CN105883336A - Dual taking and blending system and blending method thereof - Google Patents
Dual taking and blending system and blending method thereof Download PDFInfo
- Publication number
- CN105883336A CN105883336A CN201610393436.0A CN201610393436A CN105883336A CN 105883336 A CN105883336 A CN 105883336A CN 201610393436 A CN201610393436 A CN 201610393436A CN 105883336 A CN105883336 A CN 105883336A
- Authority
- CN
- China
- Prior art keywords
- reclaimer
- main
- host computer
- time
- feeding amount
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G43/00—Control devices, e.g. for safety, warning or fault-correcting
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G63/00—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations
- B65G63/008—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations for bulk material
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G2201/00—Indexing codes relating to handling devices, e.g. conveyors, characterised by the type of product or load being conveyed or handled
- B65G2201/04—Bulk
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G2203/00—Indexing code relating to control or detection of the articles or the load carriers during conveying
- B65G2203/02—Control or detection
Landscapes
- Control Of Conveyors (AREA)
Abstract
The invention provides a dual taking and blending system. The dual taking and blending system comprises belt conveyors, a center control upper computer, a driving material taking machine, a driving upper computer, a driven material taking machine and a driven upper computer, wherein the center control upper computer, the driving material taking machine, the driving upper computer, the driven material taking machine and the driven upper computer are in communication connection, and the driving material taking machine and the driven material taking machine share working information for realizing simultaneous gathering of material flow of the one-line dual-taking or different-line dual-taking work at the preset time. The dual taking and blending system realizes automation and refinement of the blending work of different bulk materials, can be used for the coal blending work at ports and guarantees that the coal blending quality meets the requirements.
Description
Technical field
The present invention relates to a kind of feed proportioning system and method, take feed proportioning system and dispensing side thereof particularly to a kind of pair
Method.
Background technology
In the industrial and mineral production processes such as coal and metallurgy, it is often necessary to the material that two or more is dissipated
Carry out dispensing mixing, and the uniformity of guarantee and the accuracy of control proportion scale and dispensing mixing is needs
The key issue solved.
Such as, current coal market structure is loose, and easy situation will become a kind of new normality.At this
Planting under new normality, dominated by the market price, supply and demand both sides are more and more higher to the requirement of Coal Quality.According to
Data statistics shows, coal blending workload accounting sustainable growth coal blending operation has become as a kind of normalization and runs mould
Formula.For meeting user's request, need to promote further coal blending quality, it is achieved the Precise control of coal blending.Double
Taking coal blending and relate to two reclaimers, only two reclaimers cooperate and just can complete.Two reclaimers
How start and stop realize synchronizing, and how to realize joining the seamless of coal blending kind and cross and terminate, how to realize the most equal
Even ginseng is joined, and two reclaimers of special circumstances how response etc., these factors, in coal blending operation process, are all
Need dynamically control.
Situation with regard to current coal blending operation is seen, whole coal blending dynamically controls to still belong to a most spacious state of comparison.
Automatic Coal Blending System seeks to be realized the dynamic control of coal blending by technological means, it is achieved between two reclaimers
Real-time, interactive and real-time response, thus the requirement of the coal blending that reaches to become more meticulous.
Summary of the invention
It is an object of the invention to provide a kind of automatization, become more meticulous double take feed proportioning system and double take dispensing side
Method.For achieving the above object, the solution of the present invention is as follows:
A kind of pair takes feed proportioning system, for dissipating feeding and the dispensing of material, comprising: belt feeder, middle control
Host computer, main reclaimer and main host computer, from reclaimer and from host computer,
Described middle control host computer, main reclaimer and main host computer, from reclaimer and between host computer keep phase
Intercommunication connects,
Described main reclaimer and the material stream being taken as industry by the realization pair of shared job information from reclaimer converge simultaneously
Collection is to Rendezvous Point.
Further, described job information includes: target feeding amount, main reclaimer and from reclaimer judge, prolong
Time after and current accumulative feeding amount, instantaneous delivery, job scheduling percentage ratio, dispensing real-time scale.
Further, described target feeding amount for specify double be taken as in industry main reclaimer and needed for reclaimer feeding
Tonnage;
Described main reclaimer and being judged as according to the first reclaimer (21) and the second reclaimer (22) point from reclaimer
Distance between other and described Rendezvous Point, it is judged that distant is main reclaimer, and close together be from
Reclaimer;
Accumulative feeding amount, instantaneous delivery and job scheduling percentage ratio after described time delay, for according to obtain master,
Flow to reach the time difference of Rendezvous Point from reclaimer each material, first by accumulative feeding amount current for main reclaimer,
The data of instantaneous delivery and job scheduling percentage ratio carry out storing rather than being transmitted directly to from reclaimer, only
Have and just the data of storage are read by the storehouse treatment principle of first in first out after described time difference, and show
On the host computer of reclaimer, the speed adjusting feeding in real time according to these data from reclaimer comes close to requirement
Proportion scale;
Described current accumulative feeding amount, instantaneous delivery and job scheduling percentage ratio refer to main reclaimer and from feeding
Accumulative feeding amount, instantaneous delivery and the job scheduling percentage ratio that machine is the most real-time;
Described dispensing real-time scale is main reclaimer and from reclaimer respective material stream when material stream collects simultaneously
Real-time scale, when the first reclaimer (21) is main reclaimer, described dispensing real-time scale is the first feeding
The instantaneous delivery that instantaneous delivery after machine (21) time delay is more current than upper second reclaimer (22), or described dispensing
Real-time scale is tires out more current than upper second reclaimer (22) of the accumulative feeding amount after the first reclaimer (21) time delay
Long-pending feeding amount;When the first reclaimer (21) is from reclaimer, described dispensing real-time scale is the first reclaimer
(21) current instantaneous delivery is than the instantaneous delivery after the time delay of upper second reclaimer (22), or described dispensing is real
Time ratio be the current accumulative feeding amount of the first reclaimer (21) than after the time delay of upper second reclaimer (22) accumulative
Feeding amount.
Further, double take job initiation time, from reclaimer place belt delayed startup, and ensure material stream
Collect in Rendezvous Point simultaneously.
Further, described system also includes that alarm device, described main reclaimer job scheduling percentage ratio prolong
Time process, when described job scheduling percentage ratio is more than 100%, or
When described dispensing real-time scale and setting ratio exceed ± 10% time, or
When main reclaimer and the job scheduling percentage ratio from reclaimer differ by more than 10%, alarm device sends
Report to the police;
Further, described middle control host computer is provided with material variety information, deposit material target buttress position information,
Target feeding amount, target bin number, target binning amount and batching mode;
The display unit of described main host computer is located on the instrumental panel panel of described main reclaimer, and shows that it is made
Industry information;
The described display unit from host computer is located at described from the instrumental panel panel of reclaimer, and shows that it is made
Industry information.
Further, described double it is taken as collinear double take or different line is double takes.
A kind of above-mentioned double feed proportioning system that takes is used to carry out double method taking dispensing, it is characterised in that:
The first step, inputs material variety information at middle control host computer, deposits the target buttress position information of material, mesh
Mark feeding amount, target bin number, target binning amount, batching mode, obtain according to the ratio of target feeding amount and set
Fixed proportion scale;
Second step, it is judged that main reclaimer and from reclaimer, it is thus achieved that material stream from main reclaimer and from reclaimer to
The time difference of Rendezvous Point;
3rd step, the data of its accumulative feeding amount, instantaneous delivery and job scheduling percentage ratio are entered by main reclaimer
Row stores, and shows on reclaimer host computer with the described time difference time delay in second step;
4th step, main reclaimer and the job information shown according to its respective host computer from reclaimer carry out phase
Answer operation.
Further, when the job scheduling percentage ratio that master and slave reclaimer host computer shows is more than 100%, stop
Operation is also sent warning by alarm device;Or
When two reclaimer progresses of operation differ by more than 10%, stop operation and sent report by alarm device
Alert.
It is an advantage of the present invention that double feed proportioning system that takes is by arranging master and slave reclaimer and shared mutual
Job information, can be to feeding and the accurate control of blending process, especially from reclaimer according to through certain
The job information of the main reclaimer after time delay adjusts feeding amount and feeding progress, it is ensured that master and slave take
The taken material of material machine collects in the Rendezvous Point specified simultaneously, it is achieved thereby that control proportion scale accurately and
It is uniform that dispensing mixes.
Accompanying drawing explanation
Fig. 1 is to utilize the present invention couple to take feed proportioning system to carry out the schematic diagram of coal blending
Fig. 2 is to utilize the present invention couple to take feed proportioning system to carry out the startup journey figure of coal blending
Fig. 3 is to utilize the present invention couple to take feed proportioning system to carry out the operational flow diagram of coal blending
Fig. 4 is to utilize the present invention couple to take feed proportioning system to carry out the stopping flow chart of coal blending
Detailed description of the invention
The double of the present invention take feed proportioning system, and its capital equipment related to is: main reclaimer, from reclaimer, skin
Band machine and control device.Scattered material is taken out from stockyard by reclaimer, is transported to specify position by belt feeder,
Transporting equipment (such as boats and ships) is sent into again by charging appliance (such as ship loader).Wherein, control device bag
Include: middle control host computer, the main host computer of main reclaimer and from reclaimer from host computer, control device is preferred
Possess calculating for PLC or industrial computer etc. and process the equipment of function, be used for calculating reclaimer distance, main reclaimer
With from reclaimer delay value and storage feeding instantaneous delivery and cumulant etc..Middle control host computer, main reclaimer
And main host computer, from reclaimer and keep being in communication with each other connection between host computer, main reclaimer and from feeding
Machine realizes collinear double take or the double material stream being taken as industry of different line is pooled to specify at the same time by shared job information
Rendezvous Point.The present invention double take feed proportioning system and further relate to following equipment:
1) reclaimer and the position detecting device of charging appliance, generally encoder, Gray bus or GPS
Positioners etc., are mainly used in the position detection of reclaimer etc., and then according to position judgment master slave relation and stream
Measure the time difference to Rendezvous Point;
2) metering devices such as the real-time weighing-appliance of material, such as belt conveyer scale are dissipated, for monitoring reclaimer feeding
Instantaneous delivery and the cumulant in certain time;
3) data transmission set, can use fiber optic communications or wireless telecommunications physical medium, by the feeding of reclaimer
Data are transferred mutually by transmitting and receiving device;
4) human-computer interaction device, can be computer or the graphics device of other customizations, for operation
Personnel provide current proportion scale information, to adjust flow targetedly.
Should be appreciated that the present invention double take feed proportioning system be applicable to various occasion (such as: harbour, steel mill,
Power plant, grain distribution station and feed factory etc.) dispersion stacked or the material deposited (such as: coal, Ore, sand
Stone and grain etc.) carry out feeding, dispensing etc..Multiple (second is such as set up from taking from reclaimer by setting up
Material machine, the 3rd from reclaimer) can realize feeding and the dispensing of multiple different material, i.e. take dispensing more.
Hereinafter double the taking by harbour to the present invention double, is taken feed proportioning system as a example by coal blending transport and be described further.
In order to realize being mixed the most uniformly by two different kinds of coal, have employed Fig. 1
Shown double taking feed proportioning system, its capital equipment related to is: main reclaimer 21 and from reclaimer 22, skin
Band machine 31-36 and control device.Wherein, control device includes middle control host computer, the Your Majesty of main reclaimer
Position machine and from reclaimer from host computer.First, reclaimer by two different kinds of coal respectively from stockyard 11
Take out in 12, be delivered to transferring tower 41,42 by belt feeder 31,32 the most respectively, then by belt feeder
33-36 is transported to ship loader 51-54, finally sends into boats and ships.Main reclaimer and being believed by shared operation from reclaimer
Breath realizes collinear double take or the double coal stream being taken as industry of different line is pooled to Rendezvous Point simultaneously.
Fig. 2 is to utilize the present invention double to take feed proportioning system to carry out the Booting sequence figure of coal blending.At middle control host computer
After upper selected flow process, reclaimer host computer judges whether this reclaimer is main reclaimer, if main reclaimer,
First the most main reclaimer starts, if it is determined that this reclaimer is from reclaimer, does not then receive startup from reclaimer
Before signal, wait enabling signal.Main reclaimer enters next step after starting and judges whether heavy duty.Take if main
Material machine is not heavy duty, then be directly entered process flow operation.If main reclaimer is case of heavy load, at this moment need from
Reclaimer dispensing together, then override signal can be sent to from reclaimer after main reclaimer starts, from feeding
Machine enters trigger countdown after receiving main reclaimer override signal, and countdown brings into operation after terminating, enters
Enter process flow operation, thus realize the flow process of master and slave two reclaimer dispensings together.
Fig. 3 is to utilize the present invention couple to take feed proportioning system to carry out the operational flow diagram of coal blending.In process flow operation process
In, main reclaimer shows current accumulative feeding amount, instantaneous delivery and job scheduling percentage ratio, and according to working as
Front value carries out coal blending.And need time delay from information such as the instantaneous delivery of reclaimer, accumulative feeding amounts.Time delay
After accumulative feeding amount, instantaneous delivery and job scheduling percentage ratio, refer to master and slave take according to calculate
Material machine each coal flows to reach ship loader time difference, first main reclaimer is currently added up feeding amount, instantaneous delivery
Carry out storing rather than being transmitted directly to from reclaimer with the data of job scheduling percentage ratio, only work as the time
After difference, the data of storage are read by side by the storehouse treatment principle of first in first out, and show from reclaimer
On host computer, the speed that manipulation personnel adjust feeding in real time according to these data comes close to the chlorine adding ratio required.
Fig. 4 is to utilize the present invention couple to take feed proportioning system to carry out the stopping flow chart of coal blending.In stopping flow process,
Main reclaimer first completes feeding task, i.e. can be out of service after completing feeding task, when system judges main taking
In the case of material machine completes feeding task and has been zero load, transmission airborne signals is to from reclaimer, from feeding
Machine starts countdown, and countdown terminates, then also stop feeding from reclaimer, and i.e. all reclaimer is out of service,
Complete feeding task.
Utilize that the present invention is double to be taken feed proportioning system to carry out the concrete operations running of coal blending as follows:
First, in middle control host computer typing production information, i.e. choose corresponding pair and take dispensing flow process, including:
Coal information, deposit the target buttress position information of material, target feeding amount, target bin number, target binning amount and
Coal blending mode and chlorine adding ratio.
Then, sending the production information of above typing, corresponding two reclaimers all can receive institute's transmission information,
And show on host computer, hereafter will will be described in detail.
Middle control host computer flow monitoring include monitor coal blending relevant information, as the job information of reclaimer i.e. pile up neatly position,
Coal, target feeding amount, accumulative feeding amount, coal blending real-time scale, reclaimer job scheduling (main reclaimer
Do delay process).
Principal and subordinate's reclaimer judges: takes in flow process at different line pair, according to the encoder numerical value of two reclaimers, changes
Be counted as the reclaimer transferring tower distance to place belt, concrete, distance between reclaimer and transferring tower with
Reclaimer encoder numerical value is corresponding, therefore, it can converse reclaimer according to reclaimer encoder numerical value and arrives
The transferring tower distance of place belt, further according to the distance of each transferring tower to transferring tower 41, draws two reclaimers
To the distance of transferring tower 41, further according to the encoder numerical value of ship loader, it is converted into ship loader to 41 transferring towers
Distance, concrete, the distance between ship loader with transferring tower is corresponding with ship loader encoder numerical value, therefore,
Can converse ship loader to transferring tower distance according to ship loader encoder numerical value, finally summation draws each feeding
Machine is to the distance of ship loader.
Because reclaimer is different to the distance of ship loader, if two reclaimers start simultaneously at operation, distance is relatively
The coal taken of near reclaimer would first, through ship loader, and such coal blending quality is uneven.At the end of flow process,
If two reclaimers complete feeding task simultaneously, the part of coal that distant reclaimer is taken will be last
By ship loader, such coal blending quality is uneven, the finest, it is impossible to reach the requirement of client.So in order to
Ensure becoming more meticulous must be requested that the coal stream of two reclaimers crosses to Rendezvous Point and ties simultaneously simultaneously of coal blending
Bundle.
Distance according to reclaimer to ship loader compares and determines close together being set to from reclaimer, and distance
Farther out be set to main reclaimer, by being calculated the range difference of two reclaimers and known each belt feeder
The speed of service, draw two reclaimers to shipment machine-made egg-shaped or honey-comb coal briquets stream from getting the time difference of dress, and this time difference
It is exactly reclaimer with playing the error that the coal stream caused with the stopping time can not collect and terminate.So when main reclaimer is transported
During row, collect according to time difference delayed startup, such guarantee coal stream from reclaimer simultaneously.When main feeding
When machine completes feeding, completing feeding from reclaimer according to time difference time delay, such guarantee coal stream is with for the moment
Between terminate.
Owing to reclaimer driver operation level is inconsistent, it is impossible to ensure that reclaimer brings into operation with regard to feeding, in order to
Reducing temporal error, design is when flow startup, and main reclaimer is first begin to feeding, when belt conveyer scale wink
Shi Liuliang, more than 300 ton hour lasting more than 5s, determines that main reclaimer is in heavy service, and will weight
Information carrying number is sent automatically to from reclaimer, now starts feeding from reclaimer, reduces the most further by mistake
Difference.
After flow process brings into operation, will be according to flow and the progress tightly following main reclaimer from reclaimer, it is ensured that
The main reclaimer of reclaimer progress infinite approach, when reclaimer is near completion feeding task, and main reclaimer feeding is entered
Degree reaches 100% the most out of service, now airborne signals is sent to from reclaimer, receives letter from reclaimer
After number, start to stop feeding countdown, need in count down time, complete taking of self from reclaimer driver
Material task.Thus whole flow process terminates, coal blending program completes.
Delay process: in reclaimer operation process, reclaimer only shows that the instantaneous delivery of the other side is not anticipate
Justice, because needing to follow main reclaimer from reclaimer, if according to the main reclaimer of display from reclaimer
Instantaneous delivery carries out with reference to feeding, then the material that the same time is taken from reclaimer and main reclaimer can not be
Finally pool together, so this instantaneous delivery for just becoming nonsensical from reclaimer.In order to solve
This problem, it is simply that ensure to have used with main reclaimer flows match from the instantaneous delivery of reclaimer
State the time difference mentioned, by PLC program, instantaneous delivery each second of main reclaimer stored,
So time difference is within several seconds, just to store how many data, then the data stored at first are shown from reclaimer
Host computer on, carry out the most successively, the first spilling first stored.Now, reclaimer is with reference to this time difference
Instantaneous delivery after time delay carries out feeding, the coal so taken just and display main reclaimer instantaneous delivery
After pool together, reflect coal blending quality at that time.
Same reason, if entered according to current accumulative feeding amount and the reclaimer of main reclaimer from reclaimer
Degree is followed, then two reclaimers will complete feeding task simultaneously, and the most out of service, then
Coal stream can not terminate the same time, so main reclaimer shown from reclaimer adds up feeding amount and takes
Material machine progress also operation delay process, processing method is ibid.
Meanwhile, due to from reclaimer starting more late than main reclaimer, therefore, from the point of view of energy-conservation,
The time after the belt feeder delayed startup from reclaimer place, the time of time delay and time delay it is provided with in program
Unanimously.Thus avoid the long-time zero load from reclaimer place belt feeder.
By above method, four flow monitoring pages at middle control host computer add relevant information, convenient
Middle control dispatcher's overall management and monitoring coal blending performance, it is ensured that coal blending quality.
The job information of reclaimer includes: coal blending real-time scale, refers to double take in flow process, the coal of two reclaimers
The real-time scale of two kinds of coals at stream Rendezvous Point, as it is shown in figure 1, Rendezvous Point i.e. belt feeder 32 and belt feeder
35 (any one in belt feeder 33-36 can be selected as required, the most only as a example by belt feeder 35)
Joint;Accumulative feeding amount, the accumulative feeding amount of the most main reclaimer has done delay process, from reclaimer
The feeding amount of display current time.Reclaimer job scheduling shows and includes: add taking of reclaimer 21,22
Material progress, computational methods are that the cumulant of reclaimer is done divided by target feeding amount, the most main reclaimer progress
Delay process, when progress is more than 100%, can flash warning.When two reclaimer progresses of operation differ by more than
10%, also can point out warning.
The computational methods of real-time scale are: when reclaimer 21 is main reclaimer, and real-time scale is reclaimer
Instantaneous delivery after 21 time delays is than the instantaneous delivery of upper reclaimer 22, or real-time scale is that reclaimer 21 prolongs
Accumulative feeding amount time after is than the accumulative feeding amount of upper reclaimer 22;When reclaimer 21 is from reclaimer,
Real-time scale be the current instantaneous delivery of reclaimer 21 than the instantaneous delivery after the time delay of upper reclaimer 22, or
Real-time scale is that the current accumulative feeding amount of reclaimer 21 is than the accumulative feeding amount after the time delay of upper reclaimer 22.
Although instantaneous delivery has certain undulatory property, but from general trend body, can passing ratio size obtain
Go out and control the fine degree of coal blending.
Middle control dispatcher just can check real-time coal blending process according to the data shown by the upper page, when
During the feeding progress infinite approach of the reclaimer of two reclaimers, illustrate that coal blending quality is the highest.
Reclaimer is as the tool-type equipment of feeding, and its duty is to determine the important composition of coal blending quality
Part.Reclaimer become more meticulous now coal blending aspect urgent problem have following some:
(1) duty of the other side's reclaimer cannot be known during reclaimer coal blending operation, between big machine driver more
Real-time communication cannot be accomplished, it is difficult to ensure coal blending effect.
The big machine driver of (2) two coal blending operations cannot judge two by the positional information of two reclaimers
The relative feeding time difference of big machine, this has resulted in all can there is coal in two stages of flow startup and stopping
The situation that stream cannot mix so that coal blending quality declines.
(3) double when taking batch operation, owing to the maximum stream flow sum of two reclaimers is far longer than ground belt
Bearing capacity, this damage being possible to cause ground belt.
(4) during reclaimer operation, data that belt claims that what driver paid close attention to most is exactly, and these data are by many
The conversion of individual link and transmission, real-time is not enough, has certain time delay.
For with above Railway Project, start with in terms of upper display of reclaimer etc., it transformed.
1. according in control the job instruction provided, carry out logical operations with PLC program, it is judged that whether flow process is
Coal blending flow process;Judge the reclaimer numbering of two coal blendings;What so both sides driver just can be real-time
Solve handling situations and the progress of the other side's reclaimer, from the beginning of operation until the end of operation, be achieved that
Fine-grained management to whole coal blending process.
2., after being extracted data, double ship loader " leading " rank reclaimer farther out of adjusting the distance in blending process is taken
Requiring relatively low, he has only to ensure data according to the numerical value of upper " the target instantaneous delivery " calculated as far as possible
Feeding amount uniformly.And for distance ship loader close together " from " for rank reclaimer,
To be controlled is the most.Because the reclaiming process " leading " rank reclaimer has occurred and that, it is can not
Change, this just require " from " rank reclaimer to follow " leading " rank reclaimer always and carry out operation,
Coal blending quality is ensured with this.In order to greatest extent convenient " from " operation of rank reclaimer, carry for it
Data are the most intuitively supplied.
To " from " for reclaimer, the target instantaneous delivery of oneself reclaimer includes: the mesh of oneself reclaimer
Mark instantaneous delivery, draws according to the chlorine adding ratio of two reclaimers.No matter " lead " or " from " reclaimer
The workload needing to reach in oneself this flow process will be understood, to reach the highest work by these data
Industry efficiency.
The other side's reclaimer is that the work data of " leading " reclaimer includes: the work data of the other side's reclaimer, bag
(delay process by being taken now coal stream with oneself to include the other side's instantaneous delivery after the other side's reclaimer numbering, time delay
The instantaneous delivery of " leading " reclaimer converged), (delay process is for for the other side's actual feeding amount after time delay
" leading " reclaimer integrated flow through converging with oneself taken coal stream) and the target feeding amount etc. of the other side.
By these data, " from " reclaimer can be real-time the working condition grasping the other side's reclaimer, the most whole
Individual work flow, and by with the other side's time delay after instantaneous delivery ensure that ground belt occurs without overload condition,
Ensure that the safety of equipment.
The instantaneous delivery of this reclaimer includes with cumulative amount: the instantaneous delivery of this reclaimer and cumulative amount, helps
Driver understands the handling situations of oneself.
The job schedule of both sides' reclaimer includes with real-time chlorine adding ratio: the job schedule of both sides' reclaimer and reality
Time chlorine adding ratio, this has also been the major part of coal blending of becoming more meticulous, and " leads " rank feeding in this part
Machine can only see the job schedule of oneself, is only its offer and shows intuitively.And " from " rank takes
Material machine is necessary for paying close attention in real time the progress of both sides, in operation process, he to ensure as far as possible the progress on both sides without
Limiting close, the chlorine adding ratio of display is identical with the chlorine adding ratio of actual requirement in real time, if " from " rank feeding
Machine has ensured this state, finally can be realized as optimal coal blending effect.
3. in order to avoid the situation that coal stream cannot mix occurring the two of flow startup and stopping stages, at stream
Two stages of Cheng Qidong and stopping show for having carried out animation from rank reclaimer, and driver can pass through this
Display starts feeding and stops feeding, ensures that coal stream is in flow startup and two stages of stopping with this
Also can guarantee that good mixing." from " rank reclaimer can be according to the animation effect of coal stream flowing with during feeding
Between countdown control the time that feeding starts, at the end of feeding countdown, reclaimer just should be
Feeding starts, and what upper interface there is also " can be with feeding " flashes prompting.When system detects feeding
After machine feeding, flashing prompting will disappear.
When flow process stops taking, upper also having shuts down prompting accordingly.
In conjunction with Fig. 1-4, main reclaimer 21 with carry out coal blending operation, the most main reclaimer 21 from reclaimer 22
The material taken (can be selected in belt feeder 33-36 to belt feeder 35 as required by belt feeder 31 transport
Any one, the most only as a example by belt feeder 35), and the material taken from reclaimer 22 passes through belt feeder
32 transports are to belt feeder 35, then arrive ship loader 54 by belt feeder 35 transport.
After middle control chooses this flow process, PLC program calculates main reclaimer 21 automatically, from reclaimer 22, time
Between difference for 60s, start to input production information, production information includes: main reclaimer taken coal information, deposit
Put the buttress position information of material, target feeding amount, such as 3000 tons;From reclaimer 22 taken coal information,
Buttress position information, target feeding amount, such as 3000 tons;The storehouse number of boats and ships corresponding to ship loader 54;Coal blending side
Formula, such as " double take ".Target binning amount automatically generates, for example, according to the target feeding amount of principal and subordinate's reclaimer
6000 tons, if the target feeding amount of principal and subordinate's reclaimer is all 3000 tons, then chlorine adding ratio automatically generates,
For example, 1:1, selects the berth at boats and ships place, finally sends these production informations above-mentioned.
The data of middle control institute typing have been sent on two reclaimers of operation at once, and middle control starts Booting sequence,
First belt feeder 31 brings into operation, and main reclaimer 21 starts feeding, and middle control host computer display belt feeder 5 is opened
The countdown of beginning 60s, when main reclaimer 21 reach heavy duty require time, send self from trend from reclaimer 22
Override signal, starts feeding countdown 60s, from reclaimer 22 after 60s from the display of reclaimer 22 host computer
Starting feeding, stream acquired by the most main reclaimer 21 should be on belt feeder 31, but along with the fortune of belt feeder
OK, the material that main reclaimer 21 is taken by with the material taken from reclaimer 22 at belt feeder 35 and belt feeder 32
Intersection collect the same time.
In operation process, main reclaimer 21 can check the job scheduling percentage ratio from reclaimer 22 at any time,
The job scheduling before main reclaimer 60s can be viewed, when from reclaimer 22 feeding progress from reclaimer 22
When differing bigger with main reclaimer 21 feeding progress, preferably differ by more than ± 10% time, middle control host computer, master
Reclaimer host computer and warning reminding, reclaimer being adjusted according to own situation from reclaimer host computer
Whole.
When flow process closes to an end, first main reclaimer 21 completes feeding task, and main reclaimer 21 stops fortune
Airborne signals is also automatically transmitted to from reclaimer 22 by row, starts display and stop from reclaimer 22 host computer
Feeding countdown 60s, needs to complete self feeding task in this 60s, from taking after 60s from reclaimer 22
Material machine 22 is out of service, and along with the operation of belt feeder, two-way stream will be at belt feeder 32 and belt feeder 35
Intersection terminate the same time.
By above means, it is possible to allow driver have a relatively accurate feeding and to stop the time taken, thus
Being sufficiently mixed of coal stream can be accomplished accurately, improve coal blending quality.
Above, with reference to the accompanying drawings of the present invention and embodiment.And these embodiments are included in the present invention
In technological thought described in claim.Further, these embodiments are merely exemplary, do not apply
Carry out limited interpretation scope of the presently claimed invention.
Claims (9)
1. double take a feed proportioning system, for dissipating feeding and the dispensing of material, it is characterised in that comprising:
Belt feeder, middle control host computer, main reclaimer and main host computer, from reclaimer and from host computer,
Described middle control host computer, main reclaimer and main host computer, from reclaimer and between host computer keep be in communication with each other connection,
Described main reclaimer and the material stream being taken as industry by the realization pair of shared job information from reclaimer are pooled to Rendezvous Point simultaneously.
2. as claimed in claim 1 pair takes feed proportioning system, it is characterised in that:
Described job information includes: target feeding amount, main reclaimer and judging from reclaimer, after time delay and current accumulative feeding amount, instantaneous delivery, job scheduling percentage ratio, dispensing real-time scale.
3. as claimed in claim 2 pair takes feed proportioning system, it is characterised in that:
Described target feeding amount be specify double be taken as in industry main reclaimer and needed for reclaimer the tonnage of feeding;
Described main reclaimer and be judged as the distance respectively and between described Rendezvous Point according to the first reclaimer (21) and the second reclaimer (22) from reclaimer, it is judged that distant is main reclaimer, and close together be from reclaimer;
Accumulative feeding amount after described time delay, instantaneous delivery and job scheduling percentage ratio, for according to the master obtained, flow to reach the time difference of Rendezvous Point from reclaimer each material, first by accumulative feeding amount current for main reclaimer, the data of instantaneous delivery and job scheduling percentage ratio store, rather than it is transmitted directly to from reclaimer, only just the data of storage are read by the storehouse treatment principle of first in first out after described time difference, and show on the host computer of reclaimer, the speed adjusting feeding in real time according to these data from reclaimer comes close to the proportion scale required;
Described current accumulative feeding amount, instantaneous delivery and job scheduling percentage ratio refer to main reclaimer and from the most real-time accumulative feeding amount, instantaneous delivery and the job scheduling percentage ratio of reclaimer;
Described dispensing real-time scale is main reclaimer and from reclaimer real-time scale of respective material stream when material stream collects simultaneously, when the first reclaimer (21) is main reclaimer, described dispensing real-time scale is the instantaneous delivery that the instantaneous delivery after the first reclaimer (21) time delay is more current than upper second reclaimer (22), or described dispensing real-time scale is the accumulation feeding amount that the accumulative feeding amount after the first reclaimer (21) time delay is more current than upper second reclaimer (22);When the first reclaimer (21) is from reclaimer, described dispensing real-time scale is the current instantaneous delivery of the first reclaimer (21) than the instantaneous delivery after the time delay of upper second reclaimer (22), or described dispensing real-time scale is that the current accumulative feeding amount of the first reclaimer (21) is than the accumulative feeding amount after the time delay of upper second reclaimer (22).
4. as claimed in claim 3 double take feed proportioning system, it is characterised in that: double take job initiation time, from reclaimer place belt delayed startup, and ensure that material stream collects in Rendezvous Point simultaneously.
5. as claimed in claim 3 pair takes feed proportioning system, it is characterised in that: described system also includes alarm device, and described main reclaimer job scheduling percentage ratio has done delay process, when described job scheduling percentage ratio is more than 100%, or
When described dispensing real-time scale and setting ratio exceed ± 10% time, or
When main reclaimer and the job scheduling percentage ratio from reclaimer differ by more than 10%,
Alarm device sends warning.
6. double as described in any one of claim 1-5 take feed proportioning system, it is characterised in that:
Described middle control host computer is provided with material variety information, deposits target buttress position information, target feeding amount, target bin number, target binning amount and the batching mode of material;
The display unit of described main host computer is located on the instrumental panel panel of described main reclaimer, and shows its job information;
The described display unit from host computer is located at described from the instrumental panel panel of reclaimer, and shows its job information.
7. as claimed in claim 6 double take feed proportioning system, it is characterised in that: described double it is taken as collinear double take or different line is double takes.
8. one kind uses double feed proportioning system that takes according to claim 6 to carry out double method taking dispensing, it is characterised in that:
The first step, inputs material variety information at middle control host computer, deposits the target buttress position information of material, target feeding amount, target bin number, target binning amount, batching mode, obtain, according to the ratio of target feeding amount, the proportion scale set;
Second step, it is judged that main reclaimer and from reclaimer, it is thus achieved that material stream is from main reclaimer and the time difference from reclaimer to Rendezvous Point;
3rd step, the data of its accumulative feeding amount, instantaneous delivery and job scheduling percentage ratio are stored by main reclaimer, show on reclaimer host computer with the described time difference time delay in second step;
4th step, main reclaimer and the job information shown according to its respective host computer from reclaimer carry out corresponding operation.
The most according to claim 8 pair takes distribution, it is characterised in that: when the job scheduling percentage ratio that master and slave reclaimer host computer shows is more than 100%, stops operation and sent warning by alarm device;Or
When two reclaimer progresses of operation differ by more than 10%, stop operation and sent warning by alarm device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610393436.0A CN105883336B (en) | 2016-06-03 | 2016-06-03 | It is double to take feed proportioning system and its distribution |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610393436.0A CN105883336B (en) | 2016-06-03 | 2016-06-03 | It is double to take feed proportioning system and its distribution |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105883336A true CN105883336A (en) | 2016-08-24 |
CN105883336B CN105883336B (en) | 2017-12-29 |
Family
ID=56710284
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610393436.0A Active CN105883336B (en) | 2016-06-03 | 2016-06-03 | It is double to take feed proportioning system and its distribution |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105883336B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108363353A (en) * | 2018-03-12 | 2018-08-03 | 唐山曹妃甸实业港务有限公司 | The operation quality guarantee of more reclaimer proportioning operating systems and operation quality detection method |
CN114476706A (en) * | 2021-12-08 | 2022-05-13 | 中交水运规划设计院有限公司 | Coal blending method |
US20220342536A1 (en) * | 2021-04-26 | 2022-10-27 | Bushel, Inc. | User interface for adjusting component proportions |
CN117075479A (en) * | 2023-09-15 | 2023-11-17 | 秦皇岛燕大滨沅科技发展有限公司 | Uniform batching control system and method for bulk cargo port |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11180561A (en) * | 1997-12-22 | 1999-07-06 | Kawasaki Heavy Ind Ltd | Quantitative dispensation controller for delivering equipment for coal or the like |
JP2002234611A (en) * | 2001-02-09 | 2002-08-23 | Mitsui Miike Mach Co Ltd | Mixed coal delivery control system by reclaimer |
KR100752124B1 (en) * | 2006-03-27 | 2007-08-24 | 주식회사 포스코 | Belt conveyor total weighing control apparatus |
CN103625936A (en) * | 2013-12-18 | 2014-03-12 | 泰富重工制造有限公司 | Material filing and taking operating line arrangement structure of scattered material storage yard and filing and taking technology |
CN103738705A (en) * | 2014-01-08 | 2014-04-23 | 中国神华能源股份有限公司 | Material fetching machine coal blending control method and system |
CN203581900U (en) * | 2013-12-12 | 2014-05-07 | 南京西坝码头有限公司 | Coal blending PLC control management system |
CN103803278A (en) * | 2014-02-10 | 2014-05-21 | 中国神华能源股份有限公司 | Method, device and system for controlling blended coal flow of double reclaimers |
-
2016
- 2016-06-03 CN CN201610393436.0A patent/CN105883336B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11180561A (en) * | 1997-12-22 | 1999-07-06 | Kawasaki Heavy Ind Ltd | Quantitative dispensation controller for delivering equipment for coal or the like |
JP2002234611A (en) * | 2001-02-09 | 2002-08-23 | Mitsui Miike Mach Co Ltd | Mixed coal delivery control system by reclaimer |
KR100752124B1 (en) * | 2006-03-27 | 2007-08-24 | 주식회사 포스코 | Belt conveyor total weighing control apparatus |
CN203581900U (en) * | 2013-12-12 | 2014-05-07 | 南京西坝码头有限公司 | Coal blending PLC control management system |
CN103625936A (en) * | 2013-12-18 | 2014-03-12 | 泰富重工制造有限公司 | Material filing and taking operating line arrangement structure of scattered material storage yard and filing and taking technology |
CN103738705A (en) * | 2014-01-08 | 2014-04-23 | 中国神华能源股份有限公司 | Material fetching machine coal blending control method and system |
CN103803278A (en) * | 2014-02-10 | 2014-05-21 | 中国神华能源股份有限公司 | Method, device and system for controlling blended coal flow of double reclaimers |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108363353A (en) * | 2018-03-12 | 2018-08-03 | 唐山曹妃甸实业港务有限公司 | The operation quality guarantee of more reclaimer proportioning operating systems and operation quality detection method |
CN108363353B (en) * | 2018-03-12 | 2020-07-07 | 唐山曹妃甸实业港务有限公司 | Operation quality guarantee and operation quality detection method for multi-reclaimer proportioning operation system |
US20220342536A1 (en) * | 2021-04-26 | 2022-10-27 | Bushel, Inc. | User interface for adjusting component proportions |
US12001664B2 (en) * | 2021-04-26 | 2024-06-04 | Bushel, Inc. | User interface for adjusting component proportions |
CN114476706A (en) * | 2021-12-08 | 2022-05-13 | 中交水运规划设计院有限公司 | Coal blending method |
CN114476706B (en) * | 2021-12-08 | 2024-08-09 | 中交水运规划设计院有限公司 | Coal blending method |
CN117075479A (en) * | 2023-09-15 | 2023-11-17 | 秦皇岛燕大滨沅科技发展有限公司 | Uniform batching control system and method for bulk cargo port |
CN117075479B (en) * | 2023-09-15 | 2024-05-03 | 滨沅国科(秦皇岛)智能科技股份有限公司 | Uniform batching control system and method for bulk cargo port |
Also Published As
Publication number | Publication date |
---|---|
CN105883336B (en) | 2017-12-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103276137B (en) | Control method used for computer batch charging system of steelmaking converter | |
CN105883336A (en) | Dual taking and blending system and blending method thereof | |
CN101694576A (en) | Stockyard operation dynamic display and real-time management system and management method thereof | |
CN205068142U (en) | Unmanned on duty joins in marriage fertile station | |
CN109100997A (en) | A kind of Production Scheduling System and method poured in real time based on concrete | |
CN112007738B (en) | Unmanned mine homogenizing batching system and method | |
CN102424889A (en) | Automatic feeding system for automatic steel smelting converter and control method thereof | |
CN105259883A (en) | Unattended fertilizer preparation station | |
CN111546503A (en) | Torpedo tank master station control system, concrete distribution system and distribution method | |
CN106125554A (en) | A kind of continuous batching feed bin charging Operating Ratio automatic adjusting method | |
CN204352833U (en) | A kind of stirring system | |
CN104911291A (en) | Blast furnace multiple-material preparation system and method in concentrated weighing mode | |
CN109213088A (en) | A kind of stock yard physical-distribution intelligent control method | |
CN106017636A (en) | Calcium carbide raw material accurate batching control system and method | |
CN203427160U (en) | Automatic dosing system for raw materials of electrically-fused bricks | |
CN202700444U (en) | Automatic burdening system for wooden-plastic material | |
CN112573221A (en) | Control system and method for intelligent belt transmission flow of stock yard | |
CN103662722B (en) | Coal blending system and process | |
CN104647605A (en) | Aggregate distribution device of dosing machine for stirring station | |
CN203806658U (en) | Ore blending system | |
CN111532805A (en) | Short-flow mixed ore processing technology and system | |
CN203581900U (en) | Coal blending PLC control management system | |
CN102229475B (en) | Control system and method for cement ingredients | |
CN115818157A (en) | Intelligent stock bin management system and method for blast furnace | |
CN110316535A (en) | A kind of automatic feeding system and method for feeding |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |