remote regulating are incorporated into one, referred to as combination digital telemechanical apparatus by technology, and its service behaviour has bright
Aobvious raising.But this device is constituted by hard wired logic mode, circuit is difficult to change once determination, is subject in terms of function and capacity
To limiting, in the later stage seventies, engineering staff succeeds in developing the telemechanical of programmable type on the basis of combination digital telemechanical apparatus
Device, has the advantages that strong adaptability, extension are convenient.The end of the eighties, microcomputer develop into telemechanical provide strong
Technical support, make motion technology enter brand-new epoch using microcomputer, its major advantage be strong adaptability, function and
Capacity extension is convenient, be easy to the advantages of communicate, and 1987, department of electrical engineering of Tsing-Hua University succeeded in developing first transformer station of China
Complex automatic system, puts into operation in Wang Dao transformer station of Weihai in Shandong province, from the beginning of 20th century the mid-80s, electric power load control system
System has obtained extensive promotion and application in China, has once played pass for the imbalance between power supply and demand before alleviation China's the mid-90
The effect of key.
Since entering 21 century, with the fast development of computer technology, mechanics of communication and artificial intelligence technology, intelligence electricity
Power monitoring system has obtained increasingly being widely applied in power industry and other relevant industries, so-called Intelligent power monitoring system
System, refers to using computer, metering protective device and bussing technique, to the real time data of distribution system, on off state and long-range
Control the soft and hardware equipment carrying out centralized detecting and centralized management, intelligent power monitoring system has hardware, software modularity,
Telecommunication network, the features such as communication channel customizations and graphical interface, moral is breathed out in such as isa-1 and disa of Nan Rui group, Beijing
The df3003 series of the csc200, the es60 of Shandong University and Dongfang Electronics in prestige four directions is respectively provided with considerable influence at home.These
Intelligent power monitoring system is typically by management level (station level), communication layers (intermediate layer), wall (on-site supervision layer) three parts
Composition.In terms of data acquisition process, monitoring system typically can in real time and each electric parameter of timing acquiring field apparatus and switch
Amount state (includes three-phase voltage, electric current, power, power factor, frequency, electric energy, temperature, the position of the switch, equipment running status
Deng), by the data collecting or directly display or new intuitively data message generated by statistical computation show again and (total be
System power, load maximum, power factor bound etc.), and database purchase is carried out to important quantity of information.
In terms of user management and Report Server Management, monitoring system typically can give different rights to the user of different stage,
Thus ensureing safety and reliability in running for the system.As the conjunction/sub-switching operation to certain important loop, need operator
Outside level user input operation password, also need the divisional user input of engineering can complete this operation, monitoring system one after confirming password
As there is the electric energy statement form of standard, and the statement form of its needs can be met according to user's request design.System can be automatic
Count and automatically generate various types of real time execution forms, history report, event fault and alarm record form, operation note
Form etc., can inquire about all data values with print system record, automatically generate day of electric energy, the moon, season, annual report form, root
Generate the rate form of electric energy according to the period of multi tariff and the setting value of rate, the parameter such as the starting point of inquiry printing, interval can be certainly
Row setting;System design also can be according to the customized report output functions of meeting different requirements of user's request.In logout
With fault alarm aspect, monitoring system is typically out-of-limit to all user operations, switch changed position, parameter and other user's actual need
Event be respectively provided with detailed writing function, the time location occurring including event, whether current operator on duty's event confirm
Information, the information such as out-of-limit to switch changed position, parameter also has sound alarm function, automatically sends control to operation equipment simultaneously and refers to
Order or prompting operator on duty fix a breakdown rapidly.
In current power consumer, there are many and be stationed Shi Daiwei client, often switchgear house send someone on duty, switchgear house this
There are a lot of problems in pattern on duty of kind sending someone: first, mode is too traditional;Second, personnel only cannot ensure with sense organ by rule of thumb
Switchgear house safety;3rd, Personnel Skill Levels and experience this work not competent at all;4th, the inertia of people cannot overcome;
Finally, manually on duty extremely inefficient.And current, with developing rapidly of intelligent power grid technology, Utilities Electric Co. to transformer station and opens
Close station unattended three distant (remote measurement, remote signalling, remote control) pattern ripe, using big data, cloud computing and modern the Internet
Technology and four distant (remote measurement, remote signalling, distant analysis, distant storage) technological incorporation, develop and possess the Internet thinking and " the Internet+" feature
Switchgear house monitoring system on duty has wider application prospect, is also the trend of future development.
Content of the invention
The main object of the present invention is in order to the Shi Daiwei switchgear house of being stationed solving to adopt in current electric power monitoring system is sent
What people's monitoring system existed cannot be effectively ensured switchgear house safety, the low problem of monitoring efficiency, provide a kind of power distribution room intelligence
Can generation dimension monitoring system.
The purpose of the present invention can be reached by adopting the following technical scheme that:
A kind of power distribution room intelligence generation dimension monitoring system, rushes to repair including under online service system, intelligent monitor system, line
System and software update system, described online service system respectively with described intelligent monitor system, described line under repairing system it
Between connect, described online service system, described intelligent monitor system be connected with described software update system, described online service system
Unite for being collected to the data of electrical equipment measuring, the data remote transmission of measurement will be collected to described intelligent monitoring system
System, is monitored to data, alarm and operating analysis, provides operation report, stores data in cloud space and hard disk,
Described intelligent monitor system is used for carrying out intelligent monitoring to the operation of power distribution room, and under described line, repairing system at regular intervals arranges specially
Industry personnel are maked an inspection tour to electrical equipment and electrical equipment are monitored, and the electrical equipment breaking down is rushed to repair,
Described software update system is used for setting up two grades of software upgradings and guarantee system, for ensureing described online service system, described
The normal operation of intelligent monitor system and data transfer, and personnel are giveed training.
As a kind of preferred version, described online service system includes telemetry module, remote signal module, distant analysis module and distant storage
Module, described telemetry module, described remote signal module, described distant analysis module, described distant storage module all with described intelligent monitor system,
Described software update system connects.
As the preferred version of such scheme, described telemetry module is set to electricity consumption by intelligence instrument and Intelligent Measurement module
Standby data is collected measuring;The data remote transmission collecting measurement is arrived by described remote signal module by remote transmission software
Described intelligent monitor system;Described distant analysis module is monitored to data, alarm and operating analysis, periodically provides switchgear house
Run report, report content includes eliminating safe hidden trouble and economical operation suggestion;It is empty that described distant storage module stores data in cloud
Between and hard disk in.
As the preferred version of such scheme, described intelligent monitor system includes high voltage power distribution monitoring module and low-voltage distribution
Monitoring module, described high voltage power distribution monitoring module is used for high-tension distribution equipment is monitored, described low-voltage distribution monitoring module
For being monitored to low-voltage distribution apparatus, described high voltage power distribution monitoring module and described low-voltage distribution monitoring module all with described
Connect between online service system.
As the preferred version of such scheme, described intelligent monitor system also includes electricity consumption curve module, data record mould
Block, Realtime Alerts module, history alarm module and statement management module, described electricity consumption curve module is used for providing voltage electricity consumption bent
Line chart, electric current electricity consumption curve chart, power and degree of unbalancedness curve chart, described data recordin module is used for recording and stores
Collect the data of measurement.
As the preferred version of such scheme, described Realtime Alerts module is used for carrying out reality when electrical equipment breaks down
Alarm, provides Realtime Alerts information, and provides warning message to filter, and described Realtime Alerts information includes the concrete of generation of reporting to the police
Time, warning title, current state and alarming value, described history alarm module is used for record and query history warning message, institute
State statement management module for automatic report generation.
As the preferred version of such scheme, described high voltage power distribution monitoring module include the first isolation cabinet, the first incoming line cabinet,
First metering cabinet, the first transformer case, mother isolation cabinet and mother cabinet, between described first isolation cabinet and described first incoming line cabinet
Connect, described first transformer case and described first metering cabinet, described mother isolation cabinet are connected, described mother isolate cabinet with described
Mother cabinet connects.
As the preferred version of such scheme, described high voltage power distribution monitoring module also includes the second transformer case, the 3rd change
Depressor cabinet, the second metering cabinet, the second incoming line cabinet and the second isolation cabinet, described mother cabinet is connected with described second transformer case, institute
State the 3rd transformer case to be connected with described second transformer case, described second metering cabinet, described second incoming line cabinet and described second
Metering cabinet, described second isolation cabinet connect.
As the preferred version of such scheme, described low-voltage distribution monitoring module include multiple isolation cabinets, multiple incoming line cabinet,
Multiple metering cabinets, multiple transformer case, mother isolation cabinet and mother cabinet.
The Advantageous Effects of the present invention: power distribution room of the present invention intelligence generation dimension monitoring system, improve safe class
And level, increased the means of electric power safety, the past is merely that people is on duty, be people now and system coordinates jointly, decrease people
Insurmountable problem on duty, solves the problems, such as that people's efficiency on duty is low, improves power safety technique level, itself sets improving
Also improve major network safety while for safe class, substantially reduce accident rate, the inspection maintenance of cooperation professional contingent, improve event
Barrier remediation efficiency, reduces accident rate.
Power distribution room of the present invention intelligence generation dimension monitoring system, saves switchgear house operation funds, the system can substitute
The function of most of operator on duty, therefore can reduce operator on duty according to user's practical situation, and the year service charge of this system
It is only the expense of an electrician, overall operation and maintenance expenses will be greatlyd save and use, can be carried out according to the various data in running quality report
Analysis, provides energy-saving scheme and economical operation is finally realized in suggestion.
Brief description
Fig. 1 is power distribution room of the present invention intelligence generation dimension monitoring system schematic diagram;
Fig. 2 is online service system schematic of the present invention;
Fig. 3 is intelligent monitor system schematic diagram of the present invention;
Fig. 4 is intelligent monitor system high voltage power distribution monitoring module schematic diagram of the present invention;
Fig. 5 is intelligent monitor system low-voltage distribution monitoring module of the present invention;
Fig. 6 is intelligent monitor system voltage electricity consumption curve chart of the present invention;
Fig. 7 is intelligent monitor system electric current electricity consumption curve chart of the present invention;
Fig. 8 is intelligent monitor system power of the present invention;
Fig. 9 is intelligent monitor system degree of unbalancedness curve chart of the present invention.
In figure: 1- online service system, 2- intelligent monitor system, rush to repair system, 4- software update system, 11- under 3- line
Telemetry module, 12- remote signal module, 13- distant analysis module, 14- distant storage module, 21- high voltage power distribution monitoring module, 22- low-voltage distribution
Monitoring module, 23- electricity consumption curve module, 24- data recordin module, 25- Realtime Alerts module, 26- history alarm module, 27-
Statement management module, 211- first isolation cabinet, 212- first incoming line cabinet, 213- first metering cabinet, 214- first transformer case,
215- mother isolation cabinet, 216- mother cabinet, 217- second transformer case, 218- the 3rd transformer case, 219- second metering cabinet,
2110- second incoming line cabinet, 2111- second isolates cabinet.
Specific embodiment
For making those skilled in the art more understand and clear and definite technical scheme, with reference to embodiment and accompanying drawing
The present invention is described in further detail, but embodiments of the present invention not limited to this.
As shown in figure 1, the present embodiment provide power distribution room intelligence generation dimension monitoring system, including online service system 1,
Repairing system 3 and software update system 4 under intelligent monitor system 2, line, described online service system 1 is supervised with described intelligence respectively
Connect between repairing system 3 under control system 2, described line, described online service system 1, described intelligent monitor system 2 are soft with described
Part upgrade-system 4 connects, and described online service system 1 is used for the data of electrical equipment being collected measure, and will collect measurement
Data remote transmission to described intelligent monitor system 2, data is monitored, alarm and operating analysis, provides operation
Report, stores data in cloud space and hard disk, and described intelligent monitor system 2 is used for carrying out intelligence to the operation of power distribution room
Can monitor, under described line, repairing system 3 regularly schedules professional and electrical equipment maked an inspection tour and electrical equipment is supervised
Survey, and the electrical equipment breaking down is rushed to repair, described software update system 4 is used for setting up two grades of software upgradings and guarantee
System, for ensureing described online service system 1, the normal operation of described intelligent monitor system 2 and data transfer, and to personnel
Give training.
In the present embodiment, as shown in Fig. 2 described online service system 1 includes telemetry module 11, remote signal module 12, distant
Analysis module 13 and distant storage module 14, described telemetry module 11, described remote signal module 12, described distant analysis module 13, described distant storage mould
Block 14 is all connected with described intelligent monitor system 2, described software update system 4, described telemetry module 11 pass through intelligence instrument and
Intelligent Measurement module to electrical equipment data be collected measure;Described remote signal module 12 will be received by remote transmission software
The data remote transmission of collection measurement is to described intelligent monitor system 2;Described distant analysis module 13 is monitored to data, alarm
And operating analysis, periodically provide switchgear house and run report, report content includes eliminating safe hidden trouble and economical operation suggestion;Described
Distant storage module 14 stores data in cloud space and hard disk.
In the present embodiment, as shown in Fig. 3, Fig. 6, Fig. 7, Fig. 8 and Fig. 9, described intelligent monitor system 2 includes high voltage power distribution
Monitoring module 21 and low-voltage distribution monitoring module 22, described high voltage power distribution monitoring module 21 is used for high-tension distribution equipment is supervised
Control, described low-voltage distribution monitoring module 22 is used for low-voltage distribution apparatus are monitored, described high voltage power distribution monitoring module 21 He
Described low-voltage distribution monitoring module 22 is equal to be connected and described online service system 1 between, and described intelligent monitor system 2 also includes using
Electric curve module 23, data recordin module 24, Realtime Alerts module 25, history alarm module 26 and statement management module 27, institute
State electricity consumption curve module 23 to be used for providing voltage electricity consumption curve chart, electric current electricity consumption curve chart, power and imbalance to write music
Line chart, described data recordin module 24 is used for record and the data of measurement is collected in storage, and described Realtime Alerts module 25 is used for
Carry out Realtime Alerts when electrical equipment breaks down, Realtime Alerts information is provided, and provide warning message to filter, described real-time report
Alarming information includes the report to the police concrete time occurring, warning title, current state and alarming value, and described history alarm module 26 is used for
Record and query history warning message, described statement management module 27 is used for automatic report generation.
In the present embodiment, as shown in figure 4, described high voltage power distribution monitoring module 21 includes the first isolation cabinet 211, first enters
Line cabinet 212, the first metering cabinet 213, the first transformer case 214, mother isolation cabinet 215 and mother cabinet 216, described first isolation cabinet
It is connected between 211 with described first incoming line cabinet 212, described first transformer case 214 and described first metering cabinet 213, described mother
Connection isolation cabinet 215 connects, and described mother isolation cabinet 215 is connected with described mother cabinet 216, and described high voltage power distribution monitoring module 21 is also
Including the second transformer case 217, the 3rd transformer case 218, the second metering cabinet 219, the second incoming line cabinet 2110 and the second isolation cabinet
2111, described mother cabinet 216 is connected with described second transformer case 217, described 3rd transformer case 218 and described second transformation
Device cabinet 217, described second metering cabinet 219 connect, described second incoming line cabinet 2110 and described second metering cabinet 219, described second
Isolation cabinet 2111 connects.
In the present embodiment, described low-voltage distribution monitoring module 22 includes multiple isolation cabinet (attached not shown in FIG.), multiple
Incoming line cabinet (attached not shown in FIG.), multiple metering cabinet (attached not shown in FIG.), multiple transformer case (attached not shown in FIG.), mother
Isolation cabinet (attached not shown in FIG.) and mother cabinet (attached not shown in FIG.).
In sum, the power distribution room intelligence generation dimension monitoring system that the present embodiment provides, improves safe class and water
Flat, increased the means of electric power safety, the past is merely that people is on duty, be people now and system coordinates jointly, decrease people on duty
Insurmountable problem, solve the problems, such as that people's efficiency on duty is low, improve power safety technique level, improve equipment of itself peace
Also improve major network safety while congruent level, substantially reduce accident rate, the inspection maintenance of cooperation professional contingent, improve fault and repair
Multiple efficiency, reduces accident rate, saves switchgear house operation funds, and the system can substitute the work(of most of operator on duty
Can, therefore operator on duty can be reduced according to user's practical situation, and the year service charge of this system is only the expense of an electrician,
Overall operation and maintenance expenses will be greatlyd save use, can be analyzed according to the various data in running quality report, be given energy-saving scheme and
Economical operation is finally realized in suggestion.
The above, further embodiment only of the present invention, but protection scope of the present invention is not limited thereto, and any
In scope disclosed in this invention, technology according to the present invention scheme and its design add those familiar with the art
With equivalent or change, broadly fall into protection scope of the present invention.
Claims (9)
1. a kind of power distribution room intelligence generation dimension monitoring system it is characterised in that: include online service system (1), intelligent monitoring
Repairing system (3) and software update system (4) under system (2), line, described online service system (1) is supervised with described intelligence respectively
Connect between repairing system (3) under control system (2), described line, described online service system (1), described intelligent monitor system (2)
It is connected with described software update system (4), described online service system (1) is used for the data of electrical equipment being collected survey
Amount, will collect the data remote transmission of measurement to described intelligent monitor system (2), data is monitored, alarm and fortune
Row analysis, provides operation report, stores data in cloud space and hard disk, described intelligent monitor system (2) is used for electric power
The operation of switchgear house carries out intelligent monitoring, and repairing system (3) under described line regularly schedules professional and electrical equipment is patrolled
Depending on and electrical equipment is monitored, and the electrical equipment breaking down is rushed to repair, described software update system (4) is used for
Set up two grades of software upgradings and guarantee system, for ensureing described online service system (1), described intelligent monitor system (2)
Normal operation and data transfer, and personnel are giveed training.
2. a kind of power distribution room according to claim 1 intelligence generation dimension monitoring system it is characterised in that: take on described line
Business system (1) includes telemetry module (11), remote signal module (12), distant analysis module (13) and distant storage module (14), described remote measurement mould
Block (11), described remote signal module (12), described distant analysis module (13), described distant storage module (14) all with described intelligent monitor system
(2), described software update system (4) connects.
3. a kind of power distribution room according to claim 2 intelligence generation dimension monitoring system it is characterised in that: described remote measurement mould
Block (11) by intelligence instrument and Intelligent Measurement module to electrical equipment data be collected measuring;Described remote signal module
(12) pass through remote transmission software and will collect the data remote transmission of measurement to described intelligent monitor system (2);Described distant analysis mould
Block (13) is monitored to data, alarm and operating analysis, periodically provides switchgear house and runs report, report content includes disappearing
Except potential safety hazard and economical operation suggestion;Described distant storage module (14) stores data in cloud space and hard disk.
4. a kind of power distribution room according to claim 1 intelligence generation dimension monitoring system it is characterised in that: described intelligence is supervised
Control system (2) includes high voltage power distribution monitoring module (21) and low-voltage distribution monitoring module (22), described high voltage power distribution monitoring module
(21) it is used for high-tension distribution equipment is monitored, described low-voltage distribution monitoring module (22) is used for low-voltage distribution apparatus are carried out
Monitoring, described high voltage power distribution monitoring module (21) and described low-voltage distribution monitoring module (22) all with described online service system
(1) connect between.
5. a kind of power distribution room according to claim 4 intelligence generation dimension monitoring system it is characterised in that: described intelligence is supervised
Control system (2) also includes electricity consumption curve module (23), data recordin module (24), Realtime Alerts module (25), history warning mould
Block (26) and statement management module (27), described electricity consumption curve module (23) is used for providing voltage electricity consumption curve chart, electric current electricity consumption
Curve chart, power and degree of unbalancedness curve chart, described data recordin module (24) is used for record and measurement is collected in storage
Data.
6. a kind of power distribution room according to claim 5 intelligence generation dimension monitoring system it is characterised in that: described real-time report
Alert module (25) is used for carrying out Realtime Alerts when electrical equipment breaks down, and provides Realtime Alerts information, and provides alarm signal
Breath filters, and described Realtime Alerts information includes the report to the police concrete time occurring, warning title, current state and alarming value, described
History alarm module (26) is used for record and query history warning message, and described statement management module (27) is used for automatically generating report
Table.
7. a kind of power distribution room according to claim 4 intelligence generation dimension monitoring system it is characterised in that: described height is press-fitted
Electric monitoring module (21) includes the first isolation cabinet (211), the first incoming line cabinet (212), the first metering cabinet (213), the first transformator
Cabinet (214), mother isolation cabinet (215) and mother cabinet (216), described first isolation cabinet (211) and described first incoming line cabinet (212)
Between connect, described first transformer case (214) and described first metering cabinet (213), described mother are isolated cabinet (215) and are connected,
Described mother isolation cabinet (215) is connected with described mother cabinet (216).
8. a kind of power distribution room according to claim 7 intelligence generation dimension monitoring system it is characterised in that: described height is press-fitted
Electric monitoring module (21) also include the second transformer case (217), the 3rd transformer case (218), the second metering cabinet (219), second
Incoming line cabinet (2110) and the second isolation cabinet (2111), described mother cabinet (216) is connected with described second transformer case (217), institute
State the 3rd transformer case (218) to be connected with described second transformer case (217), described second metering cabinet (219), described second enters
Line cabinet (2110) is connected with described second metering cabinet (219), described second isolation cabinet (2111).
9. a kind of power distribution room according to claim 4 intelligence generation dimension monitoring system it is characterised in that: described low pressure is joined
Electric monitoring module (22) include multiple isolation cabinets, multiple incoming line cabinet, multiple metering cabinet, multiple transformer case, mother isolation cabinet and
Mother cabinet.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610835357.0A CN106340963B (en) | 2016-09-20 | 2016-09-20 | A kind of power distribution room intelligence generation dimension monitoring system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610835357.0A CN106340963B (en) | 2016-09-20 | 2016-09-20 | A kind of power distribution room intelligence generation dimension monitoring system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106340963A true CN106340963A (en) | 2017-01-18 |
CN106340963B CN106340963B (en) | 2018-08-17 |
Family
ID=57839041
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610835357.0A Active CN106340963B (en) | 2016-09-20 | 2016-09-20 | A kind of power distribution room intelligence generation dimension monitoring system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106340963B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106655523A (en) * | 2017-03-07 | 2017-05-10 | 江苏华康能达电气设备有限公司 | Smart electric service system |
CN108899994A (en) * | 2018-06-04 | 2018-11-27 | 国网浙江省电力有限公司温州供电公司 | The thin production method of log based on electrical power distribution automatization system |
CN111313552A (en) * | 2020-03-06 | 2020-06-19 | 广东君兆建设集团有限公司 | Monitoring system for power electromechanical distribution station room |
CN112510838A (en) * | 2020-12-07 | 2021-03-16 | 杰瑞环保科技有限公司 | Low-voltage power distribution system based on oil sludge treatment station |
CN116865447A (en) * | 2023-07-20 | 2023-10-10 | 南京欧陆电气股份有限公司 | Distributed photovoltaic power generation control management method and system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102437650A (en) * | 2011-12-25 | 2012-05-02 | 西安福安创意咨询有限责任公司 | Intelligent electric power distribution system |
CN103138388A (en) * | 2011-11-22 | 2013-06-05 | 大连金州电器有限公司 | Power distribution station management system |
CN104242471A (en) * | 2014-10-17 | 2014-12-24 | 成都四为电子信息股份有限公司 | Integrated automation system of transformer substation |
CN105337422A (en) * | 2015-12-09 | 2016-02-17 | 王亲武 | Intelligent power supply and distribution management system based on Internet of things |
-
2016
- 2016-09-20 CN CN201610835357.0A patent/CN106340963B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103138388A (en) * | 2011-11-22 | 2013-06-05 | 大连金州电器有限公司 | Power distribution station management system |
CN102437650A (en) * | 2011-12-25 | 2012-05-02 | 西安福安创意咨询有限责任公司 | Intelligent electric power distribution system |
CN104242471A (en) * | 2014-10-17 | 2014-12-24 | 成都四为电子信息股份有限公司 | Integrated automation system of transformer substation |
CN105337422A (en) * | 2015-12-09 | 2016-02-17 | 王亲武 | Intelligent power supply and distribution management system based on Internet of things |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106655523A (en) * | 2017-03-07 | 2017-05-10 | 江苏华康能达电气设备有限公司 | Smart electric service system |
CN108899994A (en) * | 2018-06-04 | 2018-11-27 | 国网浙江省电力有限公司温州供电公司 | The thin production method of log based on electrical power distribution automatization system |
CN111313552A (en) * | 2020-03-06 | 2020-06-19 | 广东君兆建设集团有限公司 | Monitoring system for power electromechanical distribution station room |
CN112510838A (en) * | 2020-12-07 | 2021-03-16 | 杰瑞环保科技有限公司 | Low-voltage power distribution system based on oil sludge treatment station |
CN116865447A (en) * | 2023-07-20 | 2023-10-10 | 南京欧陆电气股份有限公司 | Distributed photovoltaic power generation control management method and system |
CN116865447B (en) * | 2023-07-20 | 2024-01-26 | 南京欧陆电气股份有限公司 | Distributed wind power and photovoltaic complementary power generation control management method and system |
Also Published As
Publication number | Publication date |
---|---|
CN106340963B (en) | 2018-08-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Thomas et al. | Power system SCADA and smart grids | |
WO2021217695A1 (en) | Smart data collection and sorting system for smart factory framework-based power supply and distribution grid | |
CN103715767B (en) | Intelligent grid information integerated and display platform | |
CN203324773U (en) | Wind farm centralized control system | |
CN109698555B (en) | One-key remote inspection system and inspection method for unattended transformer substation | |
CN106340963A (en) | Electric power distribution room intelligent commission maintenance monitoring system | |
CN103513167B (en) | Based on the switch partial discharge state monitoring apparatus of Board of Distributed Network Constructed | |
CN106130185B (en) | A kind of monitoring system of electric substation modeling method based on status monitoring information | |
CN110879327B (en) | 10KV line monitoring method by multi-data fusion | |
CN103441571A (en) | Integrated monitoring system information platform for transformer substation | |
CN110928866A (en) | Method and system for line topology verification based on big data analysis of power outage information | |
CN107707029A (en) | Low and medium voltage distribution network integrated monitoring and management system | |
CN109217466A (en) | A kind of electric power O&M monitoring system and method | |
CN107102259A (en) | A kind of State-Inspect of High-Voltage Circuit method and system of Multi-information acquisition | |
CN105654393A (en) | Energy efficiency management service system of power distribution network area | |
CN105449849A (en) | Wind farm integrated monitoring system | |
CN103376784A (en) | Intelligent remote transformer substation monitoring system | |
CN103259333A (en) | Intelligent alarming and integrated fault analysis system | |
CN115356975A (en) | Comprehensive electrical monitoring system | |
CN109066982A (en) | A kind of robot and collecting method on duty for electric power data acquisition | |
CN116522746A (en) | Power distribution hosting method for high-energy-consumption enterprises | |
CN111509857A (en) | Low-voltage distribution transformer power-failure-free rapid monitoring system and method | |
CN204906004U (en) | Distributed intelligent regional power grid of network layering | |
CN108471165A (en) | A kind of Electrical Safety for rail traffic station monitors system and method | |
CN110837027A (en) | Auxiliary decision-making method and system based on the extraction of key information from the dispatcher in the case of power grid faults |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |