CN106336877A - Heat-insulating protective shield used during hot maintenance of coke oven carbonization room - Google Patents
Heat-insulating protective shield used during hot maintenance of coke oven carbonization room Download PDFInfo
- Publication number
- CN106336877A CN106336877A CN201610776092.1A CN201610776092A CN106336877A CN 106336877 A CN106336877 A CN 106336877A CN 201610776092 A CN201610776092 A CN 201610776092A CN 106336877 A CN106336877 A CN 106336877A
- Authority
- CN
- China
- Prior art keywords
- heat
- protective shield
- main beam
- carbonization chamber
- handrail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C10—PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
- C10B—DESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
- C10B29/00—Other details of coke ovens
-
- C—CHEMISTRY; METALLURGY
- C10—PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
- C10B—DESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
- C10B41/00—Safety devices, e.g. signalling or controlling devices for use in the discharge of coke
-
- C—CHEMISTRY; METALLURGY
- C10—PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
- C10B—DESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
- C10B45/00—Other details
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Organic Chemistry (AREA)
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
The invention discloses a heat-insulating protective shield used during hot maintenance of a coke oven carbonization room. The heat-insulating protective shield comprises a left main beam, a right main beam, connecting cross beams and a triangular base, wherein the left main beam and the right main beam are the same wave-shaped main beams; the connecting cross beams are connected at wave peaks and wave troughs of the left main beam and the right main beam; ceramic fiber ropes and rope tightening devices for tightening ceramic fiber felt are arranged on the connecting cross beams at the wave peaks; a handrail is mounted at the middle lower part of the left main beam and the right main beam; a plurality of horizontal tubes which are arranged at intervals are connected to the handrail; the horizontal tube at the bottommost end connects the bottom of the handrail and the bottoms of the left main beam and the right main beam to form the triangular base. During using, the heat-insulating protective shield used during the hot maintenance of the coke oven carbonization room, provided by the invention, can rapidly insulate high heat of the carbonization room, so that the maintenance cycle is shortened; the protective shield can be used for several times in a turnover manner, so that the maintenance cost is reduced.
Description
Technical field
The present invention relates to industrial furnace construction technology, the heat-insulated protective shield of more particularly, to a kind of coke furnace carbonization chamber hot repair.
Background technology
In the actual production process of coke oven, due to the air-flow punching in the even production process of fire resisting material of furnace body non-homogeneous expansion
Gap in brush, high-temp combustion, part brickwork joint and dilatation joint, or even there is fragment of brick fracture.In order to not affect to produce, need in heat
Under state environment, carbonization chamber metope breakage is keeped in repair or changed.In addition, fire door and the collision of firedoor frame long term mechanical, cause
Firedoor frame compression butterfly spring lost efficacy, and occurred smoldering, burns with anger (mainly at gib headed bolt) it is necessary to firedoor frame gib headed bolt and butterfly
Spring is changed.In maintenance process, carbonization chamber high temperature section (1500 degree) need to be kept apart, generally using building firebreak and laying by laying bricks or stones
Ceramic fiber blanket two ways.
Method one: firebreak form of construction work, first refractory brick polylith is banded together, be encased in charcoal from furnace roof hole of coalingging
Change room, after forming firebreak, paving ceramic fiber blanket on firebreak, the position that carbonization chamber is needed repairing separates, and waits to tie up
Repair end, ceramic fiber blanket and refractory brick are removed.The loss of the method resistance to material is big, and maintenance cycle is long, and heat-barrier material can not be secondary
Using.
Method two: laying ceramic fiber blanket mode, install first between hole and support, then paving pottery is fine on supporting
Dimension felt.The method, ceramic fiber blanket can cause to tear, collapse, block sternly, effect of heat insulation is poor, heat-insulated material because gravity tenesmus
Material turnover rate is not high.
Content of the invention
The technical problem to be solved in the present invention is for defect of the prior art, provides a kind of coke furnace carbonization chamber hot repair
Heat-insulated protective shield, using energy quick barrier carbonization chamber high temperature during this heat-insulated protective shield maintenance, shortens maintenance cycle, protective shield can be many
Secondary be used in turn, save maintenance cost, reduce heat-barrier material loss.
The technical solution adopted for the present invention to solve the technical problems is: a kind of heat-insulated protective shield of coke furnace carbonization chamber hot repair,
Including left and right girder, connecting cross beam and triangle base, described left and right girder is identical waveform girder, and described connecting cross beam is even
Connect at crest and the trough of left and right girder;
Connecting cross beam at described crest is provided with ceramic fibre rope and rope tightening device for fastening ceramic fiber blanket;
The middle and lower part of described left and right girder is provided with handrail, and described handrail is connected with multiple spaced transverse tubes, lowermost end
Transverse tube handrail bottom is connected with the bottom of left and right girder, formed triangle base.
By such scheme, described connecting cross beam and handrail are connected with steel pipe, the handrail end of steel pipe between the transverse tube of setting
The hole of termination is lifting hole;It has been horizontally disposed with fixture with lifting hole.
By such scheme, multiple shield segments of described left and right girder and the connecting cross beam heat-insulated protective shield of composition, described protection
Section is rectangle.
By such scheme, described girder is formed by steel-pipe welding, and the angle of the adjacent steel pipe of described girder is 60 degree to 150
Degree.
By such scheme, described triangle base has pulley.
By such scheme, the heat-insulated protective shield outer surface of described coke furnace carbonization chamber hot repair is coated with insulating moulding coating.
The beneficial effect comprise that:
1. when the heat-insulated protective shield of coke furnace carbonization chamber hot repair uses, the quick barrier carbonization chamber high temperature of energy, shortens maintenance cycle, protective shield
Can repeatedly be used in turn, save maintenance cost.
2. the wave structure of wave framework is ceramic fiber blanket segmentation stress, adopts ceramic fibre rope colligation further, makes
Ceramic fiber blanket is difficult tear, collapses.
3. the heat-insulated protective shield of coke furnace carbonization chamber hot repair and mobile hoistable platform combination application, heat-insulated protection is quick for installation.
Brief description
Below in conjunction with drawings and Examples, the invention will be further described, in accompanying drawing:
Fig. 1 is the structural representation of the heat-insulated protective shield of coke furnace carbonization chamber hot repair of the embodiment of the present invention;
Fig. 2 is the enlarged drawing of a part in Fig. 1;
In figure: 1, wave girder;2nd, triangle base;3rd, ceramic fiber blanket;4th, ceramic fibre rope;5th, rope tightening device;51st, connect
Head;52nd, screw rod;53rd, link up with;6th, handrail;7th, lifting hole;8th, fixture;11st, hoist hook;12nd, roller.
Specific embodiment
In order that the objects, technical solutions and advantages of the present invention become more apparent, with reference to embodiments, to the present invention
It is further elaborated.It should be appreciated that specific embodiment described herein, only in order to explain the present invention, is not used to limit
Determine the present invention.
As shown in figure 1, a kind of heat-insulated protective shield of coke furnace carbonization chamber hot repair, including left and right girder 1, connecting cross beam and triangle bottom
Seat 2, described left and right girder 1 is identical waveform girder, and described connecting cross beam connects at crest and the trough of left and right girder;
Connecting cross beam at described crest is provided with ceramic fibre rope 4 and rope tightening device 5 for fastening ceramic fiber blanket 3;As
Shown in Fig. 2, rope tightening device 5 includes union joint 51, screw rod 52 and hook 53, and union joint 51 is arranged on ceramic fibre rope two ends, even
Joint 51 is provided with hole, to install the spring of screw rod 52 or automatic tightening, as tight rope mechanism.Union joint 51 is provided with hook
53, to be connected with the rustless steel transverse tube on handrail 6.
The middle and lower part of described left and right girder is provided with handrail 6, described handrail is connected with multiple spaced transverse tubes,
Handrail bottom is connected by the transverse tube of bottom with the bottom of left and right girder, forms triangle base;
Steel pipe is connected between the transverse tube of setting on described connecting cross beam and handrail, the hole of the handrail end termination of steel pipe is lifting hole
7;It has been horizontally disposed with fixture 8 with lifting hole;
Described left and right girder and multiple shield segments of the connecting cross beam heat-insulated protective shield of composition, described shield segment is rectangle.
Described girder is welded by stainless-steel pipe, and the angle of the adjacent steel pipe of described girder is 60 degree to 150 degree, this reality
Apply in example and be 120 °.
Described triangle base has roller 12, is easy to move.
Coke furnace carbonization chamber hot repair heat-insulated protective shield outer surface is coated with insulating moulding coating, and coating has certain thermal insulation,
After 1200 DEG C of object brushing paints can with heat-insulated 110 DEG C about, after 500 DEG C of object brushing paints can with heat-insulated 40 DEG C about, 200
Can be with heat-insulated 15 DEG C about after DEG C object brushing paint.
It should be appreciated that for those of ordinary skills, can be improved according to the above description or be converted,
And all these modifications and variations all should belong to the protection domain of claims of the present invention.
Claims (6)
1. a kind of heat-insulated protective shield of coke furnace carbonization chamber hot repair is it is characterised in that include left and right girder, connecting cross beam and triangle bottom
Seat, described left and right girder is identical waveform girder, and described connecting cross beam connects at crest and the trough of left and right girder;
Connecting cross beam at described crest is provided with ceramic fibre rope and rope tightening device for fastening ceramic fiber blanket;
The middle and lower part of described left and right girder is provided with handrail, and described handrail is connected with multiple spaced transverse tubes, lowermost end
Transverse tube handrail bottom is connected with the bottom of left and right girder, formed triangle base.
2. the heat-insulated protective shield of coke furnace carbonization chamber hot repair according to claim 1 is it is characterised in that described connecting cross beam and helping
It is connected with steel pipe, the hole of the handrail end termination of steel pipe is lifting hole between the transverse tube arranging on hand;It has been horizontally disposed with lifting hole
Fixture.
3. the heat-insulated protective shield of coke furnace carbonization chamber hot repair according to claim 1 is it is characterised in that described left and right girder and company
Connect multiple shield segments that crossbeam constitutes heat-insulated protective shield, described shield segment is rectangle.
4. the heat-insulated protective shield of coke furnace carbonization chamber hot repair according to claim 1 is it is characterised in that described girder is by steel pipe welding
Connect and form, the angle of the adjacent steel pipe of described girder is 60 degree to 150 degree.
5. the heat-insulated protective shield of coke furnace carbonization chamber hot repair according to claim 1 is it is characterised in that described triangle base is divided into
There is pulley.
6. the heat-insulated protective shield of coke furnace carbonization chamber hot repair according to claim 1 is it is characterised in that described coke furnace carbonization chamber is warm
Repair heat-insulated protective shield outer surface and be coated with insulating moulding coating.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610776092.1A CN106336877A (en) | 2016-08-30 | 2016-08-30 | Heat-insulating protective shield used during hot maintenance of coke oven carbonization room |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610776092.1A CN106336877A (en) | 2016-08-30 | 2016-08-30 | Heat-insulating protective shield used during hot maintenance of coke oven carbonization room |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106336877A true CN106336877A (en) | 2017-01-18 |
Family
ID=57823414
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610776092.1A Pending CN106336877A (en) | 2016-08-30 | 2016-08-30 | Heat-insulating protective shield used during hot maintenance of coke oven carbonization room |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106336877A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107338060A (en) * | 2017-06-16 | 2017-11-10 | 五冶集团上海有限公司 | Carbonizing chamber of coke oven insulation barricade, firedoor frame change system and method |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2036950U (en) * | 1988-07-23 | 1989-05-03 | 冶金工业部鞍山焦化耐火材料设计研究院 | Heat insulation equipment of furnace mouth for hot repair of coke-oven |
JP2006342291A (en) * | 2005-06-10 | 2006-12-21 | Jfe Refractories Corp | Heat insulation box used in hot repair of oven brick work of coke oven carbonization chamber |
JP2009286835A (en) * | 2008-05-27 | 2009-12-10 | Jfe Steel Corp | Method to repair carbonization chamber of coke oven |
CN202186976U (en) * | 2011-08-11 | 2012-04-11 | 上海梅山钢铁股份有限公司 | Heat-insulating protective device for thermal state depth overhaul and maintenance for carbonizing chamber of coke oven |
CN202671492U (en) * | 2012-06-15 | 2013-01-16 | 鞍钢股份有限公司 | Heat insulation tool for repairing furnace wall of coke oven carbonization chamber |
CN203144330U (en) * | 2013-04-07 | 2013-08-21 | 攀钢集团攀枝花钢钒有限公司 | Fire stopping device for repairing furnace wall of coke oven carbonization chamber |
CN203498305U (en) * | 2013-08-28 | 2014-03-26 | 中国一冶集团有限公司 | Hot repair heat insulation device of coke oven carbonization chamber |
CN205443182U (en) * | 2016-04-05 | 2016-08-10 | 五冶集团上海有限公司 | A work platform for maintenance of coke oven furnace end |
-
2016
- 2016-08-30 CN CN201610776092.1A patent/CN106336877A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2036950U (en) * | 1988-07-23 | 1989-05-03 | 冶金工业部鞍山焦化耐火材料设计研究院 | Heat insulation equipment of furnace mouth for hot repair of coke-oven |
JP2006342291A (en) * | 2005-06-10 | 2006-12-21 | Jfe Refractories Corp | Heat insulation box used in hot repair of oven brick work of coke oven carbonization chamber |
JP2009286835A (en) * | 2008-05-27 | 2009-12-10 | Jfe Steel Corp | Method to repair carbonization chamber of coke oven |
CN202186976U (en) * | 2011-08-11 | 2012-04-11 | 上海梅山钢铁股份有限公司 | Heat-insulating protective device for thermal state depth overhaul and maintenance for carbonizing chamber of coke oven |
CN202671492U (en) * | 2012-06-15 | 2013-01-16 | 鞍钢股份有限公司 | Heat insulation tool for repairing furnace wall of coke oven carbonization chamber |
CN203144330U (en) * | 2013-04-07 | 2013-08-21 | 攀钢集团攀枝花钢钒有限公司 | Fire stopping device for repairing furnace wall of coke oven carbonization chamber |
CN203498305U (en) * | 2013-08-28 | 2014-03-26 | 中国一冶集团有限公司 | Hot repair heat insulation device of coke oven carbonization chamber |
CN205443182U (en) * | 2016-04-05 | 2016-08-10 | 五冶集团上海有限公司 | A work platform for maintenance of coke oven furnace end |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107338060A (en) * | 2017-06-16 | 2017-11-10 | 五冶集团上海有限公司 | Carbonizing chamber of coke oven insulation barricade, firedoor frame change system and method |
CN107338060B (en) * | 2017-06-16 | 2023-06-09 | 五冶集团上海有限公司 | Coke oven carbonization chamber heat preservation retaining wall, and system and method for replacing furnace door frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104976894B (en) | A kind of industrial furnace integral module structure and method of construction | |
CN203866244U (en) | Dry coke quenching furnace | |
CN205066456U (en) | Fire -resistant thermal -insulated brickwork is prevented burning with novel by forging furnace | |
CN204648950U (en) | A kind of sour gas burning furnace Fast Installation furnace lining structure | |
CN106350081A (en) | Heat-insulating method used during hot maintenance of coke oven carbonization room | |
CN206339099U (en) | A kind of heater for rolling steel furnace roof collapses the reparation furnace roof at place | |
CN106336877A (en) | Heat-insulating protective shield used during hot maintenance of coke oven carbonization room | |
CN103727791B (en) | A kind of modular construction of industrial furnace radiant section | |
US12078420B2 (en) | Modular enclosure structure of high temperature heating furnace and installation method | |
CN201259369Y (en) | Natural gas biscuit firing tunnel kiln | |
CN206546099U (en) | Erecting by overhang at the top of a kind of furnace flue | |
CN206919671U (en) | A kind of sintering ignition furnace crossbeam prefabricated component | |
CN103788966A (en) | High-temperature resistant expansion joint for dry quenching | |
CN117287979A (en) | Full-fiber composite furnace top structure | |
CN104560065B (en) | False corbel bracket and using method thereof during examining and repairing corbel bricks in dry quenching chute | |
CN202972377U (en) | Submerged arc furnace smoke thermal insulation pipe | |
CN201406405Y (en) | Heat insulation and protection structure for coke oven on-line hot repair | |
CN206843368U (en) | Carbonizing chamber of coke oven insulation barricade, firedoor frame change system | |
CN205066457U (en) | Inside lining is pour to whole injection | |
CN113088604B (en) | Hot blast stove three-fork flat-joint masonry structure and process | |
CN106766927A (en) | A kind of heater for rolling steel furnace roof collapses the reparation furnace roof and restorative procedure at place | |
CN210154324U (en) | Novel arched furnace top structure of heating furnace in forging shop | |
CN211233944U (en) | Module structure wall of high-temperature heating furnace | |
CN107892926A (en) | A kind of energy-saving fire door lining brick of coke oven | |
CN203586817U (en) | Reinforced refractory material lining anchoring nail |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |