CN105978008B - A flow battery energy storage system with black start function of wind field and its working method - Google Patents

A flow battery energy storage system with black start function of wind field and its working method Download PDF

Info

Publication number
CN105978008B
CN105978008B CN201510837505.8A CN201510837505A CN105978008B CN 105978008 B CN105978008 B CN 105978008B CN 201510837505 A CN201510837505 A CN 201510837505A CN 105978008 B CN105978008 B CN 105978008B
Authority
CN
China
Prior art keywords
flow battery
management system
energy storage
battery
bus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510837505.8A
Other languages
Chinese (zh)
Other versions
CN105978008A (en
Inventor
邵家云
张华民
马相坤
徐世博
韩乐聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Rongke Power Co Ltd
Original Assignee
Dalian Rongke Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Rongke Power Co Ltd filed Critical Dalian Rongke Power Co Ltd
Priority to CN201510837505.8A priority Critical patent/CN105978008B/en
Publication of CN105978008A publication Critical patent/CN105978008A/en
Application granted granted Critical
Publication of CN105978008B publication Critical patent/CN105978008B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • H02J3/386
    • H02J3/387
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/10Flexible AC transmission systems [FACTS]

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Control Of Eletrric Generators (AREA)
  • Fuel Cell (AREA)

Abstract

The invention discloses a flow battery energy storage system with a wind field black start function and a working method thereof, wherein the flow battery energy storage system comprises: a flow battery system; a first transformer; the energy storage inverter is connected with the flow battery system and the first transformer; a battery management system; the energy management system is connected with the battery management system, the energy storage inverter and the first bus; after the energy management system knows that the first bus is powered off, judging whether the current battery SOC of the redox flow battery system fed back by the battery management system meets a certain preset condition, and issuing a control instruction for entering a black start mode according to a judgment result that the current battery SOC of the redox flow battery system meets the certain preset condition; the invention can supply power to the unit without starting capability and part of loads of the wind field through the flow battery system under the condition that the power transmission recovery of other power grids cannot be relied on after the whole wind field is power-off and shutdown, thereby gradually expanding the recovery range of the system.

Description

一种具有风场黑启动功能的液流电池储能系统及其工作方法A flow battery energy storage system with black start function of wind field and its working method

技术领域technical field

本发明涉及一种液流电池技术领域,具体为一种具有风场黑启动功能的液流电池储能系统及其工作方法。The invention relates to the technical field of liquid flow batteries, in particular to a flow battery energy storage system with a wind field black start function and a working method thereof.

背景技术Background technique

液流电池具有设计灵活(功率和容量可独立设计)、使用寿命长、充放电性能好、选址自由、能量效率高、安全环保、维护费用低和易实现规模化蓄电等其它常规电池所不具备的诸多优点。实际应用时,液流电池可以广泛应用于风能、太阳能等可再生能源发电系统作为储能系统,使产生的电力能够连续稳定的输出;也可以用来对电网进行削峰填谷,将用电低谷的电力储存起来,在用电高峰时输出,以此来平衡电力供需;另外,还可以作为应急电源系统和备用电站等,被认为是最具商业化前景的储能技术之一。Liquid flow battery has the advantages of flexible design (power and capacity can be independently designed), long service life, good charge and discharge performance, free site selection, high energy efficiency, safety and environmental protection, low maintenance cost, and easy realization of large-scale storage. Many advantages not available. In practical applications, liquid flow batteries can be widely used in renewable energy power generation systems such as wind energy and solar energy as energy storage systems, so that the generated electricity can be output continuously and stably; The power in low valleys is stored and output during peak power consumption to balance power supply and demand; in addition, it can also be used as an emergency power system and backup power station, etc., which is considered to be one of the most promising energy storage technologies for commercialization.

风能作为一种新能源,目前已经获得了广泛的应用,但是,对于仅仅配置了风机设备的风力发电场来说,在整个电网系统因故障断电后,无自启动能力的风力发电机组在无法依靠电网送电恢复的情况下,将无法正常工作,从而限制了风力发电设备的大规模应用。为了有效防范类似情况,需要风力发电厂配套相应设备能够自己"黑启动"给负载独立可靠供电。黑启动是指通过具有自启动能力机组的启动,带动无自启动能力的机组,然后逐渐扩大系统的恢复范围。现有技术中的黑启动电源主要有以下几种:1)柴油发电机;2)燃气轮机;3)UPS不间断电源。但是对于柴油发电机来说,需要消耗化石燃料,不清洁环保;对于燃气轮机来说,其设备复杂,安装施工复杂,维护成本高;UPS带电时间受限于其容量和成本,不能够满足长时间在无电条件下进行黑启动的条件。As a new energy source, wind energy has been widely used at present. However, for wind farms equipped only with wind turbines, after the entire power grid system is powered off due to a fault, the wind turbines without self-starting capability cannot In the case of power grid recovery, it will not work normally, thus limiting the large-scale application of wind power generation equipment. In order to effectively prevent similar situations, it is necessary for the corresponding equipment of the wind power plant to be able to "black start" to independently and reliably supply power to the load. Black start refers to the start-up of units with self-starting ability to drive units without self-starting ability, and then gradually expand the recovery range of the system. The black starting power supply in the prior art mainly includes the following types: 1) diesel generator; 2) gas turbine; 3) UPS uninterruptible power supply. But for diesel generators, it needs to consume fossil fuels, which is not clean and environmentally friendly; for gas turbines, its equipment is complicated, installation and construction are complicated, and maintenance costs are high; UPS charging time is limited by its capacity and cost, and cannot meet long-term requirements. Conditions for black start under no power condition.

发明内容Contents of the invention

本发明针对以上问题的提出,而研制一种具有风场黑启动功能的液流电池储能系统及其工作方法。In view of the above problems, the present invention develops a flow battery energy storage system with a black-start function of a wind field and a working method thereof.

本发明的技术手段如下:Technical means of the present invention is as follows:

一种具有风场黑启动功能的液流电池储能系统,所述风场包括第一母线、第二母线、第一母线与第二母线之间的主变压器、以及与第一母线相连接的多条风机线路,所述液流电池储能系统包括:A liquid flow battery energy storage system with a black start function of a wind field, the wind field includes a first bus, a second bus, a main transformer between the first bus and the second bus, and a power transformer connected to the first bus A plurality of fan lines, the liquid flow battery energy storage system includes:

液流电池系统;所述液流电池系统包括电堆、正极储液罐、负极储液罐、循环泵和电解液循环管路;A flow battery system; the flow battery system includes an electric stack, a positive electrode liquid storage tank, a negative electrode liquid storage tank, a circulation pump, and an electrolyte circulation line;

与所述第一母线相连接的第一变压器;a first transformer connected to the first bus;

与所述液流电池系统和所述第一变压器相连接的储能逆变器;所述储能逆变器将液流电池系统输出的直流电进行逆变后通过第一变压器升压输出至所述第一母线,以及将第一母线上的交流电经过第一变压器降压后由储能逆变器进行整流输出给所述液流电池系统充电;An energy storage inverter connected to the flow battery system and the first transformer; the energy storage inverter inverts the direct current output from the flow battery system and then boosts the voltage through the first transformer and outputs it to the The first bus bar, and after the AC power on the first bus bar is stepped down by the first transformer, it is rectified and output by the energy storage inverter to charge the flow battery system;

与所述液流电池系统相连接的电池管理系统;所述电池管理系统用于监测液流电池系统的运行状态并获取运行参数;所述运行参数至少包括电池SOC;A battery management system connected to the flow battery system; the battery management system is used to monitor the operating state of the flow battery system and obtain operating parameters; the operating parameters include at least battery SOC;

与所述电池管理系统、储能逆变器和第一母线相连接的能量管理系统;所述能量管理系统在获知第一母线断电后,对电池管理系统反馈的液流电池系统当前电池SOC是否满足一定预设条件进行判断,并根据液流电池系统当前电池SOC满足一定预设条件的判断结果下发进入黑启动模式控制指令;在能量管理系统下发进入黑启动模式控制指令之后,所述储能逆变器由PQ控制模式改变为V/F控制模式,并且调整输出电压使得第一变压器升压后得到的电压满足电能质量国家标准所规定的电能质量要求;An energy management system connected to the battery management system, the energy storage inverter, and the first bus; after the energy management system learns that the first bus is powered off, the current battery SOC of the flow battery system fed back to the battery management system Whether it meets certain preset conditions is judged, and according to the judgment result that the current battery SOC of the flow battery system meets certain preset conditions, a control command to enter the black start mode is issued; after the energy management system issues a control command to enter the black start mode, all The energy storage inverter is changed from the PQ control mode to the V/F control mode, and the output voltage is adjusted so that the voltage obtained after the first transformer is boosted meets the power quality requirements stipulated in the national power quality standard;

进一步地,所述能量管理系统通过就地监控系统连接所述储能逆变器和液流电池系统;所述运行参数还包括电池电压;在所述能量管理系统下发进入黑启动模式控制指令之后,就地监控系统根据能量管理系统下发的进入黑启动模式控制指令启动液流电池系统,所述能量管理系统对电池管理系统反馈的液流电池系统当前电池电压是否大于等于预设电压进行判断,是则储能逆变器由PQ控制模式改变为V/F控制模式,并且调整输出电压使得第一变压器升压后得到的电压满足电能质量国家标准所规定的电能质量要求,否则能量管理系统对电池管理系统反馈的液流电池系统当前电池电压是否大于等于预设电压继续进行判断;Further, the energy management system is connected to the energy storage inverter and the flow battery system through an on-site monitoring system; the operating parameters also include the battery voltage; a control command to enter the black start mode is issued under the energy management system Afterwards, the on-site monitoring system starts the flow battery system according to the control command issued by the energy management system to enter the black start mode, and the energy management system checks whether the current battery voltage of the flow battery system fed back by the battery management system is greater than or equal to the preset voltage. Judgment, if yes, the energy storage inverter is changed from the PQ control mode to the V/F control mode, and the output voltage is adjusted so that the voltage obtained after the boost of the first transformer meets the power quality requirements stipulated in the national power quality standard; otherwise, the energy management The system continues to judge whether the current battery voltage of the flow battery system fed back by the battery management system is greater than or equal to the preset voltage;

进一步地,在所述储能逆变器调整输出电压使得第一变压器升压后得到的电压满足电能质量国家标准所规定的电能质量要求之后,所述风机线路中的任一风力发电机启动;所述风力发电机连接有控制装置;所述控制装置检测当前第一母线电压,并判断当前第一母线电压是否正常,是则控制所述风力发电机进行限功率运行,否则所述控制装置继续进行上述判断;Further, after the energy storage inverter adjusts the output voltage so that the voltage obtained after the boost of the first transformer meets the power quality requirements stipulated in the national power quality standard, any wind turbine in the wind turbine line is started; The wind generator is connected with a control device; the control device detects the current first bus voltage, and judges whether the current first bus voltage is normal, and if so, controls the wind generator to perform power-limited operation; otherwise, the control device continues make the above judgment;

进一步地,所述液流电池系统至少有2个,且互为备份;所述第一变压器具有两个初级线圈;每一液流电池系统经由一储能逆变器与所述第一变压器的一初级线圈相连接;当任一正在运行中的液流电池系统发生故障时,作为备份的另一液流电池系统启动并运行;Further, there are at least two liquid flow battery systems, and they are mutually backed up; the first transformer has two primary coils; each liquid flow battery system communicates with the first transformer through an energy storage inverter. A primary coil is connected; when any of the running liquid flow battery systems fails, another flow battery system as a backup starts and runs;

进一步地,所述液流电池储能系统还包括UPS和与第一母线相连接的第二变压器;第一母线未断电时,第二变压器对第一母线电压进行变换后输出电能给能量管理系统、液流电池系统、储能逆变器、就地监控系统和电池管理系统提供工作电源,第一母线断电时,由所述UPS给能量管理系统、液流电池系统、储能逆变器、就地监控系统和电池管理系统提供工作电源;Further, the liquid flow battery energy storage system also includes a UPS and a second transformer connected to the first bus; when the first bus is not powered off, the second transformer converts the voltage of the first bus and outputs electric energy for energy management system, liquid flow battery system, energy storage inverter, on-site monitoring system and battery management system to provide working power. When the first bus is powered off, the UPS will supply the energy management system, liquid flow battery The controller, on-site monitoring system and battery management system provide working power;

另外,所述风场还包括与第一母线相连接的多条负荷线路,多条负荷线路按照等级顺序分为重要负荷线路和非重要负荷线路,在控制所述风力发电机进行限功率运行之后,再运行所述风力发电机、液流电池系统和储能逆变器所构成的微网,并且在微网电压满足电能质量国家标准所规定的电能质量要求之后,按照等级顺序依次启动各重要负荷线路;In addition, the wind farm also includes multiple load lines connected to the first bus, and the multiple load lines are divided into important load lines and non-important load lines according to the order of rank. , and then run the microgrid composed of the wind generator, the liquid flow battery system and the energy storage inverter, and after the microgrid voltage meets the power quality requirements stipulated in the national power quality standard, start each important load line;

进一步地,所述风力发电机的发电功率低于液流电池额定功率的80%。Further, the power generated by the wind generator is lower than 80% of the rated power of the flow battery.

一种如上所述的一种具有风场黑启动功能的液流电池储能系统的工作方法,包括如下步骤:A working method of a liquid flow battery energy storage system with a wind field black start function as described above, comprising the following steps:

①电池管理系统监测液流电池系统的运行状态并获取运行参数,所述运行参数至少包括电池SOC,执行②;① The battery management system monitors the operating status of the flow battery system and obtains operating parameters, the operating parameters include at least the battery SOC, and executes ②;

②能量管理系统判断第一母线是否断电,是则执行③,否则返回②;②The energy management system judges whether the first bus is powered off, if yes, execute ③, otherwise return to ②;

③能量管理系统判断电池管理系统反馈的液流电池系统当前电池SOC是否满足一定预设条件,是则执行④,否则返回②;③ The energy management system judges whether the current battery SOC of the flow battery system fed back by the battery management system meets certain preset conditions, and if so, execute ④, otherwise return to ②;

④能量管理系统下发进入黑启动模式控制指令,执行⑤;④ The energy management system issues a control command to enter the black start mode, and executes ⑤;

⑤储能逆变器由PQ控制模式改变为V/F控制模式,并且调整输出电压使得第一变压器升压后得到的电压满足电能质量国家标准所规定的电能质量要求;⑤ The energy storage inverter is changed from the PQ control mode to the V/F control mode, and the output voltage is adjusted so that the voltage obtained after the boost of the first transformer meets the power quality requirements stipulated in the national power quality standards;

进一步地,所述运行参数还包括电池电压;所述工作方法在步骤④和步骤⑤之间还具有如下步骤:Further, the operating parameters also include the battery voltage; the working method also has the following steps between step ④ and step ⑤:

启动液流电池系统;Start the flow battery system;

能量管理系统对电池管理系统反馈的液流电池系统当前电池电压是否大于等于预设电压进行判断,是则执行⑤,否则能量管理系统对电池管理系统反馈的液流电池系统当前电池电压是否大于等于预设电压继续进行判断;The energy management system judges whether the current battery voltage of the flow battery system fed back by the battery management system is greater than or equal to the preset voltage. The preset voltage continues to judge;

进一步地,所述工作方法在步骤⑤之后还具有如下步骤:Further, the working method also has the following steps after step 5.:

启动所述风机线路中的任一风力发电机;start any wind generator in the fan line;

控制装置检测当前第一母线电压,并判断当前第一母线电压是否正常,是则控制所述风力发电机进行限功率运行,否则继续对当前第一母线电压是否正常进行判断。The control device detects the current first bus voltage and judges whether the current first bus voltage is normal, and if so, controls the wind turbine to perform power-limited operation; otherwise, continues to judge whether the current first bus voltage is normal.

由于采用了上述技术方案,本发明提供的一种具有风场黑启动功能的液流电池储能系统及其工作方法,能够在整个风场失电停运后,在无法依靠其它电网送电恢复的条件下,直接通过液流电池系统为风场无启动能力的机组和部分负荷供电,进而逐步逐级扩大风电系统的恢复范围,最终实现整个风场系统供电的恢复;由于无需额外配置柴油发电机、燃气轮机或UPS等启动电源及相应辅助设备,无需对风场储能系统和结构进行改进,该系统与现有技术相比,具有结构简单、成本大幅度降低、启动速度快,储能系统利用率高等一系列优点。Due to the adoption of the above technical solution, the present invention provides a liquid flow battery energy storage system with a black start function for wind farms and its working method, which can restore power when the entire wind farm loses power and cannot rely on other grids for power transmission. Under certain conditions, the flow battery system can directly supply power to the units and partial loads in the wind farm without starting capability, and then gradually expand the recovery range of the wind power system step by step, and finally realize the restoration of the power supply of the entire wind farm system; since there is no need to configure additional diesel generators There is no need to improve the energy storage system and structure of the wind field. Compared with the existing technology, the system has simple structure, greatly reduced cost, and fast start-up speed. The energy storage system A series of advantages such as high utilization rate.

附图说明Description of drawings

图1是本发明所述液流电池储能系统的结构示意图;Fig. 1 is a schematic structural view of the flow battery energy storage system of the present invention;

图2是本发明风场示例的结构示意图;Fig. 2 is the structural representation of wind field example of the present invention;

图3是本发明能量管理系统、就地监控系统、电池管理系统、储能逆变器和液流电池系统之间的连接示意图;Fig. 3 is a schematic diagram of the connection among the energy management system, the on-site monitoring system, the battery management system, the energy storage inverter and the flow battery system of the present invention;

图4是本发明所述工作方法的流程图;Fig. 4 is the flowchart of working method described in the present invention;

图中:1、第一母线,2、第一变压器,3、储能逆变器,4、液流电池系统,5、第二变压器,6、UPS,7、第二母线,8、1号风机线路,9、2号风机线路,10、3号风机线路,11、主变压器,12、1号负荷线路,13、2号负荷线路,14、PT线,15、SVG线路。In the figure: 1. First busbar, 2. First transformer, 3. Energy storage inverter, 4. Liquid flow battery system, 5. Second transformer, 6. UPS, 7. Second busbar, 8, No. 1 Fan line, No. 9, No. 2 fan line, No. 10, No. 3 fan line, 11, main transformer, 12, No. 1 load line, 13, No. 2 load line, 14, PT line, 15, SVG line.

具体实施方式Detailed ways

如图1、图2和图3所示的一种具有风场黑启动功能的液流电池储能系统,所述风场包括第一母线1、第二母线7、第一母线1与第二母线7之间的主变压器11、以及与第一母线1相连接的多条风机线路,所述液流电池储能系统包括:液流电池系统4;所述液流电池系统4包括电堆、正极储液罐、负极储液罐、循环泵和电解液循环管路;与所述第一母线1相连接的第一变压器2;与所述液流电池系统4和所述第一变压器2相连接的储能逆变器3;所述储能逆变器3将液流电池系统4输出的直流电进行逆变后通过第一变压器2升压输出至所述第一母线1,以及将第一母线1上的交流电经过第一变压器2降压后由储能逆变器3进行整流输出给所述液流电池系统4充电;与所述液流电池系统4相连接的电池管理系统;所述电池管理系统用于监测液流电池系统4的运行状态并获取运行参数;所述运行参数至少包括电池SOC;与所述电池管理系统、储能逆变器3和第一母线1相连接的能量管理系统;所述能量管理系统在获知第一母线1断电后,对电池管理系统反馈的液流电池系统4当前电池SOC是否满足一定预设条件进行判断,并根据液流电池系统4当前电池SOC满足一定预设条件的判断结果下发进入黑启动模式控制指令;在能量管理系统下发进入黑启动模式控制指令之后,所述储能逆变器3由PQ控制模式改变为V/F控制模式,并且调整输出电压使得第一变压器2升压后得到的电压满足电能质量国家标准所规定的电能质量要求;进一步地,所述能量管理系统通过就地监控系统连接所述储能逆变器3和液流电池系统4;所述运行参数还包括电池电压;在所述能量管理系统下发进入黑启动模式控制指令之后,就地监控系统根据能量管理系统下发的进入黑启动模式控制指令启动液流电池系统4,所述能量管理系统对电池管理系统反馈的液流电池系统4当前电池电压是否大于等于预设电压进行判断,是则储能逆变器3由PQ控制模式改变为V/F控制模式,并且调整输出电压使得第一变压器2升压后得到的电压满足电能质量国家标准所规定的电能质量要求,否则能量管理系统对电池管理系统反馈的液流电池系统当前电池电压是否大于等于预设电压继续进行判断;进一步地,在所述储能逆变器3调整输出电压使得第一变压器2升压后得到的电压满足电能质量国家标准所规定的电能质量要求之后,所述风机线路中的任一风力发电机启动;所述风力发电机连接有控制装置;所述控制装置检测当前第一母线电压,并判断当前第一母线电压是否正常,是则控制所述风力发电机进行限功率运行,否则所述控制装置继续进行上述判断;进一步地,所述液流电池系统4至少有2个,且互为备份;所述第一变压器2具有两个初级线圈;每一液流电池系统4经由一储能逆变器3与所述第一变压器2的一初级线圈相连接;当任一正在运行中的液流电池系统4发生故障时,作为备份的另一液流电池系统启动并运行;进一步地,所述液流电池储能系统还包括UPS6和与第一母线1相连接的第二变压器5;第一母线1未断电时,第二变压器5对第一母线1电压进行变换后输出电能给能量管理系统、液流电池系统4、储能逆变器3、就地监控系统和电池管理系统提供工作电源,第一母线1断电时,由所述UPS6给能量管理系统、液流电池系统4、储能逆变器3、就地监控系统和电池管理系统提供工作电源;另外,所述风场还包括与第一母线1相连接的多条负荷线路,多条负荷线路按照等级顺序分为重要负荷线路和非重要负荷线路,在控制所述风力发电机进行限功率运行之后,再运行所述风力发电机、液流电池系统4和储能逆变器3所构成的微网,并且在微网电压满足电能质量国家标准所规定的电能质量要求之后,按照等级顺序依次启动各重要负荷线路;进一步地,所述风力发电机的发电功率低于液流电池额定功率的80%。As shown in Fig. 1, Fig. 2 and Fig. 3, a liquid flow battery energy storage system with a black start function of a wind field, the wind field includes a first bus 1, a second bus 7, a first bus 1 and a second The main transformer 11 between the busbars 7 and a plurality of fan lines connected to the first busbar 1, the liquid flow battery energy storage system includes: a liquid flow battery system 4; the liquid flow battery system 4 includes an electric stack, Positive electrode liquid storage tank, negative electrode liquid storage tank, circulation pump and electrolyte circulation pipeline; first transformer 2 connected to the first bus bar 1; connected to the flow battery system 4 and the first transformer 2 A connected energy storage inverter 3; the energy storage inverter 3 inverts the DC power output by the flow battery system 4 and then boosts the voltage through the first transformer 2 and outputs it to the first bus bar 1, and converts the first The alternating current on the bus 1 is stepped down by the first transformer 2 and then rectified by the energy storage inverter 3 to charge the flow battery system 4; the battery management system connected to the flow battery system 4; the The battery management system is used to monitor the operating state of the liquid flow battery system 4 and obtain operating parameters; the operating parameters include at least the battery SOC; the energy connected to the battery management system, the energy storage inverter 3 and the first bus 1 management system; the energy management system judges whether the current battery SOC of the flow battery system 4 fed back by the battery management system satisfies certain preset conditions after learning that the first bus 1 is powered off, and according to the current battery SOC of the flow battery system 4 The judgment result that the SOC satisfies certain preset conditions issues a control command to enter the black start mode; after the energy management system issues the control command to enter the black start mode, the energy storage inverter 3 changes from the PQ control mode to the V/F control mode mode, and adjust the output voltage so that the voltage obtained after the boost of the first transformer 2 meets the power quality requirements stipulated in the national power quality standards; furthermore, the energy management system is connected to the energy storage inverter through an on-site monitoring system 3 and the liquid flow battery system 4; the operating parameters also include the battery voltage; after the energy management system issues a control command to enter the black start mode, the on-site monitoring system issues a control command to enter the black start mode according to the energy management system Start the flow battery system 4, and the energy management system judges whether the current battery voltage of the flow battery system 4 fed back by the battery management system is greater than or equal to the preset voltage, and if so, the energy storage inverter 3 changes from the PQ control mode to V /F control mode, and adjust the output voltage so that the voltage obtained after the boost of the first transformer 2 meets the power quality requirements stipulated in the national power quality standard, otherwise the energy management system will check whether the current battery voltage of the flow battery system fed back by the battery management system is It is greater than or equal to the preset voltage and continue to judge; further, after the energy storage inverter 3 adjusts the output voltage so that the voltage obtained after the first transformer 2 is boosted meets the power quality requirements stipulated in the national power quality standard, the Any wind generator in the fan line is started; the wind generator is connected with a control device; the control device detects the current first bus voltage and judges whether the current first bus voltage is normal Usually, if yes, control the wind generator to perform power-limited operation; otherwise, the control device continues to make the above judgment; further, there are at least two of the flow battery systems 4, and they are mutually backup; the first transformer 2 has two primary coils; each liquid flow battery system 4 is connected to a primary coil of the first transformer 2 via an energy storage inverter 3; when any running liquid flow battery system 4 fails , as a backup, another flow battery system starts and runs; further, the flow battery energy storage system also includes a UPS6 and a second transformer 5 connected to the first bus 1; the first bus 1 is not powered off , the second transformer 5 converts the voltage of the first bus 1 and outputs electric energy to provide working power for the energy management system, the liquid flow battery system 4, the energy storage inverter 3, the on-site monitoring system and the battery management system, and the first bus 1. When the power is cut off, the UPS6 provides working power for the energy management system, the liquid flow battery system 4, the energy storage inverter 3, the local monitoring system and the battery management system; in addition, the wind farm also includes the first The multiple load lines connected to the bus 1 are divided into important load lines and non-important load lines according to the order of rank. The micro-grid composed of the flow battery system 4 and the energy storage inverter 3, and after the micro-grid voltage meets the power quality requirements stipulated in the national power quality standard, each important load line is sequentially started in order of rank; further, the The wind turbines generate less than 80 percent of the flow battery's rated power.

如图1至图4所示的一种如上所述的一种具有风场黑启动功能的液流电池储能系统的工作方法,包括如下步骤:As shown in Figures 1 to 4, a working method of a flow battery energy storage system with a wind field black start function as described above includes the following steps:

①电池管理系统监测液流电池系统4的运行状态并获取运行参数,所述运行参数至少包括电池SOC,执行②;① The battery management system monitors the operating state of the flow battery system 4 and obtains operating parameters, the operating parameters include at least the battery SOC, and executes ②;

②能量管理系统判断第一母线1是否断电,是则执行③,否则返回②;②The energy management system judges whether the first bus 1 is powered off, if yes, execute ③, otherwise return to ②;

③能量管理系统判断电池管理系统反馈的液流电池系统4当前电池SOC是否满足一定预设条件,是则执行④,否则返回②;③ The energy management system judges whether the current battery SOC of the flow battery system 4 fed back by the battery management system meets certain preset conditions, and if so, execute ④, otherwise return to ②;

④能量管理系统下发进入黑启动模式控制指令,执行⑤;④ The energy management system issues a control command to enter the black start mode, and executes ⑤;

⑤储能逆变器3由PQ控制模式改变为V/F控制模式,并且调整输出电压使得第一变压器2升压后得到的电压满足电能质量国家标准所规定的电能质量要求;⑤ The energy storage inverter 3 is changed from the PQ control mode to the V/F control mode, and the output voltage is adjusted so that the voltage obtained after the boost of the first transformer 2 meets the power quality requirements stipulated in the national power quality standards;

进一步地,所述运行参数还包括电池电压;所述工作方法在步骤④和步骤⑤之间还具有如下步骤:Further, the operating parameters also include the battery voltage; the working method also has the following steps between step ④ and step ⑤:

启动液流电池系统4;Start the flow battery system 4;

能量管理系统对电池管理系统反馈的液流电池系统4当前电池电压是否大于等于预设电压进行判断,是则执行⑤,否则能量管理系统对电池管理系统反馈的液流电池系统4当前电池电压是否大于等于预设电压继续进行判断;The energy management system judges whether the current battery voltage of the flow battery system 4 fed back by the battery management system is greater than or equal to the preset voltage. If it is greater than or equal to the preset voltage, continue to judge;

进一步地,所述工作方法在步骤⑤之后还具有如下步骤:Further, the working method also has the following steps after step 5.:

启动所述风机线路中的任一风力发电机;start any wind generator in the fan line;

控制装置检测当前第一母线1电压,并判断当前第一母线1电压是否正常,是则控制所述风力发电机进行限功率运行,否则继续对当前第一母线1电压是否正常进行判断。The control device detects the current voltage of the first bus 1 and judges whether the current voltage of the first bus 1 is normal, and if so, controls the wind turbine to perform power-limited operation; otherwise, continues to judge whether the current voltage of the first bus 1 is normal.

本发明所述风场还包括与第一母线1相连接的PT线14和SVG线路15;其中,负荷线路包括风场内负载、风机箱变、应急照明等;PT线14主要用于检同期或检无压;SVG线路15主要补偿系统无功功率,提供功率因数,维持第一母线1电压,加强系统电压稳定性。本发明所述能量管理系统在获知第一母线1断电后,对电池管理系统反馈的液流电池系统当前电池SOC是否满足一定预设条件进行判断;所述一定预设条件为>2%;所述能量管理系统还对电池管理系统反馈的液流电池系统当前电池电压是否大于等于预设电压进行判断,这里的预设电压为储能逆变器3的工作启动电压;所述电解液循环管路包括管路、以及安装在管路上的电动阀门、流量传感器、压力传感器和温度传感器等。本发明在能量管理系统下发进入黑启动模式控制指令之后,所述储能逆变器3由PQ控制模式改变为V/F控制模式,并且调整输出电压使得第一变压器2升压后得到的电压满足电能质量国家标准所规定的电能质量要求,另外,在控制所述风力发电机进行限功率运行之后,再运行所述风力发电机、液流电池系统4和储能逆变器3所构成的微网,并且在微网电压满足电能质量国家标准所规定的电能质量要求之后,按照等级顺序依次启动各重要负荷线路,这里的电能质量国家标准具体可以为《GB/T 12325-2008电能质量供电电压偏差》和《GB/T14549-1993电能质量公用电网谐波》,本发明在控制所述风力发电机进行限功率运行之后,再运行所述风力发电机、液流电池系统4和储能逆变器3所构成的微网,下面简要描述所述微网建立并运行的过程,当风速超过风力发电机的切入风速时,浆距控制器调节叶片浆距角使风力发电机启动,当风力发电机的转速接近于同步转速时,励磁调节器工作,向风力发电机提供励磁,调节励磁电流大小使风力发电机的电压接近于微网电压,风机变流器检测微网参数是否满足并网条件,调整风力发电机的参数,确保与微网同频同相同压;并网后,通过调节励磁电流逐渐增大风力发电机的并网功率,同时监测微网电压和频率的幅值变化,在微网电压处于一定波动范围内之后,按照等级顺序依次启动各重要负荷线路;其中的浆距控制器、励磁调节器和风机变流器在控制装置判断当前第一母线1电压正常之后启动;所述控制装置判断当前的第一母线1电压是否正常,具体可以为判断当前第一母线电压的频率和相位是否与第一母线电压正常供电时的频率和相位一致,判断当前第一母线电压的幅值是否为第一母线正常供电时的电压±预设波动范围,这里的预设波动范围可以为10%,本发明的液流电池系统4可以有2个,且互为备份,每一液流电池系统4均包括电堆、正极储液罐、负极储液罐、循环泵和电解液循环管路;两个液流电池系统彼此之间电路、液路相互独立,且能够单独被调度,当其中一液流电池系统发生故障时,另外的一液流电池系统能够继续运行,提高了储能系统的利用率;所述第一变压器2可以采用双分裂变压器;液流电池系统4经由储能逆变器3、第一变压器2连接至第一母线1;能量管理系统与就地监控系统之间、以及就地监控系统与电池管理系统之间采用MODBUS_TCP通讯协议;就地监控系统与储能逆变器3之间采用CAN总线实现通讯;本发明所述控制装置用于检测当前第一母线电压的幅值、频率和相位,并用于判断当前第一母线电压的幅值、频率和相位是否与第一母线电压正常时的幅值、频率和相位一致,以及当当前第一母线电压的幅值、频率和相位与第一母线电压正常时的幅值、频率和相位一致时用于控制所述风力发电机进行限功率运行,当当前第一母线电压的幅值、频率和相位与第一母线电压正常时的幅值、频率和相位不一致时用于继续对当前第一母线电压的幅值、频率和相位是否与第一母线电压正常时的幅值、频率和相位一致进行判断;所述控制装置与各风机线路和第一母线1相连接;各风机线路中含有风力发电机。The wind field of the present invention also includes a PT line 14 and an SVG line 15 connected to the first bus 1; wherein, the load line includes loads in the wind field, wind box substations, emergency lighting, etc.; the PT line 14 is mainly used for checking the synchronization Or check for no voltage; the SVG line 15 mainly compensates system reactive power, provides power factor, maintains the voltage of the first bus 1, and strengthens the system voltage stability. The energy management system of the present invention judges whether the current battery SOC of the flow battery system fed back by the battery management system satisfies a certain preset condition after learning that the first bus 1 is powered off; the certain preset condition is >2%; The energy management system also judges whether the current battery voltage of the liquid flow battery system fed back by the battery management system is greater than or equal to a preset voltage, where the preset voltage is the working start voltage of the energy storage inverter 3; the electrolyte circulation The pipeline includes pipelines, electric valves, flow sensors, pressure sensors and temperature sensors installed on the pipelines. In the present invention, after the energy management system issues a control command to enter the black start mode, the energy storage inverter 3 is changed from the PQ control mode to the V/F control mode, and the output voltage is adjusted so that the first transformer 2 is boosted. The voltage meets the power quality requirements stipulated in the national power quality standard. In addition, after controlling the wind power generator to perform power-limited operation, then run the wind power generator, the liquid flow battery system 4 and the energy storage inverter 3. The microgrid, and after the microgrid voltage meets the power quality requirements stipulated in the national power quality standard, each important load line is started in sequence according to the order. The national power quality standard here can be "GB/T 12325-2008 power quality Power Supply Voltage Deviation" and "GB/T14549-1993 Power Quality Public Power Grid Harmonics", the present invention controls the wind power generator to perform power-limited operation, and then operates the wind power generator, liquid flow battery system 4 and energy storage The microgrid constituted by the inverter 3, the process of establishing and running the microgrid is briefly described below. When the wind speed exceeds the cut-in wind speed of the wind turbine, the pitch controller adjusts the pitch angle of the blades to start the wind turbine. When the speed of the wind generator is close to the synchronous speed, the excitation regulator works to provide excitation to the wind generator, adjust the excitation current to make the voltage of the wind generator close to the microgrid voltage, and the wind turbine converter detects whether the microgrid parameters meet and According to the grid conditions, adjust the parameters of the wind turbine to ensure the same frequency and voltage as the microgrid; after grid connection, gradually increase the grid-connected power of the wind turbine by adjusting the excitation current, and monitor the amplitude changes of the microgrid voltage and frequency , after the microgrid voltage is within a certain fluctuation range, the important load lines are started sequentially according to the order of levels; among them, the pitch controller, excitation regulator and fan converter are started after the control device judges that the current voltage of the first bus 1 is normal The control device judges whether the current voltage of the first bus 1 is normal, specifically, it can judge whether the frequency and phase of the current first bus voltage are consistent with the frequency and phase when the first bus voltage is normally powered, and judge the current first bus voltage Whether the amplitude is the voltage ± preset fluctuation range when the first bus is normally powered, the preset fluctuation range here can be 10%, and the flow battery system 4 of the present invention can have two, and they are mutually backed up, each The flow battery system 4 includes an electric stack, a positive electrode liquid storage tank, a negative electrode liquid storage tank, a circulation pump, and an electrolyte circulation pipeline; the circuits and liquid circuits of the two flow battery systems are independent of each other, and can be dispatched independently , when one of the flow battery systems fails, the other flow battery system can continue to operate, which improves the utilization rate of the energy storage system; the first transformer 2 can be a double-split transformer; the flow battery system 4 via The energy storage inverter 3 and the first transformer 2 are connected to the first bus 1; the MODBUS_TCP communication protocol is adopted between the energy management system and the on-site monitoring system, and between the on-site monitoring system and the battery management system; the on-site monitoring system and the CAN bus is used to realize communication between energy storage inverters 3; The control device is used to detect the amplitude, frequency and phase of the current first bus voltage, and to judge whether the amplitude, frequency and phase of the current first bus voltage are consistent with the amplitude, frequency and phase of the first bus voltage when it is normal, And when the amplitude, frequency and phase of the current first bus voltage are consistent with the amplitude, frequency and phase of the first bus voltage when it is normal, it is used to control the wind turbine to perform power-limited operation, when the current first bus voltage When the amplitude, frequency and phase are inconsistent with the amplitude, frequency and phase of the first bus voltage when it is normal, it is used to continue to check whether the amplitude, frequency and phase of the current first bus voltage are consistent with the amplitude, frequency and phase of the first bus voltage when it is normal. The frequency and phase are consistent to judge; the control device is connected to each fan circuit and the first bus 1; each fan circuit contains a wind generator.

本发明所述能量管理系统在获知第一母线1是否断电的同时,还检测储能逆变器3交流侧电压是否为零,以及检测主变压器11高压侧交流电压是否为零,在获知第一母线1断电、储能逆变器3交流侧电压为零、以及检测主变压器11高压侧交流电压为零之后,对电池管理系统反馈的液流电池系统4当前电池SOC是否满足一定预设条件进行判断,并根据液流电池系统4当前电池SOC满足一定预设条件的判断结果下发进入黑启动模式控制指令;本发明所述风力发电机的发电功率低于液流电池额定功率的80%,因为当风力发电机的发电功率大于液流电池额定功率时,此时微网电压的频率和幅值波动很大,远超过电能质量国家标准所规定的电能质量要求,风机变流器由于低电压穿越保护退出;逐渐风力发电机的发电功率,监测微网电压的电能质量,当风力发电机的发电功率小于液流电池额定功率的80%,此时微网电压的幅值和频率输出稳定,满足电能质量国家标准所规定的电能质量要求。The energy management system of the present invention not only knows whether the first bus 1 is powered off, but also detects whether the voltage on the AC side of the energy storage inverter 3 is zero, and detects whether the AC voltage on the high voltage side of the main transformer 11 is zero. After a bus 1 is powered off, the voltage on the AC side of the energy storage inverter 3 is zero, and the AC voltage on the high voltage side of the main transformer 11 is detected to be zero, whether the current battery SOC of the flow battery system 4 fed back by the battery management system meets a certain preset Conditions are judged, and according to the judgment result that the current battery SOC of the flow battery system 4 satisfies a certain preset condition, a control command for entering the black start mode is issued; %, because when the power generated by the wind turbine is greater than the rated power of the flow battery, the frequency and amplitude of the microgrid voltage fluctuate greatly, far exceeding the power quality requirements stipulated in the national power quality standard. Low-voltage ride-through protection exits; gradually the generated power of the wind turbine monitors the power quality of the microgrid voltage. When the generated power of the wind turbine is less than 80% of the rated power of the liquid flow battery, the amplitude and frequency of the microgrid voltage output Stable, meeting the power quality requirements stipulated in the national power quality standard.

本发明具有黑启动功能的风场内设备断电顺序符合电力规范要求即先断负荷再断电源的原则;如图2所示,在第一母线1断电后,首先依次断开各风机线路与第一母线1之间的连接,具体地,风场包括1号风机线路8、2号风机线路9和3号风机线路10,1号风机线路8通过开关S1与第一母线1相连,2号风机线路9通过开关S2与第一母线1相连,3号风机线路10通过开关S3与第一母线1相连,则依次断开开关S1、开关S2和开关S3,在各风机线路与第一母线1之间的连接断开之后,再依次断开各负荷线路与第一母线1之间的连接,具体地,风场包括1号负荷线路12、2号负荷线路13,1号负荷线路12通过开关S4与第一母线1相连,2号负荷线路13通过开关S5与第一母线1相连,则依次断开开关S4、开关S5,在各负荷线路与第一母线1之间的连接断开之后,然后断开前述PT线14、SVG线路15与第一母线1之间的连接,具体地,PT线14与第一母线1之间通过开关S6连接,SVG线路15与第一母线1之间通过开关S7连接,则依次断开开关S6、S7,最后断开第一母线1与主变压器11之间的连接,具体地,断开开关S8。The power-off sequence of the equipment in the wind field with the black start function of the present invention meets the requirements of the electric power specification, that is, the principle of first breaking the load and then the power supply; as shown in Figure 2, after the first bus 1 is powered off, firstly disconnect the lines of each fan The connection with the first bus 1, specifically, the wind field includes No. 1 fan line 8, No. 2 fan line 9 and No. 3 fan line 10. No. 1 fan line 8 is connected to the first bus 1 through switch S1, The No. fan line 9 is connected to the first bus 1 through the switch S2, and the No. 3 fan line 10 is connected to the first bus 1 through the switch S3, then the switch S1, the switch S2 and the switch S3 are turned off in turn, and each fan line is connected to the first bus. After the connection between 1 is disconnected, the connection between each load line and the first bus 1 is disconnected in turn. Specifically, the wind farm includes No. 1 load line 12 and No. 2 load line 13, and No. 1 load line 12 passes through The switch S4 is connected to the first bus 1, and the No. 2 load line 13 is connected to the first bus 1 through the switch S5, then the switches S4 and S5 are turned off in turn, and after the connection between each load line and the first bus 1 is disconnected , and then disconnect the connection between the aforementioned PT line 14, SVG line 15 and the first bus bar 1, specifically, the connection between the PT line 14 and the first bus bar 1 through switch S6, and the connection between the SVG line 15 and the first bus bar 1 If the connection is made through the switch S7, the switches S6 and S7 are turned off in turn, and finally the connection between the first bus 1 and the main transformer 11 is turned off, specifically, the switch S8 is turned off.

本发明提供的一种具有风场黑启动功能的液流电池储能系统及其工作方法,能够在整个风场失电停运后,在无法依靠其它电网送电恢复的条件下,直接通过液流电池系统为风场无启动能力的机组和部分负荷供电,进而逐步逐级扩大风电系统的恢复范围,最终实现整个风场系统供电的恢复;由于无需额外配置柴油发电机、燃气轮机或UPS等启动电源及相应辅助设备,无需对风场储能系统和结构进行改进,该系统与现有技术相比,具有结构简单、成本大幅度降低、启动速度快,储能系统利用率高等一系列优点。The invention provides a liquid flow battery energy storage system with a black start function of a wind farm and its working method, which can directly pass through the liquid flow battery under the condition that it cannot rely on other power grids to restore power after the entire wind farm loses power and shuts down. The flow battery system supplies power to the wind farm's non-startable units and partial loads, and then gradually expands the recovery range of the wind power system step by step, and finally realizes the restoration of the power supply of the entire wind farm system; since there is no need to configure additional diesel generators, gas turbines or UPS to start The power supply and corresponding auxiliary equipment do not need to improve the energy storage system and structure of the wind farm. Compared with the existing technology, this system has a series of advantages such as simple structure, greatly reduced cost, fast start-up speed, and high utilization rate of the energy storage system.

以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,根据本发明的技术方案及其发明构思加以等同替换或改变,都应涵盖在本发明的保护范围之内。The above is only a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto, any person familiar with the technical field within the technical scope disclosed in the present invention, according to the technical solution of the present invention Any equivalent replacement or change of the inventive concepts thereof shall fall within the protection scope of the present invention.

Claims (7)

1. a kind of redox flow battery energy storage system with wind field black starting-up function, the wind field include the first bus, the second bus, Main transformer between first bus and the second bus and a plurality of blower route being connected with the first bus, feature exist Include in the redox flow battery energy storage system:
Flow battery system;The flow battery system includes pile, positive fluid reservoir, cathode fluid reservoir, circulating pump and electrolysis Liquid circulation line;
The first transformer being connected with first bus;
The energy storage inverter being connected with the flow battery system and first transformer;The energy storage inverter is by liquid stream The direct current of battery system output carries out after inversion through the boosting output of the first transformer to first bus, and by first Alternating current on bus carries out rectification output to the flow battery system by energy storage inverter after the first transformer pressure-reducing Charging;
The battery management system being connected with the flow battery system;The battery management system is for monitoring flow battery system The operating status of system simultaneously obtains operating parameter;The operating parameter includes at least battery SOC;
The Energy Management System being connected with the battery management system, energy storage inverter and the first bus;The energy management Whether system meets the flow battery system present battery SOC of battery management system feedback after knowing the power-off of the first bus Certain predetermined condition is judged, and meets the judging result of certain predetermined condition according to flow battery system present battery SOC It issues and enters black starting-up mode control instruction;It issues in Energy Management System into after black starting-up mode control instruction, it is described Energy storage inverter changes into V/F control model by PQ control model, and adjust output voltage make the first transformer boost after Obtained voltage meets the power quality requirement of power quality national standard defined;
The Energy Management System connects the energy storage inverter and flow battery system by monitoring system on the spot;The operation Parameter further includes cell voltage;It issues in the Energy Management System into after black starting-up mode control instruction, monitors on the spot System starts flow battery system, the energy management according to the black starting-up mode control instruction that enters that Energy Management System issues System judges whether the flow battery system current battery level that battery management system is fed back is more than or equal to predeterminated voltage, It is that energy storage inverter changes into V/F control model by PQ control model, and adjusts output voltage and make the first transformer liter The voltage obtained after pressure meets the power quality requirement of power quality national standard defined, and otherwise Energy Management System is to battery Whether the flow battery system current battery level of management system feedback, which is more than or equal to predeterminated voltage, continues to judge;
The redox flow battery energy storage system further includes UPS and the second transformer for being connected with the first bus;First bus does not break When electric, the second transformer exports electric energy to Energy Management System, flow battery system, storage after converting to the first busbar voltage Energy inverter, on the spot monitoring system and battery management system provide working power, when the first bus powers off, by the UPS to energy Management system, flow battery system, energy storage inverter, on the spot monitoring system and battery management system offer working power are provided.
2. a kind of redox flow battery energy storage system with wind field black starting-up function according to claim 1, it is characterised in that The voltage obtained after energy storage inverter adjustment output voltage makes the first transformer boost meets power quality country mark Any wind-driven generator starting after the power quality of quasi- defined requires, in the blower route;The wind-driven generator It is connected with control device;The control device detects current first busbar voltage, and whether just to judge current first busbar voltage It often, is to control the wind-driven generator to carry out limit Power operation, otherwise the control device continues above-mentioned judgement.
3. a kind of redox flow battery energy storage system with wind field black starting-up function according to claim 1, it is characterised in that The flow battery system at least 2, and be mutually backups;There are two primary coils for the first transformer tool;Each liquid stream Battery system is connected via an energy storage inverter with a primary coil of first transformer;When in any be currently running When flow battery system breaks down, another flow battery system as backup starts and runs.
4. a kind of redox flow battery energy storage system with wind field black starting-up function according to claim 2, the wind field is also Including a plurality of charge circuit being connected with the first bus, a plurality of charge circuit according to hierarchal order be divided into important load route and Insignificant charge circuit, it is characterised in that carry out limit Power operation and then the operation wind controlling the wind-driven generator The microgrid that power generator, flow battery system and energy storage inverter are constituted, and meet power quality country in microgrid voltage After the power quality of prescribed by standard requires, successively start each important load route according to hierarchal order.
5. a kind of redox flow battery energy storage system with wind field black starting-up function according to claim 2, it is characterised in that The generated output of the wind-driven generator is lower than the 80% of flow battery rated power.
6. a kind of a kind of work side of the redox flow battery energy storage system with wind field black starting-up function as described in claim 1 Method, it is characterised in that the working method includes the following steps:
1. the operating status of battery management system monitoring flow battery system simultaneously obtains operating parameter, the operating parameter is at least wrapped Battery SOC is included, is executed 2.;
2. Energy Management System judges whether the first bus powers off, it is, executes 3., otherwise returns 2.;
3. it is certain pre- that Energy Management System judges whether the flow battery system present battery SOC of battery management system feedback meets If condition is, execute 4., otherwise returns 2.;
4. Energy Management System is issued into black starting-up mode control instruction, execute 5.;
5. energy storage inverter changes into V/F control model by PQ control model, and adjusts output voltage and make the first transformer The voltage obtained after boosting meets the power quality requirement of power quality national standard defined;
Wherein, the operating parameter further includes cell voltage;The working method step 4. and step 5. between also have such as Lower step:Start flow battery system;The flow battery system present battery that Energy Management System feeds back battery management system Whether voltage, which is more than or equal to predeterminated voltage, is judged, is to execute 5., otherwise Energy Management System is anti-to battery management system Whether the flow battery system current battery level of feedback, which is more than or equal to predeterminated voltage, continues to judge;The flow battery energy storage System further includes UPS and the second transformer for being connected with the first bus;When first bus does not power off, the second transformer is to first Busbar voltage exports electric energy to Energy Management System, flow battery system, energy storage inverter, on the spot monitoring system after being converted Working power is provided with battery management system, when the first bus powers off, by the UPS to Energy Management System, flow battery system System, energy storage inverter, on the spot monitoring system and battery management system provide working power.
7. a kind of working method of redox flow battery energy storage system with wind field black starting-up function according to claim 6, It is characterized in that 5. the working method also has following steps in step later:
Start any wind-driven generator in the blower route;
Control device detects current first busbar voltage, and judges whether current first busbar voltage is normal, is described in then control Wind-driven generator carries out limit Power operation, otherwise continues whether to be normally carried out judgement to current first busbar voltage.
CN201510837505.8A 2015-11-26 2015-11-26 A flow battery energy storage system with black start function of wind field and its working method Active CN105978008B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510837505.8A CN105978008B (en) 2015-11-26 2015-11-26 A flow battery energy storage system with black start function of wind field and its working method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510837505.8A CN105978008B (en) 2015-11-26 2015-11-26 A flow battery energy storage system with black start function of wind field and its working method

Publications (2)

Publication Number Publication Date
CN105978008A CN105978008A (en) 2016-09-28
CN105978008B true CN105978008B (en) 2018-11-23

Family

ID=56988437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510837505.8A Active CN105978008B (en) 2015-11-26 2015-11-26 A flow battery energy storage system with black start function of wind field and its working method

Country Status (1)

Country Link
CN (1) CN105978008B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106451562A (en) * 2016-12-16 2017-02-22 北京索英电气技术有限公司 Black-start system and method for wind and light power storage station
CN106652698B (en) * 2017-01-24 2019-04-30 湖南德沃普新能源有限公司 A kind of teaching demonstration system applied suitable for all-vanadium flow battery in field of renewable energy and method
CN107482661B (en) * 2017-09-07 2020-07-14 广州智光电气股份有限公司 A converter device and a flow battery energy storage system
DE102017127081B4 (en) * 2017-11-17 2019-05-29 Sma Solar Technology Ag Method for black start of a power supply device, bidirectional inverter and power supply device with a bidirectional inverter
CN108011117B (en) * 2017-12-01 2020-04-07 大连融科储能装备有限公司 Centralized monitoring system and monitoring method for flow battery
CN107947184B (en) * 2017-12-25 2024-02-02 国网辽宁省电力有限公司沈阳供电公司 Distributed flexible voltage regulation topological structure of power distribution network based on AC-AC converter
CN114977351A (en) * 2021-02-27 2022-08-30 华为数字能源技术有限公司 Energy storage system and black start method
CN114336708A (en) * 2021-12-31 2022-04-12 杭州协能科技股份有限公司 Black start method of energy storage system and energy storage system
CN114583742A (en) * 2022-03-15 2022-06-03 中国电建集团福建省电力勘测设计院有限公司 Offshore wind farm flexible direct power transmission system and black start method
US11824356B1 (en) * 2022-06-30 2023-11-21 Xi'an Thermal Power Research Institute Co., Ltd. System and method of black start for new power system with energy storage configuration

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101794997A (en) * 2010-04-02 2010-08-04 中国海洋石油总公司 Megawatt wind power storage battery combined independent power supply system
CN103683316A (en) * 2012-09-19 2014-03-26 国电联合动力技术有限公司 Wind power generation system with off-grid and grid-connection modes and working method thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101794997A (en) * 2010-04-02 2010-08-04 中国海洋石油总公司 Megawatt wind power storage battery combined independent power supply system
CN103683316A (en) * 2012-09-19 2014-03-26 国电联合动力技术有限公司 Wind power generation system with off-grid and grid-connection modes and working method thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
卧牛石风储系统黑启动问题研究;史松杰;《沈阳工程学院工程专业学位硕士学位论文》;20150114;正文第5-8、18-20、34、37-43页 *
风储发电系统黑启动模型及仿真研究;孙峰 等;《电气应用》;20150630;521-527 *

Also Published As

Publication number Publication date
CN105978008A (en) 2016-09-28

Similar Documents

Publication Publication Date Title
CN105978008B (en) A flow battery energy storage system with black start function of wind field and its working method
WO2021082423A1 (en) Direct-current coupling hydrogen production system and control method therefor
CN103986186B (en) Wind, solar and water complementary-type micro grid black start control method
CN105186660B (en) Off-network type wind power hydrogen production converting system
CN104836254B (en) A kind of power grid"black-start" system and the method for photovoltaic plant participation power grid"black-start"
CN105937477B (en) A kind of wind-powered electricity generation photovoltaic micro pumped storage system
KR101225198B1 (en) Grid connected power conversion system
CN103050995B (en) A kind of micro-capacitance sensor pilot system
CN114481179B (en) Medium-voltage direct-current collection type renewable energy power generation hydrogen production system and working method thereof
CN104410105A (en) Intelligent wind power plant control method based on direct-current bus grid structure
WO2021196406A1 (en) Power transmission system and power supply apparatus thereof
CN103337900A (en) Off-grid wind power supply system based on gird power complementation
KR101644522B1 (en) Power supply system of ac microgrid three phase
CN115102153A (en) Electro-optical hydrogen storage micro-grid for transformer substation and control method thereof
CN114223105B (en) A kind of backup power supply and its operation method
CN111864725A (en) Wind-solar-storage integrated air conditioning system based on common direct current bus and control method thereof
CN105470997A (en) Microgrid control system
JP2016082874A (en) Interconnection photovoltaic power generation system
KR102222560B1 (en) An energy storage system
CN106411230A (en) Wind, solar and diesel integrated power generation system and control method
CN110970932A (en) Photovoltaic energy storage type pumped storage power station backup power system and its control method
CN107508320B (en) Wind power station and black start method thereof
CN113949054A (en) Power grid autonomous system and method
CN219611404U (en) Standby power system of wind power generating set and wind generating set
CN211183437U (en) Backup power system of photovoltaic energy storage pumped storage power station

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant