[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN105696808A - Reinforced concrete supporting structure and dismantling method - Google Patents

Reinforced concrete supporting structure and dismantling method Download PDF

Info

Publication number
CN105696808A
CN105696808A CN201610239050.4A CN201610239050A CN105696808A CN 105696808 A CN105696808 A CN 105696808A CN 201610239050 A CN201610239050 A CN 201610239050A CN 105696808 A CN105696808 A CN 105696808A
Authority
CN
China
Prior art keywords
reinforced concrete
concrete support
section
splitting
adopt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610239050.4A
Other languages
Chinese (zh)
Inventor
毛子成
朱煜
熊玎玮
马文浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 5 Group Co Ltd
Original Assignee
Shanghai Construction No 5 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 5 Group Co Ltd filed Critical Shanghai Construction No 5 Group Co Ltd
Publication of CN105696808A publication Critical patent/CN105696808A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G25/02Shores or struts; Chocks non-telescopic
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/08Wrecking of buildings
    • E04G23/082Wrecking of buildings using shears, breakers, jaws and the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention provides a reinforced concrete support structure and a dismantling method.The reinforced concrete supporting structure comprises a reinforced concrete support and through splitting holes formed in the reinforced concrete support, the drill quantity needed during dismantling construction of the reinforced concrete support can be decreased, embedding work of part of the splitting holes is performed during pouring and tamping construction of the reinforced concrete support, and therefore following splitting and dismantling of the reinforced concrete support are conveniently performed through the splitting holes.In addition, the static splitting, steel bar cutting and mechanical lifting method is adopted in dismantling of the reinforced concrete support, the method is easy and convenient to construct, safe and reliable, low in noise, little in raise dust and few in influence on a main body structure and the ambient environment, and the construction progress of an underground structure is also guaranteed.

Description

Reinforced concrete support structure and method for dismounting
Technical field
The present invention relates to a kind of reinforced concrete support structure and method for dismounting。
Background technology
General to reinforced concrete support dismounting, the methods adopting pick machines to carry out crushing or cutting at present more。It is relatively big that pick crusher machine produces noise, can affect the rest of surrounding enviroment and nearby residents, also often agent structure and main body steel bar quality is produced impact;And adopting cutting mode, although speed is fast, but relatively costly。
Summary of the invention
It is an object of the invention to provide a kind of reinforced concrete support structure and method for dismounting, it is possible to remove reinforced concrete support easily, solve the difficult problem that concrete support is removed。
For solving the problems referred to above, the present invention provides a kind of reinforced concrete support structure, including:
Reinforced concrete support;
It is arranged at the splitting hole on described reinforced concrete support。
Further, in above-mentioned reinforced concrete support structure, described splitting hole is formed by the tubing being embedded in advance in described reinforced concrete support, described tubing one end open, and the other end is closed。
Further, in above-mentioned reinforced concrete support structure, described tubing is hollow hard paper tube。
Further, in above-mentioned reinforced concrete support structure, the external diameter of described hollow hard paper tube is 4cm。
Further, in above-mentioned reinforced concrete support structure, the blind end of described tubing is taper。
Further, in above-mentioned reinforced concrete support structure, the length of described tubing is the 75% of the thickness of described reinforced concrete support。
Another side according to the present invention, it is provided that the method for dismounting of a kind of reinforced concrete support, described reinforced concrete support adopts above-mentioned reinforced concrete support structure, and described method includes:
Reinforced concrete support is carried out segmentation division;
Remove the foreign material in splitting hole;
Adopt the super high pressure oil that hydraulic splitting machine is exported by pumping plant to drive oil cylinder, produce huge motive force the splitting hole acting on one section of reinforced concrete support after mechan-amplifier, make reinforced concrete brace split by predetermined direction;
Assemble hydraulic pincer on board a dredger, adopt described hydraulic pincer to be caught broken by the concrete of this section of reinforced concrete support, make reinforcing steel bars exposed;
The reinforcing bar of this section of reinforced concrete support is carried out artificial gas cutting;
Adopt truck crane to be hung onto by this section of reinforced concrete support and haulage vehicle is transported to off-site。
Further, in the above-mentioned methods, reinforced concrete support being carried out in the step of segmentation division, after segmentation, the Weight control of every section of reinforced concrete support is within 8 tons。
Further, in the above-mentioned methods, before reinforced concrete support is carried out the step of segmentation division, also include:
The mode adopting on-the-spot Drilling increases splitting hole on reinforced concrete support。
Further, in the above-mentioned methods, assemble hydraulic pincer on board a dredger, adopt described hydraulic pincer to be caught broken by the concrete of this section of reinforced concrete support, before making the step of reinforcing steel bars exposed, also include:
With fork truck hold this section of reinforced concrete support or the bottom of this section of reinforced concrete support adopt set up framed bent。
Further, in the above-mentioned methods, adopt truck crane to be hung onto by this section of reinforced concrete support and haulage vehicle is transported to off-site, including:
After certain section of reinforced concrete support gas cutting within the scope of the lifting of described truck crane, directly it is lifted on haulage vehicle and is transported to off-site;
Extraneous certain section of reinforced concrete support of lifting to described truck crane, after adopting transporting equipment to be transported within the scope of the lifting of truck crane, then is lifted on haulage vehicle and is transported to off-site。
Compared with prior art, the present invention passes through reinforced concrete support;It is arranged at the splitting hole on described reinforced concrete support, boring amount during reinforced concrete support Demolition Construction can be reduced, carry out the burying work beforehand in part splitting hole when concrete support waters and smashes construction, conveniently subsequently through splitting hole, described reinforced concrete support is carried out splitting and remove。Additionally removing of reinforced concrete support is adopted static state splitting, reinforcing bar to cut and the method for machinery handling by the present invention, its easy construction, safe and reliable, noise is little, airborne dust is few, agent structure and surrounding enviroment are affected less, also ensure that the construction speed of underground structure。
Accompanying drawing explanation
Fig. 1 is the structure chart of the reinforced concrete support structure of one embodiment of the invention;
Fig. 2 is the splitting pore structure figure of the reinforced concrete support structure of one embodiment of the invention;
Fig. 3 is the stepwise schematic views of the reinforced concrete support structure of one embodiment of the invention;
Fig. 4 is the local segmentation schematic diagram of the reinforced concrete support structure of one embodiment of the invention。
Detailed description of the invention
Understandable for enabling the above-mentioned purpose of the present invention, feature and advantage to become apparent from, below in conjunction with the drawings and specific embodiments, the present invention is further detailed explanation。
Embodiment one
As illustrated in fig. 1 and 2, the present invention provides a kind of reinforced concrete support structure, including:
Reinforced concrete support 1;
It is arranged at the splitting hole 2 on described reinforced concrete support。At this, for reducing boring amount during reinforced concrete support Demolition Construction, carry out the burying work beforehand in part splitting hole when concrete support waters and smashes construction, conveniently subsequently through splitting hole, described reinforced concrete support is carried out splitting and remove。It addition, the position cleaving hole and quantity on described reinforced concrete support can be determined through calculating according to the intensity of described reinforced concrete support and quantity of reinforcement。
Preferably, as in figure 2 it is shown, described splitting hole 2 is formed by the tubing 3 being embedded in advance in described reinforced concrete support 1, described tubing one end open, the other end is closed。
Preferably, described tubing is hollow hard paper tube。It is also preferred that the left the external diameter of described hollow hard paper tube is 4cm。
Preferably, as in figure 2 it is shown, the blind end of described tubing is taper, facilitates tapering point insertion just to water and smash in complete reinforced concrete support。
Preferably, as in figure 2 it is shown, the 75% of the thickness that the length of described tubing is described reinforced concrete support。Concrete, as in figure 2 it is shown, utilize the commerical ready-mixed concrete used by reinforced concrete support to have this feature of very strong mobility, after concreting, by technical parameters such as the splitting pitch-row of hole designing requirement, array pitch, angle, the degree of depth, insert just to have watered by tubing and smash in complete concrete and fix。The hollow hard paper tube that pre-buried tubing can adopt external diameter to be 4cm。The length L of tubing matter determines according to reinforced concrete support thickness, is generally the 75% of reinforced concrete support height H。
The present embodiment passes through reinforced concrete support;It is arranged at the splitting hole on described reinforced concrete support, boring amount during reinforced concrete support Demolition Construction can be reduced, carry out the burying work beforehand in part splitting hole when concrete support waters and smashes construction, conveniently subsequently through splitting hole, described reinforced concrete support is carried out splitting and remove。
Embodiment two
The present invention also provides for the method for dismounting of another kind of reinforced concrete support, and described reinforced concrete support adopts the reinforced concrete support structure described in embodiment one, and described method includes:
Step S1, as shown in Figures 3 and 4, carries out segmentation division to reinforced concrete support 1;Before removing reinforced concrete support, first carry out the segmentation to reinforced concrete support to divide, restriction due to on-the-spot place and traffic, reinforced concrete support adopts the method for piecemeal cutting handling, preferably, after segmentation, the Weight control of every section of reinforced concrete support is within 8 tons, as shown in Figures 3 and 4, is the one section of reinforced concrete support 1 divided between each two segmentation markers 4;Preferably, before step S1, also include: adopt the mode of on-the-spot Drilling to increase splitting hole on reinforced concrete support, specifically can by technical parameters such as the splitting pitch-row of hole designing requirement, array pitch, angle, the degree of depth, Drilling is carried out in reinforced concrete support relevant position, increase splitting hole when realization needs, facilitate the purpose of follow-up dismounting;
Step S2, removes the foreign material in splitting hole;
Step S3, the super high pressure oil that hydraulic splitting machine is exported by pumping plant is adopted to drive oil cylinder, produce huge motive force the splitting hole acting on one section of reinforced concrete support after mechan-amplifier, reinforced concrete brace is made to split by predetermined direction, thus creating condition easily for the construction of rear hydraulic pincer;
Step S4, assemble hydraulic pincer on board a dredger, described hydraulic pincer is adopted to be caught broken by the concrete of this section of reinforced concrete support, make reinforcing steel bars exposed, concrete, concrete is after splitting, internal structure is loosened, hydraulic pincer is adopted to be caught broken by concrete, reinforcing steel bars exposed, it is beneficial to subsequent construction, when disintegrating forceps crushes, special messenger is sent to command, oppose when preventing mechanical execution from advancing stanchion, wall steel bar damages, preferably, before step S4, also include with fork truck hold this section of reinforced concrete support or the bottom of this section of reinforced concrete support adopt set up framed bent;
Step S5, carries out artificial gas cutting to the reinforcing bar of this section of reinforced concrete support;Concrete, disintegrating forceps after concrete disintegrating, will adopt artificial gas cutting reinforcing bar;
Step S6, adopts truck crane to be hung onto by this section of reinforced concrete support and is transported to off-site on haulage vehicle。Concrete, owing to support distances hoisting point position is different during lifting, therefore crane capacity is restricted, so must calculate the weight of every block concrete before cutting according to crane capacity。Lifting lifting hourly velocity is wanted uniformly, and component is wanted steadily, time below concrete block, need to put down gently at a slow speed, and every truck crane need to configure a hoisting commanding, it is ensured that Hoisting Security。
Preferably, step S6, adopt truck crane to be hung onto by this section of reinforced concrete support and haulage vehicle is transported to off-site, including:
After certain section of reinforced concrete support gas cutting within the scope of the lifting of described truck crane, directly it is lifted on haulage vehicle and is transported to off-site;
The unit types such as extraneous certain section of reinforced concrete support of lifting to described truck crane, after adopting the transporting equipments such as fork truck to be transported within the scope of the lifting of truck crane, then is lifted on haulage vehicle and is transported to off-site, concrete fork truck are determined according to load。At this, drop on the transporting equipments such as fork truck after the cutting of reinforced concrete support block-by-block, then adopt the method for single crane hoisting to be hung onto by concret block and haulage vehicle is transported to off-site。
Removing of reinforced concrete support is adopted static state splitting, reinforcing bar to cut and the method for machinery handling by the present embodiment, its easy construction, safe and reliable, noise is little, airborne dust is few, agent structure and surrounding enviroment are affected less, also ensure that the construction speed of underground structure。
In this specification, each embodiment adopts the mode gone forward one by one to describe, and what each embodiment stressed is the difference with other embodiments, between each embodiment identical similar portion mutually referring to。
Obviously, invention can be carried out various change and modification without deviating from the spirit and scope of the present invention by those skilled in the art。So, if these amendments of the present invention and modification belong within the scope of the claims in the present invention and equivalent technologies thereof, then the present invention is also intended to include these change and modification。

Claims (11)

1. a reinforced concrete support structure, it is characterised in that including:
Reinforced concrete support;
It is arranged at the splitting hole on described reinforced concrete support。
2. reinforced concrete support structure as claimed in claim 1, it is characterised in that described splitting hole is formed by the tubing being embedded in advance in described reinforced concrete support, described tubing one end open, and the other end is closed。
3. reinforced concrete support structure as claimed in claim 2, it is characterised in that described tubing is hollow hard paper tube。
4. reinforced concrete support structure as claimed in claim 4, it is characterised in that the external diameter of described hollow hard paper tube is 4cm。
5. reinforced concrete support structure as claimed in claim 2, it is characterised in that the blind end of described tubing is taper。
6. reinforced concrete support structure as claimed in claim 2, it is characterised in that the length of described tubing is the 75% of the thickness of described reinforced concrete support。
7. the method for dismounting of a reinforced concrete support, it is characterised in that described reinforced concrete support adopts the reinforced concrete support structure as described in any one of claim 1 to 6, and described method includes:
Reinforced concrete support is carried out segmentation division;
Remove the foreign material in splitting hole;
Adopt the super high pressure oil that hydraulic splitting machine is exported by pumping plant to drive oil cylinder, produce huge motive force the splitting hole acting on one section of reinforced concrete support after mechan-amplifier, make reinforced concrete brace split by predetermined direction;
Assemble hydraulic pincer on board a dredger, adopt described hydraulic pincer to be caught broken by the concrete of this section of reinforced concrete support, make reinforcing steel bars exposed;
The reinforcing bar of this section of reinforced concrete support is carried out artificial gas cutting;
Adopt truck crane to be hung onto by this section of reinforced concrete support and haulage vehicle is transported to off-site。
8. the method for dismounting of reinforced concrete support as claimed in claim 7, it is characterised in that reinforced concrete support being carried out in the step of segmentation division, after segmentation, the Weight control of every section of reinforced concrete support is within 8 tons。
9. the method for dismounting of reinforced concrete support as claimed in claim 7, it is characterised in that before reinforced concrete support is carried out the step of segmentation division, also include:
The mode adopting on-the-spot Drilling increases splitting hole on reinforced concrete support。
10. the method for dismounting of reinforced concrete support as claimed in claim 7, it is characterized in that, assemble hydraulic pincer on board a dredger, adopt described hydraulic pincer to be caught broken by the concrete of this section of reinforced concrete support, before making the step of reinforcing steel bars exposed, also include:
With fork truck hold this section of reinforced concrete support or the bottom of this section of reinforced concrete support adopt set up framed bent。
11. the method for dismounting of the reinforced concrete support as described in any one of claim 7 to 10, it is characterised in that adopt truck crane to be hung onto by this section of reinforced concrete support and be transported to off-site on haulage vehicle, including:
After certain section of reinforced concrete support gas cutting within the scope of the lifting of described truck crane, directly it is lifted on haulage vehicle and is transported to off-site;
Extraneous certain section of reinforced concrete support of lifting to described truck crane, after adopting transporting equipment to be transported within the scope of the lifting of truck crane, then is lifted on haulage vehicle and is transported to off-site。
CN201610239050.4A 2015-12-31 2016-04-18 Reinforced concrete supporting structure and dismantling method Pending CN105696808A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201511030057 2015-12-31
CN2015110300577 2015-12-31

Publications (1)

Publication Number Publication Date
CN105696808A true CN105696808A (en) 2016-06-22

Family

ID=56217043

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610239050.4A Pending CN105696808A (en) 2015-12-31 2016-04-18 Reinforced concrete supporting structure and dismantling method

Country Status (1)

Country Link
CN (1) CN105696808A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437197A (en) * 2016-07-29 2017-02-22 上海建工四建集团有限公司 Static crushing structure for removing concrete and construction method thereof
CN106906732A (en) * 2017-03-01 2017-06-30 尚德建设集团有限公司 A kind of concrete road surface static(al) abolishes technique
CN107034776A (en) * 2017-03-15 2017-08-11 武汉二航路桥特种工程有限责任公司 A kind of restructuring bankrupt of deck paving of concrete
CN108411803A (en) * 2018-03-13 2018-08-17 北京怀仁前景工程技术有限公司 Bridge pier integrally pushes over method
CN113482397A (en) * 2021-06-30 2021-10-08 上海宝冶集团有限公司 Static force dismantling construction method for high-altitude suspension independent frame beam
CN113668414A (en) * 2021-08-25 2021-11-19 北京市政路桥管理养护集团有限公司 Bridge deck concrete pavement layer dismantling construction method
CN114061390A (en) * 2020-07-30 2022-02-18 神华神东煤炭集团有限责任公司 Blasting demolition method for artificial dam body
CN114960674A (en) * 2022-06-13 2022-08-30 中国一冶集团有限公司 Support beam and surrounding purlin dismantling and supporting device and working method thereof
CN115807563A (en) * 2022-12-05 2023-03-17 福建宏盛建设集团有限公司 Concrete support static force crushing and splitting method combined green demolition construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1037488A (en) * 1996-07-25 1998-02-10 Sakato Kosakusho:Kk Crusher
CN101985858A (en) * 2010-09-30 2011-03-16 中国华西企业有限公司 Hydraulic fracturing stripping unbonded prestressed reinforcement surface concrete construction method
CN102031783A (en) * 2010-12-16 2011-04-27 谭灵 Method for shearing and demolishing foundation reinforced concrete support
CN203547752U (en) * 2013-07-16 2014-04-16 福州德格索兰机械有限公司 Hydraulic splitting machine
CN104404965A (en) * 2014-11-05 2015-03-11 浙江海洋学院 Method for removing reinforced concrete support beams in foundation pit support
CN205713210U (en) * 2015-12-31 2016-11-23 上海建工五建集团有限公司 Reinforced concrete support structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1037488A (en) * 1996-07-25 1998-02-10 Sakato Kosakusho:Kk Crusher
CN101985858A (en) * 2010-09-30 2011-03-16 中国华西企业有限公司 Hydraulic fracturing stripping unbonded prestressed reinforcement surface concrete construction method
CN102031783A (en) * 2010-12-16 2011-04-27 谭灵 Method for shearing and demolishing foundation reinforced concrete support
CN203547752U (en) * 2013-07-16 2014-04-16 福州德格索兰机械有限公司 Hydraulic splitting machine
CN104404965A (en) * 2014-11-05 2015-03-11 浙江海洋学院 Method for removing reinforced concrete support beams in foundation pit support
CN205713210U (en) * 2015-12-31 2016-11-23 上海建工五建集团有限公司 Reinforced concrete support structure

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437197A (en) * 2016-07-29 2017-02-22 上海建工四建集团有限公司 Static crushing structure for removing concrete and construction method thereof
CN106906732A (en) * 2017-03-01 2017-06-30 尚德建设集团有限公司 A kind of concrete road surface static(al) abolishes technique
CN107034776A (en) * 2017-03-15 2017-08-11 武汉二航路桥特种工程有限责任公司 A kind of restructuring bankrupt of deck paving of concrete
CN108411803A (en) * 2018-03-13 2018-08-17 北京怀仁前景工程技术有限公司 Bridge pier integrally pushes over method
CN108411803B (en) * 2018-03-13 2021-01-05 北京怀仁前景工程技术有限公司 Integral bridge pier pushing method
CN114061390A (en) * 2020-07-30 2022-02-18 神华神东煤炭集团有限责任公司 Blasting demolition method for artificial dam body
CN113482397A (en) * 2021-06-30 2021-10-08 上海宝冶集团有限公司 Static force dismantling construction method for high-altitude suspension independent frame beam
CN113668414A (en) * 2021-08-25 2021-11-19 北京市政路桥管理养护集团有限公司 Bridge deck concrete pavement layer dismantling construction method
CN114960674A (en) * 2022-06-13 2022-08-30 中国一冶集团有限公司 Support beam and surrounding purlin dismantling and supporting device and working method thereof
CN115807563A (en) * 2022-12-05 2023-03-17 福建宏盛建设集团有限公司 Concrete support static force crushing and splitting method combined green demolition construction method

Similar Documents

Publication Publication Date Title
CN105696808A (en) Reinforced concrete supporting structure and dismantling method
CN104404965A (en) Method for removing reinforced concrete support beams in foundation pit support
CN103696784B (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN106545007B (en) The method of pile in the stratum that lower part is hard rock stratum
CN102505945A (en) Construction method for enabling rectangular pipe jacking machine to enter into tunnel in existing building
CN110820742A (en) Construction method for breaking underwater cast-in-place pile head
CN108301401B (en) Construction method for treating defect section of cast-in-place pile by utilizing water grinding drill
CN107905236A (en) The construction method of friction pile churning driven fast pore-creating and concrete placings
JP5235748B2 (en) Wall metal fittings and underground continuous wall construction method
CN108166771A (en) Steel reinforced concrete pool structural reform makes construction method
CN105862862B (en) A kind of large diameter pile buries hammer Refloatation method
CN205713210U (en) Reinforced concrete support structure
CN110318388B (en) Underground continuous wall excavation grooving method
JP2009256999A (en) Pile extracting construction method for existing hollow pile
JP6595825B2 (en) Underground building construction method
CN103266899A (en) Method for controlling floor heave deformation of soft rock roadway by means of anchor pile continuous wall
KR102333978B1 (en) Pileless-up wall demolition method
CN105002891B (en) A kind of cast-in-situ bored pile exempts from inter-pile soil excavation construction method
CN102220760B (en) Method for casting deep inverted T-shaped pile
CN108193684A (en) Cast-in-situ bored pile pile crown detaches removing method
CN108222012A (en) A kind of foundation pit anchor cable excision and the construction method that supporting pile is carried out using anchor cable excision system
KR20170142353A (en) Stone quarrying equipment and method for quarrying stone using the same
CN207436063U (en) Friction pile churning driven fast pore-creating edger
WO2006054094A1 (en) Method of breaking down concrete piles
CN214532952U (en) Emergency treatment device for underground engineering large-scale pilot shaft expanding excavation collapse

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160622