CN106178323A - Library fire system construction method of installation - Google Patents
Library fire system construction method of installation Download PDFInfo
- Publication number
- CN106178323A CN106178323A CN201610610942.0A CN201610610942A CN106178323A CN 106178323 A CN106178323 A CN 106178323A CN 201610610942 A CN201610610942 A CN 201610610942A CN 106178323 A CN106178323 A CN 106178323A
- Authority
- CN
- China
- Prior art keywords
- installation
- water
- construction method
- pipe
- system construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- A—HUMAN NECESSITIES
- A62—LIFE-SAVING; FIRE-FIGHTING
- A62C—FIRE-FIGHTING
- A62C3/00—Fire prevention, containment or extinguishing specially adapted for particular objects or places
-
- A—HUMAN NECESSITIES
- A62—LIFE-SAVING; FIRE-FIGHTING
- A62C—FIRE-FIGHTING
- A62C31/00—Delivery of fire-extinguishing material
-
- A—HUMAN NECESSITIES
- A62—LIFE-SAVING; FIRE-FIGHTING
- A62C—FIRE-FIGHTING
- A62C31/00—Delivery of fire-extinguishing material
- A62C31/28—Accessories for delivery devices, e.g. supports
Landscapes
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)
Abstract
The open library fire system construction method of installation of the present invention, it is characterised in that comprising the following steps, preparation of construction, approach facility material specification, model should meet design requirement, and tubing, shower nozzle and alarm valve are tested one by one;Construction arranges, and spray piping is installed and floor should be divided to carry out from bottom to top by subregion;Support of pipelines, support of pipelines should be sought unity of standard, and concentrates and makes;Piping network installation, answers alignment pipe and removes internal foreign material before Pipe installing, when stopping installing, mounted pipeline is uncovered should block;The water pressure test, the water pressure test should be layered and carry out, to pinpoint the problems in time;Flushing pipe;Water source control valve is installed;Water flowing debugging pipeline.
Description
Technical field
The invention belongs to agricultural tool technical field, particularly relate to a kind of library fire system construction method of installation.
Background technology
Due to socio-cultural needs, in city library to the standard of fire engineering more strict and specification, it is right to need
Fire prevention, Smoke prevention carry out subregion;In shop, No Open Flames, forbids that carrying burning things which may cause a fire disaster enters stack room.Forbid without approval privately to use big merit
Rate electrical equipment, in shop, power circuit should periodically be superintended and directed, and electric fan also should carry out once safety inspection before annual use.Make regular check on complete
The fire fighting devices such as shop fire extinguisher, fire hydrant, are allowed to be at any time serviceable condition.The fire-fighting system of library is pacified by technical staff
It is not enough that rational improvement and specification remedy technology have been gone in threading.
Summary of the invention
It is contemplated that overcome the defect of prior art, it is provided that a kind of library fire system construction method of installation, have
Good antirust property, stay-in-grade feature.
In order to solve above-mentioned technical problem, the present invention provides techniques below scheme:
Library fire system construction method of installation, it is characterised in that comprise the following steps, preparation of construction, approach facility material
Specification, model should meet design requirement, and tubing, shower nozzle and alarm valve are tested one by one;Construction arranges, and spray piping is installed should be by dividing
Distinguish floor to carry out from bottom to top;Support of pipelines, support of pipelines should be sought unity of standard, and concentrates and makes;Piping network installation, before Pipe installing
Answering alignment pipe and remove internal foreign material, when stopping installing, mounted pipeline is uncovered should block;The water pressure test, the water pressure test
Should be layered and carry out, to pinpoint the problems in time;Flushing pipe;Water source control valve is installed;Water flowing debugging pipeline.
Further, in flushing pipe, spray pipeline and do flushing work continuously hydraulic pressure pressure testing is complete.
Further, during water source control valve is installed, alarm valve group and the connection of sparge pipe main, water (flow) direction should be made consistent.
Alarm valve group is installed, and should first install water source control valve, alarm valve when installing alarm valve, then carries out subsidiary conduit and adnexa peace
Dress.When designing no requirement (NR), alarm valve group is arranged on above the fold convenient to operate, and away from flooring, height is preferably 1.2m: two
Side is not preferably less than 0.5m with the distance of wall;Front is not preferably less than 1.2m with wall distance.The flooring installing alarm valve group should have
Pumping equipment.
Further, in water flowing debugging, sprinkling system installs and carries out overall water flowing, makes system reach service pressure accurate
Standby debugging.Being discharged water by end equipment, when ductwork pressure drops to setting value, stabilized pressure pump should start, and stops discharging water, works as pipe network
When pressure returns to normal value, stabilized pressure pump should be out of service.When end equipment discharges water with the flow of 0.94--1.5L/S, voltage stabilizing
Self-locking answered by pump.Water flow indicator, pressure switch, warning water system and fire pump etc. should actions in time send corresponding signal.
Compared with prior art, the present invention has a following beneficial effect:
Benefit of the invention is, technique is skilled, and step is reasonable, makes steel tube surface adhere to zinc layers, thus plays antiseptical purpose,
Avoid steel pipe plating leakage.
Detailed description of the invention
The most peering the preferred embodiments of the present invention illustrate, it will be appreciated that preferred embodiment described herein is only
For instruction and explanation of the present invention, it is not intended to limit the present invention.
Library fire system construction method of installation, comprises the following steps, preparation of construction, approach facility material specification, type
Number should meet design requirement, tubing, shower nozzle and alarm valve are tested one by one;Construction arranges, and spray piping is installed should divide building by subregion
Layer is carried out from bottom to top;Support of pipelines, support of pipelines should be sought unity of standard, and concentrates and makes;Piping network installation, answers alignment before Pipe installing
Pipe also removes internal foreign material, and when stopping installing, mounted pipeline is uncovered should block.Pipeline is coating steel pipe.Hydraulic pressure tries
Testing, the water pressure test should be layered and carry out, to pinpoint the problems in time;Flushing pipe;
During water source control valve is installed, alarm valve group and the connection of sparge pipe main, water (flow) direction should be made consistent.Alarm valve group is pacified
Dress, should first install water source control valve, alarm valve when installing alarm valve, then carries out subsidiary conduit and adnexa is installed.When design nothing
During requirement, alarm valve group is arranged on above the fold convenient to operate, is preferably the distance of 1.2m: both sides and wall away from flooring height
It is not preferably less than 0.5m;Front is not preferably less than 1.2m with wall distance.Should there be pumping equipment the flooring installing alarm valve group.
Water flowing debugging pipeline, sprays pipeline and does flushing work continuously hydraulic pressure pressure testing is complete.Sprinkling system install carry out whole
Body water flowing, makes system reach service pressure and prepares debugging.Discharged water by end equipment, when ductwork pressure drops to setting value
Time, stabilized pressure pump should start, and stops discharging water, and when ductwork pressure returns to normal value, stabilized pressure pump should be out of service.Work as end equipment
When discharging water with the flow of 0.94--1.5L/S, stabilized pressure pump answers self-locking.Water flow indicator, pressure switch, warning water system and fire water
The timely action of pump also sends corresponding signal.
The foregoing is only explanation embodiments of the present invention, be not limited to the present invention, for the technology of this area
For personnel, all within the spirit and principles in the present invention, any modification, equivalent substitution and improvement etc. made, should be included in
Within protection scope of the present invention.
Claims (4)
1. library fire system construction method of installation, it is characterised in that comprise the following steps, preparation of construction, approach facility material
Gauge lattice, model should meet design requirement, and tubing, shower nozzle and alarm valve are tested one by one;Construction arranges, and spray piping is installed should be by
Subregion divides floor to carry out from bottom to top;Support of pipelines, support of pipelines should be sought unity of standard, and concentrates and makes;Piping network installation, Pipe installing
Before answer alignment pipe and remove internal foreign material, when stopping installing, mounted pipeline is uncovered should block;The water pressure test, hydraulic pressure tries
Test to be layered and carry out, to pinpoint the problems in time;Flushing pipe;Water source control valve is installed;Water flowing debugging pipeline.
Library fire system construction method of installation the most according to claim 1, it is characterised in that: in flushing pipe, spray
Pipeline does flushing work continuously hydraulic pressure pressure testing is complete.
Library fire system construction method of installation the most according to claim 1, it is characterised in that: water source control valve is installed
In, alarm valve group and the connection of sparge pipe main, water (flow) direction should be made consistent.
Library fire system construction method of installation the most according to claim 1, it is characterised in that: in water flowing debugging, spray
System installs and carries out overall water flowing, makes system reach service pressure and prepares debugging.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610610942.0A CN106178323A (en) | 2016-07-29 | 2016-07-29 | Library fire system construction method of installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610610942.0A CN106178323A (en) | 2016-07-29 | 2016-07-29 | Library fire system construction method of installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106178323A true CN106178323A (en) | 2016-12-07 |
Family
ID=57497812
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610610942.0A Pending CN106178323A (en) | 2016-07-29 | 2016-07-29 | Library fire system construction method of installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106178323A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108392761A (en) * | 2018-03-08 | 2018-08-14 | 山东冠世榴园旅游发展有限公司 | A kind of construction method of fire fighting device about scenic spot |
CN111111044A (en) * | 2019-10-29 | 2020-05-08 | 宁波宇东金属箱柜有限公司 | Intelligent warehouse fireproof system and method thereof |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6401487B1 (en) * | 2000-04-17 | 2002-06-11 | Igor K. Kotliar | Hypoxic fire prevention and fire suppression systems with breathable fire extinguishing compositions for human occupied environments |
CN101660344A (en) * | 2008-08-29 | 2010-03-03 | 远欣企业有限公司 | Method for constructing fire-fighting sprinkling pipeline embedded in floor slab |
CN202387148U (en) * | 2011-10-25 | 2012-08-22 | 曹馀琛 | House fire control spray system |
-
2016
- 2016-07-29 CN CN201610610942.0A patent/CN106178323A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6401487B1 (en) * | 2000-04-17 | 2002-06-11 | Igor K. Kotliar | Hypoxic fire prevention and fire suppression systems with breathable fire extinguishing compositions for human occupied environments |
CN101660344A (en) * | 2008-08-29 | 2010-03-03 | 远欣企业有限公司 | Method for constructing fire-fighting sprinkling pipeline embedded in floor slab |
CN202387148U (en) * | 2011-10-25 | 2012-08-22 | 曹馀琛 | House fire control spray system |
Non-Patent Citations (1)
Title |
---|
无: "小区自动喷淋灭火系统安装施工方法", 《HTTP://WWW.FDCEW.COM/JZXT/JZSG/95434.HTML》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108392761A (en) * | 2018-03-08 | 2018-08-14 | 山东冠世榴园旅游发展有限公司 | A kind of construction method of fire fighting device about scenic spot |
CN111111044A (en) * | 2019-10-29 | 2020-05-08 | 宁波宇东金属箱柜有限公司 | Intelligent warehouse fireproof system and method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104027924A (en) | Fire extinguishing system suitable for high-rise residential building | |
JP6219649B2 (en) | Fire extinguishing equipment and emergency shut-off device | |
CN106178323A (en) | Library fire system construction method of installation | |
CN105749470A (en) | Multifunctional fire-fighting box | |
CN204208233U (en) | A kind of fire-fighting system of Anti-vibration airtight cable duct fire of putting out a fire to save life and property | |
CN204112402U (en) | A kind of combined water supply system of fire system of quarters | |
CN205672407U (en) | A kind of automatic wet pipe sprinkler system | |
KR101236828B1 (en) | Fire disaster prevention system and method | |
CN212756939U (en) | High-pressure water mist system for fire fighting | |
CN205667692U (en) | Big zone of protection gas extinguishing system | |
JP6181490B2 (en) | Fire extinguishing equipment | |
JP2008253299A (en) | Sprinkler fire-extinguishing equipment | |
CN203408409U (en) | Rapid automatic water replenishing and fire extinguishing device | |
Mun et al. | A Study on the Application of Hydraulic Calculations Considering the Corrosion Coefficient of Steel Piping for Fire Protection | |
CN104841080A (en) | Pipeline network overlying automatic water spraying fire-extinguishing water-supply system | |
CN207012464U (en) | Indoor fireplug visualizes hydraulic pressure alarming device | |
CN114360307A (en) | Mobile training equipment | |
CN211273248U (en) | Gas fire extinguishing device | |
CN106693264A (en) | Automatic corridor fire extinguishing system | |
JP2014090890A (en) | Water flow detector and fire extinguishing facility with the same | |
CN204193354U (en) | A kind of petrochemical industry storage tank fire-fighting spray device | |
CN111053997A (en) | Automatic water-spraying fire-extinguishing system using indoor fire hydrant annular pipe network for water supply and construction method thereof | |
RU74076U1 (en) | FIRE EXTINGUISHING PIPING SYSTEM | |
JP2013248181A (en) | Fire extinguishing system | |
CN115212493B (en) | Fire extinguishing system and method suitable for oil immersed transformer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161207 |