CN106245852A - Abnormity concrete counterfort reinforcing bar localization method - Google Patents

Abnormity concrete counterfort reinforcing bar localization method Download PDF

Info

Publication number
CN106245852A
CN106245852A CN201610849088.3A CN201610849088A CN106245852A CN 106245852 A CN106245852 A CN 106245852A CN 201610849088 A CN201610849088 A CN 201610849088A CN 106245852 A CN106245852 A CN 106245852A
Authority
CN
China
Prior art keywords
reinforcing bar
section
bar
supports
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610849088.3A
Other languages
Chinese (zh)
Other versions
CN106245852B (en
Inventor
汪立焕
向海静
姚军
邵君雅
黄展恩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LONGYUAN CONSTRUCTION GROUP CO Ltd
Original Assignee
LONGYUAN CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LONGYUAN CONSTRUCTION GROUP CO Ltd filed Critical LONGYUAN CONSTRUCTION GROUP CO Ltd
Priority to CN201610849088.3A priority Critical patent/CN106245852B/en
Publication of CN106245852A publication Critical patent/CN106245852A/en
Application granted granted Critical
Publication of CN106245852B publication Critical patent/CN106245852B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of abnormity concrete counterfort reinforcing bar localization method, the steps include: 1) steel bar segmentation: reinforcing bar is divided into three joints, first segment reinforcing bar is to right cylinder and column top 5m, second section reinforcing bar to arch bifurcated the 5th section concrete below 2 meters, section three, reinforcing bar is to arch bifurcated top, and setting the support of twice location, first supports and is positioned at second section reinforcing bar top, supports the construction of second segment concrete;Second supports and is positioned at the top of Section of three reinforcing bar, supports arch bifurcated the 3rd, the construction of the concrete of the 4th section;2) reinforcing bar moulding controls;3) location supports: often group location supports and selects two steel pipes as vertical bar, and a horizontal steel pipe is placed on the downside of the reinforcing bar of two, bottom, and is welded;Another root transverse steel is placed on the downside of the reinforcing bar of two, top, and is welded, then connects horizontal steel pipe respectively with two longitudinal steel pipes, arranges several rows of steel pipe according to bar spacing, be used for supporting horizontal a lot of reinforcing bar on longitudinal steel pipe.

Description

Abnormity concrete counterfort reinforcing bar localization method
Technical field
The present invention relates to a kind of concrete counterfort reinforcing bar location, especially a kind of abnormity concrete counterfort reinforcing bar location side Method.
Background technology
Large-sized workshop, station and public venue are according to the architectural image big roof system of many employings, mixing on the downside of steel structural roof Xtah Crude Clay structure includes roof system arch springing, concrete ring beam, Special-Shaped Column and batter post beam etc..Whole roof system is a unconventional property structure Part, moulding is often abnormity hyperboloid or warped surface, and arch springing and primarily serving the purpose of of counterfort that the scale of construction is bigger support whole big roof system System, arch springing batter post and lower rebar concrete together form the plane outer support system to superstructure, it is ensured that it is stable Property and safety.
Plane outer support system feature:
1) reinforcing bar of counterfort and ring beam main muscle diameter is 40mm, and reinforcing bar follows the moulding of arch springing and ring beam constantly turning round Song, the locus of every reinforcing bar is different from, and each reinforcing bar needs separately machined according to locus, and self load Greatly, the location of reinforced bar engineering and support and must set up independent support, the location of the reinforced bar engineering of the most whole complexity, processing and Support difficulty the biggest.
2) engineering structure is complicated, and counterfort is distortion, deformed shape with cant beam component, and front and back, domed end connects respectively simultaneously Steel construction and xoncrete structure ring beam, it is to be ensured that construction is last accurately to be connected;Concrete ring beam is also the 3 D stereo knot in space Structure, and height up to about 28 meters, accordingly, it would be desirable to the locus of establishment special monitoring scheme monitoring complex component.
3) often group counterfort not every independent, but by 2 arch according to certain angle intersect converge, separate the most again, The batter post that 2, front end intersects supports moulding one arch springing of composition.Counterfort not only has radian in arch plane, and simultaneously to both sides The measurement and positioning difficulty having angle of inclination, reinforcing bar and template is the biggest.The reinforcing bar setting-out of beam column intersection is extremely complex, and installation is stranded Difficult.
4) inner side batter post is up big and down small gradual change inclined-plane post, and in conventional Joint Re-bar Construction, stirrup overlaps from the top down Mode cannot be constructed.
Summary of the invention
The present invention is to provide for a kind of abnormity concrete counterfort reinforcing bar localization method, is used for solving above-mentioned technical problem.
The technical scheme is that a kind of abnormity concrete counterfort reinforcing bar localization method, the steps include:
1) steel bar segmentation
Some angle steel muscle of the arch springing by roof system counterfort, stirrup and location are supported and controls the position of reinforcing bar and make Type, wherein reinforcing bar is divided into three joints, first segment reinforcing bar to right cylinder and column top 5m, and second section reinforcing bar is mixed to arch bifurcated the 5th section Below solidifying soil 2 meters, Section three reinforcing bar is to arch bifurcated top, and sets twice location and support, and first support is positioned at second section reinforcing bar At top, support the construction of second segment concrete;Second supports and is positioned at the top of Section of three reinforcing bar, supports arch bifurcated 3rd, the construction of the concrete of the 4th section;
2) reinforcing bar moulding controls
First, draw the graphics of reinforcing bar, according to the three-dimensional dimension dividing the reinforcing bar taking out respective point position of construction section, send It is processed to specifying process unit;After machining, according to three-dimensional dimension precise positioning reinforcement location, then support weldering with location Extremely, colligation and fixing stirrup, and control the moulding of whole roof system arch springing;Then, some angle steel muscle are laid according to bar spacing Distribution bar;
3) location supports:
Often group location supports and selects two steel pipes as vertical bar, and a horizontal steel pipe is placed under the reinforcing bar of two, bottom Side, and be welded;Another root transverse steel is placed on the downside of the reinforcing bar of two, top, and is welded, then connects respectively with two longitudinal steel pipes Connect horizontal steel pipe, longitudinal steel pipe arranges several rows of steel pipe according to bar spacing, is used for supporting horizontal a lot of reinforcing bar.
In above-mentioned steps, need roof system counterfort is carried out construction survey, first, generate room by BIM 3 d modeling software The three-dimensional structure model of lid counterfort, decomposes the coordinate of each four points in crucial cross section drawing this component, by each by software The space coordinates of the point in cross section resolves into plane coordinates, and corresponding absolute altitude;Set up the support as component of the steel platform again Platform and sterically defined operating platform, then, plane control stake doubles as high process control stake, and each control point elevation uses and closes Route pilot measurement up to scratcs, and join tax by what distance carried out mis-tie misclosure.
The invention has the beneficial effects as follows:
The abnormity concrete counterfort reinforcing bar localization method of the present invention can have a solution:
(1) location and the support of the reinforced bar engineering of counterfort and ring beam must set up independent support, the reinforcing bar of whole complexity The location of engineering, process and support the sizable technical problem of difficulty.
(2) without the locus of establishment special monitoring scheme monitoring complex component.
(3) the reinforcing bar setting-out of beam column intersection can be solved complicated, the technical problem of installation difficulty.
(4) can angle certainly inner side batter post be up big and down small gradual change inclined-plane post, in conventional Joint Re-bar Construction, stirrup be from upper The technical problem cannot constructed to the mode trapped.
Accompanying drawing explanation
Fig. 1 is that reinforcing bar positions supporting plane figure;
Fig. 2 is reinforcement positioning support figure;
Fig. 3 is the sectional view in Fig. 2 along 1-1;
Fig. 4 is that reinforcing bar positions supporting plane layout drawing.
Detailed description of the invention
A kind of abnormity concrete counterfort reinforcing bar localization method, the steps include:
1) steel bar segmentation
As it is shown in figure 1, abnormity concrete counterfort is made up of face arch bifurcated post 1-1, rear arch bifurcated post 1-2, column 1-3.Vertical There is above post 1-3 face arch bifurcated post 1-1, rear arch bifurcated post 1-2.Face arch bifurcated post 1-1 sequentially consists of face arch bifurcated Second segment 2-A, the 3rd section of 3-A of face arch bifurcated, face arch bifurcated section the 4th 4-A, the 5th section of 5-A of face arch bifurcated.Rear arch bifurcated post 1-2 Sequentially consist of rear arch bifurcated second segment 2-B, the 3rd section of 3-B of rear arch bifurcated, rear arch bifurcated the 4th section of 4-B, rear arch bifurcated 5th section of 5-B.
The reinforcing bar of counterfort, in addition to column and batter post, is all irregularly to distort reinforcing bar, so by four angle steel of arch springing Muscle, stirrup and location support position and the moulding controlling reinforcing bar.Reinforcing bar is divided into three joints, on first segment reinforcing bar 10 to column 1-3 Remove 5m, second section reinforcing bar 11 to arch bifurcated the 5th section concrete below about 2 meters, Section of three reinforcing bar is to top.If twice are fixed Position supports, and first supports 20 and is positioned at second section reinforcing bar 11 top, supports the construction of the concrete of arch bifurcated second segment;The Two roads supports 21 are positioned at the top of Section of three reinforcing bar and (take 1-1 section on 5-A section concrete), support arch bifurcated the 3rd, the The construction of four sections of mixed solidifying soil.Steel bar segmentation and location supporting plane figure are as shown in Figure 1.
2) reinforcing bar moulding controls
As a example by four angle steel muscle of face arch, removing 20mm protective layer thickness, (reinforcing bar is straight to draw the graphics of four reinforcing bars Footpath 40mm), according to the three-dimensional dimension dividing the reinforcing bar taking out respective point position of construction section, deliver to specify process unit to add Work;After machining, according to three-dimensional dimension precise positioning reinforcement location, then it is welded with location support, colligation and fixing stirrup, control Make the moulding of whole roof system arch springing.Control well and directly lay distribution steel according to bar spacing at four angle steel muscle again after moulding Muscle.Rear arch and the same face arch of coupling beam reinforcing bar value.
3) location supports:
Often group location supports and selects two 48X3mm steel pipes as vertical bar, and a horizontal steel pipe is placed on two, bottom On the downside of reinforcing bar, after confirmation, it is welded;Another root transverse steel is placed on the downside of the reinforcing bar of two, top, after confirmation, and weldering Extremely, then connect horizontal steel pipe respectively with two longitudinal steel pipes, longitudinal steel pipe arranges several rows of steel pipe according to bar spacing, uses In supporting horizontal a lot of reinforcing bar.
Whole arch springing construction deployment is as follows: basis → first segment reinforcing bar binding → first paragraph concrete construction → set up first Layer steel platform → colligation second section reinforcing bar → set up first reinforced bar support → second segment concrete construction → set up second layer steel Section of three reinforcing bar of platform → colligation → set up second reinforced bar support → dismounting first reinforced bar support → the 3rd section concrete is executed Work → set up third layer steel platform → the 4th concrete construction → dismounting second reinforced bar support → the 5th road concrete construction.Fixed What position supported sets up and removes according to the flow process construction in construction deployment
Support Position, location determines: as a example by face arch second section reinforced bar support, take 1-in BIM model at reinforced bar support 1 section, obtains profile, can take out the Z coordinate of four pads A, B, C, D of reinforcing bar and horizontal cross bar;Further according to perspective Plane graph, can take out X, Y coordinate, determines reinforcing bar and the three-dimensional coordinate of four pads of horizon bar, such as Fig. 2, shown in 3:
Reinforcing bar location supporting row frame is set up: as a example by face arch second section Steel bar rack: between Steel bar rack both sides are respectively set up Twice steel pipe away from 800, also sets up the twice steel pipe of spacing 800 simultaneously in the side that cuts section bar, and is collectively forming reinforcing bar location and supports row Frame system, as shown in Figure 4.
4) construction survey
Roof system counterfort belongs to three dimensions stereoscopic member, and the location of component exists the biggest difficulty.By BIM three-dimensional modeling Software Create three-dimensional structure model, can be decomposed by software each four points in crucial cross section drawing this component coordinate (x, Y, z), the space coordinates of the point in each cross section is resolved into plane coordinates (x, y), and corresponding absolute altitude H.
Owing to after face arch, the pitch of arch is higher, support and setting-out exists the biggest difficulty, set up steel platform propping up as component Support platform and sterically defined operating platform.
High process control: plane control stake doubles as high process control stake, vertical control point Fixed Initial Point uses owner to provide also The bench mark used is agreed to through management inspection.Each control point elevation uses closed leveling line pilot measurement, and closes by distance Poor joins tax.High process control is with reference to fourth-order leveling.

Claims (2)

1. an abnormity concrete counterfort reinforcing bar localization method, it is characterised in that the steps include:
1) steel bar segmentation
Some angle steel muscle of the arch springing by roof system counterfort, stirrup and location are supported position and the moulding controlling reinforcing bar, Wherein reinforcing bar is divided into three joints, first segment reinforcing bar to column top 5m, second section reinforcing bar to arch bifurcated the 5th section concrete below 2 Rice, Section of three reinforcing bar is to arch bifurcated top, and sets the support of twice location, and first supports and is positioned at second section reinforcing bar top, Support the construction of second segment concrete;Second supports and is positioned at the top of Section of three reinforcing bar, supports and encircles bifurcated the 3rd, and the 4th The construction of the concrete of section;
2) reinforcing bar moulding controls
First, draw the graphics of reinforcing bar, according to the three-dimensional dimension dividing the reinforcing bar taking out respective point position of construction section, deliver to refer to Determine process unit to be processed;After machining, according to three-dimensional dimension precise positioning reinforcement location, then it is welded with location support, Colligation and fixing stirrup, and control the moulding of whole roof system arch springing;Then, some angle steel muscle lay distribution according to bar spacing Reinforcing bar;
3) location supports:
Often group location supports and selects two steel pipes as vertical bar, and a horizontal steel pipe is placed on the downside of the reinforcing bar of two, bottom, And be welded;Another root transverse steel is placed on the downside of the reinforcing bar of two, top, and is welded, then connects horizontal stroke respectively with two longitudinal steel pipes To steel pipe, longitudinal steel pipe arranges several rows of steel pipe according to bar spacing, is used for supporting horizontal a lot of reinforcing bar.
Abnormity concrete counterfort reinforcing bar localization method the most according to claim 1, it is characterised in that: in above-mentioned steps, need Roof system counterfort is carried out construction survey, first, is generated the three-dimensional structure model of roof system counterfort by BIM 3 d modeling software, Decomposed the coordinate of each four points in crucial cross section drawing this component by software, the space coordinates of the point in each cross section is decomposed Become plane coordinates, and corresponding absolute altitude;Set up steel platform more flat as support platform and the sterically defined operation of component Platform, then, plane control stake doubles as high process control stake, and each control point elevation uses closed leveling line pilot measurement, and by away from Tax is joined from carry out mis-tie misclosure.
CN201610849088.3A 2016-09-24 2016-09-24 Abnormity concrete counterfort reinforcing bar localization method Active CN106245852B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610849088.3A CN106245852B (en) 2016-09-24 2016-09-24 Abnormity concrete counterfort reinforcing bar localization method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610849088.3A CN106245852B (en) 2016-09-24 2016-09-24 Abnormity concrete counterfort reinforcing bar localization method

Publications (2)

Publication Number Publication Date
CN106245852A true CN106245852A (en) 2016-12-21
CN106245852B CN106245852B (en) 2018-04-06

Family

ID=57611603

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610849088.3A Active CN106245852B (en) 2016-09-24 2016-09-24 Abnormity concrete counterfort reinforcing bar localization method

Country Status (1)

Country Link
CN (1) CN106245852B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107122539A (en) * 2017-04-24 2017-09-01 清华大学建筑设计研究院有限公司 A kind of design method based on continuous deflecting armored concrete column structure system
CN108427783A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 A kind of reinforcing bar bundle design management method and device based on BIM
CN108759775A (en) * 2018-03-14 2018-11-06 江苏恒久钢构有限公司 A kind of method for building up of vertical control network
CN110835976A (en) * 2019-12-09 2020-02-25 上海宝冶集团有限公司 Space positioning construction method for V-shaped stiff column
CN111335546A (en) * 2020-03-11 2020-06-26 中国建筑第八工程局有限公司 Construction method for binding special-shaped variable-section cylindrical steel bars
CN115263001A (en) * 2022-09-15 2022-11-01 中国二十二冶集团有限公司 Lofting construction method of bidirectional inclined reducing concrete column
CN117592173A (en) * 2024-01-19 2024-02-23 中国建筑西南设计研究院有限公司 Special-shaped bifurcation column arrangement method and system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104453270A (en) * 2014-11-26 2015-03-25 中铁城建集团北京工程有限公司 Reinforcing device for special-shaped steel reinforced concrete member and construction method
CN204492166U (en) * 2015-03-20 2015-07-22 江苏省华建建设股份有限公司 A kind of wavy roofing counterfort support shuttering
CN105178510A (en) * 2015-09-22 2015-12-23 中国建筑第八工程局有限公司 Huge steel reinforced concrete combined column structure and construction method thereof
CN205153151U (en) * 2015-12-01 2016-04-13 江苏筑森建筑设计有限公司 Joint construction of I shaped steel roof beam and rectangle counterfort

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104453270A (en) * 2014-11-26 2015-03-25 中铁城建集团北京工程有限公司 Reinforcing device for special-shaped steel reinforced concrete member and construction method
CN204492166U (en) * 2015-03-20 2015-07-22 江苏省华建建设股份有限公司 A kind of wavy roofing counterfort support shuttering
CN105178510A (en) * 2015-09-22 2015-12-23 中国建筑第八工程局有限公司 Huge steel reinforced concrete combined column structure and construction method thereof
CN205153151U (en) * 2015-12-01 2016-04-13 江苏筑森建筑设计有限公司 Joint construction of I shaped steel roof beam and rectangle counterfort

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王忠良: "异形钢筋混凝土拱柱结构的钢筋施工", 《施工技术》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107122539A (en) * 2017-04-24 2017-09-01 清华大学建筑设计研究院有限公司 A kind of design method based on continuous deflecting armored concrete column structure system
CN107122539B (en) * 2017-04-24 2019-09-03 清华大学建筑设计研究院有限公司 A kind of design method based on continuous deflecting armored concrete column structure system
CN108427783A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 A kind of reinforcing bar bundle design management method and device based on BIM
CN108759775A (en) * 2018-03-14 2018-11-06 江苏恒久钢构有限公司 A kind of method for building up of vertical control network
CN110835976A (en) * 2019-12-09 2020-02-25 上海宝冶集团有限公司 Space positioning construction method for V-shaped stiff column
CN111335546A (en) * 2020-03-11 2020-06-26 中国建筑第八工程局有限公司 Construction method for binding special-shaped variable-section cylindrical steel bars
CN111335546B (en) * 2020-03-11 2021-06-11 中国建筑第八工程局有限公司 Construction method for binding special-shaped variable-section cylindrical steel bars
CN115263001A (en) * 2022-09-15 2022-11-01 中国二十二冶集团有限公司 Lofting construction method of bidirectional inclined reducing concrete column
CN117592173A (en) * 2024-01-19 2024-02-23 中国建筑西南设计研究院有限公司 Special-shaped bifurcation column arrangement method and system
CN117592173B (en) * 2024-01-19 2024-04-19 中国建筑西南设计研究院有限公司 Special-shaped bifurcation column arrangement method and system

Also Published As

Publication number Publication date
CN106245852B (en) 2018-04-06

Similar Documents

Publication Publication Date Title
CN106245852A (en) Abnormity concrete counterfort reinforcing bar localization method
CN101556704B (en) Method for establishing temporary supporting frame system assembled by steel structures
CN107869249B (en) Arcuate structure high-formwork construction method
CN103726654B (en) The construction method of the special-shaped shell of concrete structure
CN106522984B (en) A kind of modeling method of duct pieces of shield tunnel three-dimensional fine assembly
CN106372309B (en) GIS (geographic information System) and BIM (building information modeling) -based digital laying method and system for electric power tunnel
CN102839747A (en) Construction method for steel structure truss of super high-rise special structure
CN104156544A (en) Automatic beam and column steel bar joint arranging and constructing simulation method based on BIM technology
CN103114732A (en) Cast steel penetration pipe node space positioning method
CN113343329A (en) Method for establishing parameterized railway tunnel model
CN103321350A (en) Multi-connection and large-cross-section combination-box-type thick-plate side column and construction method therefor
CN113204825A (en) BIM technology-based vertical design method for urban garden landscape
CN101761134B (en) Construction technology of spatial variable curved surface reinforced concrete irregular barrel group structure
CN107491619A (en) A kind of old project steel construction that changes based on BIM technology positions construction method for hanging
CN106827193A (en) Multiple box culvert makes mould and the method for producing box culvert using three hole box culvert moulds
CN103243928B (en) Inclined in two-way V-type column construction method
CN206128448U (en) Dysmorphism concrete arch post rebar positioning structure
CN114580057A (en) Comprehensive pipe rack pipeline outlet design method based on BIM
CN115114716A (en) BIM-based subway shield interval contact channel pre-assembly method
CN105760609A (en) Modeling method and modeling system for long-distance pipeline station model
CN101136259A (en) Modularize building method for nuclear reactor of nuclear plant
CN101736925B (en) Modular construction method for nuclear island of nuclear power station
KR101732439B1 (en) Gis aided topography based underground pipeline alignment optimization method and computer readable recording medium storing program performing the method
CN104278779A (en) Cable net of large decorative curtain wall and installation stretch-draw forming method thereof
CN204311622U (en) Saddle-shaped prestressed cable net

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant