[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN106154050A - Hand in hand circuit line loss per unit statistical method based on the band segmentation of power information acquisition system - Google Patents

Hand in hand circuit line loss per unit statistical method based on the band segmentation of power information acquisition system Download PDF

Info

Publication number
CN106154050A
CN106154050A CN201610381261.1A CN201610381261A CN106154050A CN 106154050 A CN106154050 A CN 106154050A CN 201610381261 A CN201610381261 A CN 201610381261A CN 106154050 A CN106154050 A CN 106154050A
Authority
CN
China
Prior art keywords
circuit
line number
line
disconnecting link
electricity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610381261.1A
Other languages
Chinese (zh)
Other versions
CN106154050B (en
Inventor
陶鹏
杨鹏
申洪涛
李翀
冯波
赵俊鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
State Grid Hebei Energy Technology Service Co Ltd
Marketing Service Center of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
Hebei Electric Power Construction Adjustment Test Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd, Hebei Electric Power Construction Adjustment Test Institute filed Critical State Grid Corp of China SGCC
Priority to CN201610381261.1A priority Critical patent/CN106154050B/en
Publication of CN106154050A publication Critical patent/CN106154050A/en
Application granted granted Critical
Publication of CN106154050B publication Critical patent/CN106154050B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R27/00Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
    • G01R27/02Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant
    • G01R27/26Measuring inductance or capacitance; Measuring quality factor, e.g. by using the resonance method; Measuring loss factor; Measuring dielectric constants ; Measuring impedance or related variables
    • G01R27/2688Measuring quality factor or dielectric loss, e.g. loss angle, or power factor
    • G01R27/2694Measuring dielectric loss, e.g. loss angle, loss factor or power factor

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a kind of band segmentation based on power information acquisition system to hand in hand circuit line loss per unit statistical method, it utilizes in hand in hand contact disconnecting link side, line sectionalizing switch-side installs intelligent meter and the acquisition terminal of bidirectional measuring respectively additional, by the forward and reverse power of acquisition system main station judging intelligent meter, automatically hand in hand the circuit method of operation and line sectionalizing ruuning situation are judged, automatically line loss statistics publicity is adjusted, it is achieved the line loss programming count function of circuit hand in hand;Present invention achieves the full-automatic statistics of circuit of handing in hand with segmentation, decrease artificial participation and error rate, improve the ageing and accuracy of circuit line loss per unit statistics, provide strong technical support for company's line loss calculation.

Description

Hand in hand circuit line loss per unit statistical method based on the band segmentation of power information acquisition system
Technical field
The invention belongs to power supply enterprise's line loss statistical technique field, relate to a kind of band based on power information acquisition system and divide Section circuit line loss per unit statistical method hand in hand.
Background technology
Line loss is one principal economic indicators of power supply enterprise, and matching net wire loss is in whole power grid architecture, and line loss occupies Bigger proportion.Due to the uncertainty of distribution line operation side hand in hand and supply district, the programming count of its line loss and meter Calculation cannot realize, causes strong influence to the accuracy rate of power supply enterprise's line loss statistics.
Content of the invention
The technical problem to be solved is to provide one can judge the circuit method of operation and line hand in hand automatically Road partition running situation, automatically adjust line loss statistics publicity, the circuit that realizes handing in hand line loss programming count function based on The band segmentation of power utilization information collection system is handed in hand circuit line loss per unit statistical method.
For solve above-mentioned technical problem technical scheme be: a kind of band segmentation based on power information acquisition system pulls Hand line route loss rate statistical method, specifically includes following steps:
Described band segmentation circuit of handing in hand includes website C1-C3, the first to the 6th disconnecting link D1-D6, interconnection switch S1-S2, segmentation Switch F and user R1-R2;Described website C1 is positioned at the front end of circuit line of handing in hand with segmentation, and described website C3 is positioned at band segmentation The rear end of circuit line hand in hand;Described website C1 is successively through the first disconnecting link D1, interconnection switch S1, the second disconnecting link D2, the 3rd disconnecting link D3, block switch F, the 4th disconnecting link D4, website C2, the 5th disconnecting link D5, interconnection switch S2, the 6th disconnecting link D6 go to the station to meet somebody a C3;
Interconnection switch S1 is arranged between first disconnecting link D1 and second disconnecting link D2;Described first disconnecting link D1, interconnection switch S1 Constitute the first critical point with the second disconnecting link D2;
Interconnection switch S2 is arranged between the 5th disconnecting link D5 and the 6th disconnecting link D6;Described 5th disconnecting link D5, interconnection switch S2, 6th disconnecting link D6 constitutes the second critical point;
The circuit being positioned at the first front end, critical point is set to line number X1;User R1 is last user of line number X1;
The circuit being positioned between the first critical point and the second critical point is set to line number X2;User R2 is last use of line number X2 Family;
The circuit being positioned at the second critical point rear end is set to line number X3;Wherein line number X1 < X2 < X3;
After last user R1 that line number is X1 circuit and before the first disconnecting link D1, install the first voltage transformer TP1, One current transformer TA1, bidirectional measuring intelligent meter P1 and the first acquisition terminal T1;Bidirectional measuring intelligent meter P1 passes through the first voltage Transformer TP1 and the first current transformer TA1 obtains respectively and flows through the voltage and current that line number is X1 circuit;First gathers eventually The information of bidirectional measuring intelligent meter P1 is read in end T1 timing, and is transferred to acquisition system T;
After last user R2 that line number is X2 circuit and before the 5th disconnecting link D5, install the second voltage transformer TP2, Two current transformer TA2, bidirectional measuring intelligent meter P2 and the second acquisition terminal T2;Second voltage transformer TP2 and the second electric current Transformer TA2 obtains voltage and current respectively and is transferred to bidirectional measuring intelligent meter P2;Bidirectional measuring intelligent meter P2 is by the second electricity Pressure transformer TP2 and the second current transformer TA2 obtains respectively and flows through the voltage and current that line number is X2 circuit;Second gathers The information of bidirectional measuring intelligent meter P2 is read in the timing of terminal T2, and is transferred to acquisition system T;
When installing bidirectional measuring intelligent meter P1, to flow to the first disconnecting link D1 side as forward, bidirectional measuring intelligent meter P2 is being installed When, to flow to disconnecting link D5 side as forward;
(1) in block switch F Guan Bi, during the 3rd disconnecting link D3 and the 4th disconnecting link D4 Guan Bi, interconnection switch S1, interconnection switch S2, the One disconnecting link D1 and the second disconnecting link D2 all opens, and the 5th disconnecting link D5 and the 6th disconnecting link D6 opens, and bidirectional measuring intelligent meter P1-P2 is without electricity Stream passes through, and produces without electricity, and line loss per unit calculates sees (formula 1) ~ (formula 3):
Z1=(A1-B1)/A1 (formula 1)
Z2=(A2-B2)/A2 (formula 2)
Z3=(A2-B3)/A3 (formula 3)
In (formula 1) ~ (formula 3), Z1: line number is the line loss per unit of X1 circuit, and A1: line number is the table electricity of X1 circuit, B1: line Specially public change user's electricity that road number is X1 circuit, Z2: line number is the line loss per unit of X2 circuit, and A2: line number is the 2 of X2 circuit Table electricity, B2: line number is that all special public of X2 circuit becomes user's electricity, and Z3: line number is the line loss per unit of X3 circuit, A3: Line number is the table electricity of X3 circuit, and B3: line number is that all special public of X3 circuit becomes user's electricity;
When line number is the circuit that the circuit band line number of X2 is X3, interconnection switch S2 closes, and disconnecting link D5 and D6 closes, now P2 Flow through forward current, the circuit power load that record circuit number is X3;Second acquisition terminal T2 is according to bidirectional measuring intelligent meter P2 Forward current occur, the on-the-spot method of operation of automatic decision is the circuit that the circuit band line number that line number is X2 is X3, now line Loss rate calculates sees (formula 4) ~ (formula 5):
Z4=(A4-B4-Q1)/A4 (formula 4)
Z5=(A5+Q1-B5)/(A5+Q1) (formula 5)
Z4 line number is the line loss per unit of X2 circuit, and A4: line number is the table electricity of X2 circuit, and B4: line number is the institute of X2 circuit Having the specially public user's electricity that becomes, Q1: bidirectional measuring intelligent meter P2 turns record forward electricity during band, and Z5: line number is the circuit of X3 Line loss per unit, A5: line number is the circuit table electricity of X3, and B5: line number is all special public change user's electricity of circuit of X3;
When line number is the circuit that the circuit band line number of X3 is X2, interconnection switch S2 closes, the 5th disconnecting link D5 and the 6th disconnecting link D6 closes, and now bidirectional measuring intelligent meter P2 flows through reversing the current, the circuit power load that record circuit number is X2;Second gathers There is reversing the current according to bidirectional measuring intelligent meter P2 in terminal T2, and the on-the-spot method of operation of automatic decision is the circuit that line number is X3 With the circuit that line number is X2, now line loss per unit calculates and sees (formula 6) ~ (formula 7):
Z6=(A6+Q2-B6)/(A6+Q2) (formula 6)
Z7=(A7-Q2-B7)/A7 (formula 7)
Z6: line number is the line loss per unit of X2 circuit, and A6: line number is the table electricity of X2 circuit, and B6: line number is X2 circuit All special public change user's electricity, Q2: bidirectional measuring intelligent meter P2 records reverse electricity during turning band, Z7: line number is X3 circuit Line loss per unit, A7: line number is the table electricity of X3 circuit, and B7: line number is that all special public of X3 circuit becomes user's electricity.
Line number is the circuit of X1 and each circuit line loss per unit computing formula and line when line number is to turn band between the circuit of X2 The circuit that road number is X2 is that when turning band between the circuit of X3, each circuit line loss per unit computing formula is identical with line number;
(2) when block switch, the 3rd disconnecting link D3 and the 4th disconnecting link D4 open, line number be the circuit of X2 be X3 by line number respectively Circuit and the circuit that line number is X1 turn band, the bidirectional measuring intelligent meter P2 that now interconnection switch S2 place installs occurs reverse Electric current, there is forward current in the bidirectional measuring intelligent meter P1 installing at interconnection switch S1, and the first acquisition terminal T1 and second gathers The forward and reverse electric current that terminal T2 is occurred by field erected bidirectional measuring intelligent meter P1-P2 respectively simultaneously, it is judged that circuit is line Circuit and the circuit that line number is X1 that road number is X3 turn band X2 circuit respectively;
Now line loss calculation formula:
Z8=(A8-B8-Q3)/A8 (formula 8)
Z9=(Q4+Q3-B9)/(Q4+Q3) (formula 9)
Z10=(A10-B10-Q4)/A10 (formula 10)
Z8: line number is the line loss of X1 circuit, and A8: line number is the table electricity of X1 circuit, and B8: line number is all of X1 circuit Specially public change user's electricity, Q3: bidirectional measuring intelligent meter P1 turns carried charge i.e. forward active energy;
Z9: line number is the line loss of X2 circuit, and B9: line number is that all special public of X2 circuit becomes user's electricity, Q4: bidirectional measuring Intelligent meter P2 turns the i.e. reverse active energy of carried charge;
Z10: line number is the line loss of X3 circuit, and A10: line number is the table electricity of X3 circuit, and B10: line number is X3 circuit All special public change user's electricity.
The invention has the beneficial effects as follows: the present invention is to utilize in contact disconnecting link side, line sectionalizing switch-side hand in hand respectively Install intelligent meter and the acquisition terminal of bidirectional measuring additional, be not required to the inspection of the scene of a crime and substantial amounts of human and material resources pass through acquisition system main website Judge the forward and reverse power of intelligent meter, automatically judge hand in hand the circuit method of operation and line sectionalizing ruuning situation, automatically adjust line Damage statistics publicity, it is achieved the line loss programming count function of circuit hand in hand;Present invention achieves and hand in hand the complete of circuit with segmentation Programming count, decreases artificial participation and error rate, improves the ageing and accuracy of circuit line loss per unit statistics, is company Line loss calculation provides strong technical support;Meanwhile, this method is used also can to realize reliability and the voltage stabilization of circuit Property in real time monitoring and analyze, for providing more high-quality, more comfortable electrical power services to seek a kind of detection means and technical guarantee; With the gradually propelling of distribution automation, the circuit high reliability of circuit is gradually taken, implements hand in hand, and its line loss per unit meter Calculation method always relatively backward, the present invention solves the difficulty that the line loss per unit that distribution automation brings calculates, is that distribution is automatic Change the difficult problem of line loss per unit statistics brought and provide foundation.
Brief description
Fig. 1 is that band segmentation of the present invention is handed in hand line construction schematic diagram.
Fig. 2 is to carry segmentation to hand in hand line construction schematic diagram in embodiment.
Detailed description of the invention
Below according to Fig. 1-2 and embodiment, the present invention is elaborated.
The present invention specifically includes following steps:
Described band segmentation circuit of handing in hand includes website C1-C3, the first to the 6th disconnecting link D1-D6, interconnection switch S1-S2, segmentation Switch F and user R1-R2;Described website C1 is positioned at the front end of circuit line of handing in hand with segmentation, and described website C3 is positioned at band segmentation The rear end of circuit line hand in hand;Described website C1 is successively through the first disconnecting link D1, interconnection switch S1, the second disconnecting link D2, the 3rd disconnecting link D3, block switch F, the 4th disconnecting link D4, website C2, the 5th disconnecting link D5, interconnection switch S2, the 6th disconnecting link D6 go to the station to meet somebody a C3;
Interconnection switch S1 is arranged between first disconnecting link D1 and second disconnecting link D2;Described first disconnecting link D1, interconnection switch S1 Constitute the first critical point with the second disconnecting link D2;
Interconnection switch S2 is arranged between the 5th disconnecting link D5 and the 6th disconnecting link D6;Described 5th disconnecting link D5, interconnection switch S2, 6th disconnecting link D6 constitutes the second critical point;
The circuit being positioned at the first front end, critical point is set to line number X1;User R1 is last user of line number X1;
The circuit being positioned between the first critical point and the second critical point is set to line number X2;User R2 is last use of line number X2 Family;
The circuit being positioned at the second critical point rear end is set to line number X3;Wherein line number X1 < X2 < X3;
After last user R1 that line number is X1 circuit and before the first disconnecting link D1, install the first voltage transformer TP1, One current transformer TA1, bidirectional measuring intelligent meter P1 and the first acquisition terminal T1;Bidirectional measuring intelligent meter P1 passes through the first voltage Transformer TP1 and the first current transformer TA1 obtains respectively and flows through the voltage and current that line number is X1 circuit;First gathers eventually The information of bidirectional measuring intelligent meter P1 is read in end T1 timing, and is transferred to acquisition system T;
After last user R2 that line number is X2 circuit and before the 5th disconnecting link D5, install the second voltage transformer TP2, Two current transformer TA2, bidirectional measuring intelligent meter P2 and the second acquisition terminal T2;Second voltage transformer TP2 and the second electric current Transformer TA2 obtains voltage and current respectively and is transferred to bidirectional measuring intelligent meter P2;Bidirectional measuring intelligent meter P2 is by the second electricity Pressure transformer TP2 and the second current transformer TA2 obtains respectively and flows through the voltage and current that line number is X2 circuit;Second gathers The information of bidirectional measuring intelligent meter P2 is read in the timing of terminal T2, and is transferred to acquisition system T;
When installing bidirectional measuring intelligent meter P1, to flow to the first disconnecting link D1 side as forward, bidirectional measuring intelligent meter P2 is being installed When, to flow to disconnecting link D5 side as forward;
(1) in block switch F Guan Bi, during the 3rd disconnecting link D3 and the 4th disconnecting link D4 Guan Bi, interconnection switch S1, interconnection switch S2, the One disconnecting link D1 and the second disconnecting link D2 all opens, and the 5th disconnecting link D5 and the 6th disconnecting link D6 opens, and bidirectional measuring intelligent meter P1-P2 is without electricity Stream passes through, and produces without electricity, and line loss per unit calculates sees (formula 1) ~ (formula 3):
Z1=(A1-B1)/A1 (formula 1)
Z2=(A2-B2)/A2 (formula 2)
Z3=(A2-B3)/A3 (formula 3)
In (formula 1) ~ (formula 3), Z1: line number is the line loss per unit of X1 circuit, and A1: line number is the table electricity of X1 circuit, B1: line Specially public change user's electricity that road number is X1 circuit, Z2: line number is the line loss per unit of X2 circuit, and A2: line number is the 2 of X2 circuit Table electricity, B2: line number is that all special public of X2 circuit becomes user's electricity, and Z3: line number is the line loss per unit of X3 circuit, A3: Line number is the table electricity of X3 circuit, and B3: line number is that all special public of X3 circuit becomes user's electricity;
When line number is the circuit that the circuit band line number of X2 is X3, interconnection switch S2 closes, and disconnecting link D5 and D6 closes, now P2 Flow through forward current, the circuit power load that record circuit number is X3;Second acquisition terminal T2 is according to bidirectional measuring intelligent meter P2 Forward current occur, the on-the-spot method of operation of automatic decision is the circuit that the circuit band line number that line number is X2 is X3, now line Loss rate calculates sees (formula 4) ~ (formula 5):
Z4=(A4-B4-Q1)/A4 (formula 4)
Z5=(A5+Q1-B5)/(A5+Q1) (formula 5)
Z4 line number is the line loss per unit of X2 circuit, and A4: line number is the table electricity of X2 circuit, and B4: line number is the institute of X2 circuit Having the specially public user's electricity that becomes, Q1: bidirectional measuring intelligent meter P2 turns record forward electricity during band, and Z5: line number is the circuit of X3 Line loss per unit, A5: line number is the circuit table electricity of X3, and B5: line number is all special public change user's electricity of circuit of X3;
When line number is the circuit that the circuit band line number of X3 is X2, interconnection switch S2 closes, the 5th disconnecting link D5 and the 6th disconnecting link D6 closes, and now bidirectional measuring intelligent meter P2 flows through reversing the current, the circuit power load that record circuit number is X2;Second gathers There is reversing the current according to bidirectional measuring intelligent meter P2 in terminal T2, and the on-the-spot method of operation of automatic decision is the circuit that line number is X3 With the circuit that line number is X2, now line loss per unit calculates and sees (formula 6) ~ (formula 7):
Z6=(A6+Q2-B6)/(A6+Q2) (formula 6)
Z7=(A7-Q2-B7)/A7 (formula 7)
Z6: line number is the line loss per unit of X2 circuit, and A6: line number is the table electricity of X2 circuit, and B6: line number is X2 circuit All special public change user's electricity, Q2: bidirectional measuring intelligent meter P2 records reverse electricity during turning band, Z7: line number is X3 circuit Line loss per unit, A7: line number is the table electricity of X3 circuit, and B7: line number is that all special public of X3 circuit becomes user's electricity.
Line number is the circuit of X1 and each circuit line loss per unit computing formula and line when line number is to turn band between the circuit of X2 The circuit that road number is X2 is that when turning band between the circuit of X3, each circuit line loss per unit computing formula is identical with line number;
(2) when block switch, the 3rd disconnecting link D3 and the 4th disconnecting link D4 open, line number be the circuit of X2 be X3 by line number respectively Circuit and the circuit that line number is X1 turn band, the bidirectional measuring intelligent meter P2 that now interconnection switch S2 place installs occurs reverse Electric current, there is forward current in the bidirectional measuring intelligent meter P1 installing at interconnection switch S1, and the first acquisition terminal T1 and second gathers The forward and reverse electric current that terminal T2 is occurred by field erected bidirectional measuring intelligent meter P1-P2 respectively simultaneously, it is judged that circuit is line Circuit and the circuit that line number is X1 that road number is X3 turn band X2 circuit respectively;
Now line loss calculation formula:
Z8=(A8-B8-Q3)/A8 (formula 8)
Z9=(Q4+Q3-B9)/(Q4+Q3) (formula 9)
Z10=(A10-B10-Q4)/A10 (formula 10)
Z8: line number is the line loss of X1 circuit, and A8: line number is the table electricity of X1 circuit, and B8: line number is all of X1 circuit Specially public change user's electricity, Q3: bidirectional measuring intelligent meter P1 turns carried charge i.e. forward active energy;
Z9: line number is the line loss of X2 circuit, and B9: line number is that all special public of X2 circuit becomes user's electricity, Q4: bidirectional measuring Intelligent meter P2 turns the i.e. reverse active energy of carried charge;
Z10: line number is the line loss of X3 circuit, and A10: line number is the table electricity of X3 circuit, and B10: line number is X3 circuit All special public change user's electricity.
Embodiment (see Fig. 2):
1., after little last user of line number circuit of contact node hand in hand, before disconnecting link, pacify according to site specific Dress voltage transformer, current transformer, bidirectional measuring intelligent meter and acquisition terminal.In above-mentioned model, circuit 457 and 551 is handed in hand Node is just arranged on 457 line sides;551 and 937 circuits are just arranged on 551 line sides.
2. during intelligent meter in-site installation, to flow to disconnecting link side as forward.
3., when properly functioning, switch, disconnecting link are opened, and table meter no current passes through, without electricity generation, and line loss calculation formula:
551 circuit line losses=(all special public change user's electricity under 551 Source of Gateway Meter electricity-551 circuits)/551 Source of Gateway Meter electricity
937 circuit line losses=(all special public change user's electricity under 937 Source of Gateway Meter electricity-937 circuits)/937 Source of Gateway Meter electricity
457 circuit line losses=(all special public change user's electricity under 457 Source of Gateway Meter electricity-457 circuits)/457 Source of Gateway Meter electricity
4., when Du's northern station band 551 circuit and alliance's station 937 circuit, interconnection switch and disconnecting link Guan Bi, now table meter flows through forward electricity Stream, records 937 circuit power loads.There is forward current according to table meter in acquisition system, and the on-the-spot method of operation of automatic decision is Du Northern station band 551 circuit and alliance station 937 circuits, now line loss calculation formula:
Du Beizhan 551 circuit line loss=(all special public power transformation amount-new clothes intelligent meters of Du Beizhan 551 Source of Gateway Meter electricity-551 circuit turn Electricity is recorded during band)/Du Beizhan 551 Source of Gateway Meter electricity
Alliance's station 937 circuit line losses=(new clothes intelligent meter turn band during all special public power transformation amounts of electricity-937 circuit)/new clothes intelligence Table turns electricity during band
Note: electricity statistics all from new clothes intelligent meter forward current occurs calculating.
5., when alliance station band 937 circuits and Du Beizhan 551 circuit, interconnection switch and disconnecting link Guan Bi, now table meter flows through instead To electric current, record 551 circuit power loads.There is reversing the current according to table meter in acquisition system, the on-the-spot method of operation of automatic decision Carry 937 circuits and Du Beizhan 551 circuit for alliance station, now line loss calculation formula:
Alliance's station 937 circuit line losses=(all special public power transformation amount-new clothes intelligence of alliance's station 937 circuit Source of Gateway Meter electricity-937 circuit Table turns electricity during band)/alliance station 937 circuit Source of Gateway Meter electricity
Du Beizhan 551 circuit line loss=(new clothes intelligent meter turn band during all special public power transformation amounts of electricity-551 circuit)/new clothes intelligence Table turns electricity during band
Note: electricity statistics all from new clothes intelligent meter forward current occurs calculating.
6. block switch 2015 is opened, when 551 two sections of circuits are turned band by 937 circuits and 457 circuits respectively, and now interconnection Switching the intelligent meter installed at 2438 and reversing the current occur, there is forward current in the intelligent meter installed at interconnection switch 2310, adopts By the forward and reverse electric current that field erected two intelligent meters occur simultaneously, collecting system judges that circuit is that Liang Ge transformer station turns respectively With 551 circuits one section.
Now line loss calculation formula:
551 circuit line losses=(2438 switch new clothes intelligent meters turn carried charge (reverse active energy)+interconnection switch 2310 new clothes intelligence Energy table turns all special public change user's electricity under carried charge (forward active energy)-551 circuits)/(2438 switch new clothes intelligent meters turn Carried charge (reverse active energy)+interconnection switch 2310 new clothes intelligent meter turns carried charge (forward active energy))
937 circuit line losses=(under 937 Source of Gateway Meter electricity-937 circuits, all special public user's electricity-2438 that become switch new clothes intelligent meter Turn carried charge (reverse active energy)/937 Source of Gateway Meter electricity
457 circuit line losses=(under 457 Source of Gateway Meter electricity-457 circuits, all special public affairs become user's electricity-interconnection switch 2310 new clothes intelligence Energy table turns carried charge (forward active energy))/457 Source of Gateway Meter electricity
Note: electricity statistics all from new clothes intelligent meter forward current occurs calculating.
The above embodiment is only the preferred embodiments of the present invention, and and non-invention possible embodiments exhaustive. For persons skilled in the art, done any aobvious to it on the premise of without departing substantially from the principle of the invention and spirit And the change being clear to, all should be contemplated as falling with within the claims of the present invention.

Claims (1)

1. the band segmentation based on power information acquisition system is handed in hand a circuit line loss per unit statistical method, and described band segmentation pulls Hand line road includes website C1-C3, the first to the 6th disconnecting link D1-D6, interconnection switch S1-S2, block switch F and user R1-R2;Institute Stating website C1 and being positioned at the front end of circuit line of handing in hand with segmentation, described website C3 is positioned at the rear end of circuit line of handing in hand with segmentation; Described website C1 is successively through the first disconnecting link D1, interconnection switch S1, the second disconnecting link D2, the 3rd disconnecting link D3, block switch F, the 4th cutter Lock D4, website C2, the 5th disconnecting link D5, interconnection switch S2, the 6th disconnecting link D6 go to the station to meet somebody a C3;It is characterized in that specifically including following step Rapid:
Interconnection switch S1 is arranged between first disconnecting link D1 and second disconnecting link D2;Described first disconnecting link D1, interconnection switch S1 and the second disconnecting link D2 constitutes the first critical point;
Interconnection switch S2 is arranged between the 5th disconnecting link D5 and the 6th disconnecting link D6;Described 5th disconnecting link D5, interconnection switch S2, the 6th disconnecting link D6 constitute the second critical point;
The circuit being positioned at the first front end, critical point is set to line number X1;User R1 is last user of line number X1;
The circuit being positioned between the first critical point and the second critical point is set to line number X2;User R2 is last use of line number X2 Family;
The circuit being positioned at the second critical point rear end is set to line number X3;Wherein line number size is X1 < X2 < X3;
After last user R1 that line number is X1 circuit and before the first disconnecting link D1, install the first voltage transformer TP1, One current transformer TA1, bidirectional measuring intelligent meter P1 and the first acquisition terminal T1;Bidirectional measuring intelligent meter P1 passes through the first voltage Transformer TP1 and the first current transformer TA1 obtains respectively and flows through the voltage and current that line number is X1 circuit;First gathers eventually The information of bidirectional measuring intelligent meter P1 is read in end T1 timing, and is transferred to acquisition system T;
After last user R2 that line number is X2 circuit and before the 5th disconnecting link D5, install the second voltage transformer TP2, Two current transformer TA2, bidirectional measuring intelligent meter P2 and the second acquisition terminal T2;Second voltage transformer TP2 and the second electric current Transformer TA2 obtains voltage and current respectively and is transferred to bidirectional measuring intelligent meter P2;Bidirectional measuring intelligent meter P2 is by the second electricity Pressure transformer TP2 and the second current transformer TA2 obtains respectively and flows through the voltage and current that line number is X2 circuit;Second gathers The information of bidirectional measuring intelligent meter P2 is read in the timing of terminal T2, and is transferred to acquisition system T;
When installing bidirectional measuring intelligent meter P1, to flow to the first disconnecting link D1 side as forward, bidirectional measuring intelligent meter P2 is being installed When, to flow to disconnecting link D5 side as forward;
(1) in block switch F Guan Bi, during the 3rd disconnecting link D3 and the 4th disconnecting link D4 Guan Bi, interconnection switch S1, interconnection switch S2, the One disconnecting link D1 and the second disconnecting link D2 all opens, and the 5th disconnecting link D5 and the 6th disconnecting link D6 opens, and bidirectional measuring intelligent meter P1-P2 is without electricity Stream passes through, and produces without electricity, and line loss per unit calculates sees (formula 1) ~ (formula 3):
Z1=(A1-B1)/A1 (formula 1)
Z2=(A2-B2)/A2 (formula 2)
Z3=(A2-B3)/A3 (formula 3)
In (formula 1) ~ (formula 3), Z1: line number is the line loss per unit of X1 circuit, and A1: line number is the table electricity of X1 circuit, B1: line Specially public change user's electricity that road number is X1 circuit, Z2: line number is the line loss per unit of X2 circuit, and A2: line number is the 2 of X2 circuit Table electricity, B2: line number is that all special public of X2 circuit becomes user's electricity, and Z3: line number is the line loss per unit of X3 circuit, A3: Line number is the table electricity of X3 circuit, and B3: line number is that all special public of X3 circuit becomes user's electricity;
When line number is the circuit that the circuit band line number of X2 is X3, interconnection switch S2 closes, and disconnecting link D5 and D6 closes, now P2 Flow through forward current, the circuit power load that record circuit number is X3;Second acquisition terminal T2 is according to bidirectional measuring intelligent meter P2 Forward current occur, the on-the-spot method of operation of automatic decision is the circuit that the circuit band line number that line number is X2 is X3, now line Loss rate calculates sees (formula 4) ~ (formula 5):
Z4=(A4-B4-Q1)/A4 (formula 4)
Z5=(A5+Q1-B5)/(A5+Q1) (formula 5)
Z4 line number is the line loss per unit of X2 circuit, and A4: line number is the table electricity of X2 circuit, and B4: line number is the institute of X2 circuit Having the specially public user's electricity that becomes, Q1: bidirectional measuring intelligent meter P2 turns record forward electricity during band, and Z5: line number is the circuit of X3 Line loss per unit, A5: line number is the circuit table electricity of X3, and B5: line number is all special public change user's electricity of circuit of X3;
When line number is the circuit that the circuit band line number of X3 is X2, interconnection switch S2 closes, the 5th disconnecting link D5 and the 6th disconnecting link D6 closes, and now bidirectional measuring intelligent meter P2 flows through reversing the current, the circuit power load that record circuit number is X2;Second gathers There is reversing the current according to bidirectional measuring intelligent meter P2 in terminal T2, and the on-the-spot method of operation of automatic decision is the circuit that line number is X3 With the circuit that line number is X2, now line loss per unit calculates and sees (formula 6) ~ (formula 7):
Z6=(A6+Q2-B6)/(A6+Q2) (formula 6)
Z7=(A7-Q2-B7)/A7 (formula 7)
Z6: line number is the line loss per unit of X2 circuit, and A6: line number is the table electricity of X2 circuit, and B6: line number is X2 circuit All special public change user's electricity, Q2: bidirectional measuring intelligent meter P2 records reverse electricity during turning band, Z7: line number is X3 circuit Line loss per unit, A7: line number is the table electricity of X3 circuit, and B7: line number is that all special public of X3 circuit becomes user's electricity;
Line number is the circuit of X1 and each circuit line loss per unit computing formula and line number when line number is to turn band between the circuit of X2 Circuit and line number for X2 are that when turning band between the circuit of X3, each circuit line loss per unit computing formula is identical;
(2) when block switch, the 3rd disconnecting link D3 and the 4th disconnecting link D4 open, line number be the circuit of X2 be X3 by line number respectively Circuit and the circuit that line number is X1 turn band, the bidirectional measuring intelligent meter P2 that now interconnection switch S2 place installs occurs reverse Electric current, there is forward current in the bidirectional measuring intelligent meter P1 installing at interconnection switch S1, and the first acquisition terminal T1 and second gathers The forward and reverse electric current that terminal T2 is occurred by field erected bidirectional measuring intelligent meter P1-P2 respectively simultaneously, it is judged that circuit is line Circuit and the circuit that line number is X1 that road number is X3 turn band X2 circuit respectively;
Now line loss calculation formula:
Z8=(A8-B8-Q3)/A8 (formula 8)
Z9=(Q4+Q3-B9)/(Q4+Q3) (formula 9)
Z10=(A10-B10-Q4)/A10 (formula 10)
Z8: line number is the line loss of X1 circuit, and A8: line number is the table electricity of X1 circuit, and B8: line number is all of X1 circuit Specially public change user's electricity, Q3: bidirectional measuring intelligent meter P1 turns carried charge i.e. forward active energy;
Z9: line number is the line loss of X2 circuit, and B9: line number is that all special public of X2 circuit becomes user's electricity, Q4: bidirectional measuring Intelligent meter P2 turns the i.e. reverse active energy of carried charge;
Z10: line number is the line loss of X3 circuit, and A10: line number is the table electricity of X3 circuit, and B10: line number is X3 circuit All special public change user's electricity.
CN201610381261.1A 2016-06-01 2016-06-01 Band based on power information acquisition system is segmented route line loss per unit statistical method of handing in hand Active CN106154050B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610381261.1A CN106154050B (en) 2016-06-01 2016-06-01 Band based on power information acquisition system is segmented route line loss per unit statistical method of handing in hand

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610381261.1A CN106154050B (en) 2016-06-01 2016-06-01 Band based on power information acquisition system is segmented route line loss per unit statistical method of handing in hand

Publications (2)

Publication Number Publication Date
CN106154050A true CN106154050A (en) 2016-11-23
CN106154050B CN106154050B (en) 2019-07-19

Family

ID=57353322

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610381261.1A Active CN106154050B (en) 2016-06-01 2016-06-01 Band based on power information acquisition system is segmented route line loss per unit statistical method of handing in hand

Country Status (1)

Country Link
CN (1) CN106154050B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112014668A (en) * 2020-08-24 2020-12-01 苏州苏彭志盛信息科技有限公司 Method for managing line loss of medium-voltage line and low-voltage transformer area of distribution network
CN112394213A (en) * 2020-11-04 2021-02-23 国网北京市电力公司 Overhead line branching line loss measurement switching device and method
CN112666420A (en) * 2021-03-18 2021-04-16 国网山东省电力公司安丘市供电公司 Power transmission and transformation equipment line loss abnormity detection method, system, terminal and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0989690B1 (en) * 1998-08-12 2009-10-07 Nec Corporation CDMA mobile communication system and transmision power control method with consideration of fading during soft handover
CN102175923A (en) * 2011-01-30 2011-09-07 华北电力大学(保定) Transmission line dynamic loss measurement system and method
CN102707156B (en) * 2012-06-08 2015-07-01 上海市电力公司 Method for finely and accurately comparing line losses based on smart-grid technology
CN105044657A (en) * 2015-09-11 2015-11-11 成都思晗科技股份有限公司 Gateway electric energy meter monitoring system
CN105158601A (en) * 2015-08-19 2015-12-16 国家电网公司 Electricity utilization information acquisition system-based hand-in-hand line loss rate automatic calculation method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0989690B1 (en) * 1998-08-12 2009-10-07 Nec Corporation CDMA mobile communication system and transmision power control method with consideration of fading during soft handover
CN102175923A (en) * 2011-01-30 2011-09-07 华北电力大学(保定) Transmission line dynamic loss measurement system and method
CN102707156B (en) * 2012-06-08 2015-07-01 上海市电力公司 Method for finely and accurately comparing line losses based on smart-grid technology
CN105158601A (en) * 2015-08-19 2015-12-16 国家电网公司 Electricity utilization information acquisition system-based hand-in-hand line loss rate automatic calculation method
CN105044657A (en) * 2015-09-11 2015-11-11 成都思晗科技股份有限公司 Gateway electric energy meter monitoring system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘东旗: "实现手拉手配电线路线损自动计算与统计功能的思路", 《电气应用》 *
刘东旗: "智能电网配电线损计算和管理的研究", 《2011中国电工技术学会学术年会论文集》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112014668A (en) * 2020-08-24 2020-12-01 苏州苏彭志盛信息科技有限公司 Method for managing line loss of medium-voltage line and low-voltage transformer area of distribution network
CN112394213A (en) * 2020-11-04 2021-02-23 国网北京市电力公司 Overhead line branching line loss measurement switching device and method
CN112666420A (en) * 2021-03-18 2021-04-16 国网山东省电力公司安丘市供电公司 Power transmission and transformation equipment line loss abnormity detection method, system, terminal and storage medium

Also Published As

Publication number Publication date
CN106154050B (en) 2019-07-19

Similar Documents

Publication Publication Date Title
Liao et al. Urban MV and LV distribution grid topology estimation via group lasso
CN104270091B (en) A kind of photovoltaic power generation equipment method for diagnosing faults based on monitoring system
CN103117537B (en) Power distribution network area protection method and system
EP2565656A2 (en) Systems, methods, and apparatus for locating faults on an electrical distribution network
CN109347093B (en) Power distribution network self-healing control method combining master station with local control
CN102684175B (en) A kind of implementation method of micro-capacitance sensor protection
CN101483337A (en) Failure automatic diagnosis and separation apparatus and method for power distribution network overhead line
CN102751780B (en) Wide area backup power auto-switch-on model self-adaptive generation method
CN106154050A (en) Hand in hand circuit line loss per unit statistical method based on the band segmentation of power information acquisition system
WO2015078029A1 (en) Fault locating protection apparatus and method based on power distribution network intelligent terminal
CN112421614A (en) Power distribution station self-healing control system and method based on local communication and topology identification
CN112950172A (en) Method for identifying topology of transformer area
CN113346461B (en) Automatic power recovery method based on power distribution internet of things gateway
CN111682508A (en) Differential protection and rapid self-healing method suitable for regional power distribution network
CN103872656A (en) Distributive bus fast protection realization method for intelligent transformer substation
CN102611196A (en) 10KV power grid state monitoring and fault process automation system
CN109031104A (en) One kind being used for protective relaying device relay contact device for detecting performance
CN208955742U (en) Meet the preposition access device of the special transformer terminals of phase three-wire three of dual power supply
CN207601280U (en) A kind of accumulator group state on-line measurement circuit
CN103219552B (en) Device for detection maintenance and balanced maintenance of power battery pack
CN103701202B (en) The method and system that statements based on collusion transformer station automatic closing is powered
CN103683175B (en) Outdoor intelligent protection device during unbalanced three-phase lines and the method for input thereof
CN109193941A (en) A kind of intelligent substation operation and maintenance monitoring system based on Panoptic visualization
CN112134353B (en) Distributed power distribution method based on GOOSE and power distribution automation terminal
Sharmila et al. A smart distribution automation using supervisory control and data acquisition with advanced metering infrastructure and GPRS technology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 050021 No. 238 South Sports street, Yuhua District, Hebei, Shijiazhuang

Patentee after: STATE GRID HEBEI ELECTRIC POWER Research Institute

Patentee after: STATE GRID CORPORATION OF CHINA

Patentee after: STATE GRID HEBEI ENERGY TECHNOLOGY SERVICE Co.,Ltd.

Address before: 050021 No. 238 South Sports street, Yuhua District, Hebei, Shijiazhuang

Patentee before: ELECTRIC POWER SCIENCES RESEARCH INSTITUTE OF STATE GRID HEBEI ELECTRIC POWER Co.

Patentee before: State Grid Corporation of China

Patentee before: HEBEI ELECTRIC POWER COMMISSIONING INSTITUDE

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220531

Address after: 050021 No. 238 South Sports street, Hebei, Shijiazhuang

Patentee after: STATE GRID HEBEI ELECTRIC POWER Research Institute

Patentee after: Marketing service center of State Grid Hebei Electric Power Co.,Ltd.

Patentee after: STATE GRID CORPORATION OF CHINA

Patentee after: STATE GRID HEBEI ENERGY TECHNOLOGY SERVICE Co.,Ltd.

Address before: 050021 No. 238 South Sports street, Yuhua District, Hebei, Shijiazhuang

Patentee before: STATE GRID HEBEI ELECTRIC POWER Research Institute

Patentee before: STATE GRID CORPORATION OF CHINA

Patentee before: STATE GRID HEBEI ENERGY TECHNOLOGY SERVICE Co.,Ltd.