CN106283953B - Medium-and low-speed maglev two-wire embankment location pile foundation combined type support rail beam transition section structure - Google Patents

Medium-and low-speed maglev two-wire embankment location pile foundation combined type support rail beam transition section structure Download PDF

Info

Publication number
CN106283953B
CN106283953B CN201610826167.2A CN201610826167A CN106283953B CN 106283953 B CN106283953 B CN 106283953B CN 201610826167 A CN201610826167 A CN 201610826167A CN 106283953 B CN106283953 B CN 106283953B
Authority
CN
China
Prior art keywords
support rail
rail beam
pile foundation
bottom plate
armored concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610826167.2A
Other languages
Chinese (zh)
Other versions
CN106283953A (en
Inventor
郭建湖
李小和
赵新益
姜鹰
姚洪锡
李巍
王勇刚
杨辉建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201610826167.2A priority Critical patent/CN106283953B/en
Publication of CN106283953A publication Critical patent/CN106283953A/en
Application granted granted Critical
Publication of CN106283953B publication Critical patent/CN106283953B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • E01B2/006Deep foundation of tracks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/08Deep or vertical foundation

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Line technology field is put the invention belongs to middle low speed magnetic suspension traffic engineering is low, and disclose medium-and low-speed maglev two-wire embankment location pile foundation combined type support rail beam transition section structure, roadbed filling, support rail beam both sides backfill filler, bridge abutment, trapezoidal filling body and headwall, the first pile foundation bearing structure under first pile foundation bearing structure, pile foundation joist composite bearing structure, armored concrete support rail beam bottom plate, two placing of reinforcement concrete beam-type structures, support rail beam are provided with more;Accept the reinforced concrete beam type structure in the top of armored concrete support rail beam bottom plate;Support rail beam both sides backfill filler is accepted by roadbed filling under the support rail beam.Long-time stability of the present invention are more preferable, both the high request to the deformation of support rail girder construction and settlement after construction had been met, meet the requirement of the controllability of bedding long-time stability, durability and construction quality again, effectively realize magnetic suspension elevated structure and the low smoothly transition for putting line transition section F rails.

Description

Medium-and low-speed maglev two-wire embankment location pile foundation combined type support rail beam transition section structure
Technical field
Line technology field is put the invention belongs to middle low speed magnetic suspension traffic engineering is low, more particularly, to middle low speed magnetic Floating two-wire embankment location support rail beam transition section structure pattern.
Background technology
Middle low speed magnetic suspension track traffic belongs to a kind of novel traffic mode, and achievement in research both domestic and external is less, the whole world The circuit for opening operation is even more minority.The middle low speed magnetic suspension railway business that only in March, 2005, Japan's construction was opened at present is transported The middle low speed magnetic suspension railway business operating line that line-the East Hillside Line and in June, 2014, South Korea opened.And the middle low speed of China Magnetic suspension traffic only has National University of Defense technology's test wire, Green City Mountain test wire, Tangshan experiment line at present, but do not put into effect Formal circuit, and based on elevated structure, it is rarely seen about elevated structure and the low research put in terms of line transition segment structure with Using.
In wheel rail high speed railway, substantial amounts of bridge changeover portion roadbed be present, high-speed railway changeover portion roadbed uses mostly Trapezium structure, cement stabilized graded macabam is employed in trapezoidal scope and is filled, and employ the compacting higher than non-changeover portion roadbed It is required that.During built high-speed railway operation, bridge transition segment limit, non-fragment orbit protuberance, gap, grout often occurs Etc. disease.The reason for this disease, it is due to that changeover portion roadbed is still earth structure by rock and soil constitution mostly, changeover portion It after roadbed is laid a railway track, still can occur necessarily to settle, poor (the specification permission settlement after construction of certain settlement after construction be present with bridge abutment Difference is not more than 5mm), because high-speed railway uses seamless track steel rail, allow in specification within the scope of settlement after construction difference, have no effect on Normal operation, but the diseases such as non-fragment orbit protuberance, gap, grout can be caused, it is necessary to timely repair and maintenance.
The F rails of medium-and low-speed maglev traffic lines are to be spliced by a short rail successively using fishplate bar scene, and are left between rail Seam, meet the ride comfort of the F rails of magnetic-levitation train even running requirement, to lean on works under rail to ensure substantially.It is low to put circuit location, Basis is the earth structure by rock and soil constitution under support rail beam, is influenceed by factors such as landform, geological conditions, and quality is not relatively easily-controllable System, differential settlement is also easy to produce under load and the effect of various factor of natural environment, can be occurred unavoidably and elevated structure bridge bridge The inconsistent settlement after construction of platform, generation settlement after construction is poor, and low circuit of putting differential settlement occurs with bridge abutment position, necessarily affects The ride comfort of F rails, in some instances it may even be possible to the problems such as causing F rails generation faulting of slab ends, deform, when serious, the normal fortune of maglev vehicle will be influenceed Battalion.
The content of the invention
For the disadvantages described above or Improvement requirement of prior art, the invention provides medium-and low-speed maglev two-wire embankment location to answer Box-like support rail beam transition section structure, the structure should meet elevated structure and the low rigidity put between circuit and sedimentation transition, protect Magnetic suspension traffic engineering elevated structure and the low ride comfort requirement for putting line transition section F rails are demonstrate,proved, meets magnetic floating traffic engineering again The low intensity for putting line transition section sub-rail foundation, long-time stability requirement, and construction quality controllability is strong.
To achieve the above object, it is proposed, according to the invention, provide medium-and low-speed maglev two-wire embankment location pile foundation combined type support rail Beam transition section structure, it is characterised in that including the first pile foundation bearing structure, pile foundation joist composite bearing structure, armored concrete Roadbed filling, support rail beam both sides backfill filler, bridge bridge under support rail beam bottom plate, two placing of reinforcement concrete beam-type structures, support rail beam Platform, trapezoidal filling body and headwall, wherein,
The first pile foundation bearing structure and the pile foundation joist composite bearing structure accept the armored concrete jointly Support rail beam bottom plate;
The first pile foundation bearing structure is provided with more, and the every first pile foundation bearing structure is vertically arranged, and And the armored concrete support rail beam bottom plate is accepted on the top of the every first pile foundation bearing structure, first pile foundation is held The top for carrying structure is embedded in the armored concrete support rail beam bottom plate and its rigid connection;
Reinforced concrete beam type structure described in two rows is accepted at the top of the armored concrete support rail beam bottom plate, and adjacent Internode expansion joint is set between the two section armored concrete support rail beam bottom plates;
The pile foundation joist composite bearing structure setting has the armored concrete support rail beam of multiple and adjacent two pieces A pile foundation joist composite bearing structure is respectively provided with the internode expansion joint of bottom plate, for supporting described in this two adjacent section Armored concrete support rail beam bottom plate, each pile foundation joist composite bearing structure include reinforced concrete supporting beam and second Base bearing structure, and the reinforced concrete supporting beam, the steel are accepted in the top of the every second pile foundation bearing structure Reinforced concrete joist accepts the armored concrete support rail beam bottom plate;
The top of the second pile foundation bearing structure is embedded in the reinforced concrete supporting beam and its rigid connection, the reinforced concrete Native joist and the armored concrete support rail beam bottom plate rigid connection or overlap joint, the armored concrete support rail beam bottom plate and the reinforcing bar Concrete beam-type structural integrity pouring molding is so as to collectively forming armored concrete support rail beam;
The reinforced concrete supporting beam both sides are provided with for limiting the armored concrete support rail beam bottom plate lateral displacement Convex block machine;
Wired weathering section be set between reinforced concrete beam type structure described in two rows, and weathering section has between the line Cross fall and head fall, enter for current to be introduced to the internode expansion joint of two adjacent sections armored concrete support rail beam bottom plate And current are discharged;
Roadbed filling is arranged between shallow layer reinforcement area and the armored concrete support rail beam bottom plate under the support rail beam, with It is flat for providing construction for the armored concrete support rail beam bottom plate, reinforced concrete supporting beam and support rail beam both sides backfill filler Platform, and provide lateral support for the pile foundation bearing structure;Wherein, the shallow layer reinforcement area is arranged on the superficial of soft stratum Layer, and roadbed filling and the vertical consistency of the reinforced concrete beam type structure under the shallow layer reinforcement area, the support rail beam;
The support rail beam both sides backfill filler is accepted by roadbed filling under the support rail beam, and the support rail beam both sides Backfill filler props up the both sides of the armored concrete support rail beam bottom plate, to play protection to the armored concrete support rail beam bottom plate The transverse shifting of the armored concrete support rail beam bottom plate is acted on and constrained, and maintenance passage is provided;
Roadbed filling and support rail beam both sides backfill filler collectively form filler filling body under the support rail beam, described to fill out Material filling body both sides are provided with the first weathering;
The lower end of the every first pile foundation bearing structure sequentially passes through roadbed filling, the shallow-layer under the support rail beam and added Stretched into after Gu Qu and the soft stratum in supporting course, with soft stratum produce sedimentation when, the first pile foundation bearing structure Negative friction can be born, so as to provide stable carrying to armored concrete support rail beam bottom plate and reinforced concrete beam type structure Power, to reduce because the sedimentation of filler filling body is to unfavorable caused by the vertical of armored concrete support rail beam, vertical and horizontal rigidity Influence;
One end of the armored concrete support rail beam bottom plate is overlapped on the bridge abutment, and both are connected by pin Release longitudinal restraint is connect, and limits lateral displacement;
The both sides of one end that the armored concrete support rail beam bottom plate is overlapped on the bridge abutment set the end respectively Wall, and the headwall per side is abutted with the support rail beam both sides backfill filler of respective side respectively, and the support rail is protected for gear Beam both sides backfill filler;
The trapezoidal filling body is arranged between shallow layer reinforcement area and the armored concrete support rail beam bottom plate, its with it is described Roadbed filling abuts close to one end of the bridge abutment under support rail beam, for accepting the armored concrete support rail beam bottom Plate, support rail beam both sides backfill filler and headwall;
The trapezoidal filling body both sides are provided with second weathering consistent with the first weathering gradient.
Preferably, the first pile foundation bearing structure is cast-in-situ bored pile, and reinforced concrete supporting beam is held with armored concrete Beam-and-rail bottom plate rigid connection or overlap joint, with the second pile foundation bearing structure rigid connection.
Preferably, in the position at the internode expansion joint of armored concrete support rail beam, reinforced concrete supporting beam and reinforced concrete Native support rail beam bottom plate is overlapped using pin, and remaining position uses rigid connection.
Preferably, the height and the height phase of the armored concrete support rail beam bottom plate of the support rail beam both sides backfill filler Deng.
Preferably, all these described first pile foundation bearing structures are arranged in ranks.
Preferably, the trapezoidal filling body mixes cement production systD using graded broken stone.
Preferably, the armored concrete support rail beam bottom plate is overlapped on one end of the bridge abutment and the bridge abutment Between be provided with wear-resisting sliding layer.
Preferably, the pin includes pre-buried connection reinforcing bar, pitch hemp cut and stainless steel sleeve pipe, the pre-buried connection reinforcing bar The pitch hemp cut is set in the stainless steel sleeve pipe and between the two.
Preferably, the cross fall of weathering section is 3%~5% between the line, and head fall is not less than 2 ‰.
In general, by the contemplated above technical scheme of the present invention compared with prior art, it can obtain down and show Beneficial effect:
(1) armored concrete support rail beam bottom plate of the invention, reinforced concrete beam type structure are showed using armored concrete Field one-piece casting, the two forms integral reinforced concrete structure to directly take on the magnetic-levitation train of track load and track transmission Load, then deadweight and upper load are passed to and its rigidly connected first pile foundation bearing structure, structural reliability height.
(2) the first pile foundation bearing structure of the invention is goed deep into supporting course, and when embankment produces certain sedimentation, the first pile foundation is held Can still negative friction be born and provide stronger bearing capacity by carrying structure, be avoided caused by filling compaction quality is whard to control Vertical to support rail beam, vertical and horizontal rigidity influence is settled, structure vertical cross stiffness and structural reliability are more excellent.
(3) circuit soft soil zone is put low, needs the superficial layer progress to soft stratum necessary according to embankment stability Reinforcing, its reinforcement depth controls by embankment stability, and tradition during compared to by settling and stablize Two indices control is solely For base reinforcing mode, shallow layer reinforcement area reinforcement depth is small, with reference to the first pile foundation bearing structure can effectively control roadbed reclamation and Post-construction settlement of subgrade.Non- soft soil zone can be more avoided after embankment slope at the foundation stabilization of caused wide area Reason, and the first pile foundation bearing structure construction quality is more easy to control, can effectively control construction quality, investment reduction, shorten the duration, tool There are obvious technology and economic advantages.
(4) reinforced concrete supporting beam that pile foundation bearing structure and armored concrete support rail beam bottom plate are set, can subtract significantly The stress concentration phenomenon of armored concrete support rail beam bottom plate at small pile foundation bearing structure;Further, since reinforced concrete supporting beam Lateral connection acts on, and also increases the lateral stiffness of structure and the ability of resistance differential settlement deformation, can reduce transverse pile foundation Quantity, reduce investment.
(5) while by two placing of reinforcement concrete beam-type structures of two-wire by armored concrete support rail beam floor combination one Rise, the lateral stiffness of reinforced concrete beam type structure can be effectively increased, left and right two is saved reinforced concrete beam type structure and be placed in On rigidity identical armored concrete support rail beam bottom plate, the lateral stability of reinforced concrete beam type structure can be effectively increased, The relative settlement between reinforced concrete beam type structure is controlled, is also beneficial to maintenance and maintenance during operation, measure is simple, easily applies Work, cost save, effect is good.
(6) adjacent armored concrete support rail beam bottom plate shares pile foundation joist composite bearing structure, and in adjacent steel Internode expansion joint is reserved between reinforced concrete support rail beam bottom plate, impact failure of the section by train load of encorbelmenting can be avoided, and reduce The influence of temperature stress and shrinkage and creep.
(7) armored concrete support rail beam bottom plate is overlapped on bridge abutment close to one end of elevated bridge, passes through pin Connection, avoid and settle faulting of slab ends caused by measures of foundation treatment difference between the two, it is ensured that magnetic float F rails it is low put circuit with Bridge abutment connected position will not produce faulting of slab ends, effectively realize that magnetic suspension traffic engineering elevated structure puts line transition section F with low The smoothly transition of rail.
Brief description of the drawings
Fig. 1 is the schematic longitudinal section of the present invention;
Fig. 2 is along the diagrammatic cross-section of I-I line in Fig. 1;
Fig. 3 is along the diagrammatic cross-section of II-II line in Fig. 1;
Fig. 4 is along the diagrammatic cross-section of III-III line in Fig. 1;
Fig. 5 is that armored concrete support rail beam bottom plate is overlapped on the floor map on bridge abutment in the present invention;
Fig. 6 is pile foundation joist of the present invention and armored concrete support rail beam bottom plate rigid connection connection diagram.
Fig. 7 is pile foundation joist of the present invention and armored concrete support rail beam bottom plate overlap joint connection diagram.
Fig. 8 is the cross-sectional view of pin in the present invention.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.As long as in addition, technical characteristic involved in each embodiment of invention described below Conflict can is not formed each other to be mutually combined.
1~Fig. 8 of reference picture, medium-and low-speed maglev two-wire embankment ground stage composite support rail beam transition section structure, including first Roadbed filling 5 and support rail under base bearing structure 3, armored concrete support rail beam bottom plate 2, reinforced concrete beam type structure 1, support rail beam Beam both sides backfill filler 4, wherein,
The first pile foundation bearing structure 3 and the pile foundation joist composite bearing structure 90 accept the reinforced concrete jointly Native support rail beam bottom plate 2;
The first pile foundation bearing structure 3 is provided with more, and the every first pile foundation bearing structure 3 is vertically arranged, And the armored concrete support rail beam bottom plate 2 is accepted on the top of the every first pile foundation bearing structure 3, described first The top of base bearing structure 3 is embedded in the armored concrete support rail beam bottom plate 2 and its rigid connection;
Accept reinforced concrete beam type structure 1 described in two rows, and phase in the top of the armored concrete support rail beam bottom plate 2 Internode expansion joint is reserved between the section of the neighbour two armored concrete support rail beam bottom plate 2;
The pile foundation joist composite bearing structure 90 is provided with the two multiple and adjacent section armored concrete support rails A pile foundation joist composite bearing structure 90 is respectively provided with the internode expansion joint of beam bottom plate 2, for support this adjacent two The armored concrete support rail beam bottom plate 2 is saved, each pile foundation joist composite bearing structure 90 includes armored concrete support The pile foundation bearing structure 902 of beam 901 and second, and the steel is accepted on the top of the every second pile foundation bearing structure 902 Reinforced concrete joist 901, the reinforced concrete supporting beam 901 accept the armored concrete support rail beam bottom plate 2;
The top of the second pile foundation bearing structure 902 is embedded in the reinforced concrete supporting beam 901 and its rigid connection, the steel Reinforced concrete joist 901 and the rigid connection of armored concrete support rail beam bottom plate 2 or overlap joint, the armored concrete support rail beam bottom plate 2 are molded with the formed by integrally casting of reinforced concrete beam type structure 1 so as to collectively form armored concrete support rail beam 9;
The both sides of reinforced concrete supporting beam 901 are provided with for limiting the armored concrete support rail beam bottom plate 2 laterally The convex block machine of displacement;
Wired weathering section be set between reinforced concrete beam type structure 1 described in two rows, and weathering section has between the line There are cross fall and head fall, stretched for current to be introduced to the internode of two adjacent sections armored concrete support rail beam bottom plate 2 Stitch and then discharge current;The cross fall of weathering section is 3%~5%, more preferably 4% between the line, weathering between line The head fall of section is not less than 2 ‰, in order to draining.
Under the support rail beam roadbed filling 5 be arranged on shallow layer reinforcement area 6 and the armored concrete support rail beam bottom plate 2 it Between, carried for backfilling filler 4 for the armored concrete support rail beam bottom plate 2, reinforced concrete supporting beam 901 and support rail beam both sides Lateral support is provided for construction platform, and for the pile foundation bearing structure 3;Wherein, the shallow layer reinforcement area 6 is arranged on flabbily The superficial layer of layer 7, and roadbed filling 5 and the reinforced concrete beam type structure under the shallow layer reinforcement area 6, the support rail beam 1 vertical consistency;
The support rail beam both sides backfill filler is accepted by roadbed filling under the support rail beam, and the support rail beam both sides Backfill filler props up the both sides of the armored concrete support rail beam bottom plate 2, to play guarantor to the armored concrete support rail beam bottom plate 2 Shield acts on and constrained the transverse shifting of the armored concrete support rail beam bottom plate 2, and provides maintenance passage;
Roadbed filling 5 and support rail beam both sides backfill filler 4 collectively form filler filling body 10, institute under the support rail beam State the both sides of filler filling body 10 and be provided with the first weathering 11;
The lower end of the every first pile foundation bearing structure 3 sequentially passes through roadbed filling 5, the shallow-layer under the support rail beam Stretched into after stabilization zone 6 and the soft stratum 7 in supporting course 8, so that when soft stratum 7 produces sedimentation, first pile foundation is held Negative friction can be born by carrying structure 3, so as to be provided surely to armored concrete support rail beam bottom plate 2 and reinforced concrete beam type structure 1 Fixed bearing capacity, to reduce the sedimentation because of filler filling body 10 to vertical, the vertical and horizontal rigidity of armored concrete support rail beam 9 Caused adverse effect;
One end of the armored concrete support rail beam bottom plate 2 is overlapped on the bridge abutment 12, and both pass through pin 15 Connection Release longitudinal restraints are followed closely, and limit lateral displacement;
The both sides of one end that the armored concrete support rail beam bottom plate 2 is overlapped on the bridge abutment 12 set described respectively Headwall 13, and the headwall 13 per side is abutted with the support rail beam both sides backfill filler 4 of respective side respectively, and institute is protected for gear State support rail beam both sides backfill filler 4;
The trapezoidal filling body 14 is arranged between shallow layer reinforcement area 6 and the armored concrete support rail beam bottom plate 2, its with Roadbed filling 5 abuts close to one end of the bridge abutment 12 under the support rail beam, is held for accepting the armored concrete Beam-and-rail bottom plate 2, support rail beam both sides backfill filler 4 and headwall 13;
The both sides of trapezoidal filling body 14 are provided with second weathering 17 consistent with the gradient of the first weathering 11.
Further, the first pile foundation bearing structure 3 is cast-in-situ bored pile, reinforced concrete supporting beam 901 and reinforced concrete The native rigid connection of support rail beam bottom plate 2 or overlap joint, with the rigid connection of the second pile foundation bearing structure 902.Stretched in the internode of armored concrete support rail beam The position of contracting seam is overlapped using pin 15, and remaining position uses rigid connection.
The height of the support rail beam both sides backfill filler 4 is equal with the height of the armored concrete support rail beam bottom plate 2, institute These the described first pile foundation bearing structures 3 having are arranged in ranks.
Further, the trapezoidal filling body 14 mixes cement production systD, the armored concrete support rail beam bottom using graded broken stone Plate 2, which is overlapped between one end of the bridge abutment 12 and the bridge abutment 12, is provided with wear-resisting sliding layer 16, the pin 15 include pre-buried connection reinforcing bar 15.1, pitch hemp cut 15.2 and stainless steel sleeve pipe 15.3, and the pre-buried connection reinforcing bar 15.1 is located at The pitch hemp cut 15.2 is fixedly installed in the stainless steel sleeve pipe 15.3 and between the two.
The low circuit of putting of low speed magnetic suspension traffic engineering is tight to post-construction settlement of subgrade requirement during the structural shape can be solved effectively Lattice, take traditional foundation stabilization measure caused by engineering is huge, investment is big, long in time limit, and basement process and embankment Construction quality is whard to control, bedding long-time stability and the problem of poor durability, so as to improve low circuit support rail girder construction of putting Reliability, reduce the engineering risk of traditional structure pattern.
The agent structure of armored concrete support rail beam 9 of the present invention uses reinforced concrete soil scene one-piece casting, reinforced concrete The native girder structure of support rail beam 9, then will deadweight and top directly taking on the magnetic-levitation train load of track load and track transmission Load passes to high with its rigidly connected pile foundation bearing structure 3, structural reliability.Pile foundation bearing structure 3 uses reinforced concrete Earth boring auger hole pouring pile is made, and transverse direction and longitudinal direction is made up of multiple rows of reinforced concrete bored pile, and vertical cross stiffness is big;And pile foundation Go deep into reliable supporting course 8, when generation is come to nothing between the certain sedimentation of embankment generation and armored concrete support rail beam 9, pile foundation carrying is tied Structure 3 can still bear negative friction and provide stronger bearing capacity, have stronger longitudinal, vertical and lateral stability.Two lines Reinforced concrete beam type structure is connected by sharing armored concrete support rail beam bottom plate 2, further increases the laterally firm of structure Degree and stability.
One end of armored concrete support rail beam bottom plate 2 of armored concrete support rail beam 9 is overlapped on bridge abutment 12, and the two is logical Cross pin 15 to connect, the releasable temperature stress in the longitudinal direction of pin 15, realize support rail beam stretching in longitudinal direction, laterally limit support rail beam Displacement, improve the lateral stability of structure.One end of support rail beam overlaps with bridge abutment 12, makes low to put circuit support rail beam and bridge The sedimentation of the lap position of abutment 12 is consistent, avoids bridge abutment 12 and low generation faulting of slab ends sedimentation between putting circuit support rail girder construction;It is low Put the other end of circuit armored concrete support rail beam bottom plate 2 be embedded in it is stable it is low put in line construction, it is settled puts circuit with low Structure is consistent, due to it is low put line construction through basement process and fill compacting after sedimentation value be in controlled range, therefore, support rail Sedimentation between beam both ends be located at bridge abutment 12 and it is low put line construction between, close to linear change, it is achieved thereby that overhead Bridge structure and the low sedimentation transition put between line construction, it also avoid faulting of slab ends, the smooth-going of transition segment limit F rails have been effectively ensured Property.
Wear-resisting sliding layer 16 is arranged between armored concrete support rail beam bottom plate 2 and bridge abutment 12, passes through resistance to mill sliding The effect of layer 16, can release the rotation that support rail beam is likely to occur under the load actions such as relative settlement, temperature to a certain extent Constraint, and the dynamic stress that bridge abutment 12 is transferred to magnetic-levitation train plays cushioning effect, it also avoid support rail beam and bridge abutment Abrasion and stress concentration between 12 cause the partial pressing of structure to destroy.
Adjacent armored concrete support rail beam bottom plate 2 shares pile foundation joist composite bearing structure, and in adjacent reinforcing bar Internode expansion joint is reserved between concrete support rail beam bottom plate 2, impact failure of the section by train load of encorbelmenting can be avoided, and reduce temperature Spend the influence of stress and shrinkage and creep.
The reinforced concrete supporting beam 901 that second pile foundation bearing structure 902 and armored concrete support rail beam bottom plate 2 are set, can To greatly reduce the stress concentration phenomenon of armored concrete support rail beam bottom plate 2 at pile foundation bearing structure;Further, since reinforced concrete The lateral connection effect of native joist 901, the lateral stiffness of structure and the ability of resistance differential settlement deformation are also increased, can be subtracted The quantity of few transverse pile foundation, reduces investment.
It is low when putting circuit and passing through soft soil zone, should according to embankment stability need to carry out ground superficial layer it is necessary plus Gu form shallow layer reinforcement area 6.The reinforcement depth in shallow layer reinforcement area 6 is controlled by embankment stability, and its reinforcement depth should be according to embankment Raising, foundation condition are determined by stability calculation.Compared to by settling and stablizing traditional single ground during Two indices control For reinforcing mode, the reinforcement depth of shallow layer reinforcement area 6 is small, with reference to the first pile foundation bearing structure 3 can effectively control roadbed reclamation and Post-construction settlement of subgrade.By contrast, the new structure foundation stabilization quantity is small, and investment is small, and more conducively after construction quality and work The control of sedimentation, and save cost and shorten the duration.
Specific making step of the invention is as follows:
(1) construction overhead bridge structure abutment, bridge abutment body concrete is poured, abutment of constructing, backfills abutment foundation foundation ditch; The positioning of pin and embedded work should be performed before abutment concreting;
(2) it is low after smooth platform to put circuit location construction site, carried out according to design requirement at necessary shallow layer foundation reinforcing Reason, after the completion of basement process, by changeover portion design requirement fill it is low after platform put geotechnique basis under circuit support rail beam, support rail beam after platform The lower basic filling construction synchronous with abutment cone of geotechnique.According to each position wire feeding and compaction requirement, changeover portion when filling Scope with non-changeover portion area is synchronous layered fills, next layer fills after detection meets the requirements and fills last layer again, until reinforcing bar mixes At solidifying native support rail beam bottom plate bottom surface absolute altitude;
(3) in armored concrete support rail beam bottom plate bottom surface, absolute altitude is in embankment subgrade cross section, the construction of vertical section direction is bored Hole pouring pile, i.e. the first pile foundation bearing structure 3, drilled pile construction should use and small construction technology disturbed to railway embankment, must Steel pile casting is set in embankment altitude range when wanting or draws hole;, will by specification after cast-in-situ bored pile reaches desired strength Ask amputation pile crown, assembling reinforcement concrete support rail beam bottom plate and the connection reinforcing bar with stake;
(4) according to design attitude to reinforced concrete supporting beam 901, the formwork erection of convex block machine 91, one-time-concreting shaping, before pouring Carry out all kinds of built-in fittings such as pin 15 and positioning and installation with the connection reinforcing bar of pile foundation, concrete are removed after reaching design strength Template;
(5) high-strength wearable sliding layer is laid on abutment in armored concrete support rail beam and abutment overlap joint, according to design Section length reaches design to armored concrete support rail beam bottom plate 2 and the merogenesis formwork erection of reinforced concrete beam type structure 1, each part concrete Form removal is distinguished after intensity, intilted transverse drainage slope and longitudinal direction row are made in backfill face between reinforced concrete beam type structure Top layer waterproof is simultaneously carried out in water slope by design requirement, one-time-concreting shaping, all kinds of built-in fittings such as pin, sleeper pedestal is carried out before pouring Connect the positioning and installation of reinforcing bar, water conservancy diversion rail bearing built-in fitting etc.;
(6) construction is low puts the joint both sides headwall 13 of circuit bridge abutment 12, and headwall 13 is applied using concrete one-piece casting Work, wait the concrete of headwall 13 to reach form removal after design strength, then put circuit graded broken stone top by design requirement construction is low Backfill layer, confining bed, the associated satellite structures in face, by design and construction cone top surface confining bed of bridge abutment 12 etc., side of constructing Slope protection, drainage system etc..
(7) carry out it is low put circuit and the laying of the elevated structure section of track and the installation and construction of associated satellite engineering, construction finishes Afterwards.
As it will be easily appreciated by one skilled in the art that the foregoing is merely illustrative of the preferred embodiments of the present invention, not to The limitation present invention, all any modification, equivalent and improvement made within the spirit and principles of the invention etc., all should be included Within protection scope of the present invention.

Claims (9)

1. medium-and low-speed maglev two-wire embankment location pile foundation combined type support rail beam transition section structure, it is characterised in that including first Base bearing structure, pile foundation joist composite bearing structure, armored concrete support rail beam bottom plate, two placing of reinforcement concrete beam-type structures, Roadbed filling, support rail beam both sides backfill filler, bridge abutment, trapezoidal filling body and headwall under support rail beam, wherein,
The first pile foundation bearing structure and the pile foundation joist composite bearing structure accept the armored concrete support rail jointly Beam bottom plate;
The first pile foundation bearing structure is provided with more, and the every first pile foundation bearing structure is vertically arranged, and often Accept the armored concrete support rail beam bottom plate, the first pile foundation carrying knot in the top of first pile foundation bearing structure described in root The top of structure is embedded in the armored concrete support rail beam bottom plate and its rigid connection;
Accept reinforced concrete beam type structure described in two rows, and two adjacent sections in the top of the armored concrete support rail beam bottom plate Internode expansion joint is set between the armored concrete support rail beam bottom plate;
The pile foundation joist composite bearing structure setting has the armored concrete support rail beam bottom plate of multiple and adjacent two pieces Internode expansion joint at be respectively provided with a pile foundation joist composite bearing structure, for supporting this adjacent two section reinforcing bar Concrete support rail beam bottom plate, each pile foundation joist composite bearing structure includes reinforced concrete supporting beam and the second pile foundation is held Structure is carried, and the reinforced concrete supporting beam is accepted on the top of the every second pile foundation bearing structure, and the reinforcing bar mixes Solidifying native joist accepts the armored concrete support rail beam bottom plate;
The top of the second pile foundation bearing structure is embedded in the reinforced concrete supporting beam and its rigid connection, the armored concrete support Beam and the armored concrete support rail beam bottom plate rigid connection or overlap joint, the armored concrete support rail beam bottom plate and the reinforced concrete Native girder structure formed by integrally casting is molded so as to collectively form armored concrete support rail beam;
The reinforced concrete supporting beam both sides are provided with for limiting the convex of the armored concrete support rail beam bottom plate lateral displacement Type block machine;
Wired weathering section be set between reinforced concrete beam type structure described in two rows, and weathering section has laterally between the line The gradient and head fall, for current to be introduced to the internode expansion joint of two adjacent sections armored concrete support rail beam bottom plate and then are incited somebody to action Current are discharged;
Roadbed filling is arranged between shallow layer reinforcement area and the armored concrete support rail beam bottom plate under the support rail beam, for Filler is backfilled for the armored concrete support rail beam bottom plate, reinforced concrete supporting beam and support rail beam both sides, and construction platform is provided, and Lateral support is provided for the pile foundation bearing structure;Wherein, the shallow layer reinforcement area is arranged on the superficial floor of soft stratum, and Roadbed filling and the vertical consistency of the reinforced concrete beam type structure under the shallow layer reinforcement area, the support rail beam;
The support rail beam both sides backfill filler is accepted by roadbed filling under the support rail beam, and the support rail beam both sides backfill Filler props up the both sides of the armored concrete support rail beam bottom plate, to be shielded to the armored concrete support rail beam bottom plate And the transverse shifting of the constraint armored concrete support rail beam bottom plate, and maintenance passage is provided;
Roadbed filling and support rail beam both sides backfill filler collectively form filler filling body under the support rail beam, and the filler is filled out Building body both sides are provided with the first weathering;
The lower end of the every first pile foundation bearing structure sequentially passes through roadbed filling under the support rail beam, the shallow layer reinforcement area Stretched into after the soft stratum in supporting course, so that when soft stratum produces sedimentation, the first pile foundation bearing structure can be held By negative friction, so that stable bearing capacity is provided to armored concrete support rail beam bottom plate and reinforced concrete beam type structure, with The sedimentation because of filler filling body is reduced to adverse effect caused by the vertical of armored concrete support rail beam, vertical and horizontal rigidity;
One end of the armored concrete support rail beam bottom plate is overlapped on the bridge abutment, and both are released by pin connection Longitudinal restraint is put, and limits lateral displacement;
The both sides of one end that the armored concrete support rail beam bottom plate is overlapped on the bridge abutment set the headwall respectively, and And the headwall per side is abutted with the support rail beam both sides backfill filler of respective side respectively, and the support rail beam both sides are protected for gear Backfill filler;
The trapezoidal filling body is arranged between shallow layer reinforcement area and the armored concrete support rail beam bottom plate, itself and the support rail Roadbed filling abuts close to one end of the bridge abutment under beam, for accepting the armored concrete support rail beam bottom plate, holding Beam-and-rail both sides backfill filler and headwall;
The trapezoidal filling body both sides are provided with second weathering consistent with the first weathering gradient.
2. pile foundation combined type support rail beam transition section structure in medium-and low-speed maglev two-wire embankment location according to claim 1, its It is characterised by, the first pile foundation bearing structure is cast-in-situ bored pile, reinforced concrete supporting beam and armored concrete support rail beam bottom Plate rigid connection or overlap joint, with the second pile foundation bearing structure rigid connection.
3. pile foundation combined type support rail beam transition section structure in medium-and low-speed maglev two-wire embankment location according to claim 1, its It is characterised by, in the position at the internode expansion joint of armored concrete support rail beam, reinforced concrete supporting beam and armored concrete support rail Beam bottom plate is overlapped using pin, and remaining position uses rigid connection.
4. pile foundation combined type support rail beam transition section structure in medium-and low-speed maglev two-wire embankment location according to claim 1, its It is characterised by, the height of the support rail beam both sides backfill filler is equal with the height of the armored concrete support rail beam bottom plate.
5. pile foundation combined type support rail beam transition section structure in medium-and low-speed maglev two-wire embankment location according to claim 1, its It is characterised by, all these described first pile foundation bearing structures are arranged in ranks.
6. pile foundation combined type support rail beam transition section structure in medium-and low-speed maglev two-wire embankment location according to claim 1, its It is characterised by, the trapezoidal filling body mixes cement production systD using graded broken stone.
7. pile foundation combined type support rail beam transition section structure in medium-and low-speed maglev two-wire embankment location according to claim 1, its It is characterised by, the armored concrete support rail beam bottom plate is overlapped between one end of the bridge abutment and the bridge abutment and set It is equipped with wear-resisting sliding layer.
8. pile foundation combined type support rail beam transition section structure in medium-and low-speed maglev two-wire embankment location according to claim 1, its It is characterised by, the pin includes pre-buried connection reinforcing bar, pitch hemp cut and stainless steel sleeve pipe, and the pre-buried connection reinforcing bar is located at institute State in stainless steel sleeve pipe and the pitch hemp cut is set between the two.
9. pile foundation combined type support rail beam transition section structure in medium-and low-speed maglev two-wire embankment location according to claim 1, its It is characterised by, the cross fall of weathering section is 3%~5% between the line, and head fall is not less than 2 ‰.
CN201610826167.2A 2016-09-15 2016-09-15 Medium-and low-speed maglev two-wire embankment location pile foundation combined type support rail beam transition section structure Active CN106283953B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610826167.2A CN106283953B (en) 2016-09-15 2016-09-15 Medium-and low-speed maglev two-wire embankment location pile foundation combined type support rail beam transition section structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610826167.2A CN106283953B (en) 2016-09-15 2016-09-15 Medium-and low-speed maglev two-wire embankment location pile foundation combined type support rail beam transition section structure

Publications (2)

Publication Number Publication Date
CN106283953A CN106283953A (en) 2017-01-04
CN106283953B true CN106283953B (en) 2018-01-09

Family

ID=57712586

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610826167.2A Active CN106283953B (en) 2016-09-15 2016-09-15 Medium-and low-speed maglev two-wire embankment location pile foundation combined type support rail beam transition section structure

Country Status (1)

Country Link
CN (1) CN106283953B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114134794A (en) * 2021-12-13 2022-03-04 交通运输部公路科学研究所 Abutment way back end base reinforcing column fishplate bar structure

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5425646B2 (en) * 2010-01-12 2014-02-26 公益財団法人鉄道総合技術研究所 Airtight bag body embankment
CN102535263B (en) * 2012-02-14 2013-11-13 中铁十九局集团有限公司 Roadbed with pile-net composite structure and construction method thereof
CN203270559U (en) * 2013-05-29 2013-11-06 中铁第四勘察设计院集团有限公司 Roadbed structure of screw pile network structure composite foundation
CN105544311B (en) * 2016-01-17 2018-04-27 中铁二院工程集团有限责任公司 A kind of rich water ground frost heaving resistant ballastless track roadbed structure
CN105887587B (en) * 2016-04-29 2017-06-13 中铁第四勘察设计院集团有限公司 A kind of low circuit switch area of putting of medium-and low-speed maglev is with non-switch area transition section structure
CN205557205U (en) * 2016-04-29 2016-09-07 中铁第四勘察设计院集团有限公司 Low circuit switch area NOT AND switch area changeover portion structure of putting of moderate -low speed magnetic levitation
CN206157482U (en) * 2016-09-15 2017-05-10 中铁第四勘察设计院集团有限公司 Moderate -low speed magnetic levitation double -line location pile foundation combined type support rail roof beam transition section structure that fills

Also Published As

Publication number Publication date
CN106283953A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN206219897U (en) Medium-and low-speed maglev two-wire excavation location pile foundation combined type support rail beam transition section structure
CN106283966B (en) Medium-and low-speed maglev single line embankment location independence pier stud type support rail beam transition section structure
CN106283950B (en) Medium-and low-speed maglev traffic engineering two-wire embankment location pile foundation joist type support rail beam transition section structure
CN106283957B (en) Medium-and low-speed maglev two-wire excavation location pile foundation joist framing type support rail beam transition section structure
CN106283973B (en) Medium-and low-speed maglev traffic engineering two-wire excavation location independence pier stud type support rail beam transition section structure
CN106400615B (en) Medium-and low-speed maglev single line excavation location independence pier stud type support rail beam transition section structure
CN206157488U (en) Moderate -low speed magnetic levitation traffic engineering double -line location supporting beam of pile foundation formula support rail roof beam transition section structure that fills
CN206157485U (en) Moderate -low speed magnetic levitation single line excavation location pile foundation combined type support rail roof beam transition section structure
CN106283953B (en) Medium-and low-speed maglev two-wire embankment location pile foundation combined type support rail beam transition section structure
CN106436496B (en) Medium-and low-speed maglev single line embankment location pile foundation combined type support rail beam transition section structure
CN106283956B (en) Medium-and low-speed maglev two-wire excavation location pile foundation combined type support rail beam transition section structure
CN106283967B (en) Medium-and low-speed maglev two-wire embankment location pile foundation joist framing type support rail beam transition section structure
CN106283939B (en) Medium-and low-speed maglev two-wire excavation location pile foundation joist type support rail beam transition section structure
CN106283959B (en) Medium-and low-speed maglev single line excavation location pile foundation joist type support rail beam transition section structure
CN106283946B (en) The compound framing type support rail beam transition section structure of medium-and low-speed maglev two-wire excavation location pile foundation
CN206127736U (en) Moderate -low speed magnetic levitation double -line compound framing formula support rail roof beam transition section structure of location pile foundation that fills
CN206157482U (en) Moderate -low speed magnetic levitation double -line location pile foundation combined type support rail roof beam transition section structure that fills
CN206219912U (en) Medium-and low-speed maglev two-wire embankment location pile foundation joist framing type support rail beam transition section structure
CN206127759U (en) Moderate -low speed magnetic levitation double -line location detached pier column type support rail roof beam transition section structure that fills
CN206157487U (en) Moderate -low speed magnetic levitation single line location pile foundation combined type support rail roof beam transition section structure that fills
CN206127757U (en) Moderate -low speed magnetic levitation single line location detached pier column type support rail roof beam transition section structure that fills
CN206127740U (en) Moderate -low speed magnetic levitation single line location supporting beam of pile foundation formula support rail roof beam transition section structure that fills
CN206157481U (en) Compound framing type support rail roof beam transition section structure of moderate -low speed magnetic levitation double -line excavation location pile foundation
CN206127758U (en) Moderate -low speed magnetic levitation traffic engineering double -line excavation location detached pier column type support rail roof beam transition section structure
CN206127741U (en) Moderate -low speed magnetic levitation single line excavation location detached pier column type support rail roof beam transition section structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant