CN105257034B - A kind of method for setting up garage - Google Patents

A kind of method for setting up garage Download PDF

Info

Publication number
CN105257034B
CN105257034B CN201510567276.2A CN201510567276A CN105257034B CN 105257034 B CN105257034 B CN 105257034B CN 201510567276 A CN201510567276 A CN 201510567276A CN 105257034 B CN105257034 B CN 105257034B
Authority
CN
China
Prior art keywords
column
garage
crossbeam
plate
secondary beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510567276.2A
Other languages
Chinese (zh)
Other versions
CN105257034A (en
Inventor
周祖全
牟章伟
徐兴福
陈高强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING JIEYU ARCHITECTURAL MACHINERY Co Ltd
Original Assignee
CHONGQING JIEYU ARCHITECTURAL MACHINERY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING JIEYU ARCHITECTURAL MACHINERY Co Ltd filed Critical CHONGQING JIEYU ARCHITECTURAL MACHINERY Co Ltd
Priority to CN201510567276.2A priority Critical patent/CN105257034B/en
Publication of CN105257034A publication Critical patent/CN105257034A/en
Application granted granted Critical
Publication of CN105257034B publication Critical patent/CN105257034B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

This patent application discloses a kind of method for setting up steel construction garage,This method needs component to be mounted by first being preset in factory,Such as column,Crossbeam,Secondary beam and short beam,Steel member is passed through into assembly plant of bolt elder generation garage unit in erecting bed,Garage unit is being subjected to the horizontal and vertical steel body framework for being spliced to form garage,The crossbeam and secondary beam of garage unit,And the connection between secondary beam and short beam is attached using support cushion cap,The support block for supporting steel member to be connected is provided with support cushion cap,So that steel member to be connected is only supported holding power of the block to it,And connected cross bolts are not influenceed by shearing force,The column set up in this method is as a fire protection pipeline part,When setting up,Pay particular attention to the matching of fire-fighting branch pipe,The establishment that this method is used for above-mentioned steel construction garage has the advantages of setting up short time limit.

Description

A kind of method for setting up garage
Technical field
The present invention relates to the multi-storied garage of steel construction, specially a kind of garage construction method that can independently stop.
Background technology
Increasingly highlighted with the popularization of automobile, the problem of parking difficulty, in general solution is to build more parking lots Or parking building, the fixation parking lot built by armored concrete or parking building, once being built, mobile and shape can not be realized Change so that the utilization of fixed parking lot or parking building for land resource is relatively low, and remove and it is crushing remove, Resource can not be recycled, to solve fixed parking lot or the low present situation of parking building resource utilization, occurred now Parking stall movable type mechanical garage, the parking mode in the garage are:Vehicle is initially entered on the parking stall of the bottom, then is revolved by garage Rotary device, parking stall is gradually swiveled into upper sheaf space, by constantly circulation realize solid parking, the mechanical stereo garage it is excellent Point is that floor space is small, and its shortcoming is that, when the situation that there was a mechanical failure or has a power failure, the vehicle in high level is difficult to independently leave Garage, so as to the trouble for causing to pick up the car to car owner.
A kind of existing pin-connected panel multi-storied garage, which disclose multi-storied garage and spelled by the parking stall unit of multiple frame structures Connect and form.The column and crossbeam that parking stall unit uses are H steel, and the outer wall of column and the end of crossbeam are drilled with horizontal connection Hole, when connecting column and crossbeam, it is to be connected stud wall and beam-end by one piece of connecting plate, is drilled with connecting plate The left half-edge hole matched with column outer wall connecting hole, the right half-edge hole matched with the connecting hole of beam-end.Pass through cross bolts The left half-edge hole of connecting plate is connected with column, connected the right half-edge hole of connecting plate and beam-end again by cross bolts Connect.In order to which fireproof needs, overlap joint steel construction garage needs separately to build fire protection pipeline, and on building method, cross bolts connect Connect very time-consuming so that the duration for entirely building garage is longer, it is impossible to keeps up with and sets up quick demand to garage now.
The content of the invention
The invention is intended to provide a kind of method in energy fast construction steel construction garage.
A kind of method in establishment garage that the application provides, comprises the following steps;
Step 1:Prefabricated stand column in the factory, column is hollow pipe and both ends are welded with sealing flange, is leaned in column side wall Upper junction plate is welded at 5~10cm of close end and lower connection, upper junction plate and lower connecting plate surrounding bore longitudinally connected hole, vertical Post side wall is in welding fire-fighting pipe connector below lower connecting plate;In prefabricated stand column, the sealing flange at column both ends is used to spell Connect other columns;In column side wall weld upper junction plate and it is lower connection its effect be used for connecting cross beam use;Column side wall Fire-fighting pipe connector is welded, column selects hollow pipe, its fixed part using column as fire protection pipeline.
Step 2:Be prefabricated in the factory crossbeam, secondary beam and short beam, crossbeam, secondary beam and short beam type selecting identical H profile steel conduct Base material, the longitudinally mounted hole matched with upper junction plate and lower connecting plate is bored at the both ends of crossbeam.Set at the both ends of crossbeam vertical It is to wait when mounted to the purpose of mounting hole, can ensures that the bolt on crossbeam is vertical direction, ensures the bolt not by perpendicular Nogata to shearing.
Step 3:Pedestal is preset in garage erecting bed;When pedestal designs, caused by least bearing 20 layer garages Pressure.
Step 4:Default column, crossbeam, secondary beam and short beam are transported to erecting bed;When transport, due to vertical Post, crossbeam, secondary beam and short beam are the steel member of standard, can disposably pass through Automobile Transportation to erecting bed.
Step 5:Parking stall unit is set up, column is connected on pedestal, then crossbeam one end is arranged on column, crossbeam Both ends by longitudinal bolt be arranged on column side wall upper and lower connecting plate between, short beam is more by supporting cushion cap to be connected to Between root secondary beam, secondary beam is fixed on crossbeam also by support cushion cap.Short beam is on secondary beam and short by supporting cushion cap to be connected to The end of beam is supported in support block, the square parking stall unit ultimately formed.
Step 6:Parking stall unit transverse is spliced to form to the face profile in garage, the longitudinal spliced formation garage of parking stall unit The number of plies.
Step 7:Slope lane is installed, slope lane is overlapped between two layer garages, and the gradient of slope lane is 7%, tiltedly The width in slope track is 5.8 meters.Slope lane uses the gradient when building as 7%, general slope lane select 9%~10%, but It is to have a lateral pressure to be transmitted to column when ramp travels for steel construction garage, vehicle so that column, which has, somewhat to be become Shape, in order to improve column stressing conditions, it is 7% by the gradient overlap joint of slope lane, effectively alleviates the lateral pressure of column.Tiltedly The width in slope track selects 5.8 meters, and may be constructed two-way traffic confession, vehicle travels in same section slope lane up and down.
Step 8:Extinguishing pipe is installed, column connected longitudinally is connected by vertical extinguishing pipe, vertical extinguishing pipe both ends connect It is connected on the fire-fighting connector of lower upright, the column that transverse matrix is distributed by horizontal extinguishing pipe is connected.So it may be constructed whole The individual complete fire protection pipeline system in garage.Every layer of column is connected on circulation fire-fighting pond with independent extinguishing pipe respectively, its mesh Be for the targetedly supply fire demand water to every layer garage.
Step 9:Additional facilities are installed, additional facilities include the guardrail per layer garage, fire-fighting stairway and every layer of health Between.
Preferably, gusseted reinforcing plate is provided with step 1, between column and lower connecting plate.Due under Connecting plate needs the lower pressure of crossbeam, is the main stressed member in garage, gusseted is set between lower connecting plate and column Reinforcing plate, it is effectively improved the stressing conditions of connecting plate.
The advantages of this establishment garage method, is:1st, column, crossbeam, secondary beam and short beam are in individual member and in work The prefabricated completion of factory, directly these individual members are transported to erecting bed during transport, when building using bolt by these Component is connected, and when connection, does not have large-scale groups component, can save the input of large scale equipment so that construction can transport in component It is defeated to scene after can be set up, so can save the construction period.2nd, this method directly will when considering to install fire protection pipeline Column as load-bearing makes open tubular column, and as extinguishing pipe, installation extinguishing pipe is eliminated in the process for entirely setting up garage Process.
Preferably, need to be in secondary beam and short beam end welded end plate after step 2 completion;End plate is flat steel Plate, end plate, which is drilled with, is transversely mounted hole, and because secondary beam and short beam use H profile steel, the support block for needing to put forth effort is connected using end, This programme, which uses, closes the mouth of H profile steel at the both ends of secondary beam and short beam, is bored on end plate and is transversely mounted hole as cross bolts Mounting hole.
Preferably, the support cushion cap in step 6 includes welded plate, contiguous block and support block;The support Block is arranged on the positive formed L-shaped block of contiguous block, and welded plate is arranged on the back side of connecting plate, and contiguous block is drilled with matches somebody with somebody with end plate That closes is transversely mounted hole;The connected mode of short beam and secondary beam is that the end plate of short beam is connected into support cushion cap by cross bolts On contiguous block, short beam end is supported in the support block of support cushion cap;The connected mode of secondary beam and crossbeam and short beam and secondary beam Connected mode is identical.The basis that the connecting plate of support cushion cap connects as cross bolts, support block are used to support stressed member End.
Preferably, the support cushion cap is prefabricated in the factory, while support cushion cap is passed through into welding in the factory Plate weld is on secondary beam and crossbeam side.The trouble for making support cushion cap at the scene can so be saved.
Preferably, in step 1, the column inwall sets gradually zinc coat and epoxy resin layer.Due to vertical Post needs to be passed through fire water for a long time, if the column being not handled by, in fire demand water, device inwall can be corroded, and easily be made Into the fracture of column, set gradually zinc coat and epoxy resin layer in the inwall of column and reliably overcome etch-proof shortcoming, And epoxy resin layer also has wear-resisting characteristic, even if fire water flow velocity in column is very fast, also will not column cause to rub Wear wound.
Preferably, the thickness of the epoxy resin layer is more than 2mm, and the service life for designing column is generally 20 Year, by calculating, epoxy resin layer selection is more than 2mm so that above-mentioned condition is ensured.
Preferably, short column is also associated with column, the short column both ends are provided with closing flange, set The purpose of short column is that general column makes the standard component of regular length, when needing to increase the height of every floor Wait, it is necessary to which setting up short column conduct increases part.
Preferably, garage, which also splices, transportation elevator, and transportation elevator connects with every layer of track, so in High layer garage, elevator disengaging also may be selected, be especially in rolling away from for the high-rise vehicle in garage, select transportation elevator to reduce Car owner goes out the time in garage.
Brief description of the drawings
Fig. 1 is the planar structure schematic diagram of the garage individual layer of the present invention;
Fig. 2 is connection structure diagram of the column as extinguishing pipe;
Fig. 3 is the structure chart of garage unit;
Fig. 4 supports suspended deck structure schematic diagram;
Fig. 5 is the structure chart of column;
Fig. 6 is the structural representation of slope lane;
Fig. 7 is that construction procedure block diagram is set up in garage.
Embodiment
Below by embodiment, the present invention is further detailed explanation:
As shown in Figure 1:The autonomous parking garage of module type stereo, include five layers of parking lot, every layer of parking lot bag Parking stall and track 700 are included, parking stall includes parking stall unit 200 that is multiple horizontal or/and being longitudinally detachably connected, each parking stall unit 200 selection width are 5.8 meters, and between 1.5m to 2 meters, 5.8 meters of parking stall unit 200 is enough to stop side by side the width of general dolly Lower two cars;Parking stall unit 200, which also splices, vehicle transport elevator 300, and every layer of outlet of elevator connects with track 700.For The disengaging of the high layer garage vehicle of convenience, user may be selected to use vehicle transport elevator 300.
To realize the autonomous parking of car owner, track 700 is connected to parking stall on one side, and track 700 is formed in every layer of parking lot Continuous passage, the track 700 in every layer of parking lot pass through slope lane(Fig. 6)Connection, the track of bottom offers two inlet and outlet; The width design in track is also 5.8 meters, track can be divided into two-way traffic, disclosure satisfy that the needs of the two-way meeting in same section.
As shown in Figure 3:Parking stall unit 200 include four root posts, 110, four crossbeams 140, crossbeam 140, secondary beam 146 and Short beam 147.Short beam 147 is connected to the waffle slab of composition plane between more secondary beams 146, and the secondary beam 146 on waffle slab is connected Between more crossbeams 140, so as to form the loading end of parking stall unit.The end set of column 110 is vertical for the connection of parking stall unit To flange 150, the side wall of column 110 sets spaced upper junction plate 171 and lower connecting plate 172, and the crossbeam 140 of loading end is placed in Fix to form parking stall unit between connecting plate 171 and lower connecting plate 172 and by longitudinal bolt.
As shown in Figure 4:Support cushion cap includes integrally formed backboard 301, connecting plate 302 and support block 303, the backboard 301 are connected to the back side of connecting plate 302 and form T-shaped, and support block 303 is connected to the front of connecting plate 302.The secondary beam end End plate is welded with, the end plate is connected with connecting plate by cross bolts, and the end of secondary beam 146 is supported on above support block, support The width of support block 303 of cushion cap is more than the width of secondary beam, and secondary beam end all can be positioned in support block 303, during contraposition Time is unlikely to that end is hanging, effectively prevents dropping for secondary beam.The connected mode and secondary beam of short beam and secondary beam and the connection side of crossbeam Formula is identical.
As shown in Figure 2 and Figure 5:Column 110 is hollow tube, is set on the outer wall of column 110 below cross-beam connecting plate There is fire-fighting pipe connector 111, connected between each fire-fighting connector 111 by extinguishing pipe 120;Using column 110 as extinguishing pipe A part, it is only necessary to when laying fire protection pipeline, connected column 110 by the extinguishing pipe 120 of lateral connection, vertical Fire demand water is passed through in post 110, is connected between every layer of column also by vertical extinguishing pipe 120, vertical extinguishing pipe 120 is only Upper and lower two root posts are connected, its physical length is only to get around the length designed by sealing flange, if garage design For heightening type, vertical extinguishing pipe also needs to consider to get around the length that short column is designed vertical extinguishing pipe.
As shown in Figure 6:Slope lane in track, according to garage slope lane design specification, with ramp height and tiltedly The projected length in ramp and ratio represent the gradient, and the gradient can not be more than 15%(≤1:6.67), slope lane include column 110, Crossbeam 140, cant beam 190, secondary beam 146 and car panel, column 110 are vertically arranged, and the side wall of column 110 is fixed with parallel upper company Fishplate bar and lower connecting plate, upper junction plate and lower connection are and uprights vertical, the crossbeam, cant beam are H profile steel, and beam-end connects It is connected between upper junction plate and lower connecting plate and is fixedly connected by longitudinal bolt;The cant beam is connected to two parallel crossbeams Between, by supporting cushion cap to connect between the cant beam and crossbeam, the support cushion cap includes integrally formed support panel, branch Bracer and backboard, the backboard are fixed on support panel side and are welded on crossbeam, and support block is being fixed on support panel just Face, the cant beam end face are provided with the termination connecting plate for coordinating support panel, supported upwards by support block below the cant beam, Termination connecting plate and support panel are fixed by cross bolts.
The method for setting up garage is illustrated in figure 7, is comprised the following steps;
Step 1:Prefabricated stand column in the factory, column is hollow pipe and both ends are welded with sealing flange, is leaned in column side wall Upper junction plate is welded at 5~10cm of close end and lower connection, upper junction plate and lower connecting plate surrounding bore longitudinally connected hole, vertical Post side wall is in welding fire-fighting pipe connector below lower connecting plate;In prefabricated stand column, the sealing flange at column both ends is used to spell Connect other columns;In column side wall weld upper junction plate and it is lower connection its effect be used for connecting cross beam use;Column side wall Fire-fighting pipe connector is welded, column selects hollow pipe, its fixed part using column as fire protection pipeline.
Step 2:Be prefabricated in the factory crossbeam, secondary beam and short beam, crossbeam, secondary beam and short beam type selecting identical H profile steel conduct Base material, crossbeam and secondary beam are blocked as 1.8m, bored at the both ends of crossbeam matched with upper junction plate and lower connecting plate it is longitudinally mounted Hole.It is to wait when mounted in the purpose that the both ends of crossbeam set longitudinally mounted hole, it is vertical side that can ensure the bolt on crossbeam To not influenceed by shearing.
Step 3:Manufacture end plate;End plate is plane steel plate, and end plate is welded on to the both ends of secondary beam and short beam, and end plate is drilled with It is transversely mounted hole.
Step 4:Be prefabricated in the factory support cushion cap, and the support cushion cap is held by turning, welding or forging molding, support Platform includes being easy to be welded on welded plate on crossbeam and secondary beam, for connecting the contiguous block of secondary beam or short beam and for supporting time The support block of beam and short beam;Contiguous block is drilled with is transversely mounted hole with what end plate coordinated.Support cushion cap plays middle biography in an installation The effect of power, and support block is supported on the end of stressed member, and the bolt of stressed member lateral connection is no longer influenced by shearing.
Step 5:Support cushion cap is welded in crossbeam and secondary beam lateral groove, support cushion cap takes full weld technique to weld.
Step 6:Pedestal is preset in garage erecting bed;When pedestal designs, caused by least bearing 20 layer garages Pressure.
Step 7:Default column, crossbeam, secondary beam and short beam are transported to erecting bed;When transport, due to vertical Post, crossbeam, secondary beam and short beam are the steel member of standard, can disposably pass through Automobile Transportation to erecting bed.
Step 8:Column is connected on pedestal by sealing flange, wherein four root posts form an elementary cell,
Step 9:Crossbeam one end is arranged in step 8 in elementary cell, the both ends of column are pacified by longitudinal bolt Between upper and lower connecting plate, by secondary beam by supporting cushion cap to be connected to the side of crossbeam, the end of secondary beam is supported on support block On.By short beam, cushion cap is connected on secondary beam and the end of short beam is supported in support block by supporting, and ultimately forms wide 5.8m's Square parking stall unit.
Step 10:Repeat step nine, by the horizontally-spliced face profile for forming garage of the parking stall monomer of formation, parking stall unit The longitudinal spliced number of plies for forming garage.
Step 11:Slope lane is installed, slope lane is overlapped between two layer garages, and the gradient of slope lane is 7%, The width of slope lane is 5.8 meters.Slope lane uses the gradient when building as 7%, and general slope lane selects 9%~10%, But there is a lateral pressure to be transmitted to column so that column has somewhat when ramp travels for steel construction garage, vehicle Deformation, in order to improve column stressing conditions, it is 7% by the gradient overlap joint of slope lane, effectively alleviates the lateral pressure of column. The width of slope lane selects 5.8 meters, and may be constructed two-way traffic confession, vehicle travels in same section slope lane up and down.
Step 12:Extinguishing pipe is installed, column connected longitudinally connected by vertical extinguishing pipe, vertical extinguishing pipe both ends It is connected on the fire-fighting connector of lower upright, the column that transverse matrix is distributed by horizontal extinguishing pipe is connected.So it may be constructed The complete fire protection pipeline system in whole garage.
Step 13:Every layer of column is connected on circulation fire-fighting pond with independent extinguishing pipe respectively, its purpose is to The targetedly supply fire demand water to every layer garage.
Step 14:Additional facilities are installed, additional facilities include the guardrail per layer garage, and fire-fighting stairway and every layer are defended Between life.
By calculating, five layers of parking lot lowermost end column is subjected to 26 tons of load, and design column selects hot rolling pipe Φ 203 × 12, material selection Q235, equal section pipe Φ 203 × 10 × 2800, the length of column 110 select 2.8 meters, so The load for enabling every root post to bear 33 tons, disclosure satisfy that the needs of 26 tons of load.
It when being spliced to form parking stall unit, can be directly attached, stood by longitudinal flange 150 between column and column The connecting plate that the side wall of post is set is used for connecting cross beam 140, crossbeam by longitudinally mounted hole and cross-beam connecting plate bolt connection, this Sample bolt will not be destroyed by shearing force, ensure that effective connection of crossbeam and column;When installing crossbeam, by cushion pad It is positioned between crossbeam and lower connecting plate, upper junction plate is first fixed when connection, due to plays the role of cushion pad, lower connecting plate tool There is larger surplus so that crossbeam plays the role of a buffering antidetonation.
Because vehicle is treated as dynamic loading, it is necessary to carry out reinforcement processing to track crossbeam on track, when two cars simultaneously It is carried on a crossbeam and adds the deadweight of crossbeam in itself, its total load head is 2.3 tons, such as selects H profile steel --- 150 × 100 × 6 × 9 type stage casing maximums can carry 6.34t, it is sufficient to meet carrying needs, typically when selecting shaped steel, select effective large carrying capacity In or equal to H profile steel --- 150 × 100 × 6 × 9 shaped steel.
Above-described is only embodiments of the invention, and the general knowledge such as known concrete structure and characteristic is not made herein in scheme Excessive description, technical field that the present invention belongs to is all before one skilled in the art know the applying date or priority date Ordinary technical knowledge, prior art all in the field can be known, and with using normal experiment hand before the date The ability of section, one skilled in the art can improve and implement under the enlightenment that the application provides with reference to self-ability This programme, some typical known features or known method should not implement the application as one skilled in the art Obstacle.It should be pointed out that for those skilled in the art, without departing from the structure of the invention, it can also make Go out several modifications and improvements, these should also be considered as protection scope of the present invention, these effects implemented all without the influence present invention Fruit and practical applicability.The scope of protection required by this application should be based on the content of the claims, the tool in specification The records such as body embodiment can be used for the content for explaining claim.

Claims (6)

  1. A kind of 1. method for setting up garage, it is characterised in that comprise the following steps,
    Step 1:Prefabricated stand column in the factory, column is hollow pipe and both ends are welded with sealing flange, is welded with column side wall Spaced upper junction plate and lower connecting plate, upper junction plate and lower connecting plate surrounding bore longitudinally connected hole, in column side wall On be additionally provided with the fire-fighting pipe connector communicated with inside column;
    Step 2:Be prefabricated in the factory crossbeam, secondary beam and short beam, and crossbeam, secondary beam and short beam type selecting identical H profile steel are as base Material, the longitudinally mounted hole matched with upper junction plate and lower connecting plate is bored at the both ends of crossbeam;In secondary beam and short beam end welding ends Plate;End plate is plane steel plate, and end plate, which is drilled with, is transversely mounted hole;
    Step 3:Pedestal is preset in garage erecting bed;
    Step 4:Default column, crossbeam, secondary beam and short beam are transported to erecting bed;
    Step 5:Parking stall unit is set up, first column is connected on pedestal, then crossbeam one end is arranged on column, crossbeam Both ends are arranged between the upper and lower connecting plate of column side wall by longitudinal bolt, and short beam is by supporting cushion cap to be connected to more Between secondary beam, secondary beam is fixed on crossbeam also by support cushion cap;The support cushion cap includes welded plate, contiguous block and support Block;The support block is arranged on the positive formed L-shaped block of contiguous block, and welded plate is arranged on the back side of contiguous block, contiguous block It is drilled with and is transversely mounted hole with what end plate coordinated;The connected mode of short beam and secondary beam is to connect the end plate of short beam by cross bolts On the contiguous block for connecing support cushion cap, short beam end is supported in the support block of support cushion cap;The connected mode of secondary beam and crossbeam with Short beam is identical with the connected mode of secondary beam;
    Step 6:Parking stall unit transverse is spliced to form to the face profile in garage, by the longitudinal spliced formation garage of parking stall unit The number of plies;
    Step 7:Slope lane is installed, slope lane is overlapped between two layer garages;
    Step 8:Extinguishing pipe is installed, column connected longitudinally connected by vertical extinguishing pipe, vertical extinguishing pipe both ends are connected to On the fire-fighting connector of lower upright, the column for being distributed transverse matrix by horizontal extinguishing pipe is connected;
    Step 9:Additional facilities are installed, additional facilities include the guardrail per layer garage, fire-fighting stairway and every layer of toilet.
  2. 2. the method according to claim 1 for setting up garage, it is characterised in that:The support cushion cap is prefabricated in the factory, Support cushion cap is welded on secondary beam and crossbeam side by welded plate in the factory simultaneously.
  3. 3. the method according to claim 1 for setting up garage, it is characterised in that:In step 1, column and lower connecting plate Between be provided with gusseted reinforcing plate.
  4. 4. the method according to claim 3 for setting up garage, it is characterised in that:In step 1, the column inwall according to Secondary setting zinc coat and epoxy resin layer, the thickness of the epoxy resin layer are more than 2mm.
  5. 5. the method according to claim 4 for setting up garage, it is characterised in that:In step 6, in longitudinal spliced parking stall Be also associated with short column during unit, between lower upright, the short column both ends by close flange be connected to it is two vertical up and down Between post.
  6. 6. the method according to claim 5 for setting up garage, it is characterised in that:After step 9, garage, which also splices, to be had Transportation elevator, transportation elevator connect with every layer of track.
CN201510567276.2A 2015-09-09 2015-09-09 A kind of method for setting up garage Expired - Fee Related CN105257034B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510567276.2A CN105257034B (en) 2015-09-09 2015-09-09 A kind of method for setting up garage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510567276.2A CN105257034B (en) 2015-09-09 2015-09-09 A kind of method for setting up garage

Publications (2)

Publication Number Publication Date
CN105257034A CN105257034A (en) 2016-01-20
CN105257034B true CN105257034B (en) 2018-01-19

Family

ID=55096934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510567276.2A Expired - Fee Related CN105257034B (en) 2015-09-09 2015-09-09 A kind of method for setting up garage

Country Status (1)

Country Link
CN (1) CN105257034B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107558776B (en) * 2017-09-09 2018-06-15 汤刚健 The prefabricated component of flange is equipped in six direction to be assembled into stereo garage in a whole night
CN116791669A (en) * 2017-12-31 2023-09-22 郑州泽正技术服务有限公司 Method for constructing underground automatic garage structure
CN109267780A (en) * 2018-09-05 2019-01-25 安徽鸿杰威尔停车设备有限公司 A kind of novel parking apparatus that can be installed in building roof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07293019A (en) * 1994-04-22 1995-11-07 Naigai Tekunika Kk Structure for supporting beam and method for assembling supporting part of beam
CN2687232Y (en) * 2004-03-26 2005-03-23 许德斌 Combined multi-layer parking house with steel structure
JP4853422B2 (en) * 2007-07-26 2012-01-11 パナソニック電工株式会社 Gate frame with connection of composite beams and wooden columns
CN202164712U (en) * 2011-07-19 2012-03-14 筑巢(北京)科技有限公司 Trimmer fastener and light steel structure thereof
CN203379528U (en) * 2013-05-08 2014-01-08 宣中光 Automatic fire extinguishing system for steel building
CN103266665B (en) * 2013-05-14 2015-08-26 广州联合钢结构有限公司 Metal Roof joist connected node and attaching method thereof

Also Published As

Publication number Publication date
CN105257034A (en) 2016-01-20

Similar Documents

Publication Publication Date Title
CN202245617U (en) Elevator well wall assembled by adopting combined type derricks
CN102251699B (en) Residential building system with cast-in-situ beam columns and prefabricated sandwich concrete wall panels and construction method
CN102358551B (en) Safe elevator with brake in lift car
CN107386435A (en) The assembled of prestressed node connection can recover function steel frame support system
CN105257034B (en) A kind of method for setting up garage
CN108005410A (en) A kind of assembled Residential System of Steel-concrete Composite Structure and its construction method
CN112360147A (en) Construction method of intelligent construction site fastener early-dismantling support real-time monitoring system
CN107989228A (en) A kind of prefabricated steel reinforced concrete shear wall structure and its preparation and installation method
CN110886227B (en) Main tower cast-in-place lower cross beam support system and construction method
EP3088635B1 (en) Retrofitting structure for existing building
CN202125104U (en) Residential building system formed by cast-in-place beam columns and prefabricated sandwich concrete wall slabs
CN111663449A (en) Combined cast-in-place box girder support system and construction method
CN108005264A (en) A kind of steel framework constraint precast reinforced concrete shear wall structure and preparation and installation method
CN207739674U (en) A kind of assembled Residential System of Steel-concrete Composite Structure
CN110593409A (en) Full-life-cycle detachable and replaceable frame structure system and installation and replacement method
CN108824484B (en) Vehicle section covered steel frame and covered reinforced concrete frame mixed structure
CN102913007B (en) Steel reinforcement processing shed and construction method therefor
CN110984602A (en) Design and construction method of assembly type interlayer protection device of construction elevator
CN215167057U (en) Large-span huge underground workshop arch-type steel-concrete combined ceiling structure
CN206233115U (en) A kind of supporting bracket of bridge construction
CN212612004U (en) Modular cast-in-place box girder braced system
CN116290483A (en) Assembled steel frame composite shear wall structure
CN211037290U (en) Detachable and replaceable frame structure system with full life cycle
CN108005266A (en) A kind of strip frame precast reinforced concrete shear wall structure and preparation and installation method
CN105257035B (en) The autonomous parking garage of module type stereo

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180119

Termination date: 20200909

CF01 Termination of patent right due to non-payment of annual fee