[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN106013800A - Constructional column construction method based on 3D printing filling wall - Google Patents

Constructional column construction method based on 3D printing filling wall Download PDF

Info

Publication number
CN106013800A
CN106013800A CN201610443492.0A CN201610443492A CN106013800A CN 106013800 A CN106013800 A CN 106013800A CN 201610443492 A CN201610443492 A CN 201610443492A CN 106013800 A CN106013800 A CN 106013800A
Authority
CN
China
Prior art keywords
wall part
wall
shell face
masonry
filled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610443492.0A
Other languages
Chinese (zh)
Other versions
CN106013800B (en
Inventor
马荣全
葛杰
苗冬梅
孙学锋
白洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201610443492.0A priority Critical patent/CN106013800B/en
Publication of CN106013800A publication Critical patent/CN106013800A/en
Application granted granted Critical
Publication of CN106013800B publication Critical patent/CN106013800B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • E04B2/42Walls having cavities between, as well as in, the elements; Walls of elements each consisting of two or more parts, kept in distance by means of spacers, at least one of the parts having cavities
    • E04B2/44Walls having cavities between, as well as in, the elements; Walls of elements each consisting of two or more parts, kept in distance by means of spacers, at least one of the parts having cavities using elements having specially-designed means for stabilising the position; Spacers for cavity walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/64Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/64Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of concrete
    • E04B2/68Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of concrete made by filling-up wall cavities
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4178Masonry wall ties
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • E04B2/42Walls having cavities between, as well as in, the elements; Walls of elements each consisting of two or more parts, kept in distance by means of spacers, at least one of the parts having cavities
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • E04B2/42Walls having cavities between, as well as in, the elements; Walls of elements each consisting of two or more parts, kept in distance by means of spacers, at least one of the parts having cavities
    • E04B2/50Walls having cavities between, as well as in, the elements; Walls of elements each consisting of two or more parts, kept in distance by means of spacers, at least one of the parts having cavities using elements having a general shape differing from that of a parallelepiped
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B33ADDITIVE MANUFACTURING TECHNOLOGY
    • B33YADDITIVE MANUFACTURING, i.e. MANUFACTURING OF THREE-DIMENSIONAL [3-D] OBJECTS BY ADDITIVE DEPOSITION, ADDITIVE AGGLOMERATION OR ADDITIVE LAYERING, e.g. BY 3-D PRINTING, STEREOLITHOGRAPHY OR SELECTIVE LASER SINTERING
    • B33Y80/00Products made by additive manufacturing

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Finishing Walls (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a connecting method and a connecting structure of a 3D printing filling wall and a constructional column. The connecting method includes the steps that a first wall part and a second wall part of the filling wall are manufactured by adopting the 3D printing technology, butt-joint grooves are formed in the end of the first wall part and the end of the second wall part respectively, horizontal steel bars are anchored in the first wall part and the second wall part respectively, one end of each horizontal steel bar protrudes and forms an anchoring end, the butt-joint groove of the first wall part and the butt-joint groove of the second wall part are in butt joint to form a column space, and the anchoring ends of the horizontal steel bars are placed in the column space; vertical steel bars are inserted into the column space and are bound through stirrup rings; concrete is poured into the column space to form the constructional column. Compared with the prior art, connection between the 3D printing filling wall and the constructional column is achieved, integrity and earthquake resistance of the filling wall are improved, and tie strength is improved.

Description

The Constructional Col-umn Construction method of filled wall is printed based on 3D
Technical field
The present invention relates to a kind of 3D and print the structure way of body of wall, particularly relate to one and beat based on 3D The Constructional Col-umn Construction method of print filled wall.
Background technology
The high energy consumption of building material industry, high material-consumption, high pollution, be to cause non-renewable resources interdependent The main cause that degree height, natural resources and energy consumption are big.Therefore, realized by technological innovation Save construction material and reduce the material consumption of building industry, energy consumption, reduce the building industry pollution to environment, be to build If conservation-minded society and the inevitable requirement of friendly environment society.
Traditional building, as the filled wall majority in frame structure and frame-shear-wall structure uses Hollow brick and concrete segment, need at the construction field (site) substantial amounts of labour force by Hollow brick or block according to Design requires that block-by-block is built by laying bricks or stones.In building process, hanging down of the laying depth of mortar, workability and building block Straight degree etc. will affect the construction quality of body of wall, and for there being the building of requirements for fortification against earthquake, hollow brick Or the filling wall of building block composition is the most relatively complicated with the connection way of constructional column, efficiency of construction is low.
3D prints body of wall can replace traditional hollow brick or concrete segment, as filling out in building Fill walling material, reduce energy resource consumption and construction labour force, shorten the construction period, create good Economic benefit and social benefit.But, how to utilize 3D to print stuffing wall construction constructional column, Become the problem needing solution badly.
Summary of the invention
It is an object of the invention to overcome the defect of prior art, it is provided that a kind of 3D prints filled wall With connected mode and the structure of constructional column, solve how to utilize 3D to print stuffing wall construction constructional column Problem.
For realizing above-mentioned technique effect, the invention discloses a kind of structure printing filled wall based on 3D Make column construction method, including:
3D printing technique is used to make the first wall part and the second body of wall portion of filled wall respectively Point, described first wall part and the second wall part include the multiple masonries being stacked with arranging, often One masonry uses 3D printing technique to make, including:
A, use 3D printing technique make shape adaptation in described filled wall one layer of courses of masonry extremely At the pre-buried absolute altitude of horizontal reinforcement;
B, horizontal reinforcement is set in the top of this layer of courses of masonry so that one end of described horizontal reinforcement is stretched Go out this layer of courses of masonry and form anchored end;
C, employing 3D printing technique make one layer of courses of masonry again in the top of this layer of courses of masonry, make institute The other end stating horizontal reinforcement is anchored in this two-layer courses of masonry;
D, repetition step b, c, to the designed elevation of single masonry;
The end of described first wall part and described second wall part is formed with docking groove, described right Described anchored end it is equipped with in access slot;
The docking groove of described first wall part and described second wall part is docked and forms cylinder sky Between;
It is inserted into vertical reinforcement casting concrete to form constructional column in described cylinder space.
The Constructional Col-umn Construction further improvements in methods that the present invention prints filled wall based on 3D are, The surface of described first wall part and described second wall part is formed with concave convex texture.
The Constructional Col-umn Construction further improvements in methods that the present invention prints filled wall based on 3D are, The anchored end of described horizontal reinforcement is folded end.
The Constructional Col-umn Construction further improvements in methods that the present invention prints filled wall based on 3D are, Described first wall part and described second wall part all include: use 3D printing technique to be formed First shell face, the second shell face, horizontal support rib and skewed horizontal load rib, described first shell face and described Second shell face is oppositely arranged, and described horizontal support rib and described skewed horizontal load rib all prop up and be located at described first Between shell face and described second shell face, described horizontal reinforcement is placed in described first shell face and described second shell Between face and parallel with described first shell face and described second shell face.
Due to the fact that and have employed above technical scheme so that it is have the advantages that
The filled wall printed based on 3D is made up of the most folded multiple printing masonries set, and 3D prints Filled wall instead of traditional concrete or building-block, as the filling walling in building Material, reduces energy resource consumption and site operation labour force, saves working procedure, shorten construction work Phase, create good economic benefit and social benefit.
Placed by the first wall part and the docking of the second wall part that 3D is printed filled wall, Form cylinder space between first wall part and the second wall part, in this cylinder space, anchor water Flat reinforcing bar, insertion vertical reinforcement, and with stirrup ring colligation vertical reinforcement, then in cylinder space Concrete perfusion, defines drawknot between constructional column, and constructional column and filled wall and fixes;Owing to using 3D printing technique is one-body molded, the first wall part of filled wall and the table of the second wall part Form continuous print concave convex texture on face, add in filled wall and cylinder space the concrete of cast it Between bonding strength, compare smooth surface, increase frictional force, improve bond strength, it is to avoid Shelling phenomenon, solves 3D and prints the connectivity problem of filled wall and constructional column, improve filling The globality of body of wall and shock resistance and bonding strength.
Accompanying drawing explanation
Fig. 1 is the attachment structure schematic diagram that a kind of 3D of the present invention prints filled wall and constructional column;
Fig. 2 is the structural representation that 3D of the present invention prints the first wall part of filled wall;
Fig. 3 is the signal that 3D of the present invention prints the horizontal reinforcement of the first wall part of filled wall Figure;
Fig. 4 is the structural representation that 3D of the present invention prints the second wall part of filled wall;
Fig. 5 is the construction schematic diagram that 3D of the present invention prints one layer of masonry of filled wall;
Fig. 6 is the placement construction schematic diagram of horizontal reinforcement of the present invention;And,
Fig. 7 is the construction schematic diagram that 3D of the present invention prints another layer masonry of filled wall.
Detailed description of the invention
Below in conjunction with the accompanying drawings and detailed description of the invention the present invention is further detailed explanation.
The present invention provides a kind of 3D to print filled wall and the method for attachment of constructional column and attachment structure, Print the connectivity problem of filled wall and constructional column for solving 3D, improve the entirety of filled wall Property and shock resistance.By 3D being printed the first wall part of filled wall and the second wall part Docking groove docking is placed, and forms cylinder empty between the docking groove of the first wall part and the second wall part Between, the anchored end of horizontal reinforcement is placed in cylinder space, is inserted into vertical reinforcement in this cylinder space, By stirrup ring colligation vertical reinforcement, then concrete perfusion in cylinder space, complete constructional column with The drawknot of filled wall.
Refering to Fig. 1, it is shown that a kind of 3D of the present invention prints the attachment structure of filled wall and constructional column Schematic diagram.The connection knot of filled wall and constructional column is printed below in conjunction with Fig. 1 3D a kind of to the present invention Structure illustrates.
As it is shown in figure 1, a kind of 3D of the present invention prints the attachment structure bag of filled wall and constructional column Include: 3D prints the first wall part 1 of filled wall, the second body of wall portion of 3D printing filled wall Divide 2, and pour the constructional column 3 being formed between the first wall part 1 and the second wall part 2; In first wall part 1, anchoring has horizontal reinforcement 15, and in the second wall part 2, anchoring has horizontal steel Muscle 25, and one end of horizontal reinforcement 15 and horizontal reinforcement 25 protrudes and forms anchored end 151 and anchor Fixed end 251, anchored end 151 and anchored end 251 are anchored in constructional column 3.3D prints and fills wall First wall part 1 of body and the end of the second wall part 2 are each formed with docking groove, horizontal reinforcement The anchored end 151 of 15 is placed in the docking groove of the first wall part 1, the anchored end of horizontal reinforcement 25 In 251 docking grooves being placed in the second wall part 2,3D is printed the first body of wall portion of filled wall Point 1 and second the docking groove docking of wall part 2 place, the first wall part 1 and the second body of wall portion The docking groove dividing 2 encloses formation cylinder space, horizontal reinforcement 15 and the anchored end of horizontal reinforcement 25 151 and anchored end 251 be placed in cylinder space, be inserted into vertical reinforcement 40 then at cylinder space, Vertical reinforcement 40 is enclosed, then at cylinder space concrete perfusion so that horizontal steel with stirrup ring 30 The anchored end 151 of muscle 15 and horizontal reinforcement 25 and anchored end 251 anchor in this cylinder space.? In the present embodiment, it is provided with four vertical reinforcements 40, it is preferable that four vertical reinforcements 40 are inserted respectively It is located at four angles of cylinder space, encloses vertical reinforcement 40 with stirrup ring 30, form rectangle, but also Be not limited, in actual applications, can according to the size of cylinder space, the quantity of vertical reinforcement, Size and set-up mode thereof also can make corresponding changes.
Further, the first wall part 1 and second wall part 2 of filled wall includes that multilamellar is built Body, the shape adaptation of every layer of masonry is in filled wall, and every layer of masonry all uses 3D printing technique shape Become, be provided with horizontal reinforcement 15 between two-layer masonry, and filled wall is stretched out in one end of horizontal reinforcement 15 The first wall part 1 outer form anchored end 151, increase filled wall and structure by anchored end 151 Make the drawknot intensity between post.
Refering to Fig. 2, it is shown that the structure of the first wall part that 3D of the present invention prints filled wall is shown It is intended to.Include as in figure 2 it is shown, 3D prints filled wall the first wall part 1: use 3D to beat Print the 11, second shell face 12, integrated first shell face and be located at the first shell face 11 and the second shell The horizontal support rib 14 in face 12, the first shell face 11 is oppositely arranged with the second shell face 12 and is parallel to each other, And first installed multiple tracks skewed horizontal load rib 13 between shell face 11 and the second shell face 12 further, with Strengthen the structural strength of masonry.The end in the first the 11, second shell face 12, shell face and horizontal support rib 14 Enclose docking groove.
Refering to Fig. 3, it is shown that 3D of the present invention prints the horizontal steel of the first wall part of filled wall The schematic diagram of muscle.As it is shown on figure 3, two horizontal reinforcements 15 are distributed in the first shell face 11 and the second shell Between face 12, it is respectively parallel to the first shell face 11 and the second shell face 12, and horizontal reinforcement 15 stretches out Outside first wall part 1 of filled wall, the part stretched out forms anchored end 151, anchored end 151 Being placed in the docking groove of the first wall part 1 end, anchored end 151 increases drawknot intensity.Preferably, Anchored end 151 is folded end, can horizontal buckling or vertically bend anchoring, increase horizontal reinforcement Active force between 15 and concrete.Use pre-buried horizontal reinforcement 15, horizontal reinforcement 15 can be avoided The construction inconvenience that rear installation is brought, simplifies construction.Typically, in the present embodiment, each layer of block Two horizontal reinforcements it are provided with, it is preferable that the two horizontal reinforcement can be to be arranged in parallel on body, but also It is not limited, in actual applications, can be according to the size of masonry, the quantity of horizontal reinforcement, size And set-up mode also can make corresponding changes.
Refering to Fig. 4, it is shown that the structure of the second wall part that 3D of the present invention prints filled wall is shown It is intended to.As shown in Figure 4,3D prints structure and first body of wall of filled wall the second wall part 2 Part 1 is identical, with reference to the way of the first wall part 1,3D print the various shell faces that formed with Ribs composition body of wall.3D prints filled wall the second wall part 2 and includes: use 3D to print Two body formed the 21, second shell faces 22, the first shell face and be located at the first shell face 21 and the second shell face The horizontal support rib 24 of 22, the first shell face 21 is oppositely arranged with the second shell face 22 and is parallel to each other, And first installed multiple tracks skewed horizontal load rib 23 between shell face 21 and the second shell face 22 further, with Strengthen the structural strength of filled wall.The end in the first the 21, second shell face 22, shell face and horizontal support Rib 24 encloses docking groove.Horizontal reinforcement 25 is distributed in the interior of the first shell face 21 and the second shell face 22 Side, and placement in parallel.Horizontal reinforcement 25 stretches out outside filled wall the second wall part 2, stretches The part gone out forms anchored end 251, and anchored end 251 is placed in the docking groove of the second wall part 2 end In, increase drawknot intensity by anchored end 251.
Further, at the first shell of the second wall part 2 using the making molding of 3D printing technique The surface in face 21 and the second shell face 22 forms concave convex texture, by concave convex texture increase filled wall with Bonding strength between constructional column, compares smooth inner surface, increases frictional force, improve combination Intensity, it is to avoid shelling phenomenon.
Below in conjunction with shown in Fig. 1 to Fig. 4, a kind of 3D of the present invention is printed filled wall and structure The method of attachment of post illustrates.
It is as follows with the step of the method for attachment of constructional column that a kind of 3D of the present invention prints filled wall: adopts The first wall part 1 and the second wall part 2 of filled wall is made respectively of 3D printing technique, The end of the first wall part 1 and the second wall part 2 is each formed with docking groove, the first wall part 1 anchoring has horizontal reinforcement 15, and one end of horizontal reinforcement 15 is protruded and in the first wall part 1 Forming anchored end 151 in docking groove, in the second wall part 2, anchoring has horizontal reinforcement 25, and level One end of reinforcing bar 25 is protruded and forms anchored end 251 in the docking groove of the second wall part 2;Will The docking groove docking of the first wall part 1 and the second wall part 2 end forms cylinder space, level Anchored end 151 and the anchored end 251 of reinforcing bar 15 and horizontal reinforcement 25 are placed in cylinder space;Yu Zhu Body space is inserted into vertical reinforcement, by stirrup ring colligation vertical reinforcement;Pour mixed in cylinder space Solidifying soil, forms constructional column 3.
Refering to Fig. 5 to Fig. 7, further, 3D printing technique is used to make the first of filled wall Wall part 1 or the second wall part 2, specifically include following steps:
A is as it is shown in figure 5, use 3D printing technique to make shape adaptation in one layer of filled wall At the pre-buried absolute altitude of masonry 111 to horizontal reinforcement 15;This layer of masonry 111 includes using 3D to print Integrated one first shell face 11 and one second shell face 12, and be connected to the first shell face 11 with The horizontal support rib 14 in the second shell face 12 and skewed horizontal load rib 13;First shell face 11 and the second shell face 12 are oppositely arranged, and horizontal support rib 14 and skewed horizontal load rib 13 all prop up the first shell face 11 of being located at and Between two shell faces 12;End and the horizontal support rib 14 in the first the 11, second shell face 12, shell face enclose Become docking groove;
B, as shown in Figure 6, arranges horizontal reinforcement 15 in the top of this layer of masonry 111;Horizontal reinforcement 15 are parallel to the first shell face 11 and the second shell face 12;This layer is stretched out in the one end making horizontal reinforcement 15 Masonry forms anchored end 151, and anchored end 151 is placed in docking groove, the end anchor of horizontal reinforcement 15 Fixed end 151 is folded end, horizontal buckling or vertically bend anchoring;
C is as it is shown in fig. 7, use 3D printing technique to make one again in the top of this layer of masonry 111 Layer masonry 111, makes the other end of horizontal reinforcement 15 be anchored in this two-layer masonry 111;
D, repetition step b, c, to the designed elevation of filled wall, complete the first wall of filled wall Body portion 1 or the making of the second wall part 2;
As optional embodiment, if filled wall volume is excessive, can be by for convenience of construction and transport Filled wall piecemeal prints.Specifically, repeat step a to d, complete the making of multiple masonry, and Multiple masonries carry out being stacked to the designed elevation of filled wall;Further, the first of filled wall The surface of wall part 1 and the second wall part 2 is formed with concave convex texture, is increased by concave convex texture Bonding strength between filled wall and constructional column, compares smooth inner surface, increases frictional force, Improve bond strength, it is to avoid shelling phenomenon.
A kind of 3D of the present invention prints filled wall and the method for attachment of constructional column and the useful effect of structure Fruit is: the filled wall printed based on 3D is made up of the most folded multiple printing masonries set, and 3D beats The filled wall of print instead of traditional concrete or building-block, as the filling walling in building Material, reduces energy resource consumption and site operation labour force, saves working procedure, shorten construction work Phase, create good economic benefit and social benefit.
By 3D being printed the first wall part and the docking of the second wall part end of filled wall Groove docking is placed, and forms cylinder space, at this cylinder between the first wall part and the second wall part Anchor horizontal reinforcement in space, insert vertical reinforcement, by stirrup ring colligation vertical reinforcement, then exist Concrete perfusion in this cylinder space, completes the drawknot of constructional column and filled wall;Owing to using 3D Printing technique one-body molded masonry shell, forms continuous print concave convex texture on the surface of masonry shell, Add the bonding strength between filled wall and the concrete poured, compare smooth surface, increase Frictional force, improve bond strength, it is to avoid shelling phenomenon.Solve 3D and print filled wall With the connectivity problem of constructional column, improve globality and the shock resistance of filled wall.
Above in association with accompanying drawing embodiment, the present invention is described in detail, ordinary skill people in this area The present invention can be made many variations example by member according to the above description.Thus, some details in embodiment Should not constitute limitation of the invention, the present invention by the scope that defines using appended claims as this The protection domain of invention.

Claims (4)

1. the Constructional Col-umn Construction method printing filled wall based on 3D, it is characterised in that including:
3D printing technique is used to make the first wall part and the second body of wall portion of filled wall respectively Point, described first wall part and the second wall part include the multiple masonries being stacked with arranging, often One masonry uses 3D printing technique to make, including:
A, use 3D printing technique make shape adaptation in described filled wall one layer of courses of masonry extremely At the pre-buried absolute altitude of horizontal reinforcement;
B, horizontal reinforcement is set in the top of this layer of courses of masonry so that one end of described horizontal reinforcement is stretched Go out this layer of courses of masonry and form anchored end;
C, employing 3D printing technique make one layer of courses of masonry again in the top of this layer of courses of masonry, make institute The other end stating horizontal reinforcement is anchored in this two-layer courses of masonry;
D, repetition step b, c, to the designed elevation of single masonry;
The end of described first wall part and described second wall part is formed with docking groove, described right Described anchored end it is equipped with in access slot;
The docking groove of described first wall part and described second wall part is docked and forms cylinder sky Between;
It is inserted into vertical reinforcement casting concrete to form constructional column in described cylinder space.
2. the Constructional Col-umn Construction method of filled wall is printed as claimed in claim 1 based on 3D, its Being characterised by, the surface of described first wall part and described second wall part is formed with asperities Road.
3. the Constructional Col-umn Construction method of filled wall is printed as claimed in claim 1 based on 3D, its Being characterised by, the anchored end of described horizontal reinforcement is folded end.
4. the Constructional Col-umn Construction method of filled wall is printed as claimed in claim 1 based on 3D, its Being characterised by, described first wall part and described second wall part all include: use 3D to print The first shell face, the second shell face, horizontal support rib and the skewed horizontal load rib that technology is formed, described first Shell face and described second shell face are oppositely arranged, and described horizontal support rib and described skewed horizontal load rib all install Between described first shell face and described second shell face, described horizontal reinforcement be placed in described first shell face and Between described second shell face and parallel with described first shell face and described second shell face.
CN201610443492.0A 2014-11-14 2014-11-14 Constructional Col-umn Construction method based on 3D printing filled wall Active CN106013800B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610443492.0A CN106013800B (en) 2014-11-14 2014-11-14 Constructional Col-umn Construction method based on 3D printing filled wall

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610443492.0A CN106013800B (en) 2014-11-14 2014-11-14 Constructional Col-umn Construction method based on 3D printing filled wall
CN201410648583.9A CN104453014B (en) 2014-11-14 2014-11-14 The method of attachment of 3D printing filled wall and constructional column and attachment structure

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201410648583.9A Division CN104453014B (en) 2014-11-14 2014-11-14 The method of attachment of 3D printing filled wall and constructional column and attachment structure

Publications (2)

Publication Number Publication Date
CN106013800A true CN106013800A (en) 2016-10-12
CN106013800B CN106013800B (en) 2018-08-31

Family

ID=52899707

Family Applications (6)

Application Number Title Priority Date Filing Date
CN201610442475.5A Active CN106121090B (en) 2014-11-14 2014-11-14 The method of anchor connection reinforcing bar in 3D printing filled wall
CN201610443492.0A Active CN106013800B (en) 2014-11-14 2014-11-14 Constructional Col-umn Construction method based on 3D printing filled wall
CN201610442474.0A Active CN106088396B (en) 2014-11-14 2014-11-14 The preparation method of 3D printing filled wall
CN201610443459.8A Active CN106013511B (en) 2014-11-14 2014-11-14 The 3D printing filled wall formed based on 3D printing masonry
CN201610443516.2A Active CN105908869B (en) 2014-11-14 2014-11-14 The pillar structure formed based on 3D printing filled wall
CN201410648583.9A Active CN104453014B (en) 2014-11-14 2014-11-14 The method of attachment of 3D printing filled wall and constructional column and attachment structure

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201610442475.5A Active CN106121090B (en) 2014-11-14 2014-11-14 The method of anchor connection reinforcing bar in 3D printing filled wall

Family Applications After (4)

Application Number Title Priority Date Filing Date
CN201610442474.0A Active CN106088396B (en) 2014-11-14 2014-11-14 The preparation method of 3D printing filled wall
CN201610443459.8A Active CN106013511B (en) 2014-11-14 2014-11-14 The 3D printing filled wall formed based on 3D printing masonry
CN201610443516.2A Active CN105908869B (en) 2014-11-14 2014-11-14 The pillar structure formed based on 3D printing filled wall
CN201410648583.9A Active CN104453014B (en) 2014-11-14 2014-11-14 The method of attachment of 3D printing filled wall and constructional column and attachment structure

Country Status (1)

Country Link
CN (6) CN106121090B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108312291A (en) * 2018-01-12 2018-07-24 东南大学 A kind of concrete 3D printing building structure and its method of construction
CN114108841A (en) * 2021-11-12 2022-03-01 哈尔滨工业大学 3D printed concrete constructional column bottom vertical steel bar anchoring member and construction method

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10543617B2 (en) 2016-04-22 2020-01-28 Caterpillar Inc. System and method of connecting two 3D printed structures
CN106836598A (en) * 2017-04-12 2017-06-13 中国建筑股份有限公司 A kind of 3D printing pre-stress floor and its construction method
CN106894578A (en) * 2017-04-12 2017-06-27 中国建筑股份有限公司 A kind of 3D printing wall, connecting node construction and its construction method
DE102017214340A1 (en) * 2017-08-17 2019-02-21 Airbus Operations Gmbh Process for producing a sandwich component, core for a sandwich component and sandwich component
CN109610679A (en) * 2018-10-23 2019-04-12 南京绿色增材智造研究院有限公司 A kind of 3D printing wall and processing method for going along with sb. to guard him constructional column with embedded type
WO2020152542A1 (en) * 2019-01-21 2020-07-30 Gaayatri Yarlagadda Method for building construction using three-dimensional printer
FR3101805B1 (en) * 2019-10-09 2021-12-31 Saint Gobain Weber Additive manufacturing of concrete construction elements
KR102375456B1 (en) * 2020-05-25 2022-03-18 중앙대학교 산학협력단 Fabrication method of composite structures using 3D concrete printing and machine-fabricated concrete filled tubes
US11613904B2 (en) 2020-11-18 2023-03-28 General Electric Company Pre-fabricated component for an additively manufactured wind turbine tower structure
CN113323262A (en) * 2021-02-01 2021-08-31 长沙理工大学 3D printed prefabricated wall module, wall and construction method of wall
US11939762B2 (en) 2021-04-27 2024-03-26 Ge Infrastructure Technology Llc System and method for manufacturing a tower structure
US11697222B2 (en) 2021-11-01 2023-07-11 General Electric Company Additively manufactured structure with reinforced access opening
CN115233995A (en) * 2022-07-20 2022-10-25 中南建筑设计院股份有限公司 Construction method of short-limb masonry wall

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87213891U (en) * 1987-09-30 1988-06-08 秦永淮 Pour-in-place core column type big hole concrete paving block for wall board
JPH04343946A (en) * 1991-05-21 1992-11-30 Misawa Homes Co Ltd Connecting structure of constructing structure member
CN1603538A (en) * 2004-11-05 2005-04-06 朱秦江 Composite heat insulation concrete shear wall and its construction method
CN102535841A (en) * 2011-12-12 2012-07-04 中冶建工集团有限公司 Construction technology of prefabricated wall panel
CN203113601U (en) * 2013-03-22 2013-08-07 曹佩韦 Concrete block made by using three-dimensional printing
CN203654462U (en) * 2014-01-07 2014-06-18 马义和 Middle section structure of flexible house and for 3D (three dimensional) printing
CN104120788A (en) * 2014-07-18 2014-10-29 中国建筑第八工程局有限公司 Reinforced concrete structure based on 3D printing and structure construction method

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2785625B2 (en) * 1992-12-03 1998-08-13 鹿島建設株式会社 Precast concrete wall slab and its construction method
CN1096840A (en) * 1993-06-26 1994-12-28 石家庄市建筑设计院 Seven degree are provided fortification against earthquakes and are distinguished eight floor arrangement of reinforcement brick masonry building structures
JP3939972B2 (en) * 2001-12-07 2007-07-04 實 畠中 STRUCTURAL STEEL CONNECTION MEMBER AND ARCHITECTURE STEEL CONNECTION METHOD USING THE ARCHITECTURE STEEL CONNECTION MEMBER
US20080104911A1 (en) * 2006-11-08 2008-05-08 Jarvie Shawn P Insulated concrete form
CN101967851A (en) * 2009-07-28 2011-02-09 董杨 Board-mixing structure assembly type house and building method thereof
CN102094491B (en) * 2010-12-15 2013-04-24 张建兴 Novel corner constructional column with building block-concrete structure
CN202787577U (en) * 2012-07-12 2013-03-13 南京工业大学 Prefabricated wall body shell structure of reinforced concrete superposed shear wall
CN103967276B (en) * 2014-04-29 2016-03-02 同济大学 Based on the building engineering construction device of 3D printing technique

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87213891U (en) * 1987-09-30 1988-06-08 秦永淮 Pour-in-place core column type big hole concrete paving block for wall board
JPH04343946A (en) * 1991-05-21 1992-11-30 Misawa Homes Co Ltd Connecting structure of constructing structure member
CN1603538A (en) * 2004-11-05 2005-04-06 朱秦江 Composite heat insulation concrete shear wall and its construction method
CN102535841A (en) * 2011-12-12 2012-07-04 中冶建工集团有限公司 Construction technology of prefabricated wall panel
CN203113601U (en) * 2013-03-22 2013-08-07 曹佩韦 Concrete block made by using three-dimensional printing
CN203654462U (en) * 2014-01-07 2014-06-18 马义和 Middle section structure of flexible house and for 3D (three dimensional) printing
CN104120788A (en) * 2014-07-18 2014-10-29 中国建筑第八工程局有限公司 Reinforced concrete structure based on 3D printing and structure construction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
LIM S BUSWELL R A,LETT 等: "Developments in construction-Scale additive manufacturing processes", 《AUTOMATION IN CONSTRUCTION》 *
李志国等: "3D打印建筑材料相关概念辨析", 《天津建设科技》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108312291A (en) * 2018-01-12 2018-07-24 东南大学 A kind of concrete 3D printing building structure and its method of construction
CN108312291B (en) * 2018-01-12 2024-04-12 东南大学 Construction method of concrete 3D printing building structure
CN114108841A (en) * 2021-11-12 2022-03-01 哈尔滨工业大学 3D printed concrete constructional column bottom vertical steel bar anchoring member and construction method

Also Published As

Publication number Publication date
CN106013800B (en) 2018-08-31
CN106088396A (en) 2016-11-09
CN106121090A (en) 2016-11-16
CN106121090B (en) 2018-06-19
CN106088396B (en) 2018-03-27
CN106013511B (en) 2018-03-30
CN104453014A (en) 2015-03-25
CN105908869A (en) 2016-08-31
CN104453014B (en) 2017-04-05
CN106013511A (en) 2016-10-12
CN105908869B (en) 2018-03-30

Similar Documents

Publication Publication Date Title
CN106013800A (en) Constructional column construction method based on 3D printing filling wall
CN106193368B (en) Connection method based on 3D printing reinforced masonry shear wall and insulation construction
CN105908860B (en) A kind of ruggedized construction of 3D printing reinforced masonry shear wall
CN105863138B (en) Concealed beam structure in 3D printing truss cassette ceiling
CN106088327A (en) Manufacture method based on the assembling frame post that 3D prints
CN204139191U (en) A kind of pile-raft foundation structure
CN207436045U (en) A kind of prefabricated hollow steel pipe pile
CN209837372U (en) Wall structure member built by cutting barred rocks by prestress machine
CN209369118U (en) A kind of connection system of steel frame and prefabricated panel
CN105113626B (en) Cast-in-place post precast beam construction method
CN204418208U (en) Anchor rod foundation
CN204940331U (en) A kind of reinforced retaining wall
CN206396935U (en) A kind of turning wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant