[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN106032028A - A combination die concrete pouring completion alarm technology - Google Patents

A combination die concrete pouring completion alarm technology Download PDF

Info

Publication number
CN106032028A
CN106032028A CN201510101802.6A CN201510101802A CN106032028A CN 106032028 A CN106032028 A CN 106032028A CN 201510101802 A CN201510101802 A CN 201510101802A CN 106032028 A CN106032028 A CN 106032028A
Authority
CN
China
Prior art keywords
assembling die
surface layer
plc
combination die
concreting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510101802.6A
Other languages
Chinese (zh)
Inventor
朱连吉
王晓飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Renqiu Yongji Construction and Installation Engineering Co Ltd
Original Assignee
Renqiu Yongji Construction and Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Renqiu Yongji Construction and Installation Engineering Co Ltd filed Critical Renqiu Yongji Construction and Installation Engineering Co Ltd
Priority to CN201510101802.6A priority Critical patent/CN106032028A/en
Publication of CN106032028A publication Critical patent/CN106032028A/en
Pending legal-status Critical Current

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention provides a combination die concrete pouring completion alarm technology comprising a combination die, infrared alarm devices, a PLC and an execution unit. The combination die is shaped as a cuboid, with the length, width and height being 9m, 0.3m and 3.5m respectively; the combination die comprises a frame, a surface layer and walking pulleys; the infrared alarm devices are arranged on the inner side surface of the surface layer of the combination die and are connected with the PLC in parallel; the infrared alarm devices are independent of each other; the PLC directly controls the switch action of the execution unit. The inner side of the surface layer of the combination die is provided with the infrared alarm devices which can act and give alarm when a pouring quantity reaches an upper limit; the PLC controller turns on the switch of the execution unit to stop pouring. The concrete pouring quantity can be accurately controlled, the quality of prefabricated wall boards is guaranteed, material waste is prevented and the structural safety of combination dies is improved.

Description

Assembling die concreting completes alarm technique
Technical field
The present invention relates to concreting technical field, relate to a kind of assembling die concreting and complete alarm technique;It is mainly used in sectionalized house.
Background technology
In recent years, greatly develop along with socioeconomic, low-carbon (LC) is built, the development of green building is in the ascendant, especially assembled architecture, in order to improve the yield of assembled architecture precast concrete wall panel, Vertical Combination mould arises at the historic moment, assembling die can produce the some pieces of different prefabricated panels of size simultaneously, and concreting uses casting method from bottom to top, concrete is avoided to produce bubble in casting process, improving prefabricated panel yield simultaneously, it is ensured that concrete prefabricated wallboard quality;But in prior art, use and manually carry out concreting, it is difficult to hold whether concreting completes, or the amount of pouring is too much, waste raw material, makes assembling die bearing strength aggravate, the service life of infringement assembling die and the personal safety of harm site operation personnel;Therefore the invention provides a kind of assembling die concreting and complete alarm technique, by arranging infrared warning device inside assembling die surface layer, when the amount of pouring reaches saturated, infrared warning device action and send alarm, PLC is opened performance element switch and is made to pour stopping, accurately controlling concreting amount, it is ensured that prefabricated panel quality, avoid waste of material, improve assembling die safety of structure.
Summary of the invention
The invention provides a kind of assembling die concreting and complete alarm technique, by arranging infrared warning device inside assembling die surface layer, when the amount of pouring reaches saturated, infrared warning device action and send alarm, PLC is opened performance element switch and is made to pour stopping, accurately controlling concreting amount.
The present invention is achieved through the following technical solutions: assembling die concreting completes alarm technique, including assembling die, infrared warning device, PLC, performance element;Described assembling die is cuboid, and length, width and height are respectively 9 meters, 0.3 meter, 3.5 meters, and assembling die is made up of with traveling wheel frame, surface layer;Some infrared warning devices are arranged at assembling die surface layer inner surface, and some infrared warning devices are connected in parallel with PLC, independently of one another;PLC directly controls performance element switch motion.
Described assembling die is made up of with traveling wheel frame, surface layer, and frame is that steel are made, and surface layer is steel up and down, and front and back surface layer is that double glazing is made, and steel component all does internal and external anti-corrosive and processes.
The specifications and models of described infrared warning device depend on the distance before and after assembling die between surface layer.
The invention has the beneficial effects as follows: easy for installation, simple in construction, easy to operate, accurately control, it is ensured that prefabricated panel quality, protect assembling die structural safety, accurately control concreting amount, strengthen job site safety.
Accompanying drawing explanation
Fig. 1 is present configuration schematic diagram.
Reference: 1 is assembling die, 2 is infrared warning device, and 3 is PLC, and 4 is performance element.
Detailed description of the invention
Describe the present invention below with reference to accompanying drawing.But embodiments of the present invention are not limited to this.
As it is shown in figure 1, assembling die concreting completes alarm technique, including assembling die 1, infrared warning device 2, PLC 3, performance element 4;Assembling die 1 is in cuboid, length, width and height are respectively 9 meters, 0.3 meter, 3.5 meters, assembling die 1 is made up of with traveling wheel frame, surface layer, frame is that steel are made, surface layer is steel up and down, and front and back surface layer is that double glazing is made, the convenient pouring quality observing prefabricated panel directly perceived, and steel component all does internal and external anti-corrosive and processes, it is ensured that the service life of assembling die 1;Some infrared warning devices set 2 and are placed in assembling die 1 surface layer inner surface, and some infrared warning devices 2 is connected in parallel with PLC 3, independently of one another, prevent one or several infrared warning device 2 from damaging the overall normal work of impact, the specifications and models of infrared warning device 2 depend on the distance between assembling die 1 surface layer front and back, the infrared warning device 2 of minimum power is chosen in the case of ensureing normal work, cost-effective;After PLC 3 detects and exceedes more than half generation actuation of an alarm of infrared warning device 2 sum, PLC 3 directly controls performance element 4 switch motion, makes to pour stopping.Combinations thereof mould concreting completes alarm technique, by arranging infrared warning device 2 inside assembling die 1 surface layer, when the amount of pouring reaches saturated, infrared warning device 2 action and send alarm, PLC 3 is opened performance element switch and is made to pour stopping, accurately controlling concreting amount, it is ensured that prefabricated panel quality, avoid waste of material, improve assembling die 1 safety of structure.

Claims (3)

1. assembling die concreting completes an alarm technique, including assembling die, infrared warning device, PLC, performance element;It is characterized in that, described assembling die is cuboid, and length, width and height are respectively 9 meters, 0.3 meter, 3.5 meters, and assembling die is made up of with traveling wheel frame, surface layer;Some infrared warning devices are arranged at assembling die surface layer inner surface, and some infrared warning devices are connected in parallel with PLC, independently of one another;PLC directly controls performance element switch motion.
Assembling die concreting the most according to claim 1 completes alarm technique, it is characterized in that, described assembling die is made up of with traveling wheel frame, surface layer, frame is that steel are made, surface layer is steel up and down, front and back surface layer is that double glazing is made, and steel component all does internal and external anti-corrosive and processes.
Assembling die concreting the most according to claim 1 completes alarm technique, it is characterised in that the specifications and models of described infrared warning device depend on the distance before and after assembling die between surface layer.
CN201510101802.6A 2015-03-09 2015-03-09 A combination die concrete pouring completion alarm technology Pending CN106032028A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510101802.6A CN106032028A (en) 2015-03-09 2015-03-09 A combination die concrete pouring completion alarm technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510101802.6A CN106032028A (en) 2015-03-09 2015-03-09 A combination die concrete pouring completion alarm technology

Publications (1)

Publication Number Publication Date
CN106032028A true CN106032028A (en) 2016-10-19

Family

ID=57149617

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510101802.6A Pending CN106032028A (en) 2015-03-09 2015-03-09 A combination die concrete pouring completion alarm technology

Country Status (1)

Country Link
CN (1) CN106032028A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109049296A (en) * 2018-08-17 2018-12-21 南京东垚建筑科技研究院有限公司 A kind of template poured vertically for prefabricated panel, mold method and construction technology
CN113091584A (en) * 2021-03-29 2021-07-09 民航机场建设工程有限公司 Deformation monitoring system and method for building template support

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109049296A (en) * 2018-08-17 2018-12-21 南京东垚建筑科技研究院有限公司 A kind of template poured vertically for prefabricated panel, mold method and construction technology
CN113091584A (en) * 2021-03-29 2021-07-09 民航机场建设工程有限公司 Deformation monitoring system and method for building template support

Similar Documents

Publication Publication Date Title
CN205219397U (en) Ferry -boat formula precast concrete of central authorities component production line
CN104153462A (en) Staggered floor hanging type prefabricated bay window
CN107217815B (en) Resistance to compression, safe type assembled steel construction elevartor shaft
CN103061267A (en) Construction method of combined prefabricated bridge anti-collision wall
CN103306463A (en) Metal liner concrete air channel construction method
CN102505839A (en) Arc-shaped mold plate for casting arc-shaped shear wall of industrial factory building and manufacture method of arc-shaped mold plate
CN106032028A (en) A combination die concrete pouring completion alarm technology
CN208343121U (en) Prefabricated assembled steel structure concrete wallboard mould
CN203296304U (en) Combined insulation board
CN203066099U (en) Combined steel formwork used for cup foundation construction
CN202000562U (en) Multifunctional limiting device for shear wall
CN202064636U (en) Closed stair formwork erecting device
CN203924713U (en) The reservation device of hole on a kind of concrete floor
CN203668894U (en) Concrete prefabricated form structure allowing rapid installation
CN207513002U (en) A kind of concrete prefabricated wallboard
CN105984036A (en) Bubble control technique for producing PC (polycarbonate) boards with modular molds
CN105908888B (en) A kind of balcony, kitchen, toilet drop board member and construction method
CN202787992U (en) Constructional column top concrete pouring structure
CN202370540U (en) Grotto bridge type construction trolley of large-span underground powerhouse
CN203805118U (en) Thickness-adjustable mould for manufacturing reinforcement protection layer cushion blocks
CN102953529B (en) Small dimension veneer building materials mounting structure
CN202000659U (en) Climbing mould system structure
CN106142288A (en) Shuttering precast concrete slightly vibrates technology
CN203393739U (en) Forming mold for reserved holes of equipment foundations
CN206189728U (en) Skin composite heat retaining wall board

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161019

WD01 Invention patent application deemed withdrawn after publication