CN105971016A - Utility tunnel internode connection structure - Google Patents
Utility tunnel internode connection structure Download PDFInfo
- Publication number
- CN105971016A CN105971016A CN201610544940.6A CN201610544940A CN105971016A CN 105971016 A CN105971016 A CN 105971016A CN 201610544940 A CN201610544940 A CN 201610544940A CN 105971016 A CN105971016 A CN 105971016A
- Authority
- CN
- China
- Prior art keywords
- embedded board
- connector
- piping lane
- piping
- internode
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 15
- 239000010959 steel Substances 0.000 claims description 15
- 238000010276 construction Methods 0.000 abstract description 3
- 238000003466 welding Methods 0.000 abstract description 3
- 239000010865 sewage Substances 0.000 abstract description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract 1
- 238000007789 sealing Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 230000018109 developmental process Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000011218 segmentation Effects 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 239000000567 combustion gas Substances 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000009428 plumbing Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/10—Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/16—Arrangement or construction of joints in foundation structures
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Revetment (AREA)
Abstract
Utility tunnel internode connection structure relates to municipal construction, especially a long service life's utility tunnel internode connection structure. The invention discloses a comprehensive pipe gallery internode connecting structure which is arranged at the joint of two adjacent pipe galleries. The utility model has the advantages of simple structure, scientific design and convenient use, the connecting piece is placed at the joint of two adjacent pipe galleries for welding, after welding, the two pipe galleries can be effectively connected, a water stop can be formed at the joint of the two adjacent pipe galleries, and the sewage outside the pipe galleries is prevented from entering the pipe galleries.
Description
Technical field
The present invention relates to urban construction, a kind of service life length pipe gallery internode attachment structure.
Background technology
Along with the development of Urbanization in China, set up resources conservation, environmental friendliness, the new city of energy-saving and emission-reduction have become the fundamental state policy instructing Chinese Urbanization with urban sustainable development.Pipe gallery refers to build a tunnel space in the underground in city, is concentrated by the various municipal pipelines such as plumbing, combustion gas, electric power, communication and lays.This mode is by various pipeline centralized arrangement, facilitate pipeline performance management and plant maintenance, can avoid causing owing to burying underground or keep in repair pipeline road surface to repeat the trouble that excavation is brought, and the soil corrosion failure to pipeline can be avoided, thus also be extended the service life of pipeline.
Between the piping lane segmentation of traditional cast-in-place making, using rubber fastening band to connect, the interface anti-uneven settlement of foundation ability of this form, waterstop is yielding, even by drawing crack.The prefabricated city piping lane technology occurred in recent years quickly grows, but also has similar sealing problem between tube coupling, and the most at present, the rubber fastening band interface that piping lane is conventional is extremely difficult to use centenary index;Simultaneously as when pouring, be all directly rubber fastening band to be enclosed in joint, during damage, it is impossible to be replaced.
Summary of the invention
To be solved by this invention is exactly between existing piping lane segmentation, uses rubber fastening band to connect, and waterstop is fragile, the problem of changing difficulty, it is provided that a kind of service life, the pipe gallery internode of length sealed structure.
The pipe gallery internode attachment structure of the present invention, being arranged on the junction of adjacent two section piping lane, it is characterised in that this structure includes embedded board and connector, embedded board is prefabricated on piping lane wall, connector is arranged on the seam crossing that two sections of piping lanes connect, and connector welds with embedded board.
Described connector is I shape section steel ring, and the prefabricated inwall in piping lane termination of embedded board is with on outer wall, and the end face of I shape section steel ring welds with the embedded board on piping lane inwall, outer wall respectively with bottom surface.
Described connector is U-shaped steel loop, and U-shaped steel loop is arranged in the seam of two sections of piping lanes, and embedded board is prefabricated on the inwall of piping lane termination, and both sides, U-shaped steel loop top are respectively welded on embedded board.
Connector can carry out prefabricated according to piping lane form, such as circular, square or arch door shape etc., after prefabricated piping lane is transported to job site, it is linked in sequence, and connector is set at the seam crossing of adjacent two sections of piping lanes, and connector is welded on embedded board, i.e. can reach the effect connecting with sealing.
The pipe gallery internode of the present invention seals structure, simple in construction, design science, easy to use, connector is placed on the seam crossing of adjacent two sections of piping lanes, carries out welding, after having welded, it is not only able to effectively connect two sections of piping lanes, moreover it is possible to the seam crossing at adjacent piping lane forms a waterstop, it is to avoid the outside sewage inlet pipe corridor of piping lane.
Accompanying drawing explanation
Fig. 1 is present configuration schematic diagram.
Fig. 2 is cross-sectional view of the present invention.
Fig. 3 is the embodiment of the present invention 1 structural representation.
Fig. 4 is the embodiment of the present invention 2 structural representation.
Wherein, embedded board 1, connector 2.
Detailed description of the invention
Embodiment 1: a kind of pipe gallery internode attachment structure, being arranged on the junction of adjacent two section piping lane, this structure includes embedded board 1 and connector 2, and embedded board 1 is prefabricated on piping lane wall, connector 2 is arranged on the seam crossing that two sections of piping lanes connect, and connector 2 welds with embedded board 1.Connector 2 is I shape section steel ring, and the prefabricated inwall in piping lane termination of embedded board 1 is with on outer wall, and the end face of I shape section steel ring welds with the embedded board 1 on piping lane inwall, outer wall respectively with bottom surface.Connector 2 can carry out prefabricated according to piping lane form, such as circular, square or arch door shape etc., after prefabricated piping lane is transported to job site, it is linked in sequence, and connector 2 is set at the seam crossing of adjacent two sections of piping lanes, and connector 2 is welded on embedded board 1, i.e. can reach the effect connecting with sealing.
Embodiment 2: a kind of pipe gallery internode attachment structure, being arranged on the junction of adjacent two section piping lane, this structure includes embedded board 1 and connector 2, and embedded board 1 is prefabricated on piping lane wall, connector 2 is arranged on the seam crossing that two sections of piping lanes connect, and connector 2 welds with embedded board 1.Connector 2 is U-shaped steel loop, and U-shaped steel loop is arranged in the seam of two sections of piping lanes, and embedded board 1 is prefabricated on the inwall of piping lane termination, and both sides, U-shaped steel loop top are respectively welded on embedded board 1.Connector 2 can carry out prefabricated according to piping lane form, such as circular, square or arch door shape etc., after prefabricated piping lane is transported to job site, it is linked in sequence, and connector 2 is set at the seam crossing of adjacent two sections of piping lanes, and connector 2 is welded on embedded board 1, i.e. can reach the effect connecting with sealing.
Claims (3)
1. a pipe gallery internode attachment structure, it is arranged on the junction of adjacent two section piping lane, it is characterized in that this structure includes embedded board (1) and connector (2), embedded board (1) is prefabricated on piping lane wall, connector (2) is arranged on the seam crossing that two sections of piping lanes connect, and connector (2) welds with embedded board (1).
2. pipe gallery internode attachment structure as claimed in claim 1, it is characterized in that described connector (2) is I shape section steel ring, the prefabricated inwall in piping lane termination of embedded board (1) is with on outer wall, and the end face of I shape section steel ring welds with the embedded board (1) on piping lane inwall, outer wall respectively with bottom surface.
3. pipe gallery internode attachment structure as claimed in claim 1, it is characterized in that described connector (2) is U-shaped steel loop, U-shaped steel loop is arranged in the seam of two sections of piping lanes, and embedded board (1) is prefabricated on the inwall of piping lane termination, and both sides, U-shaped steel loop top are respectively welded on embedded board (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610544940.6A CN105971016A (en) | 2016-07-12 | 2016-07-12 | Utility tunnel internode connection structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610544940.6A CN105971016A (en) | 2016-07-12 | 2016-07-12 | Utility tunnel internode connection structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105971016A true CN105971016A (en) | 2016-09-28 |
Family
ID=56952938
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610544940.6A Pending CN105971016A (en) | 2016-07-12 | 2016-07-12 | Utility tunnel internode connection structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105971016A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106638679A (en) * | 2016-10-29 | 2017-05-10 | 中国十七冶集团有限公司 | Concrete pipe rack precasting connecting method |
WO2018076499A1 (en) * | 2016-10-31 | 2018-05-03 | 浙江鑫宙竹基复合材料科技有限公司 | Pipe segment connecting component suitable for comprehensive bamboo composite pipe gallery |
CN110158881A (en) * | 2019-05-28 | 2019-08-23 | 苏州美瑞德建筑装饰有限公司 | Glass guardrail mounting structure is overhang outside a kind of Zhongting |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009215720A (en) * | 2008-03-07 | 2009-09-24 | Nishimatsu Constr Co Ltd | Case body guiding device and guiding method for case body |
JP2010095932A (en) * | 2008-10-17 | 2010-04-30 | Sapporo City | Water cut-off joint |
JP2010209555A (en) * | 2009-03-09 | 2010-09-24 | Ohbayashi Corp | Packing, construction method for laying embedded form, and tunnel constructed by the construction method |
CN204753631U (en) * | 2015-07-17 | 2015-11-11 | 哈尔滨金阳光管业有限责任公司 | Piping lane is synthesized to zinc -plating screw steel pipe underground |
CN105064398A (en) * | 2015-08-19 | 2015-11-18 | 中国能源建设集团天津电力建设有限公司 | One-time overall pouring construction method for nuclear powder single-hole GD gallery |
CN205839796U (en) * | 2016-07-12 | 2016-12-28 | 中国电建集团昆明勘测设计研究院有限公司 | Utility tunnel internode connection structure |
-
2016
- 2016-07-12 CN CN201610544940.6A patent/CN105971016A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009215720A (en) * | 2008-03-07 | 2009-09-24 | Nishimatsu Constr Co Ltd | Case body guiding device and guiding method for case body |
JP2010095932A (en) * | 2008-10-17 | 2010-04-30 | Sapporo City | Water cut-off joint |
JP2010209555A (en) * | 2009-03-09 | 2010-09-24 | Ohbayashi Corp | Packing, construction method for laying embedded form, and tunnel constructed by the construction method |
CN204753631U (en) * | 2015-07-17 | 2015-11-11 | 哈尔滨金阳光管业有限责任公司 | Piping lane is synthesized to zinc -plating screw steel pipe underground |
CN105064398A (en) * | 2015-08-19 | 2015-11-18 | 中国能源建设集团天津电力建设有限公司 | One-time overall pouring construction method for nuclear powder single-hole GD gallery |
CN205839796U (en) * | 2016-07-12 | 2016-12-28 | 中国电建集团昆明勘测设计研究院有限公司 | Utility tunnel internode connection structure |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106638679A (en) * | 2016-10-29 | 2017-05-10 | 中国十七冶集团有限公司 | Concrete pipe rack precasting connecting method |
CN106638679B (en) * | 2016-10-29 | 2018-12-18 | 中国十七冶集团有限公司 | A kind of precast concrete pipe gallery connection method |
WO2018076499A1 (en) * | 2016-10-31 | 2018-05-03 | 浙江鑫宙竹基复合材料科技有限公司 | Pipe segment connecting component suitable for comprehensive bamboo composite pipe gallery |
CN110158881A (en) * | 2019-05-28 | 2019-08-23 | 苏州美瑞德建筑装饰有限公司 | Glass guardrail mounting structure is overhang outside a kind of Zhongting |
CN110158881B (en) * | 2019-05-28 | 2024-03-15 | 苏州美瑞德建筑装饰有限公司 | Atrium external cantilever glass guardrail mounting structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106049551B (en) | Utility tunnel boss seal structure | |
CN202170515U (en) | Prefabricated assembling composite pipe line with U-shaped section | |
CN204040062U (en) | Prefabricated wedge shape flexible interface assembling piping lane | |
CN205839796U (en) | Utility tunnel internode connection structure | |
CN105971016A (en) | Utility tunnel internode connection structure | |
CN105507346A (en) | Prefabricated underground pipe gallery | |
CN203514481U (en) | Inspection well | |
CN205617426U (en) | Cast -in -place bottom plate of utility tunnel and prefabricated outer panel connection structure | |
CN204312088U (en) | A kind of pin-connected panel push pipe tunnel segment structure | |
WO2017071111A1 (en) | Underground pipe gallery protection structure | |
CN204919607U (en) | City is prefab for underpass | |
CN205776401U (en) | Utility tunnel internode seal structure | |
CN205617425U (en) | Prefabricated structure of assembling of utility tunnel | |
CN203948784U (en) | Jacking pipe joints joint waterproofing structure | |
CN208136954U (en) | Precast splice type Pipe rack | |
CN204080862U (en) | With the waterproof short tube through walls of earrings | |
CN207260191U (en) | A kind of class rectangle pipe gallery section of jurisdiction connection structure | |
CN205348225U (en) | Prefabricated assembled underground pipe gallery | |
CN205776402U (en) | Utility tunnel boss seal structure | |
CN204691791U (en) | The waterproof construction of rectangular top pipe | |
CN204098067U (en) | Side's culvert formula underground pipe gallery | |
CN105971013A (en) | Pin-connected panel utility tunnel | |
CN209622218U (en) | Double spigot mouth RC pipejacking | |
CN205839814U (en) | Utility tunnel labyrinth seal structure | |
CN105908778A (en) | Comprehensive pipe rack for corrugated spiral pipe structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160928 |