CN105672585A - Construction method for conducting water diversion and water proofing on roof planting carpet type plants - Google Patents
Construction method for conducting water diversion and water proofing on roof planting carpet type plants Download PDFInfo
- Publication number
- CN105672585A CN105672585A CN201610030299.4A CN201610030299A CN105672585A CN 105672585 A CN105672585 A CN 105672585A CN 201610030299 A CN201610030299 A CN 201610030299A CN 105672585 A CN105672585 A CN 105672585A
- Authority
- CN
- China
- Prior art keywords
- roof
- roofing
- cement
- iron sheet
- self
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 29
- 238000010276 construction Methods 0.000 title claims abstract description 14
- 238000004078 waterproofing Methods 0.000 title abstract description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 60
- 229910052742 iron Inorganic materials 0.000 claims abstract description 30
- 239000004568 cement Substances 0.000 claims abstract description 19
- 239000010426 asphalt Substances 0.000 claims abstract description 16
- 239000004033 plastic Substances 0.000 claims abstract description 7
- 229920003023 plastic Polymers 0.000 claims abstract description 7
- 239000011083 cement mortar Substances 0.000 claims abstract description 6
- 239000013556 antirust agent Substances 0.000 claims abstract description 4
- 238000000034 method Methods 0.000 claims abstract description 4
- 239000004745 nonwoven fabric Substances 0.000 claims abstract description 4
- 238000013000 roll bending Methods 0.000 claims description 16
- 239000000853 adhesive Substances 0.000 claims description 12
- 239000011104 metalized film Substances 0.000 claims description 6
- 235000009967 Erodium cicutarium Nutrition 0.000 claims description 5
- 229910001018 Cast iron Inorganic materials 0.000 claims description 4
- 230000003628 erosive effect Effects 0.000 claims description 3
- 238000009958 sewing Methods 0.000 claims description 3
- 239000007787 solid Substances 0.000 claims description 3
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 abstract description 2
- 238000007747 plating Methods 0.000 abstract 2
- 239000000463 material Substances 0.000 description 4
- 238000004140 cleaning Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000009408 flooring Methods 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 241000521257 Hydrops Species 0.000 description 1
- 206010030113 Oedema Diseases 0.000 description 1
- 208000001203 Smallpox Diseases 0.000 description 1
- 241000870995 Variola Species 0.000 description 1
- 230000032683 aging Effects 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 230000002262 irrigation Effects 0.000 description 1
- 238000003973 irrigation Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
- E04D13/16—Insulating devices or arrangements in so far as the roof covering is concerned, e.g. characterised by the material or composition of the roof insulating material or its integration in the roof structure
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
Abstract
The invention provides a construction method for conducting water diversion and water proofing on roof planting carpet type plants. The method comprises the following steps that 1, a roof is swept and kept smooth; 2, a sewer is dredged; 3, for a cement roof, it needs to be guaranteed that the drainage slope of the cement roof reaches 1%-3%, whether the roof leaks or not is inspected, for an iron sheet roof, whether the seam part and the iron nail part leak or not is inspected, and meanwhile rust spots of the iron sheet roof are coated with an antirust agent; 4, after leak repairing is conducted, for the cement roof, a self-adhesion modified asphalt waterproof coiled plate is laid on the roof, the self-adhesion modified asphalt waterproof coiled plate is laid to the portion 15 cm away from the parapet wall, then cement mortar is laid, or the cement is not laid, but aluminum-plating films on upper surface of the self-adhesion modified asphalt waterproof coiled plate are reserved, for the iron sheet roof, the self-adhesion modified asphalt waterproof coiled plate is laid on the roof, and plastic guiding gutters and plating non-woven fabrics are laid continuously; 5, carpet type plant planting is conducted.
Description
Technical field
The present invention relates to a kind of roof planting blanket type plant and carry out the construction method of water guide and waterproof.
Background technology
Existing roof greening technology is processing existing problems based on building roof water guide own, the rainwater on the flat roof of cement is collected and the problematic meeting of exhaust system causes roof hydrops, is unfavorable for the growth of the blanket type plants such as the Herba Sedi Linearis of roof planting, Jin Zhucao, heronsbill. The waterproof measure on roof is not in place simultaneously will cause that the infiltration of top layer resident variola is leaked. It is aging then to there is roofing in iron sheet pitched roof, produces seepy question, and the rough pattern structure of iron sheet roofing itself cannot plant the blanket type plants such as Herba Sedi Linearis, Jin Zhucao, heronsbill.
Summary of the invention
In view of this, problem to be solved by this invention, it is simply that propose a kind of roof planting blanket type plant and carry out the construction method of water guide and waterproof.
For solving above-mentioned technical problem, the present invention is achieved by the following technical solutions:
A kind of roof planting blanket type plant carries out the construction method of water guide and waterproof, comprises the steps:
(1) clean roofing, and make roofing keep smooth;
(2) dredging sewer, it is necessary to assure drainage pipeline is unimpeded;
(3) for cement roof, must guaranteeing that the drainage grade of cement roof reaches 1%-3%, if the gradient is inadequate, again should look for slope in the face of laying cement, then checking whether roofing has water leakage situation, if leaking, according to water protection standards mending-leakage; For iron sheet roofing, check whether the connecting sewing of iron sheet roofing and iron nail two place leak, if leaking, then carrying out mending-leakage process, getting rusty of iron sheet roofing a little should be coated antirust agent simultaneously;
(4) after mending-leakage, cement roof is directly laid on roofing to self-adhesive modified asphalt waterproof roll bending, self-adhesive modified asphalt waterproof roll bending thickness 2.5 ~ 3mm, lay to from parapet 15cm place, then laying 3 ~ 5cm solid cement mortar or do not lay cement mortar but retain the metallized film of self-adhesive modified asphalt waterproof roll bending upper surface;For iron sheet roofing, roofing is laid the thick self-adhesive modified asphalt waterproof roll bending with metallized film of 2.5 ~ 3mm, and on self-adhesive modified asphalt waterproof roll bending, lays plastics guiding gutter and plantation non-woven fabrics;
(5) finally guarantee water-tight just to carry out blanket type plant growing.
As preferably, the water guide pipeline of cement roof is Cast Iron Products discharge pipe line or PVC-U pipeline.
As preferably, the thickness of plastics guiding gutter selects guiding gutter according to the thickness of iron sheet roofing socket, makes the height of guiding gutter flush with the height of iron sheet roofing socket, for, after vegetation absorbs enough moisture, draining unnecessary water as far as possible.
As preferably, the plantation edge of iron sheet roofing is additionally provided with plantation sideline, be used for fixing, Radix Saposhnikoviae, waterproof and protection against erosion etc.
As preferably, described plantation sideline is PVC aqueduct, and offers water-guiding hole on PVC aqueduct for irrigating.
As preferably, described blanket type plant is one or more in Herba Sedi Linearis, Jin Zhucao, heronsbill.
Compared with prior art, the device have the advantages that into:
The present invention has consolidated the anti-aqueous condition of building edifice top layer to a certain extent, adds the reasonable Arrangement of drainage pipeline, for the condition that the growth offer of blanket type plant is favourable. In addition improve iron sheet roofing and be difficult to the problem of planting plants, after the operation of anti-wet blast cleaning, create, by laying of plastics guiding gutter, the condition that the blanket type plants such as Herba Sedi Linearis, Jin Zhucao, heronsbill can be planted.
Accompanying drawing explanation
Fig. 1 is the structural representation of the embodiment of the present invention 2.
Detailed description of the invention
Getting information about the present invention for allowing those skilled in the art become apparent from, below in conjunction with accompanying drawing, the present invention is further illustrated.
Embodiment 1
Cement roof plantation Herba Sedi Linearis carries out the construction method of water guide and waterproof, comprises the steps:
1. clean roofing, make roofing keep smooth;
2. the roof drainage gradient should reach 1%-3%, if the gradient is inadequate, again should look for slope in the face of laying cement;
3. dredging sewer, it is necessary to assure drainage pipeline is unimpeded, the building of northern area, because winter is cold, for preventing the situations such as waterspout frost blocking, internal drainage should be adopted, namely waterspout is positioned at inner side of outer wall; The building of southern area is generally adopted outer draining, and the most frequently used drainage pattern has the outer draining of parapet and the outer draining two kinds of eaves gutter;
4. the water guide pipeline of cement roof, the material that northern area is typically chosen has Cast Iron Products adrainage material, and southern area may select Cast Iron Products adrainage material and PVC-U (PVC) goods adrainage material;
5. whether inspection flooring has water leakage situation, flooring more than 2 years age of the buildings, if wanting to leak, it is necessary to according to water protection standards mending-leakage. New building in two years is generally without this problem, if having, also should carry out mending-leakage;
6., after mending-leakage, lay self-adhesive modified asphalt waterproof roll bending, roll bending thickness 2.5 ~ 3mm(GB at roofing), lay to from parapet 15cm place;
7., according to roof flatness, lay 3 ~ 5cm solid cement mortar; Or for reducing cost, under roofing reaches flatness requirement, it is possible to the metallized film directly retaining roll bending surface is used for planting;
8. discharge water after pair completing above waterproofing work inspection, checks whether to leak, it is ensured that water-tight just can carry out plantation Herba Sedi Linearis program.
Embodiment 2
Cement roof plantation Herba Sedi Linearis carries out the construction method of water guide and waterproof, comprises the steps:
1. clean roofing, make roofing keep cleaning;
2. iron sheet Factory Building more than 1 year age of the building, should check whether iron sheet roofing connecting sewing and iron nail two place leak, if having, then to carry out mending-leakage process;
3. iron sheet Factory Building more than 2 years age of the buildings, will carry out roofing iron sheet antirust treatment, and all of rust spot should coat antirust agent;
4., after the antirust work of mending-leakage, lay self-adhesive modified asphalt waterproof roll bending, roll bending thickness 2.5 ~ 3mm(GB at roofing), and retain the metallized film of roll bending upper surface, see Fig. 1;
5. lay regenerated plastics guiding gutter, the thickness according to iron sheet socket, select corresponding guiding gutter, make the height of guiding gutter and the height of iron sheet socket be substantially flush, make the vegetation of roofing after absorbing enough moisture, drain unnecessary water;
6. lay Herba Sedi Linearis plantation non-woven fabrics;
7. kind plant edge and plantation sideline is set, play the effects such as fixing, Radix Saposhnikoviae, waterproof and protection against erosion, and retain and discharge outlet the present embodiment adopts PVC aqueduct do plantation sideline, and in water pipe, open part water-guiding hole to do irrigation use.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all within the spirit and principles in the present invention, any amendment of making, equivalent replacement, improvement etc., should be included within protection scope of the present invention.
Claims (6)
1. a roof planting blanket type plant carries out the construction method of water guide and waterproof, it is characterised in that comprise the steps:
(1) clean roofing, and make roofing keep smooth;
(2) dredging sewer, it is necessary to assure drainage pipeline is unimpeded;
(3) for cement roof, must guaranteeing that the drainage grade of cement roof reaches 1%-3%, if the gradient is inadequate, again should look for slope in the face of laying cement, then checking whether roofing has water leakage situation, if leaking, according to water protection standards mending-leakage; For iron sheet roofing, check whether the connecting sewing of iron sheet roofing and iron nail two place leak, if leaking, then carrying out mending-leakage process, getting rusty of iron sheet roofing a little should be coated antirust agent simultaneously;
(4) after mending-leakage, cement roof is directly laid on roofing to self-adhesive modified asphalt waterproof roll bending, self-adhesive modified asphalt waterproof roll bending thickness 2.5 ~ 3mm, lay to from parapet 15cm place, then laying 3 ~ 5cm solid cement mortar or do not lay cement mortar but retain the metallized film of self-adhesive modified asphalt waterproof roll bending upper surface; For iron sheet roofing, roofing is laid the thick self-adhesive modified asphalt waterproof roll bending with metallized film of 2.5 ~ 3mm, and on self-adhesive modified asphalt waterproof roll bending, lays plastics guiding gutter and plantation non-woven fabrics;
(5) finally guarantee water-tight just to carry out blanket type plant growing.
2. roof planting blanket type plant according to claim 1 carries out the construction method of water guide and waterproof, it is characterised in that the water guide pipeline of cement roof is Cast Iron Products discharge pipe line or PVC-U pipeline.
3. roof planting blanket type plant according to claim 1 carries out the construction method of water guide and waterproof, it is characterized in that, the thickness of plastics guiding gutter selects guiding gutter according to the thickness of iron sheet roofing socket, make the height of guiding gutter flush with the height of iron sheet roofing socket as far as possible, for, after vegetation absorbs enough moisture, draining unnecessary water.
4. roof planting blanket type plant according to claim 1 carries out the construction method of water guide and waterproof, it is characterised in that the plantation edge of iron sheet roofing is additionally provided with plantation sideline, be used for fixing, Radix Saposhnikoviae, waterproof and protection against erosion etc.
5. roof planting blanket type plant according to claim 4 carries out the construction method of water guide and waterproof, it is characterised in that described plantation sideline is PVC aqueduct, and offers water-guiding hole on PVC aqueduct for irrigating.
6. roof planting blanket type plant according to claim 1 carries out the construction method of water guide and waterproof, it is characterised in that described blanket type plant is one or more in Herba Sedi Linearis, Jin Zhucao, heronsbill.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610030299.4A CN105672585B (en) | 2016-01-18 | 2016-01-18 | A kind of roof planting blanket type plant carries out the construction method of water guide and waterproof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610030299.4A CN105672585B (en) | 2016-01-18 | 2016-01-18 | A kind of roof planting blanket type plant carries out the construction method of water guide and waterproof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105672585A true CN105672585A (en) | 2016-06-15 |
CN105672585B CN105672585B (en) | 2018-03-02 |
Family
ID=56301199
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610030299.4A Active CN105672585B (en) | 2016-01-18 | 2016-01-18 | A kind of roof planting blanket type plant carries out the construction method of water guide and waterproof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105672585B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006271236A (en) * | 2005-03-29 | 2006-10-12 | Mitsui Kagaku Sanshi Kk | Resin planting container and greening method for non-flat roof using the same |
JP2010095910A (en) * | 2008-10-16 | 2010-04-30 | Yamazaki Corp | Folding roof for tree planting and method for forming the folding roof for tree planting |
CN203531260U (en) * | 2013-08-27 | 2014-04-09 | 中国建筑第二工程局有限公司 | Inverted Planting Roof Structure |
CN103899052A (en) * | 2012-12-28 | 2014-07-02 | 佳埼工程有限公司 | Green energy planting combined-structure system |
-
2016
- 2016-01-18 CN CN201610030299.4A patent/CN105672585B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006271236A (en) * | 2005-03-29 | 2006-10-12 | Mitsui Kagaku Sanshi Kk | Resin planting container and greening method for non-flat roof using the same |
JP2010095910A (en) * | 2008-10-16 | 2010-04-30 | Yamazaki Corp | Folding roof for tree planting and method for forming the folding roof for tree planting |
CN103899052A (en) * | 2012-12-28 | 2014-07-02 | 佳埼工程有限公司 | Green energy planting combined-structure system |
CN203531260U (en) * | 2013-08-27 | 2014-04-09 | 中国建筑第二工程局有限公司 | Inverted Planting Roof Structure |
Also Published As
Publication number | Publication date |
---|---|
CN105672585B (en) | 2018-03-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2017118194A1 (en) | Pds zero-slope protection siphonic drainage and collection system | |
CN105421683A (en) | Collection method and construction technology for pds zero-gradient protection siphon drainage | |
CN104831873B (en) | Compound drainage intelligence inversion formula rigid roof that holds | |
CN101096850A (en) | Plastics water discharge plate application method for underground engineering wall surface, bottom plating and top board | |
CN209555955U (en) | Anti- row's integration underdrainage system | |
CN205369740U (en) | Zero slope protection siphon drainage collecting system of pds | |
US20070094952A1 (en) | Basement wall water protection system | |
CN206467914U (en) | The discharge structure of planted roof | |
US20070068093A1 (en) | Apparatus and methods for diverting water from a building | |
CN106368239A (en) | Water stop structure arranged at position of expansion joint of urban underground comprehensive pipe rack and construction method of water stop structure | |
CN105672585A (en) | Construction method for conducting water diversion and water proofing on roof planting carpet type plants | |
CN208830084U (en) | A kind of concealed ground library surface drainage system | |
CN205894523U (en) | Roof drainage mouth waterproof insulation structure | |
CN202706354U (en) | Channelizing roof drainage equipment | |
CN116220081A (en) | Basement waterproof structure and construction method | |
CN204691095U (en) | Compound drainage intelligence inversion formula rigid roof that holds | |
CN212534233U (en) | Basement roof waterproof construction | |
CN210342156U (en) | Urban rail vehicle section upper cover drainage structure | |
CN208668802U (en) | Green roof system based on secondary drainage steam discharge pipe network | |
CN210263283U (en) | Basement roof drainage system | |
CN216664757U (en) | Planting roofing structure that contains water guide and drainage floral tube | |
CN220247404U (en) | Slope roof cornice waterproof structure | |
CN111827364B (en) | Construction method for basement structure bottom plate leakage subarea point type drainage prevention and combination | |
CN216893188U (en) | Vegetation layer buried type seepage and drainage device | |
CN206205163U (en) | Prevent the anti-leakage structure sheaf of basement water leakage of floor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180412 Address after: 510000 Xintang, Guangzhou, Zengcheng District, Xintang Town, West Avenue, No. 371, building on the ground floor, 6 Patentee after: Guangzhou Luchuang Bao Biotechnology Co. Ltd. Address before: 510000 two, 14 Meihua North Road, Yuexiu District, Guangzhou, Guangdong. Patentee before: Li Dongan |