CN105382222A - Aluminum alloy crystallizer platform - Google Patents

Aluminum alloy crystallizer platform Download PDF

Info

Publication number
CN105382222A
CN105382222A CN201510954532.3A CN201510954532A CN105382222A CN 105382222 A CN105382222 A CN 105382222A CN 201510954532 A CN201510954532 A CN 201510954532A CN 105382222 A CN105382222 A CN 105382222A
Authority
CN
China
Prior art keywords
crystallizer
water inlet
platform
crystallizer platform
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510954532.3A
Other languages
Chinese (zh)
Other versions
CN105382222B (en
Inventor
徐正权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Aluminum Group Co Ltd
Original Assignee
Southwest Aluminum Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Aluminum Group Co Ltd filed Critical Southwest Aluminum Group Co Ltd
Priority to CN201510954532.3A priority Critical patent/CN105382222B/en
Publication of CN105382222A publication Critical patent/CN105382222A/en
Application granted granted Critical
Publication of CN105382222B publication Critical patent/CN105382222B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/04Continuous casting of metals, i.e. casting in indefinite lengths into open-ended moulds
    • B22D11/055Cooling the moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Sliding Valves (AREA)
  • Valve Housings (AREA)

Abstract

The invention provides an aluminum alloy crystallizer platform. Stop valves are arranged on water inlets of the crystallizer platform. According to the platform, the stop valves are arranged on the water inlets of crystallizers, circulating water can be controlled by opening or closing the valves, and therefore the water can be saved, and the time and the labor can be saved. Furthermore, the stop valves are arranged on the water inlets of three or four of a first position, a second position, a third position, a fourth position and a fifth position of the crystallizer platform, there is no need to arrange stop valves at all the positions, and all the production requirements of producing 1-5 ingot castings can be met by cooperatively opening or closing the stop valves.

Description

A kind of aluminium alloy crystallizer platform
Technical field
The invention belongs to aluminium alloy casting technology field, particularly relate to a kind of aluminium alloy crystallizer platform.
Background technology
In aluminum alloy melt casting is produced, crystallizer platform mainly plays a part to supply water and support crystallizer.The crystallizer platform of onsite application as shown in Figure 1, Fig. 1 is existing crystallizer platform structure schematic diagram, existing crystallizer platform can place 5 crystallizers, produce 5 block casting ingots simultaneously, position as shown in numbering in Fig. 11 ~ 5, crystallizer platform is respectively arranged with crystallizer water inlet in the relevant position of each placement crystallizer, water inlet is connected with crystallizer, can by the unification of crystallizer platform for crystallizer provides recirculated water, with the ingot casting in cooler crystallizer, because current crystallizer platform all communicates with all water inlets, when only need production 4 block casting ingot even 1 block casting ingot time, the crystallizer not producing ingot casting also circulation cycle water at the same time, waste recirculated water.
Efficiency and cost are the problems must considered in producing, and the crystallizer platform used now obvious Shortcomings part aborning.Present solution is, dry crystallizer is adopted blind hole plate dash in the water inlet of crystallizer platform, but, this method, when producing ingot casting radical and changing, needs dismounting blind hole plate, as shown in Figure 2, Fig. 2 is the crystallizer platform adding blind hole plate, and need the turn of the screw in the process of dismounting or refitting, and the screw changed or blind hole plate are often lost, worker's operation is also very loaded down with trivial details.
Summary of the invention
The object of the present invention is to provide a kind of aluminium alloy crystallizer platform, recirculated water saved by crystallizer platform provided by the invention, and time saving and energy saving.
The invention provides a kind of aluminium alloy crystallizer platform, the water inlet of described crystallizer platform is provided with stop valve.
Preferably, the 1st position, the 2nd position, the 3rd position, the 4th position and the 5th position is divided into successively along described crystallizer platform long side direction, each position is for placing 1 crystallizer, and described 1st position, the 2nd position, the 3rd position, the 4th position and the 5th position are respectively arranged with independently water inlet.
Preferably, the water inlet of three positions is had to be provided with stop valve in described 1st position, the 2nd position, the 3rd position, the 4th position and the 5th position.
Preferably, described 1st position, the 3rd position and the 5th position are provided with stop valve.
Preferably, the water inlet of four positions is had to be provided with stop valve in described 1st position, the 2nd position, the 3rd position, the 4th position and the 5th position.
Preferably, the water inlet of described 1st position, the 2nd position, the 3rd position and the 5th position is provided with stop valve.
Preferably, the water inlet of described 1st position, the 3rd position, the 4th position and the 5th position is provided with stop valve.
Preferably, described stop valve is ball valve.
The invention provides a kind of aluminium alloy crystallizer platform, the water inlet of described crystallizer platform is provided with stop valve.The water inlet of crystallizer is arranged upper stop valve by the present invention, only needs controlled valve just can controlled circulation water, reaches water saving, time saving and energy saving object.
Further, the present invention in these five positions of the 1st position of crystallizer platform, the 2nd position, the 3rd position, the 4th position and the 5th position three or the water inlet corresponding to four positions arrange stop valve, do not need to arrange stop valve to all positions, by the switch that cooperatively interacts between these stop valves, all Production requirements of production 1 ~ 5 block casting ingot can be realized.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments of the invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to the accompanying drawing provided.
Fig. 1 is existing crystallizer platform structure schematic diagram;
Fig. 2 is the crystallizer platform adding blind hole plate;
Fig. 3 is the water inlet being provided with ball valve in the present invention;
Fig. 4 is the structural representation of crystallizer platform in the embodiment of the present invention 1.
Detailed description of the invention
The invention provides a kind of aluminium alloy crystallizer platform, the water inlet of described crystallizer platform is provided with stop valve.
Crystallizer platform water saving provided by the invention, and time saving and energy saving.
The present invention is provided with stop valve in the water inlet of existing crystallizer platform, the kind of the present invention to described stop valve does not have special restriction, can be one or more in gate valve, plug valve, ball valve and butterfly valve, be preferably ball valve, as shown in Figure 3, Fig. 3 is the water inlet being provided with ball valve in the present invention.The present invention does not have special restriction to the material of described stop valve and size, can match with the pipeline of described water inlet, water-tight.
In the present invention, be divided into the 1st position, the 2nd position, the 3rd position, the 4th position and the 5th position successively along described crystallizer platform long side direction, 5 crystallizers, for placing 1 crystallizer, can be placed altogether in each position.In the present invention, described 1st position, the 2nd position, the 3rd position, the 4th position and the 5th position are respectively arranged with independently water inlet, namely, independently water inlet is had to be respectively five crystallizer supply recirculated waters, the quantity of the present invention to the independently water inlet corresponding to described each position does not have special restriction, concrete, in an embodiment of the present invention, each position can have 6 water inlets to be crystallizer supply recirculated water on this position.
The water inlet of three positions of the present invention preferably in the position of above-mentioned five placement crystallizers or four positions arranges stop valve, and e.g., the water inlet of three positions arranges stop valve wherein, can be the 1st position, the 3rd position and the 5th position; Also can be the 1st position, the 2nd position and the 5th position; Or the 1st position, the 2nd position and the 3rd position, preferably stop valve is set on the 1st position, the 3rd position and the 5th position,
In the present invention, the pipeline of described crystallizer platform water inlet is the pipeline of 1-1/2 inch, and the present invention preferably adopts the ball valve of 1-1/2 inch, uses common raw material band to seal between described ball valve and pipeline.
In one embodiment of the invention, in the 1st position, the 3rd position and the 5th position arrange stop valve, and as shown in Figure 4, Fig. 4 is the structural representation of crystallizer platform in the embodiment of the present invention 1.When production 2 block casting ingot, the stop valve of 1,3,5 positions can be closed, stop the water supply of the crystallizer of these three positions; When production 3 block casting ingot, can close the stop valve of 1,5 positions, when production 4 block casting ingot, can close 3 way shut off valve, because each crystallizer has 6 feed water inlets, 3 crystallizers need increase water supply ball valve 18 altogether, and do not need to increase ball valve to all crystallizers.
Arranging stop valve at the water inlet of wherein four positions of above-mentioned five positions, can be the 1st position, the 2nd position, the 3rd position and the 4th position; Also can be the 1st position, the 2nd position, the 3rd position and the 5th position; Or the 1st position, the 2nd position, the 4th position and the 5th position.When production 1 block casting ingot, the stop valve of the 1st position, the 2nd position, the 4th position and the 5th position can be closed, stop the water supply to these four position crystallizers.
What crystallizer platform provided by the invention can adjust stop valve accordingly according to each quantity of producing ingot casting opens quantity, decreases the waste following bad water.
Only increase in crystallizer water inlet place of part ad-hoc location the ingot casting Production requirement that ball valve just can meet varying number, not only saved cost, also improved die change efficiency, alleviated worker's labour intensity.
In order to further illustrate the present invention, below in conjunction with embodiment, a kind of aluminium alloy crystallizer platform provided by the invention being described in detail, but can not limiting the scope of the present invention being understood as.
Embodiment 1
See Fig. 1, in the 1st position of crystallizer platform, the water inlet of the 3rd position and the 5th position arranges ball valve, and each position is totally 6 water inlets, arranges 18 ball valves altogether.
Use the crystallizer on the 2nd position and the 4th position to produce 2 pieces of aluminium alloy cast ingots, by 18 ball valve Close Alls of the 1st position, the 3rd position and the 5th position, then pass into recirculated water.
Produce the aluminium alloy cast ingot of 2 pieces of 620*1600 specifications, 400 tons can be economized on water.
Embodiment 2
In the 1st position of crystallizer platform, the water inlet of the 3rd position and the 5th position arranges ball valve, and each position is totally 6 water inlets, arranges 18 ball valves altogether.
Use the crystallizer on the 2nd position, the 3rd position and the 4th position to produce 3 pieces of aluminium alloy cast ingots, by 12 ball valve Close Alls of the 1st position and the 5th position, then pass into recirculated water.
Produce the aluminium alloy cast ingot of 3 pieces of 620*1600 specifications, 300 tons can be economized on water.
Embodiment 3
In the 1st position of crystallizer platform, the 2nd position, the 4th position and the 5th position water inlet ball valve is set, each position totally 6 water inlets, arrange 24 ball valves altogether.
Use the crystallizer on the 3rd position to produce 1 piece of aluminium alloy cast ingot, by 18 ball valve Close Alls of the 1st position, the 2nd position, the 4th position and the 5th position, then pass into recirculated water.
Produce the aluminium alloy cast ingot of 1 piece of 620*1600 specification, 500 tons can be economized on water.
Embodiment 4
In the 1st position of crystallizer platform, the 2nd position, the 4th position and the 5th position water inlet ball valve is set, each position totally 6 water inlets, arrange 24 ball valves altogether.
Use the crystallizer on the 1st position, the 3rd position and the 5th position to produce 3 pieces of aluminium alloy cast ingots, by 12 ball valve Close Alls of the 2nd position and the 4th position, then pass into recirculated water.
Produce the aluminium alloy cast ingot of 3 pieces of 620*1600 specifications, 300 tons can be economized on water.
The above is only the preferred embodiment of the present invention; it should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention; can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (8)

1. an aluminium alloy crystallizer platform, is characterized in that, the water inlet of described crystallizer platform is provided with stop valve.
2. aluminium alloy crystallizer platform according to claim 1, it is characterized in that, the 1st position, the 2nd position, the 3rd position, the 4th position and the 5th position is divided into successively along described crystallizer platform long side direction, each position is for placing 1 crystallizer, and described 1st position, the 2nd position, the 3rd position, the 4th position and the 5th position are respectively arranged with independently water inlet.
3. aluminium alloy crystallizer platform according to claim 2, is characterized in that, has the water inlet of three positions to be provided with stop valve in described 1st position, the 2nd position, the 3rd position, the 4th position and the 5th position.
4. aluminium alloy crystallizer platform according to claim 3, is characterized in that, described 1st position, the 3rd position and the 5th position are provided with stop valve.
5. aluminium alloy crystallizer platform according to claim 2, is characterized in that, has the water inlet of four positions to be provided with stop valve in described 1st position, the 2nd position, the 3rd position, the 4th position and the 5th position.
6. aluminium alloy crystallizer platform according to claim 5, is characterized in that, the water inlet of described 1st position, the 2nd position, the 3rd position and the 5th position is provided with stop valve.
7. aluminium alloy crystallizer platform according to claim 5, is characterized in that, the water inlet of described 1st position, the 3rd position, the 4th position and the 5th position is provided with stop valve.
8. the aluminium alloy crystallizer platform according to claim 1 ~ 7 any one, is characterized in that, described stop valve is ball valve.
CN201510954532.3A 2015-12-17 2015-12-17 A kind of aluminium alloy crystallizer platform Active CN105382222B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510954532.3A CN105382222B (en) 2015-12-17 2015-12-17 A kind of aluminium alloy crystallizer platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510954532.3A CN105382222B (en) 2015-12-17 2015-12-17 A kind of aluminium alloy crystallizer platform

Publications (2)

Publication Number Publication Date
CN105382222A true CN105382222A (en) 2016-03-09
CN105382222B CN105382222B (en) 2018-07-13

Family

ID=55415361

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510954532.3A Active CN105382222B (en) 2015-12-17 2015-12-17 A kind of aluminium alloy crystallizer platform

Country Status (1)

Country Link
CN (1) CN105382222B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6367539B1 (en) * 1999-01-13 2002-04-09 Danieli & C. Officine Meccaniche Spa Crystalliser for continuous casting
CN2889551Y (en) * 2006-02-28 2007-04-18 丁刚 Multiple-flow continuous casting apparatus for steel sintered carbide wire, bar
CN201420023Y (en) * 2009-06-04 2010-03-10 浙江中环铜业有限公司 Graphite crystallizer
CN204165707U (en) * 2014-11-20 2015-02-18 重庆钢铁(集团)有限责任公司 The platform of a kind of crystallizer examination water inspection
CN104368773A (en) * 2014-12-05 2015-02-25 西南铝业(集团)有限责任公司 Hard aluminum alloy casting crystallizer and pulse water pipeline thereof
CN205834138U (en) * 2015-12-17 2016-12-28 西南铝业(集团)有限责任公司 A kind of water saving crystallizer platform

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6367539B1 (en) * 1999-01-13 2002-04-09 Danieli & C. Officine Meccaniche Spa Crystalliser for continuous casting
CN2889551Y (en) * 2006-02-28 2007-04-18 丁刚 Multiple-flow continuous casting apparatus for steel sintered carbide wire, bar
CN201420023Y (en) * 2009-06-04 2010-03-10 浙江中环铜业有限公司 Graphite crystallizer
CN204165707U (en) * 2014-11-20 2015-02-18 重庆钢铁(集团)有限责任公司 The platform of a kind of crystallizer examination water inspection
CN104368773A (en) * 2014-12-05 2015-02-25 西南铝业(集团)有限责任公司 Hard aluminum alloy casting crystallizer and pulse water pipeline thereof
CN205834138U (en) * 2015-12-17 2016-12-28 西南铝业(集团)有限责任公司 A kind of water saving crystallizer platform

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
周士凯等: "连铸机冷却水系统常用阀门的选用", 《重型机械》 *

Also Published As

Publication number Publication date
CN105382222B (en) 2018-07-13

Similar Documents

Publication Publication Date Title
CN201482936U (en) Gravity-cast aluminum alloyed wheel casting die
CN205834138U (en) A kind of water saving crystallizer platform
CN105382222A (en) Aluminum alloy crystallizer platform
CN103121085A (en) Steel ball casting die
CN104043817B (en) Wheel hub casting mould cooling control system
CN203371328U (en) Feeding device
CN203622833U (en) Signal cylinder of hot runner system
CN203683590U (en) Energy-saving thermal-treatment circulating water system
CN202001760U (en) A new structure shunt
CN201098978Y (en) Plastic inspection well launder body die-casting forming die
CN202118285U (en) Flow regulating device of slag flushing water circulation system
CN203293463U (en) Integrated-type electromagnetic valve bank of hot-runner injection molding system
CN204061576U (en) A kind of cast welding engagement type water-cooling bearing block
CN207064371U (en) Oil cylinder controller
CN202571258U (en) Improved cooling water tank for aluminum wheel blank
CN209162175U (en) One kind is for the vertical zinc-plated mixing line passage of annealing
CN206632752U (en) A kind of lathe truss-like top cut liquid return-flow structure
CN203140700U (en) Steel ball casting mold
CN102847893A (en) Method for changing perimeter of water-cooled die casting crystallizer and special cooling copper plate units
CN203741926U (en) Water supply system of crystallizer of horizontal continuous casting unit
CN203887153U (en) Novel cooling mold
CN202562296U (en) Nitrogen isolation protection device in intermediate frequency furnace for producing vanadium and nitrogen alloys
CN203807538U (en) Semi-continuous smelting and casting integrated device for multiple products
CN204340108U (en) A kind of mould for the production of product with tooth
CN221336594U (en) Online sliding gate mechanism position adjusting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant