CN106032028A - A combination die concrete pouring completion alarm technology - Google Patents
A combination die concrete pouring completion alarm technology Download PDFInfo
- Publication number
- CN106032028A CN106032028A CN201510101802.6A CN201510101802A CN106032028A CN 106032028 A CN106032028 A CN 106032028A CN 201510101802 A CN201510101802 A CN 201510101802A CN 106032028 A CN106032028 A CN 106032028A
- Authority
- CN
- China
- Prior art keywords
- assembling die
- surface layer
- plc
- combination die
- concreting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The invention provides a combination die concrete pouring completion alarm technology comprising a combination die, infrared alarm devices, a PLC and an execution unit. The combination die is shaped as a cuboid, with the length, width and height being 9m, 0.3m and 3.5m respectively; the combination die comprises a frame, a surface layer and walking pulleys; the infrared alarm devices are arranged on the inner side surface of the surface layer of the combination die and are connected with the PLC in parallel; the infrared alarm devices are independent of each other; the PLC directly controls the switch action of the execution unit. The inner side of the surface layer of the combination die is provided with the infrared alarm devices which can act and give alarm when a pouring quantity reaches an upper limit; the PLC controller turns on the switch of the execution unit to stop pouring. The concrete pouring quantity can be accurately controlled, the quality of prefabricated wall boards is guaranteed, material waste is prevented and the structural safety of combination dies is improved.
Description
Technical field
The present invention relates to concreting technical field, relate to a kind of assembling die concreting and complete alarm technique;It is mainly used in sectionalized house.
Background technology
In recent years, greatly develop along with socioeconomic, low-carbon (LC) is built, the development of green building is in the ascendant, especially assembled architecture, in order to improve the yield of assembled architecture precast concrete wall panel, Vertical Combination mould arises at the historic moment, assembling die can produce the some pieces of different prefabricated panels of size simultaneously, and concreting uses casting method from bottom to top, concrete is avoided to produce bubble in casting process, improving prefabricated panel yield simultaneously, it is ensured that concrete prefabricated wallboard quality;But in prior art, use and manually carry out concreting, it is difficult to hold whether concreting completes, or the amount of pouring is too much, waste raw material, makes assembling die bearing strength aggravate, the service life of infringement assembling die and the personal safety of harm site operation personnel;Therefore the invention provides a kind of assembling die concreting and complete alarm technique, by arranging infrared warning device inside assembling die surface layer, when the amount of pouring reaches saturated, infrared warning device action and send alarm, PLC is opened performance element switch and is made to pour stopping, accurately controlling concreting amount, it is ensured that prefabricated panel quality, avoid waste of material, improve assembling die safety of structure.
Summary of the invention
The invention provides a kind of assembling die concreting and complete alarm technique, by arranging infrared warning device inside assembling die surface layer, when the amount of pouring reaches saturated, infrared warning device action and send alarm, PLC is opened performance element switch and is made to pour stopping, accurately controlling concreting amount.
The present invention is achieved through the following technical solutions: assembling die concreting completes alarm technique, including assembling die, infrared warning device, PLC, performance element;Described assembling die is cuboid, and length, width and height are respectively 9 meters, 0.3 meter, 3.5 meters, and assembling die is made up of with traveling wheel frame, surface layer;Some infrared warning devices are arranged at assembling die surface layer inner surface, and some infrared warning devices are connected in parallel with PLC, independently of one another;PLC directly controls performance element switch motion.
Described assembling die is made up of with traveling wheel frame, surface layer, and frame is that steel are made, and surface layer is steel up and down, and front and back surface layer is that double glazing is made, and steel component all does internal and external anti-corrosive and processes.
The specifications and models of described infrared warning device depend on the distance before and after assembling die between surface layer.
The invention has the beneficial effects as follows: easy for installation, simple in construction, easy to operate, accurately control, it is ensured that prefabricated panel quality, protect assembling die structural safety, accurately control concreting amount, strengthen job site safety.
Accompanying drawing explanation
Fig. 1 is present configuration schematic diagram.
Reference: 1 is assembling die, 2 is infrared warning device, and 3 is PLC, and 4 is performance element.
Detailed description of the invention
Describe the present invention below with reference to accompanying drawing.But embodiments of the present invention are not limited to this.
As it is shown in figure 1, assembling die concreting completes alarm technique, including assembling die 1, infrared warning device 2, PLC 3, performance element 4;Assembling die 1 is in cuboid, length, width and height are respectively 9 meters, 0.3 meter, 3.5 meters, assembling die 1 is made up of with traveling wheel frame, surface layer, frame is that steel are made, surface layer is steel up and down, and front and back surface layer is that double glazing is made, the convenient pouring quality observing prefabricated panel directly perceived, and steel component all does internal and external anti-corrosive and processes, it is ensured that the service life of assembling die 1;Some infrared warning devices set 2 and are placed in assembling die 1 surface layer inner surface, and some infrared warning devices 2 is connected in parallel with PLC 3, independently of one another, prevent one or several infrared warning device 2 from damaging the overall normal work of impact, the specifications and models of infrared warning device 2 depend on the distance between assembling die 1 surface layer front and back, the infrared warning device 2 of minimum power is chosen in the case of ensureing normal work, cost-effective;After PLC 3 detects and exceedes more than half generation actuation of an alarm of infrared warning device 2 sum, PLC 3 directly controls performance element 4 switch motion, makes to pour stopping.Combinations thereof mould concreting completes alarm technique, by arranging infrared warning device 2 inside assembling die 1 surface layer, when the amount of pouring reaches saturated, infrared warning device 2 action and send alarm, PLC 3 is opened performance element switch and is made to pour stopping, accurately controlling concreting amount, it is ensured that prefabricated panel quality, avoid waste of material, improve assembling die 1 safety of structure.
Claims (3)
1. assembling die concreting completes an alarm technique, including assembling die, infrared warning device, PLC, performance element;It is characterized in that, described assembling die is cuboid, and length, width and height are respectively 9 meters, 0.3 meter, 3.5 meters, and assembling die is made up of with traveling wheel frame, surface layer;Some infrared warning devices are arranged at assembling die surface layer inner surface, and some infrared warning devices are connected in parallel with PLC, independently of one another;PLC directly controls performance element switch motion.
Assembling die concreting the most according to claim 1 completes alarm technique, it is characterized in that, described assembling die is made up of with traveling wheel frame, surface layer, frame is that steel are made, surface layer is steel up and down, front and back surface layer is that double glazing is made, and steel component all does internal and external anti-corrosive and processes.
Assembling die concreting the most according to claim 1 completes alarm technique, it is characterised in that the specifications and models of described infrared warning device depend on the distance before and after assembling die between surface layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510101802.6A CN106032028A (en) | 2015-03-09 | 2015-03-09 | A combination die concrete pouring completion alarm technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510101802.6A CN106032028A (en) | 2015-03-09 | 2015-03-09 | A combination die concrete pouring completion alarm technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106032028A true CN106032028A (en) | 2016-10-19 |
Family
ID=57149617
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510101802.6A Pending CN106032028A (en) | 2015-03-09 | 2015-03-09 | A combination die concrete pouring completion alarm technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106032028A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109049296A (en) * | 2018-08-17 | 2018-12-21 | 南京东垚建筑科技研究院有限公司 | A kind of template poured vertically for prefabricated panel, mold method and construction technology |
CN113091584A (en) * | 2021-03-29 | 2021-07-09 | 民航机场建设工程有限公司 | Deformation monitoring system and method for building template support |
-
2015
- 2015-03-09 CN CN201510101802.6A patent/CN106032028A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109049296A (en) * | 2018-08-17 | 2018-12-21 | 南京东垚建筑科技研究院有限公司 | A kind of template poured vertically for prefabricated panel, mold method and construction technology |
CN113091584A (en) * | 2021-03-29 | 2021-07-09 | 民航机场建设工程有限公司 | Deformation monitoring system and method for building template support |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205219397U (en) | Ferry -boat formula precast concrete of central authorities component production line | |
CN104153462A (en) | Staggered floor hanging type prefabricated bay window | |
CN107217815B (en) | Resistance to compression, safe type assembled steel construction elevartor shaft | |
CN103061267A (en) | Construction method of combined prefabricated bridge anti-collision wall | |
CN103306463A (en) | Metal liner concrete air channel construction method | |
CN102505839A (en) | Arc-shaped mold plate for casting arc-shaped shear wall of industrial factory building and manufacture method of arc-shaped mold plate | |
CN106032028A (en) | A combination die concrete pouring completion alarm technology | |
CN208343121U (en) | Prefabricated assembled steel structure concrete wallboard mould | |
CN203296304U (en) | Combined insulation board | |
CN203066099U (en) | Combined steel formwork used for cup foundation construction | |
CN202000562U (en) | Multifunctional limiting device for shear wall | |
CN202064636U (en) | Closed stair formwork erecting device | |
CN203924713U (en) | The reservation device of hole on a kind of concrete floor | |
CN203668894U (en) | Concrete prefabricated form structure allowing rapid installation | |
CN207513002U (en) | A kind of concrete prefabricated wallboard | |
CN105984036A (en) | Bubble control technique for producing PC (polycarbonate) boards with modular molds | |
CN105908888B (en) | A kind of balcony, kitchen, toilet drop board member and construction method | |
CN202787992U (en) | Constructional column top concrete pouring structure | |
CN202370540U (en) | Grotto bridge type construction trolley of large-span underground powerhouse | |
CN203805118U (en) | Thickness-adjustable mould for manufacturing reinforcement protection layer cushion blocks | |
CN102953529B (en) | Small dimension veneer building materials mounting structure | |
CN202000659U (en) | Climbing mould system structure | |
CN106142288A (en) | Shuttering precast concrete slightly vibrates technology | |
CN203393739U (en) | Forming mold for reserved holes of equipment foundations | |
CN206189728U (en) | Skin composite heat retaining wall board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20161019 |
|
WD01 | Invention patent application deemed withdrawn after publication |