CN106196494A - Complete machine overload control method and device - Google Patents

Complete machine overload control method and device Download PDF

Info

Publication number
CN106196494A
CN106196494A CN201610630755.9A CN201610630755A CN106196494A CN 106196494 A CN106196494 A CN 106196494A CN 201610630755 A CN201610630755 A CN 201610630755A CN 106196494 A CN106196494 A CN 106196494A
Authority
CN
China
Prior art keywords
temperature
electric current
blower fan
complete machine
interval
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610630755.9A
Other languages
Chinese (zh)
Other versions
CN106196494B (en
Inventor
肖喜平
梁耀祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201610630755.9A priority Critical patent/CN106196494B/en
Publication of CN106196494A publication Critical patent/CN106196494A/en
Application granted granted Critical
Publication of CN106196494B publication Critical patent/CN106196494B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/72Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure
    • F24F11/74Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure for controlling air flow rate or air velocity
    • F24F11/77Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure for controlling air flow rate or air velocity by controlling the speed of ventilators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Atmospheric Sciences (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)
  • Control Of Positive-Displacement Air Blowers (AREA)

Abstract

The invention discloses a complete machine overload control method and a complete machine overload control device. Wherein, the method comprises the following steps: monitoring the temperature of a condenser tube or the current of the whole machine; and adjusting the rotating speeds of the outer fan and the inner fan according to the temperature of the condenser pipe or the current of the whole machine so as to adjust the overload capacity of the whole machine. By applying the technical scheme of the invention, the problem of control over the overload capacity of the whole machine in the prior art is solved, and the aim of improving the overload capacity of the whole machine can be achieved only by adjusting the rotating speeds of the inner fan and the outer fan without increasing any cost.

Description

A kind of complete machine overload control method and device
Technical field
The present invention relates to moving machine technical field, in particular to a kind of complete machine overload control method and device.
Background technology
In the related, the capability of overload improving complete machine typically takes following methods:
1) vaporizer, condenser arrangement are strengthened.The method needs to increase cost, more likely needs to increase the body of internal-external machine Long-pending, affect the dress cabinet amount of complete machine.
2) air quantity outside increasing.The method can increase outside noise.
3) increase electromagnetic expanding valve, by regulation cold medium flux, adapt to different environmental requirements.The method needs also exist for increasing Adding cost, complete machine pipeline is more complicated simultaneously, easily brings other integrity problems.
The difficult problem controlled for complete machine overload capability in prior art, the most not yet proposes effective solution.
Summary of the invention
The embodiment of the present invention provides a kind of complete machine overload control method and device, to solve complete machine mistake in prior art The difficult problem that load capacity controls.
For solving above-mentioned technical problem, the invention provides a kind of complete machine overload control method, wherein, the method bag Include: monitoring condenser tube temperature or complete machine electric current;According to condenser tube temperature or complete machine electric current, adjust outer blower fan and inner blower Rotating speed, to adjust the capability of overload of complete machine.
Further, according to described condenser tube temperature, adjust outer blower fan and the rotating speed of inner blower, including: according to described cold Temperature range residing for condenser Guan Wen, the described outer blower fan of corresponding adjustment and the gear of described inner blower.
Further, according to the temperature range residing for described condenser tube temperature, corresponding adjust described outer blower fan and described in The gear of blower fan, including:
If it is interval that described condenser tube temperature T is in temperature below: T < preset first temperature T1, the most described outer blower fan and Described inner blower all runs according to set position;
If it is interval that described condenser tube temperature T is in temperature below: T1< T < preset second temperature T2, the most described outer blower fan Being adjusted to high wind gear, described inner blower runs according to set position;
If it is interval that described condenser tube temperature T is in temperature below: T2< T < presets the 3rd temperature T3, the most described outer blower fan Being adjusted to high wind gear, described inner blower is adjusted to apoplexy gear;
If it is interval that described condenser tube temperature T is in temperature below: T3< T < presets the 4th temperature T4, the most described outer blower fan Being adjusted to high wind gear, described inner blower is adjusted to low wind gear;
If it is interval that described condenser tube temperature T is in temperature below: T > T4, the most described outer fan parking, described inner blower Run according to set position.
Further, described outer fan parking, before described inner blower runs according to set position, described method is also wrapped Include: by compressor operating the first duration, then shut down the second duration;Wherein, described first duration is more than described second duration.
Further, according to described complete machine electric current, adjust outer blower fan and the rotating speed of inner blower, including: according to described complete machine Electric current residing for electric current is interval, the described outer blower fan of corresponding adjustment and the gear of described inner blower.
Further, interval according to the electric current residing for described complete machine electric current, the described outer blower fan of corresponding adjustment and described endogenous wind The gear of machine, including:
If it is interval that described complete machine electric current I is in temperature below: I < presets the first electric current I1, the most described outer blower fan and institute State inner blower all to run according to set position;
If it is interval that described complete machine electric current I is in temperature below: I1< I < presets the second electric current I2, the most described outer blower fan is adjusted Whole for high wind gear, described inner blower runs according to set position;
If it is interval that described complete machine electric current I is in temperature below: I2< I < presets the 3rd electric current I3, the most described outer blower fan is adjusted Whole for high wind gear, described inner blower is adjusted to apoplexy gear;
If it is interval that described complete machine electric current I is in temperature below: I3< I < presets the 4th electric current I4, the most described outer blower fan is adjusted Whole for high wind gear, described inner blower is adjusted to low wind gear;
If it is interval that described complete machine electric current I is in temperature below: I > I4, the most described outer fan parking, described inner blower is pressed Run according to set position.
Further, described outer fan parking, before described inner blower runs according to set position, described method is also wrapped Include: by compressor operating the first duration, then shut down the second duration;Wherein, described first duration is more than described second duration.
Present invention also offers a kind of complete machine overload control apparatus, wherein, this device includes: monitoring module, is used for supervising Control condenser tube temperature or complete machine electric current;Adjusting module, for according to condenser tube temperature or complete machine electric current, adjust outer blower fan with The rotating speed of inner blower, to adjust the capability of overload of complete machine.
Further, described adjusting module includes: pipe temperature adjustment unit, for according to the temperature residing for described condenser tube temperature Degree interval, the described outer blower fan of corresponding adjustment and the gear of described inner blower.
Further, described pipe temperature adjustment unit includes:
First pipe temperature adjusts subelement, for when described condenser tube temperature T is in temperature below interval: T < presets the One temperature T1, described outer blower fan and described inner blower all run according to set position;
Second pipe temperature adjusts subelement, for when described condenser tube temperature T is in temperature below interval: T1< T < is pre- If the second temperature T2, described outer blower fan is adjusted to high wind gear, and described inner blower runs according to set position;
3rd pipe temperature adjusts subelement, for when described condenser tube temperature T is in temperature below interval: T2< T < is pre- If the 3rd temperature T3, described outer blower fan is adjusted to high wind gear, and described inner blower is adjusted to apoplexy gear;
4th pipe temperature adjusts subelement, for when described condenser tube temperature T is in temperature below interval: T3< T < is pre- If the 4th temperature T4, described outer blower fan is adjusted to high wind gear, and described inner blower is adjusted to low wind gear;
5th pipe temperature adjusts subelement, for when described condenser tube temperature T is in temperature below interval: T > T4, described Outer fan parking, described inner blower runs according to set position.
Further, described adjusting module includes: current adjustment unit, for according to the electric current residing for described complete machine electric current Interval, the described outer blower fan of corresponding adjustment and the gear of described inner blower.
Further, described current adjustment unit includes:
First electric current adjusts subelement, for when described complete machine electric current I is in temperature below interval: I < presets first Electric current I1, described outer blower fan and described inner blower all run according to set position;
Second electric current adjusts subelement, for when described complete machine electric current I is in temperature below interval: I1< I < presets Second electric current I2, described outer blower fan is adjusted to high wind gear, and described inner blower runs according to set position;
3rd electric current adjusts subelement, for when described complete machine electric current I is in temperature below interval: I2< I < presets 3rd electric current I3, described outer blower fan is adjusted to high wind gear, and described inner blower is adjusted to apoplexy gear;
4th electric current adjusts subelement, for when described complete machine electric current I is in temperature below interval: I3< I < presets 4th electric current I4, described outer blower fan is adjusted to high wind gear, and described inner blower is adjusted to low wind gear;
5th electric current adjusts subelement, for when described complete machine electric current I is in temperature below interval: I > I4, described outside Fan parking, described inner blower runs according to set position.
Application technical scheme, it is possible in the case of need not increase any cost, only by regulation The rotating speed of outer blower fan, reaches to improve the purpose of complete machine capability of overload.
Accompanying drawing explanation
Fig. 1 is the flow chart of complete machine overload control method according to embodiments of the present invention;
Fig. 2 is condenser tube temperature according to embodiments of the present invention and fan operation view;
Fig. 3 is complete machine electric current according to embodiments of the present invention and fan operation view;
Fig. 4 is the structured flowchart of complete machine overload control apparatus according to embodiments of the present invention.
Detailed description of the invention
With specific embodiment, the present invention is described in further detail below in conjunction with the accompanying drawings, but not as the limit to the present invention Fixed.
Embodiment one
Fig. 1 is the flow chart of complete machine overload control method according to embodiments of the present invention, as it is shown in figure 1, the method bag Include following steps (step S101-step S102):
Step S101, monitoring condenser tube temperature or complete machine electric current;
Step S102, according to condenser tube temperature or complete machine electric current, adjusts outer blower fan and the rotating speed of inner blower, whole to adjust The capability of overload of machine.
Below condenser tube gentleness complete machine electric current is introduced respectively.
(1) according to condenser tube temperature, outer blower fan and the rotating speed of inner blower are adjusted.
Specifically, according to the temperature range residing for condenser tube temperature, the outer blower fan of corresponding adjustment and the gear of inner blower.Below Respectively the gear how adjusting outer blower fan and inner blower under each temperature range is introduced.
1) if to be in temperature below interval for condenser tube temperature T: T < preset first temperature T1, outer blower fan and inner blower All run according to set position;
2) if condenser tube temperature T is in temperature below interval: T1< T < preset second temperature T2, outer blower fan is adjusted to High wind gear, inner blower runs according to set position;
3) if condenser tube temperature T is in temperature below interval: T2< T < presets the 3rd temperature T3, outer blower fan is adjusted to High wind gear, inner blower is adjusted to apoplexy gear;
4) if condenser tube temperature T is in temperature below interval: T3< T < presets the 4th temperature T4, outer blower fan is adjusted to High wind gear, inner blower is adjusted to low wind gear;
5) if to be in temperature below interval for condenser tube temperature T: T > T4, then by compressor operating the first duration, then stop Machine the second duration;Wherein, the first duration is more than the second duration.Outer fan parking, inner blower runs according to set position.
(2) according to complete machine electric current, outer blower fan and the rotating speed of inner blower are adjusted.
Specifically, according to the temperature range residing for complete machine electric current, the outer blower fan of corresponding adjustment and the gear of inner blower.Divide below The other gear to how adjusting outer blower fan and inner blower under each temperature range is introduced.
1) if complete machine electric current I is in temperature below interval: I < presets the first electric current I1, outer blower fan and inner blower are equal Run according to set position;
2) if complete machine electric current I is in temperature below interval: I1< I < presets the second electric current I2, outer blower fan is adjusted to high Wind gear, inner blower runs according to set position;
3) if complete machine electric current I is in temperature below interval: I2< I < presets the 3rd electric current I3, outer blower fan is adjusted to high Wind gear, inner blower is adjusted to apoplexy gear;
4) if complete machine electric current I is in temperature below interval: I3< I < presets the 4th electric current I4, outer blower fan is adjusted to high Wind gear, inner blower is adjusted to low wind gear;
5) if to be in temperature below interval for complete machine electric current I: I > I4, then by compressor operating the first duration, then shut down Second duration;Wherein, the first duration is more than the second duration.Outer fan parking, inner blower runs according to set position.
Based on this, apply the technical scheme of the present embodiment, exogenous wind can be adjusted according to condenser tube temperature or complete machine electric current Machine and the rotating speed of inner blower, thus improve the capability of overload of complete machine, it is ensured that complete machine is properly functioning.
Embodiment two
Separately below by two schemes and accompanying drawing, concrete introduction adjusts outer blower fan and inner blower according to condenser tube temperature Rotating speed, and adjust outer blower fan and the rotating speed of inner blower according to complete machine electric current.
Scheme 1:
Mobile air conditioner is when start refrigeration, and along with the rising of use ambient temperature, condenser temperature can constantly raise, compression Machine running current can increase, and after temperature and electric current are increased to certain degree, compressor can overload shutdown.This technical side The Main Function of case is to utilize condenser tube temperature T and complete machine electric current I to control the gear of outer blower fan and the gear conversion of inner blower, Reduce condensation temperature and running current, it is to avoid overload of compressor is shut down, improve the capability of overload of complete machine, improve the use of complete machine Scope.
The mobile air conditioner of indication includes at least: compressor, vaporizer, condenser, inner blower, outer blower fan, condenser temperature-sensitive Bag, current transformer.Wherein, outer blower fan, inner blower respectively comprise high, medium and low three gears.
Shown in table 1 is condenser tube temperature when being in different temperatures interval, the operation shape of outer blower fan, inner blower and compressor State.
Table 1
When mobile air conditioner refrigerating operaton, when condenser tube temperature T is less than temperature X DEG C preset, outer blower fan and inner blower The gear set by user runs: user is set as top grade, and outer blower fan operates in top grade, and inner blower operates in top grade;User Being set as middle-grade, outer blower fan operates in middle-grade, and inner blower operates in middle-grade;User is set as low grade, outer blower fan and endogenous wind Machine operates in low grade.
Fig. 2 is condenser tube temperature according to embodiments of the present invention and fan operation view, as shown in Figure 2:
When condenser tube temperature T is higher than temperature X DEG C preset, outer blower fan turns high wind shelves and runs;Inner blower is set by user Wind shelves run;
When condenser tube temperature T continues to rise, and condenser tube temperature T is higher than X+a DEG C, and outer blower fan turns high wind shelves;During inner blower turns Wind shelves;
When condenser tube temperature T continues to rise, and condenser tube temperature T is higher than X+a+b DEG C, and outer blower fan turns high wind shelves;Inner blower turns Low wind shelves;
When condenser tube temperature T continues to rise, and condensing tube temperature T is higher than X+a+b+C DEG C, and compressor is opened T minute, stops t minute, interior Blower fan turns set position and runs, and outer blower fan stops.
In the present embodiment, 65 >=X >=55,2 >=a >=5,2 >=b >=5,2 >=c >=5, the cold pipe of 100 >=T >=-30,6 >=T >= 15,5 >=t >=3.It should be noted that could again turn wind shelves after must running N minute after the conversion of wind shelves.Wherein, 5 >=N >=3. Certainly these numerical value simply schematically illustrate, and concrete numerical value needs to determine according to practical situation.
Scheme 2:
Shown in table 2 is complete machine electric current when being in different temperatures interval, the operation shape of outer blower fan, inner blower and compressor State.
Table 2
Fig. 3 is complete machine electric current according to embodiments of the present invention and fan operation view, as shown in Figure 3:
When complete machine electric current I is less than the electric current Y preset, outer blower fan, inner blower set wind shelves by user and run;
When complete machine electric current I is higher than the electric current Y preset, outer blower fan turns high wind shelves;Inner blower sets wind shelves by user and runs;
When complete machine electric current continues to rise, and complete machine electric current I is higher than the electric current Y+a1 preset, and outer blower fan turns high wind shelves;Inner blower Turn middle-grade;
When complete machine electric current continues to rise, and complete machine electric current I is higher than the electric current Y+a1+b1 preset, and outer blower fan turns high wind shelves;Endogenous wind Machine turns low-grade;
When complete machine electric current continues to rise, and complete machine electric current I is higher than the electric current Y+a1+b1+C1 preset, and compressor is opened T minute, stopped T minute, inner blower turned setting, and outer blower fan stops.
In the present embodiment, 50A >=I >=0A, 15A >=Y >=3A, 3A >=a1 >=0.5A, 3A >=b1 >=0.5A, 3A >=c1 >= 0.5A, 6 >=T >=15,5 >=t >=3.It should be noted that could again turn wind shelves after must running N minute after the conversion of wind shelves.Its In, 5 >=N >=3.Certainly these numerical value simply schematically illustrate, and concrete numerical value needs to determine according to practical situation.
Embodiment three
The complete machine overload control method introduced corresponding to Fig. 1, present embodiments provides a kind of air-conditioning self diagnosis debugging dress Putting, the structured flowchart of complete machine overload control apparatus as shown in Figure 4, this device includes:
Monitoring module 10, is used for monitoring condenser tube temperature or complete machine electric current;
Adjusting module 20, is connected to monitoring module 10, for according to condenser tube temperature or complete machine electric current, adjusts outer blower fan With the rotating speed of inner blower, to adjust the capability of overload of complete machine.
In the present embodiment, above-mentioned adjusting module 20 may include that pipe temperature adjustment unit, for according to condenser tube temperature institute The temperature range at place, the outer blower fan of corresponding adjustment and the gear of inner blower;And, current adjustment unit, for according to complete machine electric current Residing electric current is interval, the outer blower fan of corresponding adjustment and the gear of inner blower.Based on this, it is possible to adjust outer blower fan and interior targetedly The rotating speed of blower fan, reaches to improve the purpose of complete machine capability of overload.
Specifically, pipe temperature adjustment unit may include that
First pipe temperature adjusts subelement, for when condenser tube temperature T is in temperature below interval: T < presets the first temperature Degree T1, outer blower fan and inner blower all run according to set position;
Second pipe temperature adjusts subelement, for when condenser tube temperature T is in temperature below interval: T1< T < presets Two temperature T2, outer blower fan is adjusted to high wind gear, and inner blower runs according to set position;
3rd pipe temperature adjusts subelement, for when condenser tube temperature T is in temperature below interval: T2< T < presets Three temperature T3, outer blower fan is adjusted to high wind gear, and inner blower is adjusted to apoplexy gear;
4th pipe temperature adjusts subelement, for when condenser tube temperature T is in temperature below interval: T3< T < presets Four temperature T4, outer blower fan is adjusted to high wind gear, and inner blower is adjusted to low wind gear;
5th pipe temperature adjusts subelement, for when condenser tube temperature T is in temperature below interval: T > T4, outer blower fan stops Machine, inner blower runs according to set position.
Specifically, current adjustment unit may include that
First electric current adjusts subelement, for when complete machine electric current I is in temperature below interval: I < presets the first electric current I1, outer blower fan and inner blower all run according to set position;
Second electric current adjusts subelement, for when complete machine electric current I is in temperature below interval: I1< I < presets second Electric current I2, outer blower fan is adjusted to high wind gear, and inner blower runs according to set position;
3rd electric current adjusts subelement, for when complete machine electric current I is in temperature below interval: I2< I < presets the 3rd Electric current I3, outer blower fan is adjusted to high wind gear, and inner blower is adjusted to apoplexy gear;
4th electric current adjusts subelement, for when complete machine electric current I is in temperature below interval: I3< I < presets the 4th Electric current I4, outer blower fan is adjusted to high wind gear, and inner blower is adjusted to low wind gear;
5th electric current adjusts subelement, for when complete machine electric current I is in temperature below interval: I > I4, outer blower fan stops Machine, inner blower runs according to set position.
Understand from above description, apply technical scheme, can be according to condenser tube temperature or complete machine electricity Stream, adjusts outer blower fan and the rotating speed of inner blower, thus improves the capability of overload of complete machine, ensures on the premise of not increasing cost Complete machine is properly functioning.
Certainly, it is above the preferred embodiment of the present invention.It should be pointed out that, for those skilled in the art For, on the premise of without departing from its general principles, it is also possible to make some improvements and modifications, these improvements and modifications are also It is considered as protection scope of the present invention.

Claims (12)

1. a complete machine overload control method, it is characterised in that described method includes:
Monitoring condenser tube temperature or complete machine electric current;
According to condenser tube temperature or complete machine electric current, adjust outer blower fan and the rotating speed of inner blower, to adjust the overload energy of complete machine Power.
Method the most according to claim 1, it is characterised in that according to described condenser tube temperature, adjusts outer blower fan and endogenous wind The rotating speed of machine, including:
According to the temperature range residing for described condenser tube temperature, the described outer blower fan of corresponding adjustment and the gear of described inner blower.
Method the most according to claim 2, it is characterised in that according to the temperature range residing for described condenser tube temperature, right Described outer blower fan and the gear of described inner blower should be adjusted, including:
If it is interval that described condenser tube temperature T is in temperature below: T < preset first temperature T1, the most described outer blower fan and described in Blower fan all runs according to set position;
If it is interval that described condenser tube temperature T is in temperature below: T1< T < preset second temperature T2, the most described outer blower fan adjusts For high wind gear, described inner blower runs according to set position;
If it is interval that described condenser tube temperature T is in temperature below: T2< T < presets the 3rd temperature T3, the most described outer blower fan adjusts For high wind gear, described inner blower is adjusted to apoplexy gear;
If it is interval that described condenser tube temperature T is in temperature below: T3< T < presets the 4th temperature T4, the most described outer blower fan adjusts For high wind gear, described inner blower is adjusted to low wind gear;
If it is interval that described condenser tube temperature T is in temperature below: T > T4, the most described outer fan parking, described inner blower according to Set position runs.
Method the most according to claim 3, it is characterised in that described outer fan parking, described inner blower is according to setting shelves Before position is run, described method also includes:
By compressor operating the first duration, then shut down the second duration;Wherein, described first duration is more than described second duration.
Method the most according to claim 1, it is characterised in that according to described complete machine electric current, adjusts outer blower fan and inner blower Rotating speed, including:
Interval according to the electric current residing for described complete machine electric current, the described outer blower fan of corresponding adjustment and the gear of described inner blower.
Method the most according to claim 5, it is characterised in that interval according to the electric current residing for described complete machine electric current, corresponding Adjust described outer blower fan and the gear of described inner blower, including:
If it is interval that described complete machine electric current I is in temperature below: I < presets the first electric current I1, the most described outer blower fan and described endogenous wind Machine all runs according to set position;
If it is interval that described complete machine electric current I is in temperature below: I1< I < presets the second electric current I2, the most described outer blower fan is adjusted to High wind gear, described inner blower runs according to set position;
If it is interval that described complete machine electric current I is in temperature below: I2< I < presets the 3rd electric current I3, the most described outer blower fan is adjusted to High wind gear, described inner blower is adjusted to apoplexy gear;
If it is interval that described complete machine electric current I is in temperature below: I3< I < presets the 4th electric current I4, the most described outer blower fan is adjusted to High wind gear, described inner blower is adjusted to low wind gear;
If it is interval that described complete machine electric current I is in temperature below: I > I4, the most described outer fan parking, described inner blower is according to setting Determine gear to run.
Method the most according to claim 6, it is characterised in that described outer fan parking, described inner blower is according to setting shelves Before position is run, described method also includes:
By compressor operating the first duration, then shut down the second duration;Wherein, described first duration is more than described second duration.
8. a complete machine overload control apparatus, it is characterised in that described device includes:
Monitoring module, is used for monitoring condenser tube temperature or complete machine electric current;
Adjusting module, for according to condenser tube temperature or complete machine electric current, adjusts outer blower fan and the rotating speed of inner blower, whole to adjust The capability of overload of machine.
Device the most according to claim 8, it is characterised in that described adjusting module includes:
Pipe temperature adjustment unit, for according to the temperature range residing for described condenser tube temperature, correspondence adjusts described outer blower fan and institute State the gear of inner blower.
Device the most according to claim 9, it is characterised in that described pipe temperature adjustment unit includes:
First pipe temperature adjusts subelement, for when described condenser tube temperature T is in temperature below interval: T < presets the first temperature Degree T1, described outer blower fan and described inner blower all run according to set position;
Second pipe temperature adjusts subelement, for when described condenser tube temperature T is in temperature below interval: T1< T < presets second Temperature T2, described outer blower fan is adjusted to high wind gear, and described inner blower runs according to set position;
3rd pipe temperature adjusts subelement, for when described condenser tube temperature T is in temperature below interval: T2< T < presets the 3rd Temperature T3, described outer blower fan is adjusted to high wind gear, and described inner blower is adjusted to apoplexy gear;
4th pipe temperature adjusts subelement, for when described condenser tube temperature T is in temperature below interval: T3< T < presets the 4th Temperature T4, described outer blower fan is adjusted to high wind gear, and described inner blower is adjusted to low wind gear;
5th pipe temperature adjusts subelement, for when described condenser tube temperature T is in temperature below interval: T > T4, described exogenous wind Machine is shut down, and described inner blower runs according to set position.
11. devices according to claim 8, it is characterised in that described adjusting module includes:
Current adjustment unit, for interval according to the electric current residing for described complete machine electric current, the corresponding described outer blower fan and described of adjusting The gear of inner blower.
12. devices according to claim 11, it is characterised in that described current adjustment unit includes:
First electric current adjusts subelement, for when described complete machine electric current I is in temperature below interval: I < presets the first electric current I1, described outer blower fan and described inner blower all run according to set position;
Second electric current adjusts subelement, for when described complete machine electric current I is in temperature below interval: I1< I < presets the second electricity Stream I2, described outer blower fan is adjusted to high wind gear, and described inner blower runs according to set position;
3rd electric current adjusts subelement, for when described complete machine electric current I is in temperature below interval: I2< I < presets the 3rd electricity Stream I3, described outer blower fan is adjusted to high wind gear, and described inner blower is adjusted to apoplexy gear;
4th electric current adjusts subelement, for when described complete machine electric current I is in temperature below interval: I3< I < presets the 4th electricity Stream I4, described outer blower fan is adjusted to high wind gear, and described inner blower is adjusted to low wind gear;
5th electric current adjusts subelement, for when described complete machine electric current I is in temperature below interval: I > I4, described outer blower fan Shutting down, described inner blower runs according to set position.
CN201610630755.9A 2016-08-01 2016-08-01 Complete machine overload control method and device Active CN106196494B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610630755.9A CN106196494B (en) 2016-08-01 2016-08-01 Complete machine overload control method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610630755.9A CN106196494B (en) 2016-08-01 2016-08-01 Complete machine overload control method and device

Publications (2)

Publication Number Publication Date
CN106196494A true CN106196494A (en) 2016-12-07
CN106196494B CN106196494B (en) 2018-11-09

Family

ID=57497171

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610630755.9A Active CN106196494B (en) 2016-08-01 2016-08-01 Complete machine overload control method and device

Country Status (1)

Country Link
CN (1) CN106196494B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106766449A (en) * 2017-01-03 2017-05-31 奥克斯空调股份有限公司 A kind of compressor protection method during air-conditioning heating HTHP
CN106969466A (en) * 2017-03-22 2017-07-21 珠海格力电器股份有限公司 Control method, device and system for fan of condensing unit
CN107023942A (en) * 2017-03-30 2017-08-08 广东美的制冷设备有限公司 Mobile air conditioner control method and device
WO2018176331A1 (en) * 2017-03-30 2018-10-04 广东美的制冷设备有限公司 Mobile air conditioner control method and device
CN108870682A (en) * 2018-07-17 2018-11-23 奥克斯空调股份有限公司 A kind of air conditioner load control method and device
CN110319546A (en) * 2019-07-05 2019-10-11 宁波奥克斯电气股份有限公司 A kind of air conditioner temperature controlling method and air conditioner
CN110779161A (en) * 2019-11-18 2020-02-11 宁波奥克斯电气股份有限公司 Control method and device for compressor overload protection and air conditioner
CN110848898A (en) * 2019-10-11 2020-02-28 珠海格力电器股份有限公司 Control method for preventing air conditioner load conversion from stopping, computer readable storage medium and air conditioner
CN111023393A (en) * 2019-11-15 2020-04-17 宁波奥克斯电气股份有限公司 Control method and system of outdoor fan and air conditioner
CN112032968A (en) * 2020-08-27 2020-12-04 海信(山东)空调有限公司 Air conditioner, method of controlling the same, and computer-readable storage medium
CN113899061A (en) * 2021-09-28 2022-01-07 珠海格力电器股份有限公司 Control method and device of mobile air conditioner, controller and mobile air conditioner
CN115264654A (en) * 2022-07-28 2022-11-01 海信家电集团股份有限公司 Air conditioner and overload control method thereof
CN115614924A (en) * 2022-10-10 2023-01-17 珠海格力电器股份有限公司 Defrosting control method and air conditioning unit

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060018071A (en) * 2004-08-23 2006-02-28 위니아만도 주식회사 Method for controlling cool operation of air-conditioner
CN101526257A (en) * 2009-03-26 2009-09-09 宁波海诚电器有限公司 Method for protecting compressor when air conditioner makes heat in high temperature environment
CN104870225A (en) * 2012-12-18 2015-08-26 三菱自动车工业株式会社 Refrigerant circulation device
CN104879892A (en) * 2015-05-12 2015-09-02 广东美的暖通设备有限公司 Control method and control system for high-temperature protection of air conditioner internal unit
CN105091185A (en) * 2014-04-22 2015-11-25 海信(山东)空调有限公司 Method and device used for controlling air conditioner and air conditioner
CN105180362A (en) * 2015-09-02 2015-12-23 珠海格力电器股份有限公司 compressor overload protection control method and device and fixed-frequency air conditioner
CN105240987A (en) * 2014-07-08 2016-01-13 青岛海尔空调器有限总公司 Air conditioner and pressure relief control circuit and method thereof
JP2016090113A (en) * 2014-10-31 2016-05-23 ダイキン工業株式会社 Air conditioner

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060018071A (en) * 2004-08-23 2006-02-28 위니아만도 주식회사 Method for controlling cool operation of air-conditioner
CN101526257A (en) * 2009-03-26 2009-09-09 宁波海诚电器有限公司 Method for protecting compressor when air conditioner makes heat in high temperature environment
CN104870225A (en) * 2012-12-18 2015-08-26 三菱自动车工业株式会社 Refrigerant circulation device
CN105091185A (en) * 2014-04-22 2015-11-25 海信(山东)空调有限公司 Method and device used for controlling air conditioner and air conditioner
CN105240987A (en) * 2014-07-08 2016-01-13 青岛海尔空调器有限总公司 Air conditioner and pressure relief control circuit and method thereof
JP2016090113A (en) * 2014-10-31 2016-05-23 ダイキン工業株式会社 Air conditioner
CN104879892A (en) * 2015-05-12 2015-09-02 广东美的暖通设备有限公司 Control method and control system for high-temperature protection of air conditioner internal unit
CN105180362A (en) * 2015-09-02 2015-12-23 珠海格力电器股份有限公司 compressor overload protection control method and device and fixed-frequency air conditioner

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106766449A (en) * 2017-01-03 2017-05-31 奥克斯空调股份有限公司 A kind of compressor protection method during air-conditioning heating HTHP
CN106766449B (en) * 2017-01-03 2019-02-19 奥克斯空调股份有限公司 A kind of compressor protection method when air-conditioning heating high temperature and pressure
CN106969466A (en) * 2017-03-22 2017-07-21 珠海格力电器股份有限公司 Control method, device and system for fan of condensing unit
CN107023942B (en) * 2017-03-30 2021-03-19 广东美的制冷设备有限公司 Mobile air conditioner control method and device
CN107023942A (en) * 2017-03-30 2017-08-08 广东美的制冷设备有限公司 Mobile air conditioner control method and device
WO2018176331A1 (en) * 2017-03-30 2018-10-04 广东美的制冷设备有限公司 Mobile air conditioner control method and device
CN108870682A (en) * 2018-07-17 2018-11-23 奥克斯空调股份有限公司 A kind of air conditioner load control method and device
CN110319546A (en) * 2019-07-05 2019-10-11 宁波奥克斯电气股份有限公司 A kind of air conditioner temperature controlling method and air conditioner
CN110848898A (en) * 2019-10-11 2020-02-28 珠海格力电器股份有限公司 Control method for preventing air conditioner load conversion from stopping, computer readable storage medium and air conditioner
CN110848898B (en) * 2019-10-11 2021-02-12 珠海格力电器股份有限公司 Control method for preventing air conditioner load conversion from stopping, computer readable storage medium and air conditioner
CN111023393A (en) * 2019-11-15 2020-04-17 宁波奥克斯电气股份有限公司 Control method and system of outdoor fan and air conditioner
CN110779161A (en) * 2019-11-18 2020-02-11 宁波奥克斯电气股份有限公司 Control method and device for compressor overload protection and air conditioner
CN110779161B (en) * 2019-11-18 2021-08-27 宁波奥克斯电气股份有限公司 Control method and device for compressor overload protection and air conditioner
CN112032968A (en) * 2020-08-27 2020-12-04 海信(山东)空调有限公司 Air conditioner, method of controlling the same, and computer-readable storage medium
CN112032968B (en) * 2020-08-27 2022-06-03 海信(山东)空调有限公司 Air conditioner, method of controlling the same, and computer-readable storage medium
CN113899061A (en) * 2021-09-28 2022-01-07 珠海格力电器股份有限公司 Control method and device of mobile air conditioner, controller and mobile air conditioner
CN115264654A (en) * 2022-07-28 2022-11-01 海信家电集团股份有限公司 Air conditioner and overload control method thereof
CN115264654B (en) * 2022-07-28 2024-08-09 海信家电集团股份有限公司 Air conditioner and overload control method thereof
CN115614924A (en) * 2022-10-10 2023-01-17 珠海格力电器股份有限公司 Defrosting control method and air conditioning unit

Also Published As

Publication number Publication date
CN106196494B (en) 2018-11-09

Similar Documents

Publication Publication Date Title
CN106196494A (en) Complete machine overload control method and device
CN103175285B (en) The control circuit of outdoor fan of air-conditioner, control method and air-conditioner
CN101968249B (en) Method for regulating normal operating frequency of DC inverter compressor
CN105928065B (en) A kind of air-conditioning constant temperature dehumidification method and type constant temperature dehumidifying air conditioner
CN101109553A (en) Method for limiting inverter compressor maximum frequency according to outdoor environment temperature
CN203163155U (en) Control circuit of air conditioner outdoor draught fan and air conditioner
CN108534320A (en) Air conditioner cooling activation control method, air conditioner and storage medium
CN107062518A (en) A kind of air-conditioner control method and control device
CN106766376A (en) Heat pump unit adjusting method and device and air conditioner
CN105180538B (en) Frequency-changeable compressor power distribution unit and its operation method
CN101586866A (en) Control method for improving comfortability of frequency conversion air conditioner wind-discharging temperature
CN107676939B (en) Control method, control system and control device of fixed-frequency air conditioner
CN105674519A (en) Air conditioning system and defrosting control method
CN106895541A (en) A kind of energy-saving control method under air-conditioner refrigeration mode based on users'comfort
CN111102678A (en) Air conditioner control method, air conditioner system and air conditioner
CN105674505B (en) The control method of air conditioner refrigeration
CN109489217A (en) A kind of control method for preventing transducer air conditioning from shutting down up to temperature
CN102748815B (en) A kind of conditioner and control method thereof
CN102353117A (en) System protection method for sudden indoor load change of variable refrigerant volume (VRV) air conditioner
CN104748326A (en) Chilled water precision air conditioner and energy-conservation control method thereof
CN104728996A (en) Air conditioner high temperature prevention control method and device and air conditioning unit applying same
CN105402845A (en) Method for adjusting air conditioner system
CN104776633A (en) Hybrid power refrigeration system and control method thereof
CN106352510A (en) Automatic-mode control method and device suitable for air conditioner
CN202692285U (en) Precise temperature stabilization heat pipe air conditioning device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant