CN105442855A - 一种大尺寸预埋板高精度埋设方法 - Google Patents
一种大尺寸预埋板高精度埋设方法 Download PDFInfo
- Publication number
- CN105442855A CN105442855A CN201511011212.0A CN201511011212A CN105442855A CN 105442855 A CN105442855 A CN 105442855A CN 201511011212 A CN201511011212 A CN 201511011212A CN 105442855 A CN105442855 A CN 105442855A
- Authority
- CN
- China
- Prior art keywords
- embedded board
- equipment
- precision
- board
- reinforcement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Foundations (AREA)
- Road Paving Structures (AREA)
Abstract
本发明提供一种大尺寸预埋板高精度埋设方法。按照施工顺序,包括有如下步骤:现场检查底层基础钢筋网分布,在预埋板底部相应位置焊接长钢筋头,然后将轨道、轨道梁与设备底板按设计要求组装好,要求预埋板与设备底板紧密接触无缝隙并点焊牢固,使用行车将设备整体吊装至安装位置,按规范要求找平找正找标高,采取辅助构件将设备固定,焊接预埋板底部长钢筋头与基础钢筋网,最后用高强无收缩灌浆料浇筑。本发明操作简单,实用性强,可大幅提高找正工作效率,切实保证安装精度,有效降低成本,解决了常规施工工艺浇筑时,钢筋承载大易变形,连接机械振捣以及基础热涨冷缩对埋板精度影响。
Description
技术领域
本发明涉及大型设备安装施工技术领域,具体涉及一种大尺寸预埋板高精度埋设方法。
背景技术
酸洗平整线步进梁行走支撑系统包括轨道、轨道梁、设备底板。在安装过程中,轨道与轨道梁、轨道梁与设备底板、设备底板与预埋板之间均不允许设置调整垫,直接一次安装就位,对预埋板埋设精度要求高。传统方法先将预埋板按设计标高及中心设置,把锚固件与基础钢筋焊接固定,然后一次性浇筑,此方法钢筋承载大易变形,浇筑过程中混凝土机械振捣易移动,基础热涨冷缩易等都会对埋板产生影响,以至于预埋板无法达到设计精度要求,给设备安装造成了很多困难。
预埋件是在混凝土结构中留设构件,主要由钢板和锚固筋组成。主要作用为连接结构构件或非结构构件,分为受力预埋件和构造预埋件两种,其中受力预埋件主要承受荷载。通常情况下,预埋件可以是埋设在混凝土内部的锚筋,也可以是裸露在混凝土表面的锚板。预埋件作为结构连接时,是保证工程结构在任何工况下稳定性的重要组成部分,在土建工程施工中,必须抓住预埋件施工的技术要点,做好质量控制工作,尤其是大尺寸预埋板,埋设精度越高,难度越大。
发明内容
本发明所要解决的技术问题是针对上述存在的不足,提供一种解决传统工艺一次性浇筑钢筋承载大易变形;浇筑过程中混凝土机械振捣产生的震动位移;基础热涨冷缩产生动位移等问题,保证预埋板安装精度的大尺寸预埋板高精度埋设方法。
本发明解决其技术问题所采用的技术方案是:
一种大尺寸预埋板高精度埋设方法,其特征在于,按照施工顺序,包括有如下步骤:
现场检查底层基础钢筋网分布,在预埋板底部相应位置焊接长钢筋头,然后将轨道、轨道梁与设备底板按设计要求组装好,要求预埋板与设备底板紧密接触无缝隙并点焊牢固,使用行车将设备整体吊装至安装位置,按规范要求找平找正找标高,采取辅助构件将设备固定,焊接预埋板底部长钢筋头与基础钢筋网,最后用高强无收缩灌浆料浇筑。
具体工作流程为:
(1)将预埋板以下300mm区域混凝土预留暂不浇筑,根据基础钢筋网分布情况,在预埋板底部相应位置焊接长钢筋头;
(2)将轨道、轨道梁与设备底板按图纸要求组装好,并将预埋板与设备底板点焊;
(3)将预埋板及设备整体安装于设计位置,并按图纸要求将设备找正;
(4)把预埋板底部长钢筋头与基础钢筋网焊接牢固,最后用高强无收缩灌浆料浇筑剩余的300mm区域;
(5)预埋板埋设好以后,在浇筑时,要注意保护预埋板;混凝土施工的振动棒在预埋板边应延长振捣时间,保证预埋板周边的砼密实,避免产生漏浆及空鼓现象,影响预埋板质量。
本发明的原理是:
根据设备特点和现场施工条件,研究倾斜安装位置超重设备吊装技术,设置两个加长型吊轴使设备吊点延伸,实现车间内双机板钩梁垂直受力抬吊。有效利用现场条件,降低施工难度,节约施工成本。
本发明产生的有益效果是:
通过大尺寸预埋板埋设技术,待设备安装就位后,进行整体浇筑。解决了常规施工工艺浇筑时,钢筋承载大易变形,连接机械振捣以及基础热涨冷缩对埋板精度影响。操作简单,实用性强。可大幅提高找正工作效率,切实保证安装精度,有效降低成本。
附图说明
图1是本发明实施例的结构示意图
图中:1-预埋板;2-设备底板;3-轨道梁;4-轨道;5-轨道压板;6-连接螺栓;7-长钢筋头;8-基础钢筋网。
具体实施方式
下面结合具体实施方式,对本发明作进一步的说明:
如图1所示大尺寸预埋板高精度埋设方法,按照施工顺序,包括有如下步骤:
将预埋板1以下300mm区域混凝土预留暂不浇筑,根据基础钢筋网8分布情况,在预埋板1底部相应位置焊接长钢筋头7;
将轨道4、轨道梁3、轨道压板5通过连接螺栓6安装固定好,并与设备底板2按图纸要求组装好,并将预埋板1与设备底板2点焊;
将预埋板1及设备整体安装于设计位置,并按图纸要求将设备找正;
把预埋板1底部长钢筋头7与基础钢筋网8焊接牢固,最后用高强无收缩灌浆料浇筑剩余的300mm区域;
预埋板1埋设好以后,在浇筑时,要注意保护预埋板1;混凝土施工的振动棒在预埋板1边应延长振捣时间,保证预埋板1周边的砼密实,避免产生漏浆及空鼓现象,影响预埋板1质量。
本发明实施例通过大尺寸预埋板埋设技术,待设备安装就位后,进行整体浇筑。解决了常规施工工艺浇筑时,钢筋承载大易变形,连接机械振捣以及基础热涨冷缩对埋板精度影响。操作简单,实用性强。可大幅提高找正工作效率,切实保证安装精度,有效降低成本。
以上说明仅为本发明的应用实施例而已,当然不能以此来限定本发明之权利范围,因此依本发明申请专利范围所作的等效变化,仍属本发明的保护范围。
Claims (1)
1.一种大尺寸预埋板高精度埋设方法,其特征在于,按照施工顺序,包括有如下步骤:
现场检查底层基础钢筋网分布,在预埋板底部相应位置焊接长钢筋头,然后将轨道、轨道梁与设备底板按设计要求组装好,要求预埋板与设备底板紧密接触无缝隙并点焊牢固,使用行车将设备整体吊装至安装位置,按规范要求找平找正找标高,采取辅助构件将设备固定,焊接预埋板底部长钢筋头与基础钢筋网,最后用高强无收缩灌浆料浇筑;
具体工作流程为:
(1)将预埋板以下300mm区域混凝土预留暂不浇筑,根据基础钢筋网分布情况,在预埋板底部相应位置焊接长钢筋头;
(2)将轨道、轨道梁与设备底板按图纸要求组装好,并将预埋板与设备底板点焊;
(3)将预埋板及设备整体安装于设计位置,并按图纸要求将设备找正;
(4)把预埋板底部长钢筋头与基础钢筋网焊接牢固,最后用高强无收缩灌浆料浇筑剩余的300mm区域;
(5)预埋板埋设好以后,在浇筑时,要注意保护预埋板;混凝土施工的振动棒在预埋板边应延长振捣时间,保证预埋板周边的砼密实,避免产生漏浆及空鼓现象,影响预埋板质量。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511011212.0A CN105442855B (zh) | 2015-12-30 | 2015-12-30 | 一种大尺寸预埋板高精度埋设方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511011212.0A CN105442855B (zh) | 2015-12-30 | 2015-12-30 | 一种大尺寸预埋板高精度埋设方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105442855A true CN105442855A (zh) | 2016-03-30 |
CN105442855B CN105442855B (zh) | 2018-03-09 |
Family
ID=55553445
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201511011212.0A Active CN105442855B (zh) | 2015-12-30 | 2015-12-30 | 一种大尺寸预埋板高精度埋设方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105442855B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107131761A (zh) * | 2017-05-03 | 2017-09-05 | 中国二十冶集团有限公司 | 倾斜式设备安装方法 |
CN115055857A (zh) * | 2022-06-30 | 2022-09-16 | 重庆中环建设有限公司 | 一种水泥矿料下料仓轨道预埋方法 |
CN115246052A (zh) * | 2021-12-16 | 2022-10-28 | 李俊 | 一种简化矿石破碎机下料口轻轨焊接方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1060913A (ja) * | 1996-08-14 | 1998-03-03 | Sumitomo Metal Ind Ltd | 機械設備の据付方法 |
CN101307605A (zh) * | 2008-06-06 | 2008-11-19 | 中冶天工上海十三冶建设有限公司 | 高精度设备底座安装方法 |
CN102134879A (zh) * | 2011-01-12 | 2011-07-27 | 陕西建工集团第六建筑工程有限公司 | 超长设备基础平台预埋件埋置精度控制施工方法 |
CN103276747A (zh) * | 2013-06-26 | 2013-09-04 | 陕西建工集团第十一建筑工程有限公司 | 大型设备基础导轨一次性高精度预埋施工方法 |
CN103352476A (zh) * | 2013-07-22 | 2013-10-16 | 陕西建工集团第十一建筑工程有限公司 | 大型螺栓高精度预埋施工方法 |
CN103388343A (zh) * | 2013-07-31 | 2013-11-13 | 天津二十冶建设有限公司 | 超长和大型水平预埋件逆作法 |
-
2015
- 2015-12-30 CN CN201511011212.0A patent/CN105442855B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1060913A (ja) * | 1996-08-14 | 1998-03-03 | Sumitomo Metal Ind Ltd | 機械設備の据付方法 |
CN101307605A (zh) * | 2008-06-06 | 2008-11-19 | 中冶天工上海十三冶建设有限公司 | 高精度设备底座安装方法 |
CN102134879A (zh) * | 2011-01-12 | 2011-07-27 | 陕西建工集团第六建筑工程有限公司 | 超长设备基础平台预埋件埋置精度控制施工方法 |
CN103276747A (zh) * | 2013-06-26 | 2013-09-04 | 陕西建工集团第十一建筑工程有限公司 | 大型设备基础导轨一次性高精度预埋施工方法 |
CN103352476A (zh) * | 2013-07-22 | 2013-10-16 | 陕西建工集团第十一建筑工程有限公司 | 大型螺栓高精度预埋施工方法 |
CN103388343A (zh) * | 2013-07-31 | 2013-11-13 | 天津二十冶建设有限公司 | 超长和大型水平预埋件逆作法 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107131761A (zh) * | 2017-05-03 | 2017-09-05 | 中国二十冶集团有限公司 | 倾斜式设备安装方法 |
CN107131761B (zh) * | 2017-05-03 | 2019-04-26 | 中国二十冶集团有限公司 | 倾斜式设备安装方法 |
CN115246052A (zh) * | 2021-12-16 | 2022-10-28 | 李俊 | 一种简化矿石破碎机下料口轻轨焊接方法 |
CN115055857A (zh) * | 2022-06-30 | 2022-09-16 | 重庆中环建设有限公司 | 一种水泥矿料下料仓轨道预埋方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105442855B (zh) | 2018-03-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107268424B (zh) | 可快速调平的预制拼装桥墩结构及其施工方法 | |
CN203452266U (zh) | H型钢柱的固定和调平结构 | |
CN108035594A (zh) | 钢筋混凝土筒仓结构预制减压锥体施工方法 | |
CN103374923A (zh) | 一种水中墩承台的预制与安装方法 | |
CN103469732B (zh) | 一种桥梁支座地脚螺栓预留孔的施工方法 | |
CN102518300B (zh) | 预埋锥形承载接头式钢结构支座及其施工方法 | |
CN203474271U (zh) | 门式起重机专用装配式轨道基础 | |
CN105442855A (zh) | 一种大尺寸预埋板高精度埋设方法 | |
CN106958259B (zh) | 一种混凝土塔柱基础及其施工方法 | |
CN103306204B (zh) | 一种基座钢锚箱三向式定位装置 | |
CN210685444U (zh) | 预制外墙板快速调平安装支撑装置 | |
CN205934703U (zh) | 一种用于现浇桥梁的高阻尼隔震橡胶支座安装结构 | |
CN104234436A (zh) | 核电厂不锈钢覆面模块化建造方法 | |
CN103147454A (zh) | 一种钢结构厂房预制基础结构 | |
CN211447265U (zh) | 叠合板式边缘构件与实心剪力墙水平连接结构 | |
CN103132494B (zh) | 预埋锚锥精确定位方法 | |
CN203891060U (zh) | 盖挖逆作车站主体结构的永久钢管柱定位系统 | |
CN208884563U (zh) | 一种螺栓连接的装配式基础 | |
CN206512533U (zh) | 一种悬挂式空轨安装定位用地下工装 | |
CN214883824U (zh) | 一种预找平的塔基基础 | |
CN113293790B (zh) | 一种预找平的塔基基础及其找平施工方法 | |
CN204920244U (zh) | 大跨度钢结构分段吊装的支撑结构 | |
CN116005565A (zh) | 一种栈桥施工工艺 | |
CN204385743U (zh) | 一种深水桩基钢护筒施工系统 | |
CN202787300U (zh) | 固定式塔吊基础地脚螺栓位置控制模具 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |