CN105964918B CN201610479760.4A CN201610479760A CN105964918B CN 105964918 B CN105964918 B CN 105964918B CN 201610479760 A CN201610479760 A CN 201610479760A CN 105964918 B CN105964918 B CN 105964918B
Authority
CN
China
Prior art keywords
sprue
sand
balance shaft
shaft beam
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610479760.4A
Other languages
Chinese (zh)
Other versions
CN105964918A (en
Inventor
冀元贵
程俊
冉军
李洪
汪剑波
罗铖
陈森
周虎
谢涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Xing Yuan Science And Technology Ltd
Original Assignee
Hubei Xing Yuan Science And Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Xing Yuan Science And Technology Ltd filed Critical Hubei Xing Yuan Science And Technology Ltd
Priority to CN201610479760.4A priority Critical patent/CN105964918B/en
Publication of CN105964918A publication Critical patent/CN105964918A/en
Application granted granted Critical
Publication of CN105964918B publication Critical patent/CN105964918B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/02Sand moulds or like moulds for shaped castings
    • B22C9/04Use of lost patterns
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/08Features with respect to supply of molten metal, e.g. ingates, circular gates, skim gates
    • B22C9/082Sprues, pouring cups
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/22Moulds for peculiarly-shaped castings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Molds, Cores, And Manufacturing Methods Thereof (AREA)
  • Body Structure For Vehicles (AREA)

Abstract

The present invention proposes lightweight balance shaft beam lost foam casting process method, is specially:(1)The structure design of lightweight balance shaft beam:Connecting bracket, propelling rod support, crossbeam are the overall structure of one-step casting shaping, and are provided with Lightened structure;(2)Design of Runner System:Cross gate is connected with sprue, and sprue cup is provided with the top of sprue, and 3 ingates are connected to below cross gate, and are connected with product model, and 4 slag traps are divided into two groups, are separately positioned on the both ends of product model;Position corresponding to propelling rod support on product model is provided with chill;(3)Bury case moulding;(4)Cast.Using the present invention, injection system structure is simple, compact, is easy to moulding, molten metal to be easily full of die cavity, solves the defects of existing balance shaft beam impact resistance is generally poor, reaches the casting purpose of monolithic construction.

Description

Lightweight balance shaft beam lost foam casting process method
Technical field
The present invention relates to lightweight balance shaft beam lost foam casting process method.
Background technology
It is demonstrated experimentally that if vehicle complete vehicle quality mitigates 10%, fuel efficiency can improve 6%-8%;Kerb weight often mitigates 100kg, fuel consumption per hundred kilometers can reduce 0.3-0.6L.By the weight reduction of heavy truck, reduce oil consumption, with reduce discharge of poisonous waste, Save weight metering charging expenditure, improve loading capacity usage factor, increase transportation profit.Automobile can drop vehicle body center of gravity after mitigating quality Low, running car is more stable, comfortable.Lightweight can reduce rolling resistance, acceleration resistance and grade resistance, can also be real It is now high-power to create conditions.Balance shaft suspension is one of key components and parts of commercial car, and its light-weight design has necessity.
Existing dump Truck Frame balance shaft beam assembly has diversified forms, wherein most often:By 2 connection branch Frame, 2 propelling rod supports, 2 punch forming header boards form through riveting.The impact resistance of such balance shaft beam generally compared with Difference, balance shaft beam is easily torn when frame assembly carries, and makes the reduction of frame assembly performance.
The content of the invention
In order to realize the lightweight of balance shaft beam, solve that existing balance shaft beam impact resistance is universal poor to be lacked Fall into, reach the casting purpose of monolithic construction, the present invention proposes lightweight balance shaft beam lost foam casting process method.
Lightweight balance shaft beam lost foam casting process method, it is characterised in that comprise the following steps that:
(1)The structure design of lightweight balance shaft beam:Connecting bracket, propelling rod support, crossbeam are one-step casting shapings Overall structure, be provided with oval loss of weight chamber in the middle part of crossbeam, the connecting bracket at both ends is symmetrical structure, the middle position of connecting bracket Lightening grooves are installed, the oral area of lightening grooves is connected by reinforcement;
(2)Design of Runner System:Including 3 ingates, 1 cross gate, 4 slag traps, 1 sprue, cross gate with Sprue is connected, and is provided with sprue cup at the top of sprue, and 3 ingates are connected to below cross gate, 3 ingates directly with Product model connects, and 4 slag traps are divided into two groups, are separately positioned on the both ends of product model;Correspond on product model and push away The position of power rod bearing is provided with chill;
(3)Bury case moulding:
1)Add bed load, place model:Bed load height 200-300mm is filled out, vibrates 10s, vibration frequency:43Hz, bed load is scraped Into plane, one case 1 group model of placement, ensure model in sandbox centre position;
2)Back-up sand is vibrated:First plus sand is to certain altitude, ensures no-sundries, vibrates 20s, vibration frequency:46Hz ;Uniformly fill out Sand is extremely concordant with sprue upper end, vibrates 40s, vibration frequency:46Hz ;
3)Plastic covering film, add top sand:Plastic covering film, top sand is then filled, thickness is more than 50mm, by plastics mould It is real, ensure that the plastic foil of sprue cup top surface higher than face 20mm is sand flat, is then scratched, be allowed to expose and ensure to pour by sprue cup plane Cup top surface is without molding sand;
(4)Cast:
1)Pouring temperature:1450-1480℃;2)Pour into a mould negative pressure:-0.04--0.045MPa;3)It is poured, pressurize 8- 10min。
Beneficial effect:Using the present invention, injection system structure is simple, compact, is easy to moulding, and it is easy to save metal, molten metal Full of die cavity, relative superiority or inferiority bottom in molten metal temperature, solidification sequence from bottom to top, is advantageous to play the effect of rising head, cast Feeding, the defects of can preventing from pouring to thin-section casting less than, cold shut;Place at chill position category heavy wall and crucial stress, chill It can effectively avoid producing casting shrinking hole herein;The arrangement of 3 ingates makes molten metal flowing more reasonable, avoids molten metal pair The impact of coating;So as to improve the shock resistance of balance shaft beam, reach the casting purpose of monolithic construction.
Brief description of the drawings
Fig. 1 is the front view of lightweight Integral cross beam.
Fig. 2 is the top view of lightweight Integral cross beam.
Fig. 3 is the side view of lightweight Integral cross beam.
Fig. 4 is the front view of running gate system in the present invention.
Fig. 5 is the top view of running gate system in the present invention.
Embodiment
With reference to shown in Fig. 1-Fig. 5, it is as follows to further describe the present invention:
Lightweight balance shaft beam lost foam casting process method, it is characterised in that:
(1)The structure design of lightweight balance shaft beam:Connecting bracket 1, propelling rod support 2, crossbeam 3 be one-step casting into The overall structure of type, is provided with oval loss of weight chamber 4 in the middle part of crossbeam, and the connecting bracket at both ends is symmetrical structure, in connecting bracket Position has installed lightening grooves 5, and the oral area of lightening grooves connects 6 by reinforcement and connect;
(2)Design of Runner System:3 10,1 sprues 8 of slag trap of cross gate 9,4 of ingate 11,1, cross gate 9 It is connected with sprue 8,7,3 ingates 11 of sprue cup is provided with the top of sprue and are connected to below cross gate 9, are poured in 3 Mouth 11 is directly connected with product model, and 4 slag traps 10 are equally divided into two groups, are separately positioned on the both ends of product model;Producing Position on product model corresponding to propelling rod support 2 is provided with chill(Do not expressed in figure);
(3)Bury case moulding:
1)Add bed load, place model:Bed load height 200-300mm is filled out, vibrates 10s, vibration frequency:43Hz, bed load is scraped Into plane, one case 1 group model of placement, ensure model in sandbox centre position;
2)Back-up sand is vibrated:First(Use flexible manual sanding device)Add sand to certain altitude,(Will fixed batten and plastics Rope and foam block are taken out)Ensure no-sundries, vibrate 20s, vibration frequency:46Hz ;Uniform back-up sand on model sprue to holding level with both hands Together, 40s, vibration frequency are vibrated:46Hz ;
3)Plastic covering film, add top sand:Plastic covering film, top sand is then filled, thickness is more than 50mm, by plastics mould It is real, ensure that the plastic foil of sprue cup top surface higher than face 20mm is sand flat, is then scratched, be allowed to expose and ensure to pour by sprue cup plane Cup top surface is without molding sand;
(4)Cast:
1)Pouring temperature:1450-1480℃;2)Pour into a mould negative pressure:-0.04--0.045MPa;3)It is poured, pressurize 8- 10min。
Wherein, symbol " Hz " is the unit " hertz " of frequency.

Claims (1)

1. lightweight balance shaft beam lost foam casting process method, it is characterised in that comprise the following steps that:
(1)The structure design of lightweight balance shaft beam:Connecting bracket, propelling rod support, crossbeam are the whole of one-step casting shaping Body structure, crossbeam middle part are provided with oval loss of weight chamber, and the connecting bracket at both ends is symmetrical structure, and the medium position of connecting bracket is set There are lightening grooves, the oral area of lightening grooves is connected by reinforcement;
(2)Design of Runner System:Including 3 ingates, 1 cross gate, 4 slag traps, 1 sprue, cross gate is with directly pouring Road is connected, and is provided with sprue cup at the top of sprue, and 3 ingates are connected to below cross gate, and 3 ingates are directly and product Model connects, and 4 slag traps are divided into two groups, are separately positioned on the both ends of product model;Correspond to distance rod on product model The position of bearing is provided with chill;
(3)Bury case moulding:
1)Add bed load, place model:Bed load height 200-300mm is filled out, vibrates 10s, vibration frequency:43Hz, bed load is spread to flat Face, one case 1 group model of placement, ensures model in sandbox centre position;
2)Back-up sand is vibrated:First plus sand is to certain altitude, ensures no-sundries, vibrates 20s, vibration frequency:46Hz ;Uniform back-up sand is extremely It is concordant with model sprue upper end, vibrate 40s, vibration frequency:46Hz ;
3)Plastic covering film, add top sand:Plastic covering film, top sand is then filled, thickness is more than 50mm, plastic foil is compacted, and protects Then the plastic foil of sprue cup top surface is scratched higher than face 20mm is sand flat, is allowed to expose and ensure sprue cup by card sprue cup plane Top surface is without molding sand;
(4)Cast:
1)Pouring temperature:1450-1480℃;2)Pour into a mould negative pressure:-0.04--0.045MPa;3)It is poured, pressurize 8-10min.
CN201610479760.4A 2016-06-28 2016-06-28 Lightweight balance shaft beam lost foam casting process method Active CN105964918B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610479760.4A CN105964918B (en) 2016-06-28 2016-06-28 Lightweight balance shaft beam lost foam casting process method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610479760.4A CN105964918B (en) 2016-06-28 2016-06-28 Lightweight balance shaft beam lost foam casting process method

Publications (2)

Publication Number Publication Date
CN105964918A CN105964918A (en) 2016-09-28
CN105964918B true CN105964918B (en) 2018-03-02

Family

ID=57019407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610479760.4A Active CN105964918B (en) 2016-06-28 2016-06-28 Lightweight balance shaft beam lost foam casting process method

Country Status (1)

Country Link
CN (1) CN105964918B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109550895B (en) * 2017-09-25 2024-06-25 南京德惠新材料科技有限公司 Beam lost foam and method for casting beams by using same
CN114130960B (en) * 2021-11-26 2024-04-12 四川建安工业有限责任公司 Preparation method of trailing arm assembly of rear torsion beam suspension
CN114570877B (en) * 2022-03-02 2023-12-22 安徽合力股份有限公司合肥铸锻厂 Casting process of large-scale agricultural machinery cross beam

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100506427C (en) * 2004-05-19 2009-07-01 新疆维吾尔自治区第三机床厂 Method for producing milling-ball by vacuum sealing and its shaped mould
CN1911557A (en) * 2005-08-08 2007-02-14 冯玉全 Method for casting miodle trough casting of coal mine scraper conveyor using demould
CN101332490B (en) * 2008-07-04 2011-03-30 日月重工股份有限公司 Medium-pressure heavy-section outer-cylinder iron casting gating system of steam turbine
CN201694247U (en) * 2010-05-07 2011-01-05 中国重汽集团济南动力有限公司 Cast cross beam for heavy truck frame
US8714232B2 (en) * 2010-09-20 2014-05-06 GM Global Technology Operations LLC Method of making a brake component
CN102328025B (en) * 2011-08-25 2013-07-10 陕西理工学院 Lost foam casting method of balance shaft housing
CN102284679A (en) * 2011-09-19 2011-12-21 滁州金诺实业有限公司 Method for casting engine cylinder cover by using lost foam

Also Published As

Publication number Publication date
CN105964918A (en) 2016-09-28

Similar Documents

Publication Publication Date Title
CN105964918B (en) Lightweight balance shaft beam lost foam casting process method
CN106001413B (en) A kind of balance shaft support casting technique
CN102962399A (en) High-frequency vibration casting mold of conical sand maker breaking wall and casting process
CN102962398A (en) High-frequency vibration casting mold of conical sand maker rolling mortar wall and casting process
CN104226923A (en) Iron die sand overlaying process for producing steering axle
CN102941315A (en) Suspension V method casting and manufacturing technology
CN108356234A (en) The plane vertical pouring shell structure of thick big high-Ni-Cr cast iron volute
CN102962397A (en) Casting mold of conical sand maker breaking wall and casting process
CN101342574B (en) Design method for large-scale transverse beam casting parts
CN202291267U (en) Strip-shaped product die casting mould pouring system
CN105268948B (en) A kind of aluminium bell housing low pressure metal mould
CN202910255U (en) Crushing wall or rolling mortar wall high-frequency vibration pouring die for cone sand making machine
CN106955975B (en) Large-scale almag vibration absorber casting system
CN102921901B (en) Casting method for main shaft of wind generating set
CN202291291U (en) Integral casting die for high-tension switch large aluminum alloy tank body
CN207170918U (en) Device for railway cast steel wheel evaporative pattern graphite Quench antigravity casting technique
CN207971384U (en) Wheel hub manufactures sand core
CN215199544U (en) Shell mould casting brake drum gating system
CN206662204U (en) Large-scale almag vibration absorber casting system
CN202316963U (en) Moving die structure of die-casting die for Renault L38-type automobile engine suspension bracket
CN202910256U (en) Crushing wall or rolling mortar wall pouring die for cone sand making machine
CN212857641U (en) Crossover bridging type pouring system for automobile chassis cantilever casting
CN2496581Y (en) Multifunctional ladle seat for casting
CN207971389U (en) The plane vertical pouring shell structure of thick big high-Ni-Cr cast iron volute
CN110405160B (en) Lost foam casting box convenient to shakeout

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Lost foam casting process for lightweight balance shaft beam

Effective date of registration: 20221013

Granted publication date: 20180302

Pledgee: Fangxian Sub branch of Postal Savings Bank of China Co.,Ltd.

Pledgor: HUBEI XINGYUAN SCIENCE AND TECHNOLOGY CO.,LTD.

Registration number: Y2022980018301