CN105781107A - Method for setting construction joint in bracket position at end of steel reinforced concrete column in sliding formwork technique - Google Patents

Method for setting construction joint in bracket position at end of steel reinforced concrete column in sliding formwork technique Download PDF

Info

Publication number
CN105781107A
CN105781107A CN201410824306.9A CN201410824306A CN105781107A CN 105781107 A CN105781107 A CN 105781107A CN 201410824306 A CN201410824306 A CN 201410824306A CN 105781107 A CN105781107 A CN 105781107A
Authority
CN
China
Prior art keywords
sliding formwork
concrete
formwork
sliding
cased
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410824306.9A
Other languages
Chinese (zh)
Other versions
CN105781107B (en
Inventor
王纯岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201410824306.9A priority Critical patent/CN105781107B/en
Publication of CN105781107A publication Critical patent/CN105781107A/en
Application granted granted Critical
Publication of CN105781107B publication Critical patent/CN105781107B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention relates to a method for setting a construction joint in a bracket position at the end of a steel reinforced concrete column in a sliding formwork technique. The method comprises the steps that firstly, carrying bars are fixed to the end of the steel reinforced concrete column of each layer; secondly, combined formworks are arranged on the two sides of a steel reinforced concrete beam; thirdly, a first sliding formwork and a second sliding formwork are arranged on the two sides of the steel reinforced concrete beam, and a folded formwork is arranged on the inner side of the second sliding formwork; fourthly, the first sliding formwork and the second sliding formwork are lifted to the position of the top surface in a sliding mode, and the folded formwork reaches the first sliding formwork in the opening direction and is connected with the first sliding formwork through plug pins; fifthly, tension screws are fixed to the combined formworks and the folded formwork; sixthly, concrete is poured; seventhly, the folded formwork is moved to the second sliding formwork in the retracting direction and connected with the second sliding formwork through plug pins; eighthly, the carrying bars are dug out, adhesive tape sealing threaded sleeves is opened, and the carrying bars are connected; and ninthly, the first sliding formwork and the second sliding formwork are lifted to the structural construction position of the next layer in a sliding mode, and the combined formworks are taken out and moved to the construction position of the next layer. By the adoption of the method, the construction speed of a structure is increased, and semi-mechanized construction is guaranteed.

Description

Steel reinforced concrete styletable bracket position construction joint placement method in slipform process
Technical field
The present invention relates to the steel reinforced concrete styletable bracket position construction joint placement method in a kind of slipform process.
Background technology
At present, adopt the frame-core tube system of stiffness steel reinforced concrete structure, generally encorbelmenting in Core Walls Structure steel reinforced concrete sleeper end a segment type steel corbel, being connected by girder with rolled steel section en cased in concrete with outside framework profile steel concrete column, thus forming an overall lateral resisting structure system.With regard to the slipform process that the more difficult employing Core Walls Structure of this structural system is constructed in advance, generally adopt traditional template system by technique with layer integral construction of housing trestle and Core Walls Structure.This kind of construction technology speed is slow, and construction layer operation is crossing many, and construction space is fettered.
Summary of the invention
It is contemplated that overcome the defect of prior art, steel reinforced concrete styletable bracket position construction joint placement method in a kind of slipform process is provided, solving core wall structure adopts slipform process in the problem of section steel beam bracket position construction joint indwelling, optimize the construction technology of structure, improve the speed of application of structure and ensure that semi-mechanization is constructed.
In order to solve above-mentioned technical problem, the present invention is achieved in that
Steel reinforced concrete styletable bracket position construction joint placement method in a kind of slipform process, it is characterised in that comprise the steps:
Step one: before every stratotype steel concrete column stay in place form supports, principal rod at the pre-fixed girder with rolled steel section en cased in concrete meeting anchorage length of its styletable, and I grade of straight thread connector is set in the connection cross section of girder with rolled steel section en cased in concrete Yu profile steel concrete column, joint adopts adhesive tape to be wound around and closes, and described girder with rolled steel section en cased in concrete is I shape shaped steel;
Step 2: gang form is set in girder with rolled steel section en cased in concrete both sides, gang form includes the flat board that two panels is symmetrical, two panels flat board be stitched together after the I shape shape of one hollow of intermediate formation, the one side of two panels flat board is provided with latch, another side is provided with taper dabbing tip, the one side being provided with taper dabbing tip touch concrete surface, and two panels flat board is fixed by latch;
Step 3: girder with rolled steel section en cased in concrete be respectively arranged on the left side and the right side the first sliding formwork and the second sliding formwork, be positioned at inside the second sliding formwork of girder with rolled steel section en cased in concrete bottom and be provided with amounting to template, this is amounted to and is connected by folding between template with the second sliding formwork;
Step 4: the first sliding formwork and the second sliding formwork are sliding to top side location, open and amount to template, along opening direction to the first sliding formwork, and is integrally connected by latch with the first sliding formwork;
Step 5: fix Screw arbor with nut at both-ends in template with amounting in the gang form left and right sides;
Step 6: the sliding formwork of non-bracket position supports complete, casting concrete;
Step 7: after concrete setting, removes Screw arbor with nut at both-ends, opens latch, will amount to template along regaining direction to the second sliding formwork, and is connected by latch interim fixing with the second sliding formwork;
Step 8: dig out the principal rod with straight screw sleeve on girder with rolled steel section en cased in concrete cross section, opens the adhesive tape of sealing thread sleeve, connects principal rod;
Step 9: by sliding to the first sliding formwork and the second sliding formwork to next Rotating fields construction location, take out gang form and move to next layer of construction location.
Steel reinforced concrete styletable bracket position construction joint placement method in described slipform process, it is characterised in that: described profile steel concrete column is Core Walls Structure.
The invention has the beneficial effects as follows: on the basis of form construction technology, adopt this steel concrete styletable bracket position construction joint placement method, bracket by girder with rolled steel section en cased in concrete position of encorbelmenting to Core Walls Structure Shaped Steel concrete sleeper end, the method adopting gang form and the pre-buried steel reinforced concrete beam steel meeting anchorage length with straight screw sleeve, solving core wall structure adopts slipform process in the problem of section steel beam bracket position construction joint indwelling, optimize the construction technology of structure, improve the speed of application of structure and ensure that semi-mechanization is constructed.
Accompanying drawing explanation
Below in conjunction with drawings and embodiments, the present invention is described in further detail:
Fig. 1 is the structural representation of the present invention.
Fig. 2 is the structural representation that profile steel concrete column is connected node with girder with rolled steel section en cased in concrete.
Fig. 3 is the structural representation of gang form.
Fig. 4 is the structural representation in Fig. 3 side-looking direction.
Detailed description of the invention
As depicted in figs. 1 and 2: the steel reinforced concrete styletable bracket position construction joint placement method in a kind of slipform process, comprise the steps:
Step one: before every stratotype steel concrete column 1 stay in place form supports, principal rod 3 at the pre-fixed girder with rolled steel section en cased in concrete 2 meeting anchorage length of its styletable, and I grade of straight thread connector 4 is set in the connection cross section of girder with rolled steel section en cased in concrete Yu profile steel concrete column, joint adopts adhesive tape to be wound around and closes, and described girder with rolled steel section en cased in concrete is I shape shaped steel;
Step 2: gang form 5 is set in girder with rolled steel section en cased in concrete both sides, as shown in Figure 3 and Figure 4, gang form includes the symmetrical flat board that two panels is made up of the steel form that 3mm is thick, two panels flat board be stitched together after the I shape shape of one hollow of intermediate formation, the one side of two panels flat board is provided with latch 51, another side is provided with taper dabbing tip 52, and the one side being provided with taper dabbing tip touch concrete surface, and two panels flat board is fixed by latch;
Step 3: girder with rolled steel section en cased in concrete be respectively arranged on the left side and the right side the first sliding formwork 6 and the second sliding formwork 7, be positioned at inside the second sliding formwork of girder with rolled steel section en cased in concrete bottom and be provided with amounting to template 8, this is amounted to and is connected by folding 9 between template with the second sliding formwork;
Step 4: the first sliding formwork and the second sliding formwork are sliding to top side location, open and amount to template, along opening direction A to first sliding formwork, and is integrally connected by latch with the first sliding formwork;
Step 5: fix Screw arbor with nut at both-ends 10 in template with amounting in the gang form left and right sides;
Step 6: the sliding formwork of non-bracket position supports complete, casting concrete;
Step 7: after concrete setting, removes Screw arbor with nut at both-ends, opens latch, will amount to template along regaining direction B to second sliding formwork, and is connected by latch interim fixing with the second sliding formwork;
Step 8: dig out the principal rod with straight screw sleeve on girder with rolled steel section en cased in concrete cross section, opens the adhesive tape of sealing thread sleeve, connects principal rod;
Step 9: by sliding to the first sliding formwork and the second sliding formwork to next Rotating fields construction location, take out gang form and move to next layer of construction location.
Described profile steel concrete column is Core Walls Structure.

Claims (2)

1. the steel reinforced concrete styletable bracket position construction joint placement method in a slipform process, it is characterised in that comprise the steps:
Step one: before every stratotype steel concrete column stay in place form supports, principal rod at the pre-fixed girder with rolled steel section en cased in concrete meeting anchorage length of its styletable, and I grade of straight thread connector is set in the connection cross section of girder with rolled steel section en cased in concrete Yu profile steel concrete column, joint adopts adhesive tape to be wound around and closes, and described girder with rolled steel section en cased in concrete is I shape shaped steel;
Step 2: gang form is set in girder with rolled steel section en cased in concrete both sides, gang form includes the flat board that two panels is symmetrical, two panels flat board be stitched together after the I shape shape of one hollow of intermediate formation, the one side of two panels flat board is provided with latch, another side is provided with taper dabbing tip, the one side being provided with taper dabbing tip touch concrete surface, and two panels flat board is fixed by latch;
Step 3: girder with rolled steel section en cased in concrete be respectively arranged on the left side and the right side the first sliding formwork and the second sliding formwork, be positioned at inside the second sliding formwork of girder with rolled steel section en cased in concrete bottom and be provided with amounting to template, this is amounted to and is connected by folding between template with the second sliding formwork;
Step 4: the first sliding formwork and the second sliding formwork are sliding to top side location, open and amount to template, along opening direction to the first sliding formwork, and is integrally connected by latch with the first sliding formwork;
Step 5: fix Screw arbor with nut at both-ends in template with amounting in the gang form left and right sides;
Step 6: the sliding formwork of non-bracket position supports complete, casting concrete;
Step 7: after concrete setting, removes Screw arbor with nut at both-ends, opens latch, will amount to template along regaining direction to the second sliding formwork, and is connected by latch interim fixing with the second sliding formwork;
Step 8: dig out the principal rod with straight screw sleeve on girder with rolled steel section en cased in concrete cross section, opens the adhesive tape of sealing thread sleeve, connects principal rod;
Step 9: by sliding to the first sliding formwork and the second sliding formwork to next Rotating fields construction location, take out gang form and move to next layer of construction location.
2. the steel reinforced concrete styletable bracket position construction joint placement method in slipform process according to claim 1, it is characterised in that: described profile steel concrete column is Core Walls Structure.
CN201410824306.9A 2014-12-26 2014-12-26 Steel reinforced concrete styletable bracket position construction joint placement method in slipform process Active CN105781107B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410824306.9A CN105781107B (en) 2014-12-26 2014-12-26 Steel reinforced concrete styletable bracket position construction joint placement method in slipform process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410824306.9A CN105781107B (en) 2014-12-26 2014-12-26 Steel reinforced concrete styletable bracket position construction joint placement method in slipform process

Publications (2)

Publication Number Publication Date
CN105781107A true CN105781107A (en) 2016-07-20
CN105781107B CN105781107B (en) 2017-11-07

Family

ID=56388754

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410824306.9A Active CN105781107B (en) 2014-12-26 2014-12-26 Steel reinforced concrete styletable bracket position construction joint placement method in slipform process

Country Status (1)

Country Link
CN (1) CN105781107B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101979791A (en) * 2010-12-02 2011-02-23 北京建工集团有限责任公司 Ring beam and annular corbel column reinforced connection joint and construction method thereof
CN103437425A (en) * 2013-08-27 2013-12-11 陕西建科兴业钢结构有限公司 Connecting joint of prefabricated hollow steel-reinforced concrete column and steel beam and construction method
CN103806660A (en) * 2014-01-17 2014-05-21 永升建设集团有限公司 Stiff concrete structure beam-column node construction method
CN104032956A (en) * 2014-06-24 2014-09-10 天津二十冶建设有限公司 Construction method for connecting reinforced concrete beams with steel reinforced concrete columns

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101979791A (en) * 2010-12-02 2011-02-23 北京建工集团有限责任公司 Ring beam and annular corbel column reinforced connection joint and construction method thereof
CN103437425A (en) * 2013-08-27 2013-12-11 陕西建科兴业钢结构有限公司 Connecting joint of prefabricated hollow steel-reinforced concrete column and steel beam and construction method
CN103806660A (en) * 2014-01-17 2014-05-21 永升建设集团有限公司 Stiff concrete structure beam-column node construction method
CN104032956A (en) * 2014-06-24 2014-09-10 天津二十冶建设有限公司 Construction method for connecting reinforced concrete beams with steel reinforced concrete columns

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
范波等: ""中国华电大厦结构设计"", 《建筑结构》 *
赵雅等: ""型钢混凝土组合结构深化设计及施工技术"", 《赵雅第五届全国钢结构工程技术交流会论文集》 *

Also Published As

Publication number Publication date
CN105781107B (en) 2017-11-07

Similar Documents

Publication Publication Date Title
WO2018196151A1 (en) Prefabricated cavity-type perpend forming concrete shear wall
CN103790265B (en) A kind of prefabricated assembled steel tube concrete core pillar is put more energy into the making assembly method of shear wall
CN103850363B (en) Prefabricated through hole assembly type reinforced concrete shear wall and construction method of prefabricated through hole assembly type reinforced concrete shear wall
CN207582956U (en) A kind of one-time formed constructing device of concrete window tongue and groove
CN203188609U (en) Formwork structure for deformation joint
CN104847020A (en) Limb type circular tube node transferring structure and manufacturing method thereof
CN105317168A (en) Split-type steel bar sleeve full-grouting joint
CN203769116U (en) Prefabricated through hole assembly type reinforced concrete shear wall
CN203684526U (en) PBL stiffened rectangular steel tube concrete space truss
CN104763103B (en) A kind of construction method of prefabricated concrete collar tie beam
CN106193334A (en) Assembling type steel structure beam through mortise and tenon type node structure and assemble method
CN204753841U (en) Picture peg formula beam column connected node
CN204023800U (en) Steel corbel formula steel core concrete column and girder with rolled steel section en cased in concrete node connecting structure
CN203834744U (en) Frame type reinforced concrete hollow shear wall structure
CN105781107A (en) Method for setting construction joint in bracket position at end of steel reinforced concrete column in sliding formwork technique
CN206052983U (en) Assembling type steel structure beam insertion mortise and tenon type node structure
CN104929253A (en) Inserting plate type beam-column connection joint
CN104005476B (en) Be easy to fabrication and installation precast frame system and construction method
CN204571019U (en) A kind of novel T-shaped overlaid plate type shear wall edge member
CN204662739U (en) A kind of steel bar truss floor support plate and light-steel light-concrete combining structure
CN206600005U (en) The positioning component and positioner of reserved joint bar in shear wall
CN208917997U (en) The prefabricated node component of armored concrete
CN205999941U (en) A kind of underground continuous wall section attachment means
CN205349372U (en) For a short time, construct to fold friendship tunnel controllable gate shaped steel frame apart from shield only
CN204510688U (en) A kind of temporary fixing structure of precast wall panel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant