CN106089223B - A kind of TBM Quick air pushes away method - Google Patents

A kind of TBM Quick air pushes away method Download PDF

Info

Publication number
CN106089223B
CN106089223B CN201610464784.2A CN201610464784A CN106089223B CN 106089223 B CN106089223 B CN 106089223B CN 201610464784 A CN201610464784 A CN 201610464784A CN 106089223 B CN106089223 B CN 106089223B
Authority
CN
China
Prior art keywords
tbm
reaction frame
pushes away
supporting leg
guide table
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610464784.2A
Other languages
Chinese (zh)
Other versions
CN106089223A (en
Inventor
黄学军
李南川
黄永生
李宇江
戴润军
韩建坤
刘俊生
冯飞
肖利星
寇建
宫学君
时思鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Erchu Co Ltd
Original Assignee
China Railway Tunnel Group Erchu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Erchu Co Ltd filed Critical China Railway Tunnel Group Erchu Co Ltd
Priority to CN201610464784.2A priority Critical patent/CN106089223B/en
Publication of CN106089223A publication Critical patent/CN106089223A/en
Application granted granted Critical
Publication of CN106089223B publication Critical patent/CN106089223B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • E21D9/1093Devices for supporting, advancing or orientating the machine or the tool-carrier
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0621Shield advancing devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The invention belongs to technical field of tunnel construction, and in particular to a kind of TBM Quick air pushes away method, includes the following steps: that (1) stepping prepares: applying preformed hole in arc guide table, production reaction frame and push away force-transmitting ring;(2) TBM is debugged;(3) after TBM debugging is qualified, reaction frame is installed;(4) force-transmitting ring will be pushed away to be installed between reaction frame and the telescopic oil cylinder of TBM;(5) telescopic oil cylinder is stretched out, TBM is slided forward;(6) telescopic oil cylinder is retracted, reaction frame is moved forward and is repositioned;(7) repetitive cycling carries out step (5), (6), until completing propulsion task.Invention significantly improves TBM skies to push away speed of application, accelerates construction speed;Simultaneously realize reaction frame installation, remove be rapidly completed and reaction frame be recycled, realize lightweight, simplify.

Description

A kind of TBM Quick air pushes away method
Technical field
The invention belongs to technical field of tunnel construction, and in particular to a kind of TBM Quick air pushes away method.
Background technique
Currently, in shield or TBM (Tunnel Boring Machine, rock tunnel(ling) machine) construction tunnel, shield and TBM sky pushes away counterforce device mainly using field fabrication, and Production Time is longer, and can not achieve recycling, leads to shield and TBM It is slower that sky pushes away speed, inefficiency, and the empty advance rate of split run (for 24 hours) generally all only in 5~10m, greatlys restrict whole apply Work progress, while increasing construction cost.The sky of TBM pushes away construction efficiency and speed and seriously restricts to the construction period and be constructed into This, for this purpose, needing to seek a kind of i.e. simple and efficient process, and accordingly designs and produces a kind of light and handy, easy construction Tool, and realize that Rapid Circulation using counterforce device, pushes away speed of application to improve TBM sky, accelerates construction progress.
Summary of the invention
It can be improved sky in view of the deficiencies of the prior art, it is an object of the present invention to provide one kind and push away speed of application, simple height The TBM Quick air of effect pushes away method.
The technical solution that the present invention solves the problems, such as is:
A kind of TBM Quick air pushes away method, includes the following steps:
(1) stepping prepares, and includes the following steps:
(1.1) sky in arc guide table along TBM pushes away direction and applies several preformed holes;
(1.2) make reaction frame and push away force-transmitting ring: the reaction frame includes the frame body and supporting leg being combined as a whole, described Supporting leg can be fixed in arc guide table by the preformed hole;
(2) TBM is debugged: unloaded debugging is carried out to each component of TBM, unloaded debugging and load debugging are carried out to TBM complete machine, So that TBM machine condition, which has, originates driving condition;
(3) after TBM debugging is qualified, reaction frame is installed: using section of jurisdiction hoisting machine handling reaction frame, reaction frame is passed through into institute Preformed hole is stated to be fixed in arc guide table;
(4) installed thrust transmits ring: will push away force-transmitting ring and is installed between reaction frame and the telescopic oil cylinder of TBM, so that institute It states telescopic oil cylinder and provides thrust to the advance of TBM;
(5) telescopic oil cylinder is stretched out, TBM is slided forward;
(6) telescopic oil cylinder is retracted, lift by crane by section of jurisdiction hoisting machine and move forward reaction frame: the supporting leg of reaction frame is in section of jurisdiction It is extracted from the preformed hole at place under the lifting of hoisting machine, reaction frame is inserted into arc guide table by supporting leg again after moving forward in place Preformed hole repositioned;
(7) repetitive cycling carries out step (5), (6), until completing propulsion task: during propulsion, when sleeper needs When extension, it is laid with sleeper, path extends;And in the process of propulsion, periodically reaction frame is checked, is debugged, it is necessary Shi Jinhang is repaired, is reinforced.
Further, in the step (1.1), the arc guide table use strength grade for the concrete for making of C30 and At.
Further, in the step (1.1), the sky of the TBM pushes away the longitudinal direction that direction is arc guide table, described pre- The longitudinal pitch boxed out is 1000mm, and circumferential spacing is 1400mm.
Further, the preformed hole is set as two rows of, and the longitudinal direction of two rows of preformed holes arcuately guide table is parallel to each other.
Further, it is equipped in the step (1.1), in the preformed hole for cooperating with the supporting leg of reaction frame to be The supporting leg of reaction frame provides the built-in fitting of counter-force, and to enhance the structural strength and pre-buried precision of preformed hole, the built-in fitting is used Specification is side length × side length × wall thickness=250mm × 250mm × 10mm square steel.
Further, in the step (1.1), the arc guide table is equipped with the pre-buried rail for sliding for TBM, institute Stating pre-buried rail is 2, and 2 pre-buried rail are arranged in parallel, and the preformed hole is arranged between 2 pre-buried rail.
Further, in the step (1.2), the frame body is in the japanese character frame shape laid flat, and the frame body includes knot 3 transverse bars and 2 longitudinal rods being integrated, 3 transverse bars are respectively the first transverse bar set gradually, the second cross To bar, third transverse bar;The supporting leg is 4, and 4 supporting legs are separately positioned on the two of the second transverse bar and third transverse bar The lower section at end, the supporting leg is perpendicular to the plane where frame body;One end where first transverse bar of the frame body be for Push away one end of force-transmitting ring contact.
Further, in the step (1.2), the frame body and supporting leg be all made of specification be side length × side length × wall thickness= 200mm × 200mm × 8mm square steel is made.
Preferably, pass through welded connecting between each component of the reaction frame.
Further, in the step (1.2), the force-transmitting ring that pushes away is the cyclic annular knot being made of several arc ring plates Structure, the arc ring plate are formed according to the contour structures of section of jurisdiction, dimensioned, and the arc ring plate is by several steel plates and several steel Pipe is made.By using the form of steel plate and steel pipe combination, the force-transmitting ring that pushes away realizes lightweight, simplifies.
Further, 2 longitudinal terminal surfaces of the arc ring plate are 2 the first steel plates being disposed in parallel relation to one another, described in 2 It is connected between first steel plate by steel pipe, the steel pipe is perpendicular to the first steel plate;The outside cambered surface of the arc ring plate and inside Cambered surface is encapsulated by the second steel plate, and the circumferential end face of 2 of the arc ring plate is encapsulated by third steel plate;The steel pipe is several, Spacing between the steel pipe is arranged according to the spacing of the telescopic oil cylinder of TBM.
Preferably, the longitudinal length of the arc ring plate is 1500mm;The arc length of the outside cambered surface of the arc ring plate is 2500mm;The arc radius of the inside of first steel plate is 5400mm.
Preferably, in the step (4), the pre-buried rail after pushing away force-transmitting ring and being installed, in front of the cutter head of TBM It is upper to play butter.
The invention has the benefit that
1. reaction frame is fixed on arc guide table by the preformed hole by applying preformed hole in arc guide table by the present invention On, force-transmitting ring will be pushed away and be arranged between reaction frame and the telescopic oil cylinder of TBM, TBM sky is significantly improved and push away speed of application, accelerated Construction speed;
2. the present invention realizes lightweight, simplifies, such as the structure design for pushing away force-transmitting ring, while realizing anti- The installation of power frame, dismounting are rapidly completed and reaction frame is recycled.
Detailed description of the invention
Fig. 1 is the flow chart that TBM Quick air of the present invention pushes away method;
Fig. 2 is the structural schematic diagram of arc guide table used in method shown in Fig. 1;
Fig. 3 is the structural schematic diagram of reaction frame used in method shown in Fig. 1;
Fig. 4 is the structural schematic diagram that force-transmitting ring is pushed away in method shown in Fig. 1;
Fig. 5 is reaction frame in method shown in Fig. 1, arc guide table, the positional diagram for pushing away force-transmitting ring.
In figure: 1- arc guide table, 11- preformed hole, the pre-buried rail of 12-;2- reaction frame, 21- frame body, 211- first is laterally Bar, the second transverse bar of 212-, 213- third transverse bar, 214- longitudinal rod, 22- supporting leg;3- arc ring plate, the first steel plate of 31-, 32- steel pipe, the second steel plate of 33-, 34- third steel plate;4-TBM, 41- telescopic oil cylinder.
Specific embodiment
With reference to the accompanying drawings and detailed description, the present invention is further illustrated.
As Figure 1-Figure 5, a kind of TBM Quick air pushes away method, includes the following steps:
(1) stepping prepares, and includes the following steps:
(1.1) sky in arc guide table 1 along TBM 4 pushes away direction and applies several preformed holes 11;
(1.2) make reaction frame 2 and push away force-transmitting ring: the reaction frame 2 includes the frame body 21 and supporting leg being combined as a whole 22, the supporting leg 22 can be fixed in arc guide table 1 by the preformed hole 11;
(2) debugging of TBM 4: carrying out unloaded debugging to each component of TBM 4, carries out unloaded debugging to 4 complete machine of TBM and bears Debugging is carried, so that 4 machine condition of TBM, which has, originates driving condition;
(3) after TBM 4 debugs qualification, reaction frame 2 is installed: section of jurisdiction hoisting machine handling reaction frame 2 is used, by reaction frame 2 It is fixed in arc guide table 1 by the preformed hole 11;
(4) installed thrust transmits ring: force-transmitting ring will be pushed away and be installed between reaction frame 2 and the telescopic oil cylinder 41 of TBM 4, with The telescopic oil cylinder 41 is set to provide thrust to the advance of TBM 4;
(5) telescopic oil cylinder 41 is stretched out, TBM 4 is slided forward;
(6) telescopic oil cylinder 41 is retracted, reaction frame 2: the supporting leg 22 of reaction frame 2 is lifted by crane and moved forward by section of jurisdiction hoisting machine It is extracted from the preformed hole 11 at place under the lifting of section of jurisdiction hoisting machine, reaction frame 2 passes through supporting leg 22 after moving forward in place again The preformed hole 11 of insertion arc guide table 1 is repositioned;
(7) repetitive cycling carries out step (5), (6), until completing propulsion task: during propulsion, when sleeper needs When extension, it is laid with sleeper, path extends;And in the process of propulsion, periodically reaction frame 2 is checked, is debugged, it is necessary Shi Jinhang is repaired, is reinforced.
In the step (1.1), the arc guide table 1 uses strength grade to form for the concrete for making of C30.It is described The sky of TBM4 pushes away the longitudinal direction that direction is arc guide table 1, and the longitudinal pitch of the preformed hole 11 is 1000mm, and circumferential spacing is 1400mm.The preformed hole 11 is set as two rows of, and the longitudinal direction of two rows of preformed holes 11 arcuately guide table 1 is parallel to each other.It is described pre- Box out be equipped in 11 for the cooperation of the supporting leg 22 of reaction frame 2 to provide the built-in fitting of counter-force for the supporting leg 22 of reaction frame 2, with Enhance the structural strength and pre-buried precision of preformed hole 11, the built-in fitting uses specification for side length × side length × wall thickness=250mm The square steel of × 250mm × 10mm.The arc guide table 1 is equipped with the pre-buried rail 12 for sliding for TBM 4, the pre-buried steel Rail 12 is 2, and 2 pre-buried rail 12 are arranged in parallel, and the preformed hole 11 is arranged between 2 pre-buried rail 12.
In the step (1.2), the frame body 21 is in the japanese character frame shape laid flat, and the frame body 21 includes being combined into one 3 transverse bars of body and 2 longitudinal rods, 214,3 transverse bars are respectively first the 211, second cross of transverse bar set gradually To bar 212, third transverse bar 213;The supporting leg 22 is 4, and 4 supporting legs 22 are separately positioned on 212 He of the second transverse bar The lower section at the both ends of third transverse bar 213, the supporting leg 22 is perpendicular to the plane where frame body 21;The first of the frame body 21 is horizontal To one end where bar 211 be for one end for pushing away force-transmitting ring and contacting.The frame body 21 and supporting leg 22 are all made of specification and are Side length × side length × wall thickness=200mm × 200mm × 8mm square steel is made.Pass through between each component of the reaction frame 2 It is welded to connect.
In the step (1.2), the force-transmitting ring that pushes away is the cyclic structure being made of several arc ring plates 3, described Arc ring plate 3 is formed according to the contour structures of section of jurisdiction, dimensioned, and the arc ring plate 3 is by several steel plates and several steel pipes 32 It is made.By using the combined form of steel plate and steel pipe 32, the force-transmitting ring that pushes away realizes lightweight, simplifies.Institute 2 longitudinal terminal surfaces for stating arc ring plate 3 are to lead between 2 31,2 first steel plates 31 of the first steel plate being disposed in parallel relation to one another The connection of steel pipe 32 is crossed, the steel pipe 32 is perpendicular to the first steel plate 31;The outside cambered surface and inside cambered surface of the arc ring plate 3 are by The encapsulation of two steel plates 33, the circumferential end face of 2 of the arc ring plate 3 are encapsulated by third steel plate 34;The steel pipe 32 is 2, described Spacing between steel pipe 32 is arranged according to the spacing of the telescopic oil cylinder 41 of TBM 4.The longitudinal length of the arc ring plate 3 is 1500mm;The arc length of the outside cambered surface of the arc ring plate 3 is 2500mm;The arc radius of the inside of first steel plate 31 is 5400mm。
In the step (4), after pushing away force-transmitting ring and being installed, on the pre-buried rail 12 in front of the cutter head of TBM 4 Play butter.
Present invention is not limited to the embodiments described above, without departing substantially from substantive content of the present invention, art technology Any deformation, improvement, the replacement that personnel are contemplated that each fall within protection scope of the present invention.

Claims (7)

1. a kind of TBM Quick air pushes away method, which comprises the steps of:
(1) stepping prepares, and includes the following steps:
(1.1) sky in arc guide table along TBM pushes away direction and applies several preformed holes, be equipped in the preformed hole for it is anti- To provide the built-in fitting of counter-force for the supporting leg of reaction frame, the built-in fitting uses specification for side length × side for the supporting leg cooperation of power frame Length × wall thickness=250mm × 250mm × 10mm square steel;
(1.2) make reaction frame and push away force-transmitting ring: the reaction frame includes the frame body and supporting leg being combined as a whole, the supporting leg It can be fixed in arc guide table by the preformed hole, the force-transmitting ring that pushes away is the cyclic annular knot being made of several arc ring plates Structure, the arc ring plate are formed according to the contour structures of section of jurisdiction, dimensioned, and the arc ring plate is by several steel plates and several steel Pipe is made, and 2 longitudinal terminal surfaces of the arc ring plate are 2 the first steel plates being disposed in parallel relation to one another, 2 first steel It is connected between plate by steel pipe, the steel pipe is perpendicular to the first steel plate;The outside cambered surface and inside cambered surface of the arc ring plate by The encapsulation of second steel plate, the circumferential end face of 2 of the arc ring plate are encapsulated by third steel plate;The steel pipe be several, the steel Spacing between pipe is arranged according to the spacing of the telescopic oil cylinder of TBM;
(2) TBM is debugged: being carried out unloaded debugging to each component of TBM, is carried out unloaded debugging and load debugging to TBM complete machine;
(3) after TBM debugging is qualified, reaction frame is installed: using section of jurisdiction hoisting machine handling reaction frame, reaction frame is passed through described pre- It boxes out and is fixed in arc guide table;
(4) installed thrust transmits ring: will push away force-transmitting ring and is installed between reaction frame and the telescopic oil cylinder of TBM;
(5) telescopic oil cylinder is stretched out, TBM is slided forward;
(6) retract telescopic oil cylinder, lifted by crane by section of jurisdiction hoisting machine and move forward reaction frame: the supporting leg of reaction frame is lifted in section of jurisdiction It is extracted from the preformed hole at place under the lifting of machine, reaction frame is inserted into the pre- of arc guide table by supporting leg again after moving forward in place It boxes out and is repositioned;
(7) repetitive cycling carries out step (5), (6), until completing propulsion task: during propulsion, when sleeper needs to extend When, it is laid with sleeper, path extends;And in the process of propulsion, periodically reaction frame is checked, is debugged.
2. TBM Quick air according to claim 1 pushes away method, which is characterized in that in the step (1.1), the arc Guide table uses strength grade to form for the concrete for making of C30.
3. TBM Quick air according to claim 1 pushes away method, which is characterized in that in the step (1.1), the TBM's Sky pushes away the longitudinal direction that direction is arc guide table, and the longitudinal pitch of the preformed hole is 1000mm, and circumferential spacing is 1400mm.
4. TBM Quick air according to claim 3 pushes away method, which is characterized in that the preformed hole is set as two rows of, two rows of pre- The longitudinal direction for the arcuately guide table of boxing out is parallel to each other.
5. TBM Quick air according to claim 1 pushes away method, which is characterized in that in the step (1.1), the arc Guide table is equipped with the pre-buried rail for sliding for TBM, and the pre-buried rail is 2, and 2 pre-buried rail are arranged in parallel, The preformed hole is arranged between 2 pre-buried rail.
6. TBM Quick air according to claim 1 pushes away method, which is characterized in that in the step (1.2), the frame body In the japanese character frame shape laid flat, the frame body includes 3 transverse bars and 2 longitudinal rods being combined as a whole, 3 transverse directions Bar is respectively the first transverse bar, the second transverse bar, the third transverse bar set gradually;The supporting leg is 4,4 supporting legs It is separately positioned on the lower section at the both ends of the second transverse bar and third transverse bar, the supporting leg is perpendicular to the plane where frame body;Institute State one end where the first transverse bar of frame body be for one end for pushing away force-transmitting ring and contacting.
7. TBM Quick air according to claim 6 pushes away method, which is characterized in that the frame body and supporting leg are all made of specification It is made for side length × side length × wall thickness=200mm × 200mm × 8mm square steel.
CN201610464784.2A 2016-06-24 2016-06-24 A kind of TBM Quick air pushes away method Active CN106089223B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610464784.2A CN106089223B (en) 2016-06-24 2016-06-24 A kind of TBM Quick air pushes away method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610464784.2A CN106089223B (en) 2016-06-24 2016-06-24 A kind of TBM Quick air pushes away method

Publications (2)

Publication Number Publication Date
CN106089223A CN106089223A (en) 2016-11-09
CN106089223B true CN106089223B (en) 2019-04-19

Family

ID=57253482

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610464784.2A Active CN106089223B (en) 2016-06-24 2016-06-24 A kind of TBM Quick air pushes away method

Country Status (1)

Country Link
CN (1) CN106089223B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020172195A1 (en) * 2019-02-21 2020-08-27 TopEng Inc. System and method for simultaneous excavation and segment erection of tbm by thrust shell
NL2023905B1 (en) * 2019-09-25 2020-09-04 Shanghai Minie Tech Co Ltd Plane sliding advancing device for shield machine
CN113756827B (en) * 2021-09-13 2023-08-11 广东水电二局股份有限公司 Bearing wheel device and TBM air-pushing stepping method based on bearing wheel device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425433A (en) * 2011-12-30 2012-04-25 中铁一局集团有限公司 Minus-ring-free originating construction method for constructing sectional shield tunnel
CN102425427A (en) * 2011-12-30 2012-04-25 中铁二局股份有限公司 Shield air-pushing mine method tunnel construction method
KR101149836B1 (en) * 2009-11-06 2012-05-29 성림산업(주) high speed assembling method of curved panel using a radial shape assembling device and conduit line construction process using the same
CN104653229A (en) * 2015-01-27 2015-05-27 粤水电轨道交通建设有限公司 Shielding sliding shoe curvilinear pushing-up hole-passing construction method
CN204402559U (en) * 2015-01-26 2015-06-17 粤水电轨道交通建设有限公司 A kind of large jacking force shield machine air pushes through hole truss-like reaction support group
CN105587322A (en) * 2015-12-31 2016-05-18 中交一公局第三工程有限公司 TBM integral step station-crossing method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101149836B1 (en) * 2009-11-06 2012-05-29 성림산업(주) high speed assembling method of curved panel using a radial shape assembling device and conduit line construction process using the same
CN102425433A (en) * 2011-12-30 2012-04-25 中铁一局集团有限公司 Minus-ring-free originating construction method for constructing sectional shield tunnel
CN102425427A (en) * 2011-12-30 2012-04-25 中铁二局股份有限公司 Shield air-pushing mine method tunnel construction method
CN204402559U (en) * 2015-01-26 2015-06-17 粤水电轨道交通建设有限公司 A kind of large jacking force shield machine air pushes through hole truss-like reaction support group
CN104653229A (en) * 2015-01-27 2015-05-27 粤水电轨道交通建设有限公司 Shielding sliding shoe curvilinear pushing-up hole-passing construction method
CN105587322A (en) * 2015-12-31 2016-05-18 中交一公局第三工程有限公司 TBM integral step station-crossing method

Also Published As

Publication number Publication date
CN106089223A (en) 2016-11-09

Similar Documents

Publication Publication Date Title
CN105041357B (en) Single track handling tail becomes first formula advance support system
CN106089223B (en) A kind of TBM Quick air pushes away method
CN102381495B (en) Automatic blanking device for steel pipe
CN104763446A (en) Multi-functional trolley for subway station construction
CN207513606U (en) A kind of counterforce device for shield launching
CN107054388A (en) Track chassis and its application method in the construction of major diameter penstock
CN105261990B (en) Power type cable bending device
CN204402559U (en) A kind of large jacking force shield machine air pushes through hole truss-like reaction support group
CN106345946A (en) Safe-to-use steel bar cutter
CN106493856A (en) It is applied to the automatic installation locking robot of high speed railway fragments-free track slab steel reinforcement cage tension rod
CN108099927B (en) Unloading method of super-long steel rail conveying device
CN203684113U (en) Automatic beam placement platform device
CN203419675U (en) Traveling track for girder crane
CN103215653B (en) Batch-type ramie divides fine rinsing machine
CN203330319U (en) Hydraulic forging press
CN106541059A (en) Suitable for the self-positioning colligation frock of high speed railway fragments-free track slab steel reinforcement cage
CN203285347U (en) Pallet type derrick moving device for well drilling
CN206393814U (en) One kind is applied to the automatic installation locking robot of high speed railway fragments-free track slab steel reinforcement cage tension rod
CN102207002A (en) Equipment special for disassembling and assembling coal mine underground comprehensive machine equipment
CN104692248A (en) Portal crane with embedded leads
CN205928072U (en) Saw bit duplex position loading attachment
CN201138725Y (en) Door type frame for indoor equipment repair
CN203668779U (en) Double-block type ballastless track sleeper interval adjusting device
CN108798714A (en) A kind of working portable shifting formwork trolley of channel wall body and its construction method
CN203495126U (en) Automatic rivet jumping device used for quadrangular head riveting machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Huang Xuejun

Inventor after: Kou Jian

Inventor after: Gong Xuejun

Inventor after: Shi Sipeng

Inventor after: Li Nanchuan

Inventor after: Huang Yongsheng

Inventor after: Li Yujiang

Inventor after: Dai Runjun

Inventor after: Han Jiankun

Inventor after: Liu Junsheng

Inventor after: Feng Fei

Inventor after: Xiao Lixing

Inventor before: Huang Xuejun

Inventor before: Kou Jian

Inventor before: Gong Xuejun

Inventor before: Shi Sipeng

Inventor before: Li Nanchuan

Inventor before: Huang Yongsheng

Inventor before: Li Yujiang

Inventor before: Dai Runjun

Inventor before: Han Jiankun

Inventor before: Liu Junsheng

Inventor before: Feng Fei

Inventor before: Xiao Lixing

GR01 Patent grant
GR01 Patent grant