[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN106304555A - Control method, Apparatus and system for lighting mains - Google Patents

Control method, Apparatus and system for lighting mains Download PDF

Info

Publication number
CN106304555A
CN106304555A CN201610721003.3A CN201610721003A CN106304555A CN 106304555 A CN106304555 A CN 106304555A CN 201610721003 A CN201610721003 A CN 201610721003A CN 106304555 A CN106304555 A CN 106304555A
Authority
CN
China
Prior art keywords
single lamp
control
lamp
centralized controller
control command
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610721003.3A
Other languages
Chinese (zh)
Inventor
吴战江
王海东
魏星
刘高强
王晓璐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING AIPUZHICHENG NETWORK TECHNOLOGY Co Ltd
Original Assignee
BEIJING AIPUZHICHENG NETWORK TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING AIPUZHICHENG NETWORK TECHNOLOGY Co Ltd filed Critical BEIJING AIPUZHICHENG NETWORK TECHNOLOGY Co Ltd
Priority to CN201610721003.3A priority Critical patent/CN106304555A/en
Publication of CN106304555A publication Critical patent/CN106304555A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05BELECTRIC HEATING; ELECTRIC LIGHT SOURCES NOT OTHERWISE PROVIDED FOR; CIRCUIT ARRANGEMENTS FOR ELECTRIC LIGHT SOURCES, IN GENERAL
    • H05B47/00Circuit arrangements for operating light sources in general, i.e. where the type of light source is not relevant
    • H05B47/10Controlling the light source
    • H05B47/175Controlling the light source by remote control
    • H05B47/19Controlling the light source by remote control via wireless transmission
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B20/00Energy efficient lighting technologies, e.g. halogen lamps or gas discharge lamps
    • Y02B20/40Control techniques providing energy savings, e.g. smart controller or presence detection

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Circuit Arrangement For Electric Light Sources In General (AREA)

Abstract

The invention discloses a kind of control method for lighting mains, Apparatus and system.This control method being used for lighting mains includes: obtaining the control command for performing to control to single lamp, wherein, lighting mains includes multiple single lamp;Control single lamp according to control command and perform the predetermined registration operation of preset time period;And the status information that the single lamp of transmission is when performing predetermined registration operation is to Centralized Controller, wherein, Centralized Controller is for forwarding status information to monitoring system, and monitoring system is for according to status information adjustment control command.By the present invention, reach to improve the effect of the motility that lighting mains controls.

Description

Control method, Apparatus and system for lighting mains
Technical field
The present invention relates to the communications field, in particular to a kind of control method for lighting mains, device and be System.
Background technology
At present, city illumination is the important step being related to numerous citizen's vital interests, directly reflects city Its construction level in city and mental attitude, the control of street lamp and management level more demonstrate the up-to-dateness in city.Thus it is guaranteed that City street lamp reliablely and stablely runs, and urban public security, urban beautification, night traffic and city civilization construction are risen important work With, provide important guarantee for city people's lives and economic activity;And for improving the investment climate, attract foreign trader to throw Money, promoting economic development etc. plays very important effect.
Along with the development of China's economic construction, the acceleration of urbanization process and the high speed development of transportation cause, city Tremendous development has been obtained with city illumination.Continuous for the developing energy demand in city and city illumination and consumption Strengthen, and the problem such as light pollution, the Ministry of Construction carries forward vigorously Green Lighting Project together with the department such as National Development and Reform Committee, the Department of Science and Technology, Achieve significant economic benefit and social benefit.But, in general, city and traffic green illumination work ground zero, send out Exhibition imbalance, there is also many problems and weak link, and such as, the centralized guidance of city and city illumination has not enough Power, relevant accompanying institution also imperfection, the problem such as poor efficiency, high energy consumption, light pollution is the most prominent.Illumination quality and Level has become measurement social modernization and the important symbol of progress of human society sustainable development.
Along with intelligent building at home universal, intelligent lighting system be rapidly introduced into should China, domestic street lamp system Main employing technology of uniting has: the centralized Energy Saving Control in platform district, is controlled the power of whole piece illuminating line, it is impossible to control each The actual power of small cup street lamp, is not belonging to the control on demand that becomes more meticulous, that is, the power of circuit head end and end list light fixture cannot be overcome Difference, cannot guarantee that the illumination uniformity of sliver road lighting lantern;Single distributed Energy Saving Control of lamp, respectively to every single light fixture list Solely carry out power control, belong to the control on demand that becomes more meticulous, it is achieved that based on longitude and latitude single lamp control, but control strategy is ineffective Live, abnormal scene is considered deficiency;Remotely control, use remote control table to be controlled, depend on remote system unduly, logical In the case of letter poor signal, control strategy timely in the effective time, cannot be made;Artificial Anomalies patrols lamp, the abnormal row of street lamp Looking into the artificial identification method of employing, such manual detection error is big, and the activity duration is long, and investigation difficulty is big, and human cost puts into big, row Checking method is single.
For the problem of the very flexible that lighting mains in correlation technique controls, effective solution party is the most not yet proposed Case.
Summary of the invention
Present invention is primarily targeted at offer a kind of control method for lighting mains, Apparatus and system, with at least Solve the problem of the very flexible that lighting mains controls in correlation technique.
To achieve these goals, according to an aspect of the invention, it is provided a kind of controlling party for lighting mains Method.This control method being used for lighting mains includes: obtain the control command for performing to control, wherein, lighting mains to single lamp Network includes multiple single lamp;Control single lamp according to control command and perform the predetermined registration operation of preset time period;And send single lamp and holding Status information during row predetermined registration operation is to Centralized Controller, wherein, Centralized Controller for forwarding status information to monitoring system, Monitoring system is for adjusting control command according to status information.
Further, send single lamp status information when performing predetermined registration operation to include to Centralized Controller: the single lamp of detection Service data;Judge whether the service data of single lamp meets pre-conditioned;And if it is judged that the service data of single lamp not Meet pre-conditioned, determine single lamp operation exception, and report the exception for indicating single lamp operation exception by Centralized Controller Information, wherein, status information includes abnormal information.
Further, the service data judging single lamp whether meet pre-conditioned after, if it is judged that the fortune of single lamp Row data do not meet pre-conditioned, according to abnormal information alert, and abnormal information are carried out early warning analysis.
Further, after the status information when sending single lamp in execution predetermined registration operation to Centralized Controller, this is used for The control method of lighting mains also includes: by Centralized Controller, the service data of declaration form lamp is to Cloud Server, wherein, and cloud takes Business device, for the service data of single lamp being performed calculating according to preset algorithm, obtains result of calculation, and by presupposition analysis model Result of calculation is performed analysis, obtains the first analysis result, determine the running status of single lamp according to the first analysis result.
Further, before controlling, according to control command, the predetermined registration operation that single lamp performs preset time period, this is used for shining Bright network-based control method also includes: by brightness impression device collection for representing the brightness data of single lamp surrounding brightness;And Transmission brightness data is to background server, and wherein, background server, for brightness data is performed analysis, obtains the second analysis knot Really, and according to the second analysis result send for controlling single lamp execution bright light operation or the control command of operation of turning off the light.
Further, the predetermined registration operation performing preset time period according to the single lamp of control command control includes: obtains and deposits in advance Store up in local preset rules;And the predetermined registration operation of preset time period is determined according to preset rules.
Further, obtain the control command being used for performing to control to single lamp to include: obtain the pre-of Centralized Controller transmission If information;And presupposed information is performed parsing, obtain control command.
To achieve these goals, according to a further aspect in the invention, a kind of control for lighting mains is additionally provided Device.This control device being used for lighting mains includes: acquiring unit, for obtaining the control life for performing to control to single lamp Order, wherein, lighting mains includes multiple single lamp;Control unit, performs preset time period for controlling single lamp according to control command Predetermined registration operation;And transmitting element, for sending single lamp status information when performing predetermined registration operation to Centralized Controller, its In, Centralized Controller is for forwarding status information to monitoring system, and monitoring system is for adjusting control command according to status information.
To achieve these goals, according to a further aspect in the invention, a kind of control for lighting mains is additionally provided System.This control system being used for lighting mains includes: single lamp control equipment, for according to the control life performing to control to single lamp Order controls single lamp and performs the predetermined registration operation of preset time period;Centralized Controller, is connected with single lamp control equipment, for receiving Single lamp performs status information during predetermined registration operation;And monitoring system, it is connected with Centralized Controller, for according to status information Adjust control command, the channel that Centralized Controller transmits for providing the data between monitoring system and single lamp control equipment.
Further, this Centralized Controller includes: WEB application system, for providing operation and control interface based on mobile terminal; WIFI module, is connected with WEB application system, and for setting up wireless connections with mobile terminal, mobile terminal is for holding single lamp Row controls and debugging.
In embodiments of the present invention, obtaining the control command for performing to control to single lamp, wherein, lighting mains includes many Individual single lamp;Control single lamp according to control command and perform the predetermined registration operation of preset time period;And send single lamp the default behaviour of execution Status information when making is to Centralized Controller, and wherein, Centralized Controller is used for forwarding status information to monitoring system, monitoring system For adjusting control command according to status information, solve the problem of the very flexible that lighting mains controls in correlation technique, enter And reached to improve the effect of the motility that lighting mains controls.
Accompanying drawing explanation
The accompanying drawing of the part constituting the application is used for providing a further understanding of the present invention, and the present invention's is schematic real Execute example and illustrate for explaining the present invention, being not intended that inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the schematic diagram of a kind of control system for lighting mains according to embodiments of the present invention;
Fig. 2 is the schematic diagram for the control system of lighting mains of the another kind according to embodiments of the present invention;
Fig. 3 is the flow chart of a kind of control method for lighting mains according to embodiments of the present invention;
Fig. 4 is the schematic diagram of bright light based on the time period scheme of a kind of single-lamp controller according to embodiments of the present invention;
Fig. 5 is the schematic diagram of bright light based on the time period scheme of another kind of single-lamp controller according to embodiments of the present invention;
Fig. 6 is the schematic diagram of bright light based on the time period scheme of another kind of single-lamp controller according to embodiments of the present invention;
Fig. 7 is a kind of schematic diagram quantifying the service data of single lamp according to embodiments of the present invention;And
Fig. 8 is a kind of schematic diagram controlling device for lighting mains according to embodiments of the present invention.
Detailed description of the invention
It should be noted that in the case of not conflicting, the embodiment in the application and the feature in embodiment can phases Combination mutually.Describe the present invention below with reference to the accompanying drawings and in conjunction with the embodiments in detail.
In order to make those skilled in the art be more fully understood that the application scheme, below in conjunction with in the embodiment of the present application Accompanying drawing, is clearly and completely described the technical scheme in the embodiment of the present application, it is clear that described embodiment is only The embodiment of the application part rather than whole embodiments.Based on the embodiment in the application, ordinary skill people The every other embodiment that member is obtained under not making creative work premise, all should belong to the model of the application protection Enclose.
It should be noted that term " first " in the description and claims of this application and above-mentioned accompanying drawing, " Two " it is etc. for distinguishing similar object, without being used for describing specific order or precedence.Should be appreciated that so use Data can exchange in the appropriate case, in order to embodiments herein described herein.Additionally, term " includes " and " tool Have " and their any deformation, it is intended that cover non-exclusive comprising, such as, contain series of steps or unit Process, method, system, product or equipment are not necessarily limited to those steps or the unit clearly listed, but can include the most clear That list to Chu or for intrinsic other step of these processes, method, product or equipment or unit.
Embodiments provide a kind of control system for lighting mains.
Fig. 1 is the schematic diagram of a kind of control system for lighting mains according to embodiments of the present invention.As it is shown in figure 1, This control system being used for lighting mains includes: single lamp control equipment 10, Centralized Controller 20 and monitoring system 30.
Single lamp control equipment 10, performs preset time period for controlling single lamp according to the control command that single lamp is performed control Predetermined registration operation.
Single lamp control equipment 10, that is, single-lamp controller, for receiving the control command that single lamp performs control, is shining Having preset address in bright network, this list lamp is an illuminating lamp in lighting mains.Alternatively, single lamp control equipment 10 basis Single lamp is remotely controlled by control command.This single lamp control equipment 10 controls single lamp according to control command and performs preset time period Predetermined registration operation, the presupposed information including control command can be received, presupposed information is resolved, obtain control command, press According to pre-setting the control rule that single lamp is controlled, single lamp is in a planned way controlled, such as, in inclement weather Due to the Communication between equipment, cause communication to be obstructed, but single lamp control equipment 10 still can be according to control command control Single lamp performs the predetermined registration operation of preset time period.Wherein, preset time period is the time period being controlled single lamp according to plan, from And making single lamp be operated in the effective time, predetermined registration operation is the operation corresponding with preset time period, such as, multiple single lamp controls Control equipment 10 controls multiple single lamp and performs predetermined registration operation in preset time period, and multiple single lamp control equipment 10 are with multiple single lamps one by one Correspondence, multiple single lamp entirety realize in preset time period all light, entirely go out, are spaced the operations such as bright, 1/3 bright, size Serpentis is bright, permissible To Scene realization flexible configuration such as crossroad, T-shaped road junction ends, thus realize many strategies of single lamp control are run purpose, Reach diversified bright light effect, it is to avoid the centralized Energy Saving Control in Liao Tai district can not control the actual power of each single lamp not Foot, it also avoid single lamp control strategy dumb, and abnormal scene is considered not enough defect.
Centralized Controller 20, is connected with single lamp control equipment 10, for receiving the shape when single lamp performs predetermined registration operation State information.
Centralized Controller 20 is connected with single lamp control equipment 10, can transmit information to single lamp control equipment 10.At list During lamp performs predetermined registration operation, the status informations such as running status, such as, the status information of normal operation can be produced, or The status information etc. of operation troubles, Centralized Controller 20 receives status information during single lamp execution predetermined registration operation.Alternatively, shape is worked as During information when state information is to be in an emergency, such as, when power failure cannot normal power supply time, Centralized Controller 20 Actively sending power failure cannot the status information of normal power supply.
Centralized Controller 20 forwards the control command for controlling single lamp execution control to single lamp control equipment 10, Ke Yigen According to preset address, control command is forwarded to the single lamp control equipment 10 corresponding with preset address.Alternatively, Centralized Controller 20 transmit preset address and control command etc. by wide area power line carrier (WPLC) communication/Ethernet to single-lamp controller 10 believes Breath, if the preset address that single-lamp controller 10 receives is corresponding with the address of self, then single-lamp controller 10 is according to reception The control command arrived performs the predetermined registration operation in preset time period.
Monitoring system 30, is connected with Centralized Controller 20, for adjusting control command according to status information.
Monitoring system 30, that is, Surveillance center, passes through Centralized Controller 20 with single-lamp controller 10 and carries out the biography of information Defeated.After status information when Centralized Controller 20 receives single lamp execution predetermined registration operation, Centralized Controller 20 is by status information Sending to monitoring system 30, monitoring system 30 obtains the running status of single lamp in real time according to status information, adjusts in time and controls life Order, so adjust single-lamp controller 10 operational factor, such as, perform bright operation time parameter, perform extinguish operation time Between parameter etc., this monitoring system 30 is additionally operable to strategy generating and abnormal data is comprehensively analyzed, and this monitoring system 30 is additionally operable to plan Slightly generate and abnormal data is comprehensively analyzed.Centralized Controller 20 be used for providing this monitoring system 30 and single lamp control equipment 10 it Between data transmission channel.
Alternatively, monitoring system 30 receives the status information of single lamp that Centralized Controller 20 sends, can be with selectivity DIGEN Adjust order according to useful status information, and useless status information is ignored, such as, to occur in inclement weather The fault message of single lamp ignores, it is to avoid monitoring system 30 all adjusts, to any status information, the place that control command is caused Reason burden weight, the problem reducing treatment effeciency.
Monitoring system 30 issues the presupposed information including control command to Centralized Controller 20, and Centralized Controller 20 is to single lamp Controller 10 forwards this presupposed information, single-lamp controller 10 presupposed information to be performed parsing, obtains control command, according to controlling life Order performs the predetermined registration operation in preset time period.
Alternatively, monitoring system 30 is by general packet radio service (General Packet Radio Service, letter Be referred to as GPRS) wireless network and WPLC/ aether net-based communication technology and single-lamp controller 10 realize telecommunication, complete single lamp On-off control and the monitoring information such as operation exception, and then realize the maintenance of bright light strategy to single lamp, improve lighting mains The motility that network controls.
This embodiment controls single lamp by single lamp control equipment 10 according to the control command that single lamp is performed control and performs pre- If the predetermined registration operation of time period, it is connected with single lamp control equipment 10 by Centralized Controller 20, receives and perform to preset at single lamp Status information during operation, is connected according to status information adjustment control command by monitoring system 30 with Centralized Controller 20, Improve the motility that lighting mains controls.
Alternatively, this Centralized Controller includes: webpage (WEB) application system, for providing manipulation based on mobile terminal Interface;Wireless Fidelity (Wireless-Fidelity, referred to as WIFI) module, is connected with WEB application system, is used for and shifting Dynamic terminal sets up wireless connections, and mobile terminal is for performing to control and debugging to single lamp by Centralized Controller.
This embodiment can realize mobile terminal and control, that is, install WEB application system in local Centralized Controller And WIFI module, single lamp directly can be controlled and debug by local WIFI connection by mobile terminal, such as, and tester The operation and control interface being controlled single lamp by mobile phone open, can be controlled single lamp and operate in real time, obtain in real time Take the running status of single lamp, the fault message of quick obtaining list lamp, in order to quickly single lamp is safeguarded, it is to avoid due to single lamp Fault cannot find in time and the severe situation of causing trouble occurs, improve the safety that single lamp runs, it is to avoid artificial inspection Surveying that error is big, activity duration length, investigation difficulty are big, human cost puts into problem big, that investigation method is single, to improve right simultaneously The motility of single lamp control.
Alternatively, single lamp control equipment includes: first reports mechanism, for reporting for indicating the different of single lamp operation exception Often information, status information includes abnormal information.
Single lamp produces status information during running, and this status information includes what single lamp occurred during running Abnormal information.Single lamp control equipment reports mechanism to report the abnormal information for indicating single lamp operation exception by first.Optional Ground, single lamp control equipment arranges predetermined threshold value, when the service data single lamp being detected exceeds predetermined threshold value, it is determined that single lamp goes out Now abnormal, report the abnormal information for indicating single lamp operation exception to Centralized Controller, forwarded by Centralized Controller abnormal Information is to monitoring system, that is, abnormal information is reported to main website.This abnormal information can be such as: switch lamp is abnormal, terrible The information such as lamp, current anomaly.
Alternatively, this single lamp control equipment also includes: alarm mechanism, is used for according to abnormal information alert, and Abnormal information is carried out early warning analysis.
When single lamp occurs abnormal during running, that is, single lamp is operated in abnormality, single lamp control equipment can With by alarm mechanism according to abnormal information alert, thus prompting maintenance personnel's list lamp run during occur Exception, carries out early warning analysis to abnormal information simultaneously, to determine that abnormal reason occurs in single lamp, thus takes to carry out single lamp Corresponding maintenance and maintenance measures, to avoid single lamp exception again occur during running, affect bright light scheme.
Alternatively, this single lamp control equipment includes: second reports mechanism, for the service data of upper declaration form lamp to cloud service Device, Cloud Server is for performing analysis by presupposition analysis model to result of calculation, and result of calculation is passed through to preset by Cloud Server The service data of single lamp is performed to be calculated by algorithm.
Single lamp service data during work, including the operational factor of single lamp, reports mechanism to report by second To Cloud Server, the service data of Cloud Server real-time collecting list lamp, will be counted in the range of configuration by platform configuration computational methods According to result of calculation come out, thus according to result of calculation, single lamp is controlled and debugs, this service data can be photograph The Centralized Controller number of bright network, single-lamp controller quantity, Centralized Controller puts into operation number, and event number has filled ammeter number, located Director's number of packages, also includes weather data etc..Alternatively, the part during this Cloud Server is monitoring system.
Alternatively, monitoring system also includes: brightness impression device and background server.Wherein, brightness impression device, it is used for gathering For representing the brightness data of single lamp surrounding brightness;Background server, is connected with brightness impression device, for according to brightness data Send for controlling single lamp execution bright light operation or the control command of operation of turning off the light.
Brightness impression device, for sensing the brightness around single lamp, gathers the brightness data for representing single lamp surrounding brightness. Such as, the brightness around list lamp can change at day or time sky goes out, and brightness impression device gathers brightness data, and by brightness data Send to background server, background server analysis comprehensive to brightness data, determine that single lamp performs bright light and operates the behaviour that still turns off the light Make, send the control command corresponding with bright light operation and operation of turning off the light, it is achieved that send according to brightness data and be used for controlling Single lamp performs bright light operation or the control command of operation of turning off the light.
Alternatively, single lamp control equipment includes: receiving mechanism and analytical mechanism.Wherein, receiving mechanism, it is used for receiving concentration The presupposed information that controller sends;Analytical mechanism, is connected with receiving mechanism, for presupposed information is performed parsing, is controlled System order.
Single lamp control equipment is connected with Centralized Controller, and Centralized Controller is connected with monitoring system, Centralized Controller Receiving the presupposed information that monitoring system issues, this presupposed information includes the address information of single-lamp controller and for entering single lamp The control command that row controls.Presupposed information is forwarded to the single lamp control corresponding with presupposed information according to address information by Centralized Controller Control equipment, single lamp control equipment receives presupposed information by receiving mechanism, by analytical mechanism, presupposed information is performed parsing, To control command, and then perform the predetermined registration operation in preset time period according to control command.
Alternatively, Centralized Controller includes: the first communication means, is connected with receiving mechanism, for by WPLC/ ether Net transmits presupposed information to receiving mechanism.
Centralized Controller is after receiving the presupposed information that monitoring system issues, by the first communication means with WPLC/ Ethernet transmits presupposed information to the receiving mechanism of single-lamp controller.First communication means can be with WPLC downstream signal 25bits/s issues presupposed information to single lamp control equipment.
Alternatively, single lamp control equipment includes: transmitting mechanism, for being sent the shape of single lamp to Centralized Controller by WPLC State information.
Single lamp produces status information during running, and single lamp control equipment is sent out to Centralized Controller by transmitting mechanism Sending the status information of single lamp, this transmitting mechanism can send status information with WPLC upward signal 25bit/s to Centralized Controller. Status information, after receiving status information, can be resolved by Centralized Controller, actively with GPRS upward signal to prison Ore-controlling Role sends the information after resolving.
Alternatively, Centralized Controller includes: the second communication means, is connected with monitoring system, for by GPRS/ code division The control command that multiple access (Code Division Multiple Access, referred to as CDMA) communications reception monitoring system issues Status information with upper leaflet lamp.
Using GPRS/CDMA communication pattern between Centralized Controller and monitoring system, monitoring system issues control command and arrives Centralized Controller, that is, monitoring system issues communication downlink signal, Centralized Controller passes through WPLC communication/Ethernet to single lamp The controller transmission information such as address information and control command.Lighting mains includes multiple single-lamp controller, each single lamp control Device is to there being address information, and the single-lamp controller parsing information corresponding with address information is to obtain control command, according to controlling life Order performs the predetermined registration operation in preset time period.Single-lamp controller sends the state letter of self-operating state to Centralized Controller Breath, Centralized Controller actively sends status information by the second communication means, and monitoring system adjusts according to status information and controls life Order, improves the motility that lighting mains controls.
Below in conjunction with preferred embodiment, the control system of the lighting mains of the present invention is illustrated.
Fig. 2 is the schematic diagram for the control system of lighting mains of the another kind according to embodiments of the present invention.Such as Fig. 2 institute Showing, the control system of this lighting mains includes Surveillance center, two groups of Centralized Controllers and two groups of single-lamp controllers 1, single lamp control Device 2, single-lamp controller 3 to single-lamp controller n.
Surveillance center, that is, control centre's management system, uses GPRS/CDMA to lead between Surveillance center and Centralized Controller Letter pattern, Surveillance center's transmitting order to lower levels to Centralized Controller (communication downlink signal), Centralized Controller passes through WPLC communication/ether Net transmits the information such as address and control command to single-lamp controller (WPLC downstream signal 25bits/s), and single-lamp controller is to information Perform parsing, obtain control command, control single lamp according to control command and perform the predetermined registration operation of preset time period, such as, two groups The all light of multiple single lamp that single-lamp controller 1, single-lamp controller 2, single-lamp controller 3 to single-lamp controller n are corresponding, entirely go out, Every bright, 1/3, size Serpentis bright.Single lamp in each district is divided into multiple logical groups, to all kinds of fields such as crossroad, T-shaped road ends Scape realizes flexible configuration, it is achieved that the many strategies of single lamp control run, and Surveillance center also includes application software, and SMS alarm is applied, Other application system.
Single-lamp controller sends from preset time period to Centralized Controller (WPLC upward signal 25bits/s) The information such as the running status of predetermined registration operation, after Centralized Controller is resolved to corresponding signal, actively send to Surveillance center after resolving Information, such as, be sent in information (GPRS upward signal) in emergency circumstances.Surveillance center is optionally to Centralized Controller The information reported processes, it is to avoid process to garbage.
Two groups of single-lamp controllers 1, single-lamp controller 2, single-lamp controller 3 can be understood in real time to single lamp control in Surveillance center The operation conditions of single lamp that device n processed is corresponding, adjusts control system and the operational factor of single-lamp controller of lighting mains in time.Borrow Help GPRS wireless network and WPLC/ aether net-based communication technology to realize telecommunication, complete the on-off control to single lamp and light fixture The collection of abnormal accident information and the maintenance function of bright light strategy.
This embodiment uses many quadrat methods bright light, at the locally located control strategy corresponding with predetermined registration operation, introduces list Lamp controller, the fancy bright light performed according to plan by each single lamp of this system to the long-range control realization of single lamp, even if Occur to there is Communication with equipment during vile weather, it is also possible to allow two groups of single-lamp controllers 1, single-lamp controller 2, single lamp control Single lamp corresponding for device 3 to single-lamp controller n performs fancy bright light according to plan, it is achieved that the implementation effect that this locality prestores.
Single lamp there will be exception in running, needs single lamp is carried out brightness anomaly analysis.Bright light anomaly analysis bag Include two ways: one is that the equipment including single lamp is pre-set pre-set threshold value, the data monitored during by equipment self-operating with Predetermined threshold value is compared, and obtains comparison result, determines that according to comparison result the running status of single lamp is the most abnormal, if it is determined that The running status of single lamp is abnormal, reports abnormality to adjust control command to Surveillance center, Surveillance center according to abnormality.Two For high in the clouds big data analysis exception monitoring, single lamp, at real-time report data, far-end cloud platform real-time collecting equipment operating data, leads to Cross platform configuration computational methods, the result of calculation of data in the range of configuration is come out.Thus reach analytical equipment exception Purpose.
Mobile terminal controls to be to install WEB application system and WIFI module in local concentrator, and mobile device is led to Cross local WIFI to connect, directly equipment be controlled and debug, it is to avoid manual detection error is big, activity duration length, investigation Difficulty is big, human cost puts into problem big, that investigation method is single.
The control system for lighting mains of this embodiment gathers two groups of single-lamp controllers 1, list by brightness impression device The brightness data for representing brightness around single lamp that lamp controller 2, single-lamp controller 3 to single-lamp controller n are corresponding.And lead to Later station server is comprehensively analyzed, thus obtain to two groups of single-lamp controllers 1, single-lamp controller 2, single-lamp controller 3 to The strategy turning on/off lamp made by single lamp corresponding for single-lamp controller n, has reached to improve the effect of the motility that lighting mains controls.
The embodiment of the present invention additionally provides a kind of control method for lighting mains.It should be noted that this embodiment The control method for lighting mains can by the embodiment of the present invention for lighting mains control system perform.
Fig. 3 is the flow chart of a kind of control method for lighting mains according to embodiments of the present invention.As it is shown on figure 3, This control method being used for lighting mains comprises the following steps:
Step S301, obtains the control command for performing to control to single lamp.
Obtaining the control command for performing to control to single lamp, wherein, single lamp is an illuminating lamp in lighting mains, shines Bright network includes multiple single lamp.The control command that single lamp is performed to be controlled, single-lamp controller can be received by single-lamp controller There is in lighting mains preset address.Alternatively, control single lamp according to control command and perform the predetermined registration operation of preset time period, The presupposed information including control command can be received, presupposed information is resolved, obtain control command, according to pre-setting Single lamp is in a planned way controlled by the control rule being controlled single lamp, such as, in inclement weather due to equipment between Communication, cause communication to be obstructed, but single lamp control equipment still can according to control command control single lamp perform to preset time Between the predetermined registration operation of section.Wherein, preset time period is the time period being controlled single lamp according to plan, so that single lamp is operated in In the effective time, predetermined registration operation is the operation corresponding with preset time period, such as, controls multiple single lamp in preset time period Perform predetermined registration operation, multiple single lamp entirety realize in preset time period all light, entirely go out, be spaced bright, 1/3 bright, size Serpentis is bright Operation, to Scene realization flexible configuration such as crossroad, T-shaped road junction ends, thus can realize the how strategy to single lamp control Run mesh, reach diversified bright light effect, it is to avoid the centralized Energy Saving Control in Liao Tai district can not control the reality of each single lamp The deficiency of power, it also avoid single lamp control strategy and makes little of, and abnormal scene is considered not enough defect.
Step S302, controls single lamp according to control command and performs the predetermined registration operation of preset time period.
In acquisition after single lamp is performed the control command controlled, when performing to preset according to the single lamp of control command control Between the predetermined registration operation of section.During single lamp performs predetermined registration operation, the status informations such as running status can be produced, such as, run Normal status information, or the status information etc. of operation troubles.Alternatively, the letter when status information is to be in an emergency During breath, such as, when power failure cannot normal power supply time, actively sent single lamp by Centralized Controller and perform predetermined registration operation Time status information, Centralized Controller may be used for controlling the control command that single lamp performs to control, and will control according to preset address Order is forwarded to the single lamp control equipment corresponding with preset address.Alternatively, Centralized Controller passes through wide area power line carrier (WPLC) communication/Ethernet transmits the information such as preset address and control command to single-lamp controller, if single-lamp controller receives The preset address arrived is corresponding with self, then single-lamp controller according to the control command that receives perform in preset time period pre- If operation.
Step S303, sends single lamp status information when performing predetermined registration operation to Centralized Controller.
The transmission single lamp status information when performing predetermined registration operation is to Centralized Controller, and wherein, Centralized Controller is for turning Sending out status information to monitoring system, monitoring system is for adjusting control command according to status information.Monitoring system, that is, monitoring Center, with the transmission that single-lamp controller carries out information by Centralized Controller.Receive single lamp at Centralized Controller to perform to preset behaviour After status information when making, status information is sent to monitoring system by Centralized Controller, and monitoring system is real according to status information Time obtain the running status of single lamp, adjust control command in time, and then adjust the operational factor of single-lamp controller, such as, perform The time parameter of bright operation, execution extinguish the time parameter etc. of operation.
Alternatively, being sent the status information of single lamp to monitoring system by Centralized Controller, monitoring system can be with selectivity Ground adjusts order according to useful status information, and ignores useless status information, such as, occurs in inclement weather The fault message of single lamp ignore, it is to avoid monitoring system all adjusts, to any status information, the place that control command is caused Reason burden weight, the problem reducing treatment effeciency.
Received by Centralized Controller and issued the presupposed information including control command by monitoring system, and presupposed information is held Row resolves, and obtains control command, performs the predetermined registration operation in preset time period according to control command.
Alternatively, realize telecommunication with monitoring system by GPRS wireless network and WPLC/ aether net-based communication technology, complete The information such as the on-off control of the most single lamp and monitoring operation exception, and then the maintenance that realization is to the bright light strategy of single lamp, improve The motility that lighting mains controls.
This embodiment is by obtaining the control command for performing to control to single lamp, and lighting mains includes multiple single lamp;Root Control single lamp according to control command and perform the predetermined registration operation of preset time period;And send single lamp state when performing predetermined registration operation Information is to Centralized Controller, and wherein, Centralized Controller is for forwarding status information to monitoring system, and monitoring system is for according to shape State information adjusts control command, has reached to improve the effect of the motility that lighting mains controls.
As the optional embodiment of one, send single lamp status information when performing predetermined registration operation to Centralized Controller Including: the service data of the single lamp of detection;Judge whether the service data of single lamp meets pre-conditioned;And if it is judged that single lamp Service data do not meet pre-conditioned, determine single lamp operation exception, and reported for indicating single lamp fortune by Centralized Controller The abnormal information that row is abnormal, wherein, status information includes abnormal information.
Single lamp produces status information during running, and this status information includes what single lamp occurred during running Abnormal information.The abnormal information for indicating single lamp operation exception is reported by Centralized Controller.Alternatively, the fortune of the single lamp of detection Whether row data there is exception, when the service data single lamp being detected exceeds predetermined threshold value, it is determined that the service data of single lamp Do not meet pre-conditioned, determine that single lamp occurs abnormal, report the abnormal information for indicating single lamp operation exception to centralized Control Device, by Centralized Controller forwarding abnormal information to monitoring system, that is, abnormal information is reported to main website.
As the optional embodiment of one, the service data judging single lamp whether meet pre-conditioned after, if Judge that the service data of single lamp does not meets pre-conditioned, according to abnormal information alert, and abnormal information is carried out Early warning analysis.
When single lamp occurs abnormal during running, that is, single lamp is operated in abnormality, single lamp control equipment can With according to abnormal information alert, thus prompting maintenance personnel's list lamp occurs in that exception, simultaneously during running Abnormal information is carried out early warning analysis, to determine that abnormal reason occurs in single lamp, so that attendant takes to carry out single lamp Corresponding maintenance and maintenance measures, to avoid single lamp exception again occur during running, affect bright light scheme.
As the optional embodiment of one, sending single lamp status information when performing predetermined registration operation to centralized Control After device, by Centralized Controller, the service data of declaration form lamp is to Cloud Server, wherein, Cloud Server is for according to pre-imputation Method performs calculating to the service data of single lamp, obtains result of calculation, and by presupposition analysis model, result of calculation is performed analysis, Obtain the first analysis result, determine the running status of single lamp according to the first analysis result.
Single lamp service data during work, including the operational factor of single lamp, is reported to by Centralized Controller Cloud Server, the service data of Cloud Server real-time collecting list lamp, data in the range of being configured by platform configuration computational methods Result of calculation come out, and result of calculation is performed analysis by presupposition analysis model, obtains the first analysis result, according to First analysis result determines the running status of single lamp, adjusts control command according to running status, it is achieved thereby that according to calculating knot Single lamp is controlled and debugs by fruit.Alternatively, the part during this Cloud Server is monitoring system.
As the optional embodiment of one, perform the predetermined registration operation of preset time period controlling single lamp according to control command Before, by brightness impression device collection for representing the brightness data of single lamp surrounding brightness;And send brightness data to backstage Server, wherein, background server, for brightness data is performed analysis, obtains the second analysis result, and analyzes according to second Result sends for controlling single lamp execution bright light operation or the control command of operation of turning off the light.
Brightness impression device, for sensing the brightness around single lamp, gathers the brightness data for representing single lamp surrounding brightness. Such as, at day, when sky goes out, the brightness around single lamp can change, and brightness impression device gathers brightness data, and by brightness data Send to background server, background server analysis comprehensive to brightness data, determine that single lamp performs bright light and operates the behaviour that still turns off the light Make, send the control command corresponding with bright light operation and operation of turning off the light, it is achieved that send according to brightness data and be used for controlling Single lamp performs bright light operation or the control command of operation of turning off the light.
As the optional embodiment of one, control single lamp according to control command and perform the predetermined registration operation bag of preset time period Include: obtain the preset rules being stored in advance in this locality;And the predetermined registration operation of preset time period is determined according to preset rules.
The predetermined registration operation of the preset time period that single lamp performs is to be set according to the preset rules being stored in advance in this locality , make each single lamp perform operation according to schedule, though the most unaffected.This preset rules has variation Feature, can change, obtain be stored in advance in this locality preset rules, according to preset rules determine preset time period preset Operation, it is achieved that the style bright light that single lamp performs, has reached the local implementation effect prestored.
As the optional embodiment of one, obtain and include for the control command performing to control to single lamp: obtain and concentrate The presupposed information that controller sends;And presupposed information is performed parsing, obtain control command.
Receiving, by Centralized Controller, the presupposed information that monitoring system issues, this presupposed information includes the ground of single-lamp controller Location information and for the control command that single lamp is controlled.Presupposed information is performed parsing, obtains control command, Jin Ergen Perform the predetermined registration operation in preset time period according to control command, send single lamp by WPLC to Centralized Controller and perform predetermined registration operation Time status information.
Alternatively, Centralized Controller transmits above-mentioned presupposed information by WPLC/ Ethernet to receiving mechanism, can be with WPLC Downstream signal 25bits/s issues presupposed information.
Alternatively, receive, by cdma communication, control command and the upper leaflet lamp that monitoring system issues by Centralized Controller Status information.
Using GPRS/CDMA communication pattern between Centralized Controller and monitoring system, monitoring system issues control command and arrives Centralized Controller, that is, monitoring system issues communication downlink signal, Centralized Controller passes through WPLC communication/Ethernet to single lamp The controller transmission information such as address information and control command.Lighting mains includes multiple single-lamp controller, each single lamp control Device is to there being address information, and the single-lamp controller parsing information corresponding with address information is to obtain control command, according to controlling life Order performs the predetermined registration operation in preset time period.Single-lamp controller sends the state letter of self-operating state to Centralized Controller Breath, Centralized Controller actively sends status information by the second communication means, and monitoring system adjusts according to status information and controls life Order, improves the motility that lighting mains controls.
Below in conjunction with preferred embodiment, technical scheme is illustrated.
The single-lamp controller of this embodiment is bright light scheme based on the time period in the predetermined registration operation that preset time period performs And plan, include daily scheme and plan, scheme festivals or holidays and plan.The kind of bright light scheme includes the complete of multiple single lamp Bright, entirely go out, be spaced bright, 1/3 bright, size Serpentis is bright.Each district's list lamp is divided into multiple logical groups, to crossroad, T-shaped road All kinds of Scene realization flexible configuration such as end, controls simple and quick, it is achieved thereby that run many strategies of single lamp control.
Fig. 4 is the schematic diagram of bright light based on the time period scheme of a kind of single-lamp controller according to embodiments of the present invention.As Shown in Fig. 4, single-lamp controller bright light based on time period scheme includes scheme 1 and scheme 3-test.For 16:00 to 22:00 Time period, single lamp that single-lamp controller controls correspondence according to scheme 1 performs bright light or the operation turned off the light, can be that king light 1 is complete Bright;For the time period of 22:00 to 08:00, single-lamp controller according to scheme 3-test control corresponding single lamp perform bright light or The operation turned off the light, can be king light 1 all light, king light 2 all light, auxiliary lamp all light, thus has reached the motility that lighting mains controls Effect.
Fig. 5 is the schematic diagram of bright light based on the time period scheme of another kind of single-lamp controller according to embodiments of the present invention. As it is shown in figure 5, this embodiment is for testing Surveillance center, including backstage C test physics concentrator and java test.Its In, backstage C tests physics concentrator, controls duration and could be arranged to 15 points, and node 1 loop includes open and close circuit behavior, node 2 include open and close circuit behavior, it is also possible to perform always to turn on light operation, the operation that performs always to turn off the light, perform solution division operation, survey is called in execution together Operation;Java test, control duration could be arranged to 15 points, node 2 loop include open and close circuit behavior, node 2 include out, Close circuit behavior, it is also possible to perform always turn on light operation, perform always turn off the light operation, perform solve division operation, perform call together survey operate, its In, call together and survey the status information referring to obtain single lamp, thus reached the effect of the motility that lighting mains controls.
Fig. 6 is the schematic diagram of bright light based on the time period scheme of another kind of single-lamp controller according to embodiments of the present invention. As shown in Figure 6, the control to street lamp includes that common method control, customizing method control and single method controls.Wherein, 1 group Street lamp quantity be 4, lamp holder quantity is 8, control duration be set to 15 minutes.For common method control, including A scheme and B Scheme.Wherein, A scheme is that king light is bright, and auxiliary lamp goes out, and B scheme is that auxiliary lamp is bright, and king light goes out, and fractional energy savings has all reached 80%.Receiving After touching signals to " execution " button, start to perform corresponding scheme, thus reached the motility that lighting mains controls Effect.
Fig. 7 is a kind of schematic diagram quantifying the service data of single lamp according to embodiments of the present invention.Such as Fig. 7 institute Show, use big Data Analysis Platform to quantify, to show the operation situation of lighting mains, display set the service data of single lamp The online overview of middle controller.Selecting management region, such as, Beijing, display set middle controller number is 2, single lamp Amount controller is 86, and the Centralized Controller number that puts into operation is 2, and event number is 0, and having filled ammeter number is 2, processed event Number is 0.Also showing weather today, such as, today is fine, temperature 8~4 degrees Celsius, north wind 3-4 level, and longitude and latitude is 114.49 | 38.05, the time of sunrise is 7:12, and the time of sunset is 17:59 etc., goes back the online overview of display set middle controller, including concentrating The overview of data 1 to the data 5 of controller.
This embodiment carries out anomaly analysis and statistics to street lamp, uses big Data Analysis Platform, the single lamp to Real-time Collection Data quantify, and are analyzed road lamp cap abnormality by setting up effective data model, in time different to street lamp Often state carries out reporting to the police and early warning analysis, plays good directive function to manually patrolling lamp, shortens the lamp time of patrolling, decreases and patrol Lamp flow process, effectively provide cost savings.
This embodiment also achieves light sensation intelligence and turns on/off lamp, by brightness impression device collection for representing around single lamp Brightness data, then by backstage, brightness data is comprehensively analyzed, obtain turning on/off lamp strategy.
Fig. 4 can carry out local control, local control terminal built-in WEB service based on mobile terminal to embodiment illustrated in fig. 7 Device, hardware product has WIFI wireless transmitter module, and common intelligent terminal can be used to realize facing lighting mains in this locality Time control, site problems investigation, the function such as field adjustable and parameter configuration, make local control and debugging efforts smoothly completes, The convenience making local control and debugging is higher, is used as under conditions of not having network.Big Data Analysis Platform is by each The data quick-processing analysis to gathering of the alanysis model, can play good directive function to manually patrolling lamp, shorten and patrol lamp Time, decrease and patrol lamp flow process, be greatly saved cost of labor.
Fig. 4 achieves bright light scheme based on the time period and plan to embodiment illustrated in fig. 7, single-lamp controller many strategies control The single lamp of system runs, and local controls terminal built-in WEB server, and hardware product has WIFI wireless transmitter module, different to single lamp Often state is analyzed, and has street lamp exceptional state alarm and an effect of early warning analysis and light sensation intelligence turns on/off the effect of lamp, Reach to improve the effect of the motility that lighting mains controls.
It should be noted that can be at such as one group of computer executable instructions in the step shown in the flow chart of accompanying drawing Computer system performs, and, although show logical order in flow charts, but in some cases, can be with not It is same as the step shown or described by order execution herein.
The embodiment of the present invention additionally provides a kind of control device for lighting mains.It should be noted that this embodiment For lighting mains control device may be used for perform the embodiment of the present invention the control method for lighting mains.
Fig. 8 is a kind of schematic diagram controlling device for lighting mains according to embodiments of the present invention.As shown in Figure 8, This control device being used for lighting mains includes: acquiring unit 40, control unit 50 and transmitting element 60.
Acquiring unit 40, for obtaining the control command for performing to control to single lamp, wherein, lighting mains includes multiple Single lamp.
Control unit 50, performs the predetermined registration operation of preset time period for controlling single lamp according to control command.
Transmitting element 60, for sending single lamp status information when performing predetermined registration operation to Centralized Controller, wherein, collection Middle controller is for forwarding status information to monitoring system, and monitoring system is for adjusting control command according to status information.
Alternatively, transmitting element 60 includes: detection module, judge module and processing module.Wherein, detection module is used for examining Survey the operational factor of single lamp;Whether judge module meets pre-conditioned for the operational factor judging single lamp;Processing module is used for Do not meet pre-conditioned in the operational factor judging single lamp, determine single lamp operation exception, and report use by Centralized Controller In the abnormal information of the single lamp operation exception of instruction, wherein, status information includes abnormal information.
This control device being used for lighting mains also includes: alarm unit, for when judging the operational factor of single lamp not When meeting pre-conditioned, according to abnormal information alert, and abnormal information is carried out early warning analysis.
This control device being used for lighting mains also includes: report unit, for sending single lamp in execution predetermined registration operation Time status information to after Centralized Controller, by Centralized Controller, the operational factor of declaration form lamp is to Cloud Server, wherein, Cloud Server, for the operational factor of single lamp being performed calculating according to preset algorithm, obtains result of calculation, and passes through presupposition analysis Model performs analysis to result of calculation, obtains the first analysis result, determines the running status of single lamp according to the first analysis result.
This control device being used for lighting mains also includes: collecting unit, for according to control command and preset rules Before controlling the predetermined registration operation that single lamp performs preset time period, gathered the brightness data of single lamp by streetlight sensor;Send single Unit 60 is used for sending brightness data to background server, and wherein, background server, for brightness data is performed analysis, obtains the Two analysis results, and the control life performing bright light operation or operation of turning off the light for controlling single lamp is sent according to the second analysis result Order.
Control unit 50 includes: the first acquisition module and determine module.Wherein, the first acquisition module is deposited in advance for obtaining Store up in local preset rules;Determine that module for determining the predetermined registration operation of preset time period according to preset rules.
Control unit 50 includes: the second acquisition module and parsing module, and wherein, the second acquisition module is used for obtaining concentration control The presupposed information that device processed sends;Parsing module, for presupposed information is performed parsing, obtains control command.
This embodiment obtains the control command for performing to control, wherein, lighting mains to single lamp by acquiring unit 40 Including multiple single lamps, control single lamp by control unit 50 according to control command and perform the predetermined registration operation of preset time period, pass through Transmitting element 6 sends single lamp status information when performing predetermined registration operation to Centralized Controller, and wherein, Centralized Controller is for turning Send out status information and for adjusting control command according to status information, reach raising lighting mains to monitoring system, monitoring system The effect of the motility controlled.
Obviously, those skilled in the art should be understood that each module of the above-mentioned present invention or each step can be with general Calculating device realize, they can concentrate on single calculating device, or be distributed in multiple calculating device and formed Network on, alternatively, they can with calculate the executable program code of device realize, it is thus possible to by they store Performed by calculating device in the storage device, or they are fabricated to respectively each integrated circuit modules, or by them In multiple modules or step be fabricated to single integrated circuit module and realize.So, the present invention be not restricted to any specifically Hardware and software combines.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.All within the spirit and principles in the present invention, that is made any repaiies Change, equivalent, improvement etc., should be included within the scope of the present invention.

Claims (10)

1. the control method for lighting mains, it is characterised in that including:
Obtaining the control command for performing to control to single lamp, wherein, described lighting mains includes multiple described single lamp;
Control described single lamp according to described control command and perform the predetermined registration operation of preset time period;And
Send described single lamp perform described predetermined registration operation time status information to Centralized Controller, wherein, described centralized Control Device is used for forwarding described status information to monitoring system, and described monitoring system is for adjusting described control according to described status information Order.
Method the most according to claim 1, it is characterised in that send the described single lamp shape when performing described predetermined registration operation State information to described Centralized Controller includes:
Detect the service data of described single lamp;
Judge whether the service data of described single lamp meets pre-conditioned;And
If it is judged that the service data of described single lamp does not meets described pre-conditioned, determine described single lamp operation exception, and lead to Crossing described Centralized Controller and report the abnormal information for indicating described single lamp operation exception, wherein, described status information includes Described abnormal information.
Method the most according to claim 2, it is characterised in that whether meet described in the service data judging described single lamp After pre-conditioned, described method also includes:
If it is judged that the service data of described single lamp does not meets described pre-conditioned, send alarm signal according to described abnormal information Breath, and described abnormal information is carried out early warning analysis.
Method the most according to claim 1, it is characterised in that when sending described single lamp in the described predetermined registration operation of execution After status information extremely described Centralized Controller, described method also includes:
Reporting the service data of described single lamp to Cloud Server by described Centralized Controller, wherein, described Cloud Server is used for According to preset algorithm, the service data of described single lamp is performed calculating, obtain result of calculation, and by presupposition analysis model to institute State result of calculation and perform analysis, obtain the first analysis result, determine the operation shape of described single lamp according to described first analysis result State.
Method the most according to claim 1, it is characterised in that perform institute controlling described single lamp according to described control command Before stating the predetermined registration operation of preset time period, described method also includes:
By brightness impression device collection for representing the brightness data of single lamp surrounding brightness;And
Sending described brightness data to background server, wherein, described background server is for performing described brightness data point Analysis, obtains the second analysis result, and send according to described second analysis result be used for controlling described single lamp perform bright light operation or Person turn off the light operation control command.
Method the most according to claim 1, it is characterised in that control described single lamp according to described control command and perform described The predetermined registration operation of preset time period includes:
Obtain the preset rules being stored in advance in this locality;And
The predetermined registration operation of described preset time period is determined according to described preset rules.
Method the most according to claim 1, it is characterised in that obtain the control command for performing to control to described single lamp Including:
Obtain the presupposed information that described Centralized Controller sends;And
Described presupposed information is performed parsing, obtains described control command.
8. the control device for lighting mains, it is characterised in that including:
Acquiring unit, for obtaining the control command for performing to control to single lamp, wherein, described lighting mains includes multiple institute State single lamp;
Control unit, performs the predetermined registration operation of preset time period for controlling described single lamp according to described control command;And
Transmitting element, for send described single lamp perform described predetermined registration operation time status information to Centralized Controller, wherein, Described Centralized Controller is used for forwarding described status information to monitoring system, and described monitoring system is for according to described status information Adjust described control command.
9. the control system for lighting mains, it is characterised in that including:
Single lamp control equipment, performs preset time period for controlling described single lamp according to the control command that single lamp is performed control Predetermined registration operation;
Centralized Controller, is connected with described single lamp control equipment, for receiving when described single lamp performs described predetermined registration operation Status information;And
Monitoring system, is connected with described Centralized Controller, for adjusting described control command according to described status information, described The channel that Centralized Controller transmits for providing the data between described monitoring system and described single lamp control equipment.
Control system the most according to claim 9, it is characterised in that described Centralized Controller includes:
WEB application system, for providing operation and control interface based on mobile terminal;
WIFI module, is connected with described WEB application system, for setting up wireless connections, described movement with described mobile terminal Terminal is for performing to control and debugging to described single lamp by described Centralized Controller.
CN201610721003.3A 2016-08-24 2016-08-24 Control method, Apparatus and system for lighting mains Pending CN106304555A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610721003.3A CN106304555A (en) 2016-08-24 2016-08-24 Control method, Apparatus and system for lighting mains

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610721003.3A CN106304555A (en) 2016-08-24 2016-08-24 Control method, Apparatus and system for lighting mains

Publications (1)

Publication Number Publication Date
CN106304555A true CN106304555A (en) 2017-01-04

Family

ID=57616238

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610721003.3A Pending CN106304555A (en) 2016-08-24 2016-08-24 Control method, Apparatus and system for lighting mains

Country Status (1)

Country Link
CN (1) CN106304555A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108366477A (en) * 2018-04-23 2018-08-03 长春理工大学 A kind of street lamp control system
CN110536514A (en) * 2019-09-20 2019-12-03 杭州鸿雁电器有限公司 Street lamp control system and its control method, device, storage medium and processor
CN111556608A (en) * 2020-04-10 2020-08-18 洪阳伟业光电科技(苏州)有限公司 Illumination control method, control system and terminal based on LoRa wireless communication
CN112055451A (en) * 2020-07-14 2020-12-08 厦门市智联信通物联网科技有限公司 Street lamp monitoring system with intelligent fault discrimination and intelligent fault analysis
CN113096365A (en) * 2021-04-06 2021-07-09 成都圣路电器有限公司 Central control lighting system and central control light source fault alarm method
CN113099592A (en) * 2021-03-25 2021-07-09 深圳佳兆业科技集团有限公司 Lighting lamp control method and device based on Internet of things, computer equipment and medium

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201550323U (en) * 2009-10-27 2010-08-11 深圳华智测控技术有限公司 Road lamp remote control system
CN102065612A (en) * 2010-12-31 2011-05-18 深圳华智测控技术有限公司 Streetlight control system
CN104363677A (en) * 2014-11-06 2015-02-18 厦门市致创能源技术有限公司 Street lamp control method
CN204578822U (en) * 2015-04-07 2015-08-19 青岛华控能源科技有限公司 A kind of LED street lamp closed loop controller
CN104994662A (en) * 2015-07-29 2015-10-21 深圳市瑞恩科技有限公司 Road illumination control system based on dual-mode communication
CN105050224A (en) * 2015-01-07 2015-11-11 泰华智慧产业集团股份有限公司 System for supervising street lamps and landscape lighting and supervising method
CN205987498U (en) * 2016-08-24 2017-02-22 北京艾普智城网络科技有限公司 A control system for illumination network

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201550323U (en) * 2009-10-27 2010-08-11 深圳华智测控技术有限公司 Road lamp remote control system
CN102065612A (en) * 2010-12-31 2011-05-18 深圳华智测控技术有限公司 Streetlight control system
CN104363677A (en) * 2014-11-06 2015-02-18 厦门市致创能源技术有限公司 Street lamp control method
CN105050224A (en) * 2015-01-07 2015-11-11 泰华智慧产业集团股份有限公司 System for supervising street lamps and landscape lighting and supervising method
CN204578822U (en) * 2015-04-07 2015-08-19 青岛华控能源科技有限公司 A kind of LED street lamp closed loop controller
CN104994662A (en) * 2015-07-29 2015-10-21 深圳市瑞恩科技有限公司 Road illumination control system based on dual-mode communication
CN205987498U (en) * 2016-08-24 2017-02-22 北京艾普智城网络科技有限公司 A control system for illumination network

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108366477A (en) * 2018-04-23 2018-08-03 长春理工大学 A kind of street lamp control system
CN110536514A (en) * 2019-09-20 2019-12-03 杭州鸿雁电器有限公司 Street lamp control system and its control method, device, storage medium and processor
CN110536514B (en) * 2019-09-20 2024-09-03 杭州鸿雁电器有限公司 Street lamp control system, control method and device thereof, storage medium and processor
CN111556608A (en) * 2020-04-10 2020-08-18 洪阳伟业光电科技(苏州)有限公司 Illumination control method, control system and terminal based on LoRa wireless communication
CN112055451A (en) * 2020-07-14 2020-12-08 厦门市智联信通物联网科技有限公司 Street lamp monitoring system with intelligent fault discrimination and intelligent fault analysis
CN112055451B (en) * 2020-07-14 2022-01-04 厦门市智联信通物联网科技有限公司 Street lamp monitoring system with intelligent fault discrimination and intelligent fault analysis
CN113099592A (en) * 2021-03-25 2021-07-09 深圳佳兆业科技集团有限公司 Lighting lamp control method and device based on Internet of things, computer equipment and medium
CN113096365A (en) * 2021-04-06 2021-07-09 成都圣路电器有限公司 Central control lighting system and central control light source fault alarm method
CN113096365B (en) * 2021-04-06 2022-10-21 成都圣路电器有限公司 Central control lighting system and central control light source fault alarm method

Similar Documents

Publication Publication Date Title
CN106304555A (en) Control method, Apparatus and system for lighting mains
KR102135598B1 (en) IoT based intelligent street light control system
KR102060572B1 (en) DIMMING CONTROL SYSTEM OF LED STREETLIGHT AND SECURITY LIGHT BASED ON IoT
CN105070086B (en) A kind of traffic signal light fault Intelligent Measurement, warning system and method
CN202721876U (en) Single lamp monitoring system for LED streetlamp
US20100292815A1 (en) Control system and control method for intelligent solar street lamp
CN106604507A (en) Intelligent street lamp control system
CN106993059A (en) A kind of agriculture feelings monitoring system based on NB IoT
CN110248449A (en) Outdoor lighting control system based on NB-IoT communication mode
CN103561529A (en) Intelligent management system for street lamps
CN110740546A (en) night illumination sensing system based on intelligent Internet of things
CN205987498U (en) A control system for illumination network
CN107580386B (en) Railway tunnel illumination control method based on Zigbee single-lamp controller
CN104853485A (en) Intelligent road illumination and monitoring system based on ZigBee and 4G technology
CN112235894A (en) Town road wisdom street lamp
CN106937455A (en) Intelligent city lighting energy saving monitoring management system based on technology of Internet of things
CN206879157U (en) Wisdom road lamp system
CN110446314A (en) Mesh road lamp system, management method and storage medium
CN106959294B (en) A kind of transmission tower defect analysis device and method based on unmanned plane inspection
CN116647970A (en) Light control system
CN112020184B (en) Building lighting system and method based on Internet of things
CN106878470A (en) A kind of aviation obstruction beacon Intelligent internet of things control and monitoring system
CN206894971U (en) A kind of street lamp remote control
CN106304580A (en) A kind of Landscape Lighting remote intelligent control system
CN206283697U (en) Intelligent street lamp control system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170104

RJ01 Rejection of invention patent application after publication