CN105737697B - A kind of outlining blasting method suitable for joints development rock mass - Google Patents

A kind of outlining blasting method suitable for joints development rock mass Download PDF

Info

Publication number
CN105737697B
CN105737697B CN201610290939.5A CN201610290939A CN105737697B CN 105737697 B CN105737697 B CN 105737697B CN 201610290939 A CN201610290939 A CN 201610290939A CN 105737697 B CN105737697 B CN 105737697B
Authority
CN
China
Prior art keywords
hole
cement mortar
powder charge
explosive
outlining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610290939.5A
Other languages
Chinese (zh)
Other versions
CN105737697A (en
Inventor
陈明
邓珂
卢文波
严鹏
王高辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University WHU
Original Assignee
Wuhan University WHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University WHU filed Critical Wuhan University WHU
Priority to CN201610290939.5A priority Critical patent/CN105737697B/en
Publication of CN105737697A publication Critical patent/CN105737697A/en
Application granted granted Critical
Publication of CN105737697B publication Critical patent/CN105737697B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/08Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of outlining blasting method suitable for joints development rock mass, belong to Hydraulic and Hydro-Power Engineering technical field.The inventive method comprises the following steps:To loading explosive and initiating equipment in outlining blasting hole, reinforcement charge constitution is only being used at the aperture and bottom hole for blocking section in powder charge section;Then cement mortar is poured into, cement mortar is filled to the joint on outlining blasting hole and its periphery, crack using its deadweight, the ignition charge before cement mortar initial set.Present invention cement mortar makees couplant, the joint fissure of blasthole and its surrounding rock body can be filled, improve the intensity and globality of rock mass, under the effect of blast impulse pressure, the compressibility of cement mortar is small, and the speed of expansion of detonation gas is slow, and action time increases, so that explosive load gently and is uniformly acted on the hole wall of surrounding, preferable outlining blasting effect is obtained.Meanwhile, the present invention can improve the capacity usage ratio of explosive, effectively reduce the consumption of explosive and explosive, reduce blast cost.

Description

A kind of outlining blasting method suitable for joints development rock mass
Technical field
The present invention relates to Hydraulic and Hydro-Power Engineering technical field, and in particular to a kind of profile suitable for joints development rock mass is quick-fried Broken method.
Background technology
The excavation quality of waterwork rock mass is directly connected to rock mass structure and hydraulic structure exists in Hydraulic and Hydro-Power Engineering The displacement of construction time and runtime and stability control, are the key technical problems during Hydraulic and Hydro-Power Engineering is built.In recent years, greatly The construction zero turn radius southwest high-mountain gorge areas of type Hydraulic and Hydro-Power Engineering, and southwest complex geologic conditions, Weathering Zones of Igneous Rock Big compared with deep, off-load depth, developmental joint fissure brings huge challenge to rock blasting excavation work.Such as white crane beach power station Prismatical joint basalt etc. easily occur the rock mass for damaging and loosening under explosive load effect, technical staff needs to propose a kind of The blasting method for more optimizing, effectively to control Rock Damage.The main method of control rock excavation quality is using wheel at this stage Wide blasting method, but the outlining blasting method of routine has been difficult easily occur the rock mass of damage and loosening suitable for prismatical joint etc.. It is current urgent problem that the excavation quality of this kind of rock mass how to be controlled to obtain preferable excavation effect.
The content of the invention
It is an object of the invention to overcome the shortcomings of that prior art is present, there is provided a kind of wheel suitable for joints development rock mass Wide blasting method, it is adaptable to the Blasting Excavation engineering of the engineering field such as water conservancy and hydropower, railway, urban construction.
The purpose of the present invention is achieved through the following technical solutions:
A kind of outlining blasting method suitable for joints development rock mass, comprises the following steps:Load in outlining blasting hole Explosive and initiating equipment, in powder charge section only at aperture(Powder charge section is near the position blocked at section)Filled using reinforcement with bottom hole Medicine structure;Then cement mortar is poured into, cement mortar is filled out to the joint on outlining blasting hole and its periphery, crack using its deadweight Fill, the ignition charge before cement mortar initial set.
Described cement mortar, should meet following requirement:
(1)The general Portland cement or silicate dam cement that C32.5 is not less than using label, consumption is unsuitable small In 200kg/m3
(2)Requirement to cement fineness is to be not more than 5% by the screen over-size of 80 μm of square hole screens, and general cement granules should be small In the 1/3~1/5 of Fracture Width.
(3)The ratio of mud is controlled 0.35:1~5:1, retarder is added in cement mortar controls the presetting period of cement mortar 1~5 hour.The volume of additive is usually no more than the 5% of cement quality.
Described explosive and initiating equipment be by explosive with the material such as bamboo chip or PVC plastic flitch be supporter and primacord bundle It is held together, is then placed into blasthole;In powder charge section, only in aperture(Powder charge section is near blocking section position)Used with bottom hole Strengthen powder charge, remaining position not explosive, the length of primacord is identical with powder charge segment length.Ignited using primacord propagation of explosion The explosive at powder charge section two ends, and primacord also generates the energy of part blast, the energy using two ends explosive and primacord enters Row explosion forms contoured surface.
The described outlining blasting method suitable for joints development rock mass, specifically includes following steps:
(1)According to explosion design requirement, after excavating quick-fried area and being drilled with outlining blasting hole, by explosive with bamboo chip or PVC plastic The materials such as flitch are bundled for supporter with primacord, to powder charge in outlining blasting hole.Powder charge section two ends aperture at and Using powder charge is strengthened at bottom hole, the length of primacord is identical with the length of powder charge section, and Nonel detonator is located at powder charge section upper end hole At mouthful(Powder charge section is at the aperture for blocking section), and bundle overlap joint with primacord.
(2)Using grouting equipment to the cement mortar that foundation field requirement is prepared is fed into hole, cement mortar is set to utilize it Conduct oneself with dignity and the joint on outlining blasting hole and its periphery, crack are filled.And blasthole is blocked with rock slag, stemming length according to Explosion design requirement.
(3)Each Nonel detonator is connected according to blasting network design requirement detonator and confirm initiation net safety. Before cement mortar initial set, by Nonel detonator ignition charge.The degree of impairment of profiled orifice is observed, detected after the completion of explosion.
Principle of the invention is, is that supporter is fixed by materials such as explosive bamboo chip, PVC plastic flitch after drilling, quick-fried with leading Rope is bundled and is put into hole, using reinforcement powder charge only at powder charge sector hole mouthful and bottom hole.After explosive is placed, using note The grout pouring that slurry equipment will be prepared enters in outlining blasting hole, makes cement mortar in the full outlining blasting hole of Gravitative Loads retrofilling And its joint, the crack of surrounding.Blocking section is placed in as plugging material with the rock slag of collection in worksite, primacord is not passed through blocking Section.Before cement mortar initial set, using the primacord in cap sensitive hole, primacord is then ignited positioned at the fried of aperture and bottom hole Medicine.The present invention replaces the couplants such as traditional air or water with cement mortar, and cement mortar can fill blasthole and its surrounding rock body Joint fissure, the intensity and globality of rock mass can be improved after hardening.Under huge blast impulse pressure effect, cement mortar Compressibility is relatively small, and the speed of expansion of detonation gas is slower, and action time increases, so that explosive load is than shallower and equal On the even hole wall for acting on surrounding, preferable outlining blasting effect is obtained in joints development rock mass, and reduce explosion damage Effect.Meanwhile, the capacity usage ratio of explosive can be improved, the consumption of explosive and explosive is effectively reduced, reduce blast cost.
Compared with prior art, the beneficial effects of the present invention are:
1st, acted on using the gravity grouting of cement mortar so that the trickle joint fissure in joints development rock mass is filled with, and makes The intensity for obtaining joints development rock mass is improved with globality.
2nd, in outlining blasting hole fill cement mortar as couplant, for more traditional water, air, in huge blast Under impulsive force, compressibility is smaller, effectively the action time of extension detonation gas, improves explosive utilization rate, can so reduce dress Medicine is consumed, and reduces construction costs.
3rd, perfusion equipment and process is simple, the lower cost for material of cement mortar, it is easy to obtain.
4th, in hole, using explosive and primacord in cap sensitive outlining blasting hole, more safety can for primacord full section Lean on.
5th, only strengthen powder charge at powder charge sector hole mouthful and bottom hole, using the energy of primacord and two ends explosive carry out explosion from And contoured surface is formed, this kind of charge constitution greatlys save explosive consumption, reduces construction costs.
Brief description of the drawings
Fig. 1 is outlining blasting hole of the present invention overall structure diagram;
Fig. 2 is protective layer excavation borehole pattern;
Fig. 3 be Fig. 2 in A-A to profile;
In figure, 1 is detonator, and 2 is rock slag, and 3 is Nonel detonator, and 4 to strengthen powder charge section, and 5 is primacord and bamboo chip, 6 It is cement mortar, 7 to block section, and 8 is powder charge section, and 9 is main blast hole, and 10 is cushion hole, and 11 is outlining blasting hole, and α is rock foundation Inclination angle.
Specific embodiment
The present invention will be further described with specific embodiment for explanation below in conjunction with the accompanying drawings.
Outlining blasting hole of the present invention overall structure diagram is as shown in figure 1, be divided into blocking section 7 and powder charge 8 two parts of section.It is fried Medicine is bundled as supporter and primacord with bamboo chip and is positioned in blasthole, the length phase of the length of primacord and powder charge section Together, in Fig. 1,5 is primacord and bamboo chip, and 4 is reinforcement powder charge section.Positioned at powder charge section upper end aperture at Nonel detonator 3 with lead Quick-fried rope binding overlap joint, one end of detonator 1 is connected with Nonel detonator 3, other end exposed hole outward and with other outlining blasting holes Detonator connection.Powder charge 8 grout injections 6 of section, block section 7 and are blocked for 2 pairs with rock slag.
The present invention specifically includes following steps suitable for the outlining blasting method of joints development rock mass:
(1)According to explosion design requirement, after excavating quick-fried area and being drilled with outlining blasting hole, by explosive with bamboo chip or PVC plastic The materials such as flitch are bundled for supporter with primacord, to powder charge in outlining blasting hole.The aperture and hole at powder charge section two ends Using strengthening, powder charge, the length of primacord are identical with the length of powder charge section for bottom, and Nonel detonator is located at powder charge section upper end aperture Place, and bundle overlap joint with primacord.
(2)Using grouting equipment to the cement mortar that foundation field requirement is prepared is fed into hole, cement mortar is set to utilize it Conduct oneself with dignity and the joint on outlining blasting hole and its periphery, crack are filled.And blasthole is blocked with rock slag, stemming length according to Explosion design requirement.
(3)Each Nonel detonator is connected according to blasting network design requirement detonator and confirm initiation net safety. Before cement mortar initial set, by Nonel detonator ignition charge.The degree of impairment of profiled orifice is observed, detected after the completion of explosion.
Embodiment 1
Certain Hydraulic and Hydro-Power Engineering induced joint rock foundation protection course excavation project, because basic rock mass belongs to prismatical joint rock Body, conventional outlining blasting blasting vibration is big, and explosion damage range is big, and column joint plane loose range is big after explosion.Therefore consider to use To ensure excavation quality, as requested, outlining blasting mode selects presplit blasting scheme to outlining blasting technology of the invention.Protection Layer uses Long-hole Bench Blasting, and protective layer excavation drilling is arranged as shown in Figures 2 and 3, shoulder height 8m, rock foundation inclination alpha=65 O, protective layer thickness is 5m, pre- ceasma 11(Outlining blasting hole)Drilling depth is 8.8m, and main blast hole 9 needs outdrill with cushion hole 10 0.3m, is 9.1m.0.8~the 0.9m of spacing of pre- ceasma 11, burden is 1m.The spacing 1.8m of cushion hole 10, burden is 1.5m.It is main The spacing of blast hole 9 is 3m, and burden is 2.5m.Bore diameter is 90mm, main blast hole Explosive roll diameter 70mm, cushion hole explosive medicine Coil diameter 50mm, a diameter of 32mm of Explosive roll of pre- ceasma, often save powder stick 20cm long, weight 150g.Main blast hole 9, cushion hole 10 It is consistent with rock foundation inclination alpha with the angle of inclination in outlining blasting hole 11.
Comprise the following steps that:
1st, drill:According to explosion design requirement, surveying and locating boring point is drilled with blast hole behind position, to be carried out after the completion of drilling Verify work.Design altitude is got into not enough the mending of hole depth, and the blasthole of ultra-deep will do back-up sand treatment.
2nd, powder charge:, using conventional level charging structure, explosive is uniformly distributed along blasthole axis for main blast hole and cushion hole powder charge. For pre- ceasma, the explosive series connection of volume 3 are placed at powder charge sector hole mouthful and bottom hole respectively, and primacord parallel connection bind is on bamboo chip. Near 1 section of Nonel detonator binding overlap joint of one section of primacord in aperture and two hairs, then it is connected with Nonel detonator with detonator, is led The other end extension of booster is portalled outer.
3rd, grout injection:It is existing to being injected in the pre- ceasma being drilled with using grouting equipment after explosive is positioned over into blasthole The good cement mortar of mixing, makes cement mortar be filled to the joint on pre- ceasma and its periphery, crack using its deadweight.Cement mortar Using C32.5 Portland cements, fineness is 10 μm, and the ratio of mud uses 1:1, according to《Hydraulic structure cement grout is constructed Technical specification》(SL62-94)Calculate, cement consumption about 210kg in every cubic meter of water mud, water is 210kg.
4th, block:Using collection in worksite to rock slag main blast hole, cushion hole and pre- ceasma are blocked, stemming length is 1m。
5th, networking and detonation:Before cement mortar initial set, the detonator that pre- ceasma is exposed outside is connected into according to design requirement After blasting network, after confirming that personnel equipment withdraws in network security and fence coverage, detonate whole blasting network.
6th, demolition effect detection:After explosion is completed, the flatness and its crack distribution situation of contoured surface are observed, using sound Ripple test equipment detects the lesion depths of wall interior rock.
Specific embodiment described herein is only to the spiritual explanation for example of the present invention.Technology neck belonging to of the invention The technical staff in domain can be made various modifications or supplement to described specific embodiment or be replaced using similar method Generation, but without departing from spirit of the invention or surmount scope defined in appended claims.

Claims (4)

1. a kind of outlining blasting method suitable for joints development rock mass, it is characterised in that comprise the following steps:To outlining blasting Loading explosive and initiating equipment in hole, reinforcement charge constitution is being used in powder charge section at the aperture for blocking section and at bottom hole; Then cement mortar is poured into, cement mortar is filled to the joint on outlining blasting hole and its periphery, crack using its deadweight, in water Ignition charge forms contoured surface before mud initial set.
2. the outlining blasting method suitable for joints development rock mass according to claim 1, it is characterised in that:Described water Mud meets following requirement:
(1) Portland cement or silicate dam cement of C32.5 are not less than using label, consumption is less than 200kg/m3
(2) requirement of cement fineness is to be not more than 5% by the screen over-size of 80 μm of square hole screens, and cement granules are less than Fracture Width 1/3;
(3) ratio of mud control is 0.35:1~5:1, retarder is added in cement mortar makes the presetting period of cement mortar control 1~5 Hour;5% of the volume of additive no more than cement quality.
3. the outlining blasting method suitable for joints development rock mass according to claim 1, it is characterised in that:Described is fried Medicine is to bundle explosive supporter and primacord with initiating equipment;In powder charge section, only near the aperture for blocking section Strengthen powder charge, not powder charge at remaining with being used at bottom hole.
4. the outlining blasting method suitable for joints development rock mass according to claim 1, it is characterised in that including as follows Step:
(1) after excavating quick-fried area and being drilled with outlining blasting hole, explosive supporter and primacord are bundled, it is quick-fried to profile Powder charge in holes;Powder charge section is at the aperture for blocking section and at bottom hole using reinforcement powder charge, length and the powder charge section of primacord Length it is identical, Nonel detonator be located at powder charge section near block section aperture at, and with primacord bundle overlap;
(2) using grouting equipment to the cement mortar for preparing is fed into hole, make cement mortar using its deadweight to outlining blasting hole And its joint on periphery, crack are filled;And blasthole is blocked with rock slag;
(3) connect each Nonel detonator with detonator and confirm initiation net safety;Before cement mortar initial set, by detonator thunder Pipe ignition charge;The degree of impairment of profiled orifice is observed, detected after the completion of explosion.
CN201610290939.5A 2016-05-05 2016-05-05 A kind of outlining blasting method suitable for joints development rock mass Active CN105737697B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610290939.5A CN105737697B (en) 2016-05-05 2016-05-05 A kind of outlining blasting method suitable for joints development rock mass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610290939.5A CN105737697B (en) 2016-05-05 2016-05-05 A kind of outlining blasting method suitable for joints development rock mass

Publications (2)

Publication Number Publication Date
CN105737697A CN105737697A (en) 2016-07-06
CN105737697B true CN105737697B (en) 2017-06-27

Family

ID=56287995

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610290939.5A Active CN105737697B (en) 2016-05-05 2016-05-05 A kind of outlining blasting method suitable for joints development rock mass

Country Status (1)

Country Link
CN (1) CN105737697B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108844424B (en) * 2018-06-11 2019-11-08 武汉大学 Blasthole blocking up method
CN110500925B (en) * 2019-09-02 2021-10-26 中铁四局集团有限公司 Deep hole blasting charging method for penetrating through molten cavity and molten cavity detection device
CN111536839B (en) * 2020-04-23 2022-07-26 重庆交通大学 Hydraulic blasting construction method for joint fracture development rock mass tunnel
CN114659417B (en) * 2020-12-23 2024-07-19 西南科技大学 Ultrasonic excitation assisted hard rock blasting method
CN112880506A (en) * 2021-01-28 2021-06-01 中国水利水电第九工程局有限公司 Construction method for mine bench blasting
CN114353610B (en) * 2021-12-21 2023-04-25 湖北工业大学 Structure and construction method for sectional charging in horizontal or gently inclined blind blasthole
CN114353609B (en) * 2021-12-21 2023-05-12 湖北工业大学 Structure and method for sectional charging in downward blast hole
CN114440721B (en) * 2022-03-09 2023-06-06 黄河勘测规划设计研究院有限公司 Slurry explosion reinforcement method for hard surrounding rock joint development area of tunnel

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103148748A (en) * 2013-03-08 2013-06-12 中国矿业大学 Pressure-adjustable expansion plastic pipe deep hole blasting control method
CN103603675A (en) * 2013-09-20 2014-02-26 张瀚 Supporting method of permeable soft broken rock stratum roadway
CN103774651A (en) * 2012-10-26 2014-05-07 兰州大学 Olive-shaped anti-slip key grouted anchoring supporting blasting anchor rod
CN104215137A (en) * 2014-09-28 2014-12-17 武汉大学 Method for blasting and excavating dam foundation and rock foundation
CN104457459A (en) * 2014-10-20 2015-03-25 西安科技大学 Coal mine roof deep hole roof breaking charging structure and detonation method
CN105300203A (en) * 2015-10-22 2016-02-03 武汉大学 Outline blasting method used for rock foundation excavation

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8413584B2 (en) * 2010-04-23 2013-04-09 Minova International Limited Cementitious compositions

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103774651A (en) * 2012-10-26 2014-05-07 兰州大学 Olive-shaped anti-slip key grouted anchoring supporting blasting anchor rod
CN103148748A (en) * 2013-03-08 2013-06-12 中国矿业大学 Pressure-adjustable expansion plastic pipe deep hole blasting control method
CN103603675A (en) * 2013-09-20 2014-02-26 张瀚 Supporting method of permeable soft broken rock stratum roadway
CN104215137A (en) * 2014-09-28 2014-12-17 武汉大学 Method for blasting and excavating dam foundation and rock foundation
CN104457459A (en) * 2014-10-20 2015-03-25 西安科技大学 Coal mine roof deep hole roof breaking charging structure and detonation method
CN105300203A (en) * 2015-10-22 2016-02-03 武汉大学 Outline blasting method used for rock foundation excavation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
充填水泥浆岩石节理峰值剪切强度模型;孙辅庭等;《岩石力学与工程学报》;20141231;第33卷(第12期);2481-2489 *

Also Published As

Publication number Publication date
CN105737697A (en) 2016-07-06

Similar Documents

Publication Publication Date Title
CN105737697B (en) A kind of outlining blasting method suitable for joints development rock mass
CN105300203B (en) A kind of outlining blasting method excavated for batholith
Huang et al. Hydraulic fracturing after water pressure control blasting for increased fracturing
CN102121395B (en) Method for integrated comprehensive management of gas in low-permeability single coal bed
CN106949797B (en) The moulding composite spherical energy-dissipating structure of impact for vertical holes explosion
CN104005415B (en) The efficient forming construction method thereof of diaphram wall in light weathered granite
CN104215137A (en) Method for blasting and excavating dam foundation and rock foundation
CN106437497B (en) Hydraulic pressure demolition fracturing builds the hot dry rock method that manually heat is stored up
CN101709651A (en) Grouting water blocking method for undersea tunnel
CN107024154A (en) High slope deep hole blasting construction method under a kind of complex environment
CN102878874A (en) Deep-hole pre-splitting blasting grouting method
CN111365002B (en) Ground pre-grouting method for small-section high wellbore in complex stratum
CN103267455A (en) Dam foundation one-step forming drilling blasting method by combining energy dissipation and energy collection of blast hole bottom
CN105484269B (en) Foundation pit enclosure structure seepage prevention and treatment construction method under blasting condition
CN103362117A (en) Full-section grouting method for grouting section
CN105401946A (en) Reverse blasting excavation method of shaft and pilot shaft
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
CN103835723A (en) Comprehensive pretreatment method for shaft penetration in mined-out area stratum
CN106013078B (en) Construction method of strong permeable stratum reinforcing curtain structure
CN102011591A (en) Grouting process for working surface of deep well
CN110056360A (en) A kind of construction method in highway stone matter tunnel
CN104654941A (en) Dam foundation rapid excavation blasting forming method based on mixed loading truck
Tian et al. Study on the deformation failure mechanism and coupling support technology of soft rock roadways in strong wind oxidation zones
CN101493305A (en) Damping blasting method for tunnel diggin
CN103147435A (en) Method for treating construction engineering foundation in gob

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant