[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN105986836B - A kind of single-track railway tunnel substrate guarded drainage strengthen the system - Google Patents

A kind of single-track railway tunnel substrate guarded drainage strengthen the system Download PDF

Info

Publication number
CN105986836B
CN105986836B CN201610419973.8A CN201610419973A CN105986836B CN 105986836 B CN105986836 B CN 105986836B CN 201610419973 A CN201610419973 A CN 201610419973A CN 105986836 B CN105986836 B CN 105986836B
Authority
CN
China
Prior art keywords
tunnel
drainage
buried
ditch
blind pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610419973.8A
Other languages
Chinese (zh)
Other versions
CN105986836A (en
Inventor
孙晓科
翟可
李勇
李皓
王洪勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Liuyuan Group Co Ltd
Original Assignee
CRTG Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRTG Survey and Design Institute Co Ltd filed Critical CRTG Survey and Design Institute Co Ltd
Priority to CN201610419973.8A priority Critical patent/CN105986836B/en
Publication of CN105986836A publication Critical patent/CN105986836A/en
Application granted granted Critical
Publication of CN105986836B publication Critical patent/CN105986836B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention belongs to waterproof and water drainage system fields, more particularly to a kind of single-track railway tunnel substrate guarded drainage strengthen the system, it is characterized by: the inside two sides of the Tunnel Base are provided with ditch in tunnel, the buried weeper drain longitudinally disposed along Tunnel Base is arranged in the tunnel outside the lower section lining cutting in ditch, the buried weeper drain is internally provided with permeable layer, longitudinal drainage blind pipe has been longitudinally arranged along buried weeper drain in the permeable layer, the transverse drainage blind pipe is arranged along the transverse direction of Tunnel Base and the buried weeper drain of two sides is connected to form latticed ring longitudinal drainage blind pipe combined drain system by it;Set pressure reduction well in the buried weeper drain, the well bore of the pressure reduction well passes through tunnel the interior lining of ditch bottom two and first branch structure is goed deep into country rock.Tunnel solves the unfavoured state of Tunnel Base rich water pressure-bearing by substrate draining and the double approach of pressure release, more advantageous to structure stress, more advantageous to the long-term operation security in tunnel.

Description

A kind of single-track railway tunnel substrate guarded drainage strengthen the system
Technical field
The invention belongs to the anti-rows outside waterproof and water drainage system field more particularly to a kind of single-track railway tunnel substrate just branch inverted arch Water strengthen the system.
Background technique
Railway tunnel generallys use composite lining structural shape at present, and full packet or half packet are set between preliminary bracing and two linings Watertight insulation is disposed with the outer drainage system of tunnel-liner on the outside of watertight insulation, the tunnel hole Nei You inner water drainage system, this Three has collectively constituted the waterproof and water drainage system in tunnel.
Tunnel waterproof and water drainage system Normal practice is as follows: layer of non-woven fabric+splash guard, interval one are laid between first branch and two linings Circumferential blind pipe is arranged in set a distance, or directly uses drain bar band, and longitudinal drainage blind pipe is arranged on the top of abutment wall basis behind, Circumferential blind pipe is connected to using three-way connection with longitudinal blind pipe, and longitudinal blind pipe is spaced apart to set lateral water guide blind pipe introducing tunnel Medial sulcus forms complete vertically and horizontally drainage system.
Wherein waterproof system is divided into water plate in the air by inverted arch, and is divided into half packet waterproof and full packet waterproof.It has been generally acknowledged that Full packet form waterproof will cause two linings and bear hydraulic pressure for a long time, leakage disease easily occurs and reduces the service life.It is more in railway tunnel Using the form of half packet waterproof.
Drainage system divides in outside hole and hole, is normally only to be realized outside hole by the ring longitudinal direction blind pipe outside lining cutting, longitudinal blind Pipe position is located at abutment wall basis behind top, does not set the following drainage channel in tunnel bottom.Water is arranged in hole inner water drainage system, usually two sides Ditch, to double track tunnel, standing to be equipped with Central drain when water is larger, most of Central drain is located at filled layer above inverted arch It is interior, to severe cold area, some Central drains take it is buried, be located at first branch inverted arch below.
But for single-track railway tunnel, especially heavy haul railway, it is different from double track tunnel, if the also lower section in the middle part of inverted arch Central drain is set, the globality of railway roadbed will be weakened significantly, it is also unfavorable to inverted arch structure stress.Therefore, simple center is buried Ditch is poor to single-track railway tunnel adaptability, need to consider to improve.
Meanwhile above-mentioned conventional guarded drainage mode, be only capable of being discharged longitudinal blind pipe with the water of upper bit, to below longitudinal blind pipe with And the water under inverted arch, it can not be discharged;And wrap due to half, without waterproof layer below inverted arch, when the following country rock in tunnel bottom is soft stratum, or When with the characteristic for meeting water softening, the diseases such as substrate rich water can frequently result in differential settlement, stratum depression of bearing force, rise soil Evil.To heavy haul railway or high-speed railway, since the train operation frequency is high, maintenance Window time is short, and above-mentioned disease occur can be to fortune Battalion makes a big impact.
Therefore, how the water of reasonable white-out tunnel bottom, be still that tunnel water handling designs the emphasis that should pay close attention to.
Based on above-mentioned premise, in single-track railway tunnel waterproof and drainage design, it is necessary to Tunnel Base waterproof and water drainage system into Row is reinforced.It is exactly that tunnel bottom longitudinal direction blind pipe water below can not be discharged that problem is maximum in existing waterproof and drainage design, substrate It is chronically at rich water state, hydraulic pressure is born in tunnel-liner.
Summary of the invention
In order to solve the problems, such as Tunnel Base rich water, the present invention, which implements, to reinforce Tunnel Base guarded drainage and increases pressure release to lead to The design concept in road provides a kind of single-track railway tunnel substrate guarded drainage strengthen the system.
The technical scheme adopted by the invention is as follows:
A kind of single-track railway tunnel substrate guarded drainage strengthen the system, it is characterised in that: blind including Tunnel Base, transverse drainage Pipe, the inside two sides of the Tunnel Base are provided with ditch in tunnel, are arranged with outside the lower section lining cutting in ditch in the tunnel The buried weeper drain longitudinally disposed along Tunnel Base, the buried weeper drain are internally provided with permeable layer, the infiltration It is longitudinally arranged longitudinal drainage blind pipe along buried weeper drain in layer, the transverse drainage blind pipe is set along the transverse direction of Tunnel Base It sets and the buried weeper drain of two sides is connected to form latticed ring longitudinal drainage blind pipe combined drain system by it;The depth It buries and sets pressure reduction well in weeper drain, the well bore of the pressure reduction well passes through tunnel interior ditch bottom two lining and first branch structure is deeply enclosed In rock.
The outside of the Tunnel Base is successively laid with splash guard, non-woven fabrics, and the splash guard, non-woven fabrics are located at buried row The top of water french drain.
Bottom in the buried weeper drain is provided with the drainage layer below permeable layer.
The permeable layer is metalling, and the drainage layer is coarse sands layer.
The pressure reduction well penetrates longitudinal drainage blind pipe.
Steel floral tube is buried in the pressure reduction well.
The nozzle absolute altitude of the steel floral tube is higher by tunnel the cross-section of river in ditch, and the steel floral tube is located at ditch in tunnel It is not provided with pore on the lining of ditch bottom two and the tube wall of first branch inside configuration point in internal and tunnel, the steel floral tube is located at decompression Pore is set on well and the tube wall of buried weeper drain inner part.
Gap is blocked with sealing material between the bottom surface of ditch in the steel floral tube and tunnel.
The sealing material uses polyurethane sealant and Bituminous hemp fiber.
The longitudinal drainage blind pipe, steel floral tube outside be enclosed with non-woven fabrics.
The invention has the benefit that
1, the present invention implements the design concept reinforced Tunnel Base guarded drainage and increase pressure release passage, that is, in tunnel Buried weeper drain is set below ditch in the tunnel of substrate two sides, and the buried weeper drain in two sides is connected to by transverse drainage blind pipe; Pressure reduction well separately is set in the buried weeper drain in tunnel two sides, one drain passage of inverted arch bottom hydraulic pressure is given, is in sole Passive state, to weaken the harm of soft stratum substrate rich water significantly;
2, tunnel solves the unfavoured state of Tunnel Base rich water pressure-bearing, to knot by substrate draining and the double approach of pressure release Structure stress is more advantageous, more advantageous to the long-term operation security in tunnel;
3, the present invention can dredge single-track railway tunnel bottom water pressure, avoid tunnel bottom bottom rich water pressure-bearing, in long-term DYNAMIC LOADING OF DRIVING TRAIN ON BRIDGES Phenomena such as acting on lower substrate softening, rising soil, ensures train operation safety;
4, the buried weeper drain porosity in two sides is big, and drainability is strong, and major diameter longitudinal drainage is separately disposed in french drain Blind pipe, wraps up in nonwoven cloth filter material outside longitudinal drainage blind pipe, spaced apart between the buried weeper drain in two sides to be provided with transverse direction Blind pipe is drained, forms tunnel spacer screen trellis ring longitudinal drainage blind pipe combined drain system, even if locally blocking, water flow still may be used By other Path reroutings, drainability and reliability are greatly improved;
5, pressure reduction well is longitudinally spaced-apart along buried weeper drain and sets, and penetrates longitudinal drainage blind pipe, with tunnel base Bottom is connected with outer ring longitudinal drainage blind pipe combined drain system, increases the drain passage of Tunnel Base water;
6, pressure reduction well can be encrypted or be replaced according to operation phase service condition, and entire pressure relief system can play work always With hole Nei Shui can also be drained by pressure reduction well even if lower loop longitudinal drainage blind pipe combined drain system locally blocks Ditch;
7, ditch draining will not seep under recharge to Tunnel Base hereinafter, Tunnel Base guarded drainage strengthen the system and tunnel in tunnel Ditch draining does not occur directly to contact in road, only when Tunnel Base pressure-bearing, is drained by pressure reduction well to ditch in tunnel;
8, entire tunnel bottom full width is laid with non-woven fabrics, splash guard, forms full packet system, and relatively half packet waterproof is to preventing tunnel Substrate is risen soil advantageously.
Detailed description of the invention
Fig. 1 is that Tunnel Base reinforces waterproof and water drainage system diagrammatic cross-section in the present invention;
Fig. 2 is Tunnel Base drainage system floor map in the present invention;
Fig. 3 is the cross-sectional configuration schematic diagram of buried weeper drain in the present invention;
Fig. 4 is the organigram of steel floral tube in the present invention;
Fig. 5 is pressure reduction well hole sealing structure schematic diagram in the present invention.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings:
In figure, 1- Tunnel Base, in the tunnel 2- ditch, 3- transverse drainage blind pipe, the buried weeper drain of 4-, 5- permeable layer, 6- longitudinal drainage blind pipe, 7- pressure reduction well, 8- non-woven fabrics, 9- splash guard, 10- drainage layer, 11- steel floral tube, 12- pore, 13- sealing Material, 14- non-woven fabrics, 15- polyurethane sealant, 16- Bituminous hemp fiber, 17- internal rail top surface, the not set pore section of 18-, 19- tunnel Ditch bottom surface in road.
Embodiment
As shown in Figs. 1-5, a kind of single-track railway tunnel substrate guarded drainage strengthen the system, including Tunnel Base 1, transverse drainage Blind pipe 3, the inside two sides of Tunnel Base 1 are provided with ditch 2 in tunnel, are arranged with edge in tunnel outside the lower section lining cutting in ditch 2 The longitudinally disposed buried weeper drain 4 of Tunnel Base 1, buried weeper drain 4 are internally provided with permeable layer 5, edge in permeable layer 5 Buried weeper drain 4 has been longitudinally arranged longitudinal drainage blind pipe 6, transverse drainage blind pipe 3 along Tunnel Base 1 lateral setting and The connection of buried weeper drain 4 of two sides is formed latticed ring longitudinal drainage blind pipe combined drain system by it;Buried draining is blind Set pressure reduction well 7 in ditch 4, the well bore of pressure reduction well 7 passes through tunnel interior 2 bottom two of ditch lining and first branch structure is goed deep into country rock.
The outside of Tunnel Base 1 is successively laid with splash guard 9, non-woven fabrics 8, and splash guard 9, non-woven fabrics 8 are located at buried draining The top of french drain 4.
Bottom in buried weeper drain 4 is provided with the drainage layer 10 positioned at 5 lower section of permeable layer.
Permeable layer 5 is metalling, and drainage layer 10 is coarse sands layer.
Pressure reduction well 7 penetrates longitudinal drainage blind pipe 6.
Steel floral tube 11 is buried in pressure reduction well 7.
The nozzle absolute altitude of steel floral tube 11 is higher by tunnel the cross-section of river in ditch 2, and steel floral tube 11 is located in tunnel in ditch 2 It is not provided with pore on 2 bottom two of ditch lining and the tube wall of first branch inside configuration point in portion and tunnel, steel floral tube 11 is located at pressure reduction well 7 And pore 12 is set on the tube wall of buried 4 inner part of weeper drain.
Gap is blocked with sealing material 13 between 2 bottom surface of ditch in steel floral tube 11 and tunnel.
Sealing material 13 uses polyurethane sealant 15 and Bituminous hemp fiber 16.
Longitudinal drainage blind pipe 6, steel floral tube 11 outside be enclosed with non-woven fabrics 14.
Single-track railway tunnel substrate guarded drainage strengthen the system is by Tunnel Base guarded drainage and Tunnel Base pressure relief system two It is grouped as, steps are as follows for Specific construction:
Tunnel Base waterproof and water drainage system:
Under Tunnel Base 1 when half section excavation, along the tunnel of two sides 2 position of ditch utilize Miniature digging machine, downward cutting, Two longitudinal grooves are excavated out as buried weeper drain 4, the interior backfill rubble of the channel bottom of buried weeper drain 4 is as infiltration Layer 5 blocks drainage channel, is first one layer of 10- in the trench bottom of buried weeper drain 4 to prevent soil layer particle from entering permeable layer 5 15cm coarse sand drainage layer 10 is permeable layer 5 in drainage layer 10, and permeable layer 5 is backfilled by 2-4cm rubble, is buried in permeable layer 5 Longitudinal drainage blind pipe 6, it is outer on longitudinal drainage blind pipe 6 to wrap up in non-woven fabrics 14, setting spaced apart between the buried weeper drain 4 in two sides One of transverse drainage blind pipe 3, transverse drainage blind pipe 3 protrude into the buried weeper drain 4 in two sides, it is blind to form latticed ring longitudinal drainage Pipe combined drain system is laid with layer of non-woven fabric 8+ splash guard 9, as Tunnel Base 1 every pulp layer, then on permeable layer 5 The first branch inverted arch of construction tunnel again.
Tunnel Base pressure relief system:
After the completion of tunnel double-lining and buried weeper drain 4 are constructed, 2 longitudinal gap of ditch is certain along the tunnel of two sides in hole Distance sets pressure reduction well 7 using air drill drilling, and hole depth gos deep into country rock 2-3m outside just branch inverted arch and be advisable to penetrate, lower in hole outer to wrap up in nothing The steel floral tube 11 of woven fabric 14;Not aperture in 11 oral area 1.5m of steel floral tube, aperture that 11 lower part of steel floral tube is quincunx, aperture 6mm, the spray of molten steel 11 nozzle absolute altitude of pipe is higher by tunnel cross-section of river certain altitude in ditch 2, steel floral tube 11 and the sky between 2 bottom surface of ditch in tunnel Gap is blocked with sealing material 13.
Working principle: the water around buried weeper drain 4 passes through drainage layer 10, permeable layer 5 enters longitudinal drainage blind pipe 6 It is interior, it is drained by longitudinal drainage blind pipe 6, is formd since transverse drainage blind pipe 3 is connected to the longitudinal drainage blind pipe 6 of two sides Latticed ring longitudinal drainage blind pipe combined drain system, when locally blocking for ring longitudinal drainage blind pipe combined drain system When, water flow still can keep proper drainage by other Path reroutings;Pressure reduction well 7 is along buried 4 longitudinal gap of weeper drain, one spacing From setting, and longitudinal drainage blind pipe 6 is penetrated, is linked to be one with Tunnel Base 1 with outer ring longitudinal drainage blind pipe combined drain system Body, when lower loop longitudinal drainage blind pipe combined drain system locally blocks, ring longitudinal drainage blind pipe combined drain system Water inside interior water and pressure reduction well 7 is entered inside steel floral tube 11 by the pore 12 of 11 lower part of steel floral tube, due to steel floral tube The not set pore 12 in 11 tops, in the presence of hydraulic pressure, the water inside steel floral tube 11 are discharged by the nozzle at 11 top of steel floral tube Ditch 2 in tunnel drain pressure release by ditch 2 in tunnel.
1 embodiment of the invention is described in detail above, but the content is only preferable implementation of the invention Example, should not be considered as limiting the scope of the invention.It is all according to all the changes and improvements made by the present patent application range Deng should still be within the scope of the patent of the present invention.

Claims (10)

1. a kind of single-track railway tunnel substrate guarded drainage strengthen the system, it is characterised in that: blind including Tunnel Base, transverse drainage Pipe, the inside two sides of the Tunnel Base are provided with ditch in tunnel, are arranged with outside the lower section lining cutting in ditch in the tunnel The buried weeper drain longitudinally disposed along Tunnel Base, the buried weeper drain are internally provided with permeable layer, the infiltration It is longitudinally arranged longitudinal drainage blind pipe along buried weeper drain in layer, the transverse drainage blind pipe is set along the transverse direction of Tunnel Base It sets and the buried weeper drain of two sides is connected to form latticed ring longitudinal drainage blind pipe combined drain system by it;The depth It buries and sets pressure reduction well in weeper drain, the well bore of the pressure reduction well passes through tunnel interior ditch bottom two lining and first branch structure is deeply enclosed In rock;
The single-track railway tunnel substrate guarded drainage strengthen the system is by Tunnel Base guarded drainage and Tunnel Base pressure relief system two parts Composition, steps are as follows for Specific construction:
Tunnel Base waterproof and water drainage system:
Under Tunnel Base when half section excavation, ditch position utilizes Miniature digging machine along the tunnel of two sides, and downward cutting is excavated out Two longitudinal grooves, as permeable layer, are anti-as buried weeper drain, the interior backfill rubble of the channel bottom of buried weeper drain Only soil layer particle enters permeable layer, blocks drainage channel, first does one layer of 10-15cm coarse sand filter in the trench bottom of buried weeper drain Water layer is permeable layer in drainage layer, and permeable layer is backfilled by 2-4cm rubble, and longitudinal drainage blind pipe is buried in permeable layer, longitudinal It is outer on draining blind pipe to wrap up in non-woven fabrics, one of transverse drainage blind pipe of setting spaced apart between the buried weeper drain in two sides, laterally Draining blind pipe protrudes into the buried weeper drain in two sides, latticed ring longitudinal drainage blind pipe combined drain system is formed, in permeable layer Upper laying layer of non-woven fabric+splash guard, as Tunnel Base every pulp layer, the subsequent first branch inverted arch of construction tunnel again;
Tunnel Base pressure relief system:
After the completion of tunnel double-lining and the construction of buried weeper drain, ditch is longitudinally spaced-apart benefit along the tunnel of two sides in hole Pressure reduction well is set with air drill drilling, just branch inverted arch gos deep into country rock 2-3m, the lower outer steel floral tube for wrapping up in non-woven fabrics in hole outside for hole deep penetration; Not aperture in spray of molten steel spout part 1.5m, aperture that steel floral tube lower part is quincunx, aperture 6mm, steel floral tube nozzle absolute altitude are higher by tunnel Gap is blocked with sealing material between the bottom surface of ditch in the cross-section of river in ditch, steel floral tube and tunnel.
2. a kind of single-track railway tunnel substrate guarded drainage strengthen the system according to claim 1, it is characterised in that: the tunnel The outside of road substrate is successively laid with splash guard, non-woven fabrics, and the splash guard, non-woven fabrics are located at the top of buried weeper drain.
3. a kind of single-track railway tunnel substrate guarded drainage strengthen the system according to claim 1, it is characterised in that: the depth Bury the drainage layer that the bottom in weeper drain is provided with below permeable layer.
4. a kind of single-track railway tunnel substrate guarded drainage strengthen the system according to claim 3, it is characterised in that: the infiltration Water layer is metalling, and the drainage layer is coarse sands layer.
5. a kind of single-track railway tunnel substrate guarded drainage strengthen the system according to claim 1, it is characterised in that: the drop Kill-job penetrates longitudinal drainage blind pipe.
6. a kind of single-track railway tunnel substrate guarded drainage strengthen the system according to claim 1, it is characterised in that: the drop Steel floral tube is buried in kill-job.
7. a kind of single-track railway tunnel substrate guarded drainage strengthen the system according to claim 6, it is characterised in that: the steel The nozzle absolute altitude of floral tube is higher by tunnel the cross-section of river in ditch, and the steel floral tube is located in tunnel inside ditch and tunnel Nei Shui Pore is not provided on the lining of ditch bottom two and the tube wall of first branch inside configuration point, the steel floral tube is located at pressure reduction well and buried draining is blind Pore is set on the tube wall of ditch inner part.
8. a kind of single-track railway tunnel substrate guarded drainage strengthen the system according to claim 7, it is characterised in that: the steel Gap is blocked with sealing material between the bottom surface of ditch in floral tube and tunnel.
9. a kind of single-track railway tunnel substrate guarded drainage strengthen the system according to claim 8, it is characterised in that: described close Closure material uses polyurethane sealant and Bituminous hemp fiber.
10. a kind of single-track railway tunnel substrate guarded drainage strengthen the system according to claim 6, it is characterised in that: described Longitudinal drainage blind pipe, steel floral tube outside be enclosed with non-woven fabrics.
CN201610419973.8A 2016-06-14 2016-06-14 A kind of single-track railway tunnel substrate guarded drainage strengthen the system Active CN105986836B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610419973.8A CN105986836B (en) 2016-06-14 2016-06-14 A kind of single-track railway tunnel substrate guarded drainage strengthen the system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610419973.8A CN105986836B (en) 2016-06-14 2016-06-14 A kind of single-track railway tunnel substrate guarded drainage strengthen the system

Publications (2)

Publication Number Publication Date
CN105986836A CN105986836A (en) 2016-10-05
CN105986836B true CN105986836B (en) 2018-12-14

Family

ID=57044600

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610419973.8A Active CN105986836B (en) 2016-06-14 2016-06-14 A kind of single-track railway tunnel substrate guarded drainage strengthen the system

Country Status (1)

Country Link
CN (1) CN105986836B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437841B (en) * 2016-10-27 2019-05-07 中煤第三建设(集团)有限责任公司 It is a kind of can antiseep railway tunnel draining blind pipe and its construction method
CN106968712B (en) * 2017-05-12 2023-06-09 西南交通大学 Tunnel bottom drainage structure of water-rich stratum and construction method thereof
CN107905812A (en) * 2017-12-27 2018-04-13 中铁二院工程集团有限责任公司 The hollow compound arch tunnel-liner in type tunnel bottom and its drainage system construction of falling from power
CN108222975B (en) * 2017-12-27 2024-07-19 中铁二院工程集团有限责任公司 Large arch base bottom plate type lining and drainage system structure thereof
CN107905811B (en) * 2017-12-27 2024-01-19 中铁二院工程集团有限责任公司 Inverted arch-free lining of foundation hollow longitudinal beam bearing arch structure
CN107905810A (en) * 2017-12-27 2018-04-13 中铁二院工程集团有限责任公司 Boot last pedestal combed tunnel bottom liner structure and its drainage system
CN108457659B (en) * 2018-03-20 2019-04-30 中铁七局集团郑州工程有限公司 Railway single method for tunnel construction of the extremely frigid zones with center Deeply buried ditch
CN109236321A (en) * 2018-11-28 2019-01-18 西南交通大学 A kind of band can maintenance type drainage gallery composite lining of tunnel structure
CN109973147B (en) * 2019-03-08 2020-05-22 中铁十九局集团第三工程有限公司 Construction method of highway tunnel drainage ditch
CN109958005B (en) * 2019-03-11 2020-02-07 浙江大学 Drainage device and method for treating slurry pumping of plate-type ballastless track subgrade of high-speed railway
CN110454222A (en) * 2019-07-22 2019-11-15 中铁六局集团有限公司 Collapsible loess tunnel Central Drainage construction method
CN114278374A (en) * 2021-11-29 2022-04-05 国能朔黄铁路发展有限责任公司 Tunnel basement drainage system

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5470178A (en) * 1994-02-17 1995-11-28 Weholt; Raymond L. Insulating tunnel liner system
CN101435342A (en) * 2008-12-22 2009-05-20 长安大学 Tunnel ring direction drainpipe equipped with strip heat-insulating layer
CN101798939A (en) * 2010-03-17 2010-08-11 中铁隧道勘测设计院有限公司 Maintainable tunnel drainage system
CN102661171A (en) * 2012-05-02 2012-09-12 中铁十一局集团第五工程有限公司 Frost damage prevention drainage system for tunnel
CN202578783U (en) * 2012-05-29 2012-12-05 中水东北勘测设计研究有限责任公司 Bored decompression side-ditch centralized drainage structure for traffic tunnel
CN202926388U (en) * 2012-11-26 2013-05-08 宁波交通工程建设集团有限公司 Drainage facility for road surface bubbling water of highway tunnel
CN103306683A (en) * 2013-06-18 2013-09-18 中铁隧道集团有限公司 Construction method for comprehensive precipitation in hole in deep-buried tunnel excavation process
CN104196562A (en) * 2014-08-15 2014-12-10 重庆国翔新材料有限公司 Drainage structure for controlled drainage of tunnel and tunnel drainage system with same
CN104454001A (en) * 2014-12-11 2015-03-25 中铁十九局集团有限公司 Dewatering system and dewatering method in tunnel of low-permeability silty-fine sand stratum
CN204357485U (en) * 2014-12-11 2015-05-27 中铁十一局集团第五工程有限公司 The drainage system of anti-tunnel double-lining behind ponding crossfire
CN104806272A (en) * 2015-04-15 2015-07-29 西安科技大学 Tunnel diversion composite type waterproof and drainage system as well as construction method and use method thereof
CN204552818U (en) * 2014-12-11 2015-08-12 中铁十一局集团第五工程有限公司 The drainage system of ditch, side, anti-tunnel bottom leaky
CN204960952U (en) * 2015-08-19 2016-01-13 铁道第三勘察设计院集团有限公司 Tunnel structure with hoop heat preservation rubble french drain
CN205025498U (en) * 2015-08-21 2016-02-10 中铁第一勘察设计院集团有限公司 Han qu tunnel drainage system
CN205677668U (en) * 2016-06-14 2016-11-09 中铁隧道勘测设计院有限公司 A kind of single-track railway tunnel substrate guarded drainage strengthening system

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5470178A (en) * 1994-02-17 1995-11-28 Weholt; Raymond L. Insulating tunnel liner system
CN101435342A (en) * 2008-12-22 2009-05-20 长安大学 Tunnel ring direction drainpipe equipped with strip heat-insulating layer
CN101798939A (en) * 2010-03-17 2010-08-11 中铁隧道勘测设计院有限公司 Maintainable tunnel drainage system
CN102661171A (en) * 2012-05-02 2012-09-12 中铁十一局集团第五工程有限公司 Frost damage prevention drainage system for tunnel
CN202578783U (en) * 2012-05-29 2012-12-05 中水东北勘测设计研究有限责任公司 Bored decompression side-ditch centralized drainage structure for traffic tunnel
CN202926388U (en) * 2012-11-26 2013-05-08 宁波交通工程建设集团有限公司 Drainage facility for road surface bubbling water of highway tunnel
CN103306683A (en) * 2013-06-18 2013-09-18 中铁隧道集团有限公司 Construction method for comprehensive precipitation in hole in deep-buried tunnel excavation process
CN104196562A (en) * 2014-08-15 2014-12-10 重庆国翔新材料有限公司 Drainage structure for controlled drainage of tunnel and tunnel drainage system with same
CN104454001A (en) * 2014-12-11 2015-03-25 中铁十九局集团有限公司 Dewatering system and dewatering method in tunnel of low-permeability silty-fine sand stratum
CN204357485U (en) * 2014-12-11 2015-05-27 中铁十一局集团第五工程有限公司 The drainage system of anti-tunnel double-lining behind ponding crossfire
CN204552818U (en) * 2014-12-11 2015-08-12 中铁十一局集团第五工程有限公司 The drainage system of ditch, side, anti-tunnel bottom leaky
CN104806272A (en) * 2015-04-15 2015-07-29 西安科技大学 Tunnel diversion composite type waterproof and drainage system as well as construction method and use method thereof
CN204960952U (en) * 2015-08-19 2016-01-13 铁道第三勘察设计院集团有限公司 Tunnel structure with hoop heat preservation rubble french drain
CN205025498U (en) * 2015-08-21 2016-02-10 中铁第一勘察设计院集团有限公司 Han qu tunnel drainage system
CN205677668U (en) * 2016-06-14 2016-11-09 中铁隧道勘测设计院有限公司 A kind of single-track railway tunnel substrate guarded drainage strengthening system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
预防富水铁路隧道道床翻浆冒泥病害的设计施工措施探讨;翟可;《隧道建设》;20130531;第33卷(第5期);第388-392页 *

Also Published As

Publication number Publication date
CN105986836A (en) 2016-10-05

Similar Documents

Publication Publication Date Title
CN105986836B (en) A kind of single-track railway tunnel substrate guarded drainage strengthen the system
CN105863671B (en) Frame-type subdrain system tunnel lining structure
CN105927272B (en) Bottom plate anchors restricted type tunnel lining structure
CN204098937U (en) Tunnel deformation joint waterproof construction and constructing tunnel structure
CN108194102B (en) The dismounting of limit section and safe stress check calculation construction method are invaded in Tunnel deformation
CN103032097B (en) Be applicable to tunnel drainage structure and the construction method thereof of bias voltage water rich strata
CN102606176B (en) Collapsible loess tunnel construction method
CN105840210A (en) Box type tunnel-bottom composite arched tunnel lining structure with water drain function
KR100936471B1 (en) A circular structure supported by the segment with A drainage structure and method constructing the shield tunnel
CN205677631U (en) It is combined arch tunnel lining structure at the bottom of the box tunnel with hydrophobic function
CN206233951U (en) Depressurize drainage system in a kind of high-speed railway double track tunnel base
CN104499479A (en) Dig-hole pile construction method based on penetration of sand gravel backfilling layer
CN106437726A (en) Ground fracture crushed zone passing construction method for shallow-buried tunnel excavation
CN106089244A (en) Frame props up arched tunnel lining structure
CN108979659A (en) The ruggedized construction and method of structures are worn under weak soil rich water large cross-section tunnel group
CN206174963U (en) Cross shallow undercut tunnel supporting construction of burying of ground fissure crushed zone
CN104404974A (en) High-pressure-bearing water and thick sand and pebble formation deep foundation pit grouting bottom-sealing structure and construction technology thereof
CN207813651U (en) A kind of ground water drainage system for double-hole tunnel
CN108797620A (en) A kind of OPT construction method of interlocking pile
CN208310794U (en) The tunnel-liner of haunch floor type and the drainage system of leaked oil is arranged in tunnel bottom
CN105735055A (en) Imbibition drainage method
CN105370289A (en) Ultra-long shallow-buried excavation construction method for existing pipeline in complex environment
CN108150190A (en) Unevenly-pressured shallow tunnel rock crusher section excavates safeguard structure and construction method
CN205677668U (en) A kind of single-track railway tunnel substrate guarded drainage strengthening system
CN208310807U (en) A kind of single-track railway floor type lining structure using refuge chamber setting inspection shaft

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190213

Address after: 300000 Tianjin Free Trade Test Zone (Airport Economic Zone) No. 36 West Central Road

Patentee after: CHINA RAILWAY LIUYUAN GROUP CO., LTD.

Address before: 300000 Hongqiao District, Tianjin City, Bridge South East Road

Patentee before: Zhongtie Tunnel Survey and Design Inst., Ltd.