CN105203887A - Prewarning method, device and system for overload of transformer - Google Patents
Prewarning method, device and system for overload of transformer Download PDFInfo
- Publication number
- CN105203887A CN105203887A CN201510683334.8A CN201510683334A CN105203887A CN 105203887 A CN105203887 A CN 105203887A CN 201510683334 A CN201510683334 A CN 201510683334A CN 105203887 A CN105203887 A CN 105203887A
- Authority
- CN
- China
- Prior art keywords
- power
- distribution network
- transformer
- early warning
- time
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 33
- 238000009826 distribution Methods 0.000 claims abstract description 123
- 238000004519 manufacturing process Methods 0.000 claims abstract description 37
- 238000012544 monitoring process Methods 0.000 claims abstract description 17
- 238000012545 processing Methods 0.000 claims description 23
- 238000004891 communication Methods 0.000 claims description 21
- 238000003860 storage Methods 0.000 claims description 7
- 102000008071 Mismatch Repair Endonuclease PMS2 Human genes 0.000 claims description 3
- 108010074346 Mismatch Repair Endonuclease PMS2 Proteins 0.000 claims description 3
- 230000009467 reduction Effects 0.000 claims description 3
- 230000010354 integration Effects 0.000 abstract description 6
- 230000001681 protective effect Effects 0.000 abstract description 2
- 238000007726 management method Methods 0.000 description 11
- 238000010586 diagram Methods 0.000 description 9
- 238000012423 maintenance Methods 0.000 description 8
- 238000004590 computer program Methods 0.000 description 7
- 230000002159 abnormal effect Effects 0.000 description 6
- 238000004364 calculation method Methods 0.000 description 3
- 230000006870 function Effects 0.000 description 3
- 230000008439 repair process Effects 0.000 description 3
- 230000005611 electricity Effects 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 230000003044 adaptive effect Effects 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 239000013307 optical fiber Substances 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000005070 sampling Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
本发明提供了一种变压器过负荷预警的方法、装置及系统,涉及电网营配贯通技术领域。方法包括:实时监测电网中的配网变压器的电压信号和电流信号,确定实时功率;监测实时功率是否大于一预先设置的安全功率阈值;若是,则生成预警信息,并将预警信息上传到用电信息采集系统服务器,以使得用电信息采集系统服务器将预警信息传输到营销业务应用系统服务器以及生产PMS2.0系统服务器;若过负荷时间大于预先设置的时间阈值,控制配网变压器通路中的负荷保护断路器将配网变压器通路断开。本发明可以解决当前电网系统中的生产PMS2.0系统没有与营销系统贯通,不能获取到配网变压器的负荷信息,当配网发生故障时,无法实现对配网变压器的过负荷预警及保护的问题。
The invention provides a transformer overload early warning method, device and system, and relates to the technical field of grid operation and distribution integration. The method includes: monitoring the voltage signal and current signal of the distribution network transformer in the power grid in real time to determine the real-time power; monitoring whether the real-time power is greater than a preset safe power threshold; if so, generating early warning information and uploading the early warning information to the power consumption The information collection system server, so that the power consumption information collection system server transmits the early warning information to the marketing business application system server and the production PMS2.0 system server; if the overload time is greater than the preset time threshold, control the load in the distribution network transformer channel The protective circuit breaker disconnects the distribution network transformer path. The invention can solve the problem that the production PMS2.0 system in the current power grid system is not connected with the marketing system, and the load information of the distribution network transformer cannot be obtained. When the distribution network fails, the overload warning and protection of the distribution network transformer cannot be realized. question.
Description
技术领域technical field
本发明涉及电网营配贯通技术领域,尤其涉及一种变压器过负荷预警的方法、装置及系统。The invention relates to the technical field of power grid operation and distribution integration, in particular to a method, device and system for early warning of transformer overload.
背景技术Background technique
当前,为了进一步整合资源,畅通电网营销、检修等专业协同工作,促进电网营销、运检等部门在提升客户服务品质上形成合力,国家电网公司正在开展营配贯通工程建设。营配贯通系统是以开展营配数据采录与治理为基础,通过对生产、营销、电网GIS(GeographicInformationSystem)等系统进行适应性改造,从而能够支撑故障报修/抢修、计划停电管理等业务,辅助配网规划、线损精益化管理、业扩自动报装等集成应用。At present, in order to further integrate resources, smooth the professional coordination of power grid marketing and maintenance, and promote the joint efforts of power grid marketing, transportation inspection and other departments to improve customer service quality, the State Grid Corporation of China is carrying out the construction of business and distribution integration projects. The marketing and distribution integration system is based on the collection and management of marketing and distribution data. Through adaptive transformation of production, marketing, power grid GIS (Geographic Information System) and other systems, it can support fault repair/emergency repair, planned power outage management and other businesses, and assist distribution Integrated applications such as network planning, line loss lean management, and automatic report and installation for business expansion.
在生产系统、营销系统、电网GIS等系统的贯通中,通过建立营销台账信息与变电站、线路、变压器等电网设施信息的关联,构建统一的电网设施模型、客户信息模型、基础资料和拓扑关系,可以实现跨部门、跨专业的数据共享和业务融合。In the integration of production system, marketing system, power grid GIS and other systems, a unified power grid facility model, customer information model, basic data and topology relationship are constructed by establishing the association between marketing ledger information and power grid facility information such as substations, lines, and transformers , which can realize cross-departmental and cross-professional data sharing and business integration.
然而,在电网系统中的设备(资产)运维精益管理系统(PMS2.0系统)还没有与营销系统贯通,不能获取到配网变压器的负荷信息,当配网发生故障时,无法实现对配网变压器的过负荷预警及配网变压器的保护。However, the equipment (asset) operation and maintenance lean management system (PMS2.0 system) in the power grid system has not been connected with the marketing system, and the load information of the distribution network transformer cannot be obtained. When the distribution network fails, the matching cannot be realized. Network transformer overload warning and distribution network transformer protection.
发明内容Contents of the invention
本发明的实施例提供一种变压器过负荷预警的方法、装置及系统,以解决当前电网系统中的设备(资产)运维精益管理系统(PMS2.0系统)还没有与营销系统贯通,不能获取到配网变压器的负荷信息,当配网发生故障时,无法实现对配网变压器的过负荷预警及配网变压器的保护的问题。Embodiments of the present invention provide a transformer overload early warning method, device and system to solve the problem that the equipment (asset) operation and maintenance lean management system (PMS2.0 system) in the current power grid system has not been connected with the marketing system and cannot obtain To the load information of the distribution network transformer, when the distribution network fails, it is impossible to realize the overload warning of the distribution network transformer and the protection of the distribution network transformer.
为达到上述目的,本发明采用如下技术方案:To achieve the above object, the present invention adopts the following technical solutions:
一种变压器过负荷预警的方法,包括:A method for early warning of transformer overload, comprising:
实时监测电网中的配网变压器的电压信号和电流信号;Real-time monitoring of the voltage signal and current signal of the distribution transformer in the power grid;
根据所述电压信号和电流信号,确定所述配网变压器的实时功率;determining the real-time power of the distribution network transformer according to the voltage signal and the current signal;
监测所述实时功率是否大于一预先设置的安全功率阈值;monitoring whether the real-time power is greater than a preset safe power threshold;
若所述实时功率大于所述安全功率阈值,生成预警信息,并将所述预警信息上传到用电信息采集系统服务器,以使得所述用电信息采集系统服务器将所述预警信息传输到营销业务应用系统服务器以及生产PMS2.0系统服务器;If the real-time power is greater than the safe power threshold, generate early warning information, and upload the early warning information to the server of the power consumption information collection system, so that the server of the power consumption information collection system transmits the early warning information to the marketing business Application system server and production PMS2.0 system server;
判断所述实时功率大于所述安全功率阈值的过负荷时间是否大于一预先设置的时间阈值;judging whether the overload time during which the real-time power is greater than the safe power threshold is greater than a preset time threshold;
若所述过负荷时间大于所述时间阈值,控制所述配网变压器通路中的负荷保护断路器将配网变压器通路断开。If the overload time is greater than the time threshold, control the load protection circuit breaker in the path of the distribution network transformer to disconnect the path of the distribution network transformer.
进一步的,所述变压器过负荷预警的方法,还包括:Further, the method for early warning of transformer overload also includes:
将所述预警信息存储于本地数据库中。The warning information is stored in a local database.
进一步的,所述变压器过负荷预警的方法,还包括:Further, the method for early warning of transformer overload also includes:
从所述预警信息中获取配网变压器的历史最大功率、当前实际功率,并将所述历史最大功率和当前实际功率通过一显示电路进行显示。The historical maximum power and current actual power of the distribution network transformer are obtained from the warning information, and the historical maximum power and current actual power are displayed through a display circuit.
具体的,所述根据所述电压信号和电流信号,确定所述配网变压器的实时功率,包括:Specifically, the determining the real-time power of the distribution network transformer according to the voltage signal and the current signal includes:
将所述电压信号和所述电流信号分别缩小,以使得所述电压信号和所述电流信号分别为缩小后的电压信号和缩小后的电流信号的一预设倍数;Respectively reducing the voltage signal and the current signal, so that the voltage signal and the current signal are respectively a preset multiple of the reduced voltage signal and the reduced current signal;
根据缩小后的电压信号和缩小后的电路信号,确定所述配网变压器的实时功率。The real-time power of the distribution network transformer is determined according to the reduced voltage signal and the reduced circuit signal.
一种变压器过负荷预警的装置,包括:A transformer overload warning device, comprising:
第一监测单元,用于实时监测电网中的配网变压器的电压信号和电流信号;The first monitoring unit is used to monitor the voltage signal and current signal of the distribution transformer in the power grid in real time;
实时功率确定单元,用于根据所述电压信号和电流信号,确定所述配网变压器的实时功率;a real-time power determination unit, configured to determine the real-time power of the distribution network transformer according to the voltage signal and the current signal;
第二监测单元,用于监测所述实时功率是否大于一预先设置的安全功率阈值;A second monitoring unit, configured to monitor whether the real-time power is greater than a preset safe power threshold;
预警单元,用于在所述实时功率大于所述安全功率阈值时,生成预警信息,并将所述预警信息上传到用电信息采集系统服务器,以使得所述用电信息采集系统服务器将所述预警信息传输到营销业务应用系统服务器以及生产PMS2.0系统服务器;An early warning unit, configured to generate early warning information when the real-time power is greater than the safe power threshold, and upload the early warning information to the server of the power consumption information collection system, so that the server of the power consumption information collection system The early warning information is transmitted to the marketing business application system server and the production PMS2.0 system server;
判断单元,用于判断所述实时功率大于所述安全功率阈值的过负荷时间是否大于一预先设置的时间阈值;A judging unit, configured to judge whether the overload time during which the real-time power is greater than the safe power threshold is greater than a preset time threshold;
过负荷保护单元,用于在所述过负荷时间大于所述时间阈值时,控制所述配网变压器通路中的负荷保护断路器将配网变压器通路断开。The overload protection unit is configured to control a load protection circuit breaker in the path of the distribution network transformer to disconnect the path of the distribution network transformer when the overload time is greater than the time threshold.
进一步的,所述变压器过负荷预警的装置,还包括:Further, the device for early warning of transformer overload also includes:
存储单元,用于将所述预警信息存储于本地数据库中。A storage unit, configured to store the warning information in a local database.
进一步的,所述变压器过负荷预警的装置,还包括:Further, the device for early warning of transformer overload also includes:
显示单元,用于从所述预警信息中获取配网变压器的历史最大功率、当前实际功率,并将所述历史最大功率和当前实际功率通过一显示电路进行显示。The display unit is used to obtain the historical maximum power and current actual power of the distribution network transformer from the warning information, and display the historical maximum power and current actual power through a display circuit.
具体的,所述实时功率确定单元,包括:Specifically, the real-time power determination unit includes:
信号缩小模块,用于将所述电压信号和所述电流信号分别缩小,以使得所述电压信号和所述电流信号分别为缩小后的电压信号和缩小后的电流信号的一预设倍数;A signal reduction module, configured to reduce the voltage signal and the current signal respectively, so that the voltage signal and the current signal are respectively a preset multiple of the reduced voltage signal and the reduced current signal;
实时功率确定模块,用于根据缩小后的电压信号和缩小后的电路信号,确定所述配网变压器的实时功率。The real-time power determination module is used to determine the real-time power of the distribution network transformer according to the reduced voltage signal and the reduced circuit signal.
一种变压器过负荷预警的系统,包括信号采集电路、运算处理芯片电路、电源电路、通信电路、负荷控制电路以及用电信息采集系统服务器、营销业务应用系统服务器以及生产PMS2.0系统服务器;A system for early warning of transformer overload, including a signal acquisition circuit, an operation processing chip circuit, a power supply circuit, a communication circuit, a load control circuit, a power consumption information collection system server, a marketing business application system server, and a production PMS2.0 system server;
所述信号采集电路一端与配网变压器连接,所述信号采集电路的另一端与运算处理芯片电路连接,以向运算处理芯片电路传输信号采集电路所采集的配网变压器的电压信号和电流信号;One end of the signal acquisition circuit is connected to the distribution network transformer, and the other end of the signal acquisition circuit is connected to the operation processing chip circuit to transmit the voltage signal and current signal of the distribution network transformer collected by the signal acquisition circuit to the operation processing chip circuit;
所述运算处理芯片电路与所述通信电路连接;The arithmetic processing chip circuit is connected to the communication circuit;
所述通信电路还分别连接所述负荷控制电路和用电信息采集系统服务器;The communication circuit is also respectively connected to the load control circuit and the server of the power consumption information collection system;
所述用电信息采集系统服务器还连接所述负荷控制电路和所述营销业务应用系统服务器;The power consumption information collection system server is also connected to the load control circuit and the marketing business application system server;
所述营销业务应用系统服务器还与所述生产PMS2.0系统服务器连接;The marketing business application system server is also connected with the production PMS2.0 system server;
所述电源电路分别连接所述信号采集电路、运算处理芯片电路、通信电路以及所述负荷控制电路的供电输入接口,以为所述信号采集电路、运算处理芯片电路、通信电路以及所述负荷控制电路供电。The power supply circuit is respectively connected to the power supply input interface of the signal acquisition circuit, the operation processing chip circuit, the communication circuit and the load control circuit, so as to provide the power supply input interface for the signal acquisition circuit, operation processing chip circuit, communication circuit and the load control circuit powered by.
进一步的,所述变压器过负荷预警的系统还包括显示电路;所述显示电路分别与所述电源电路及所述通信电路连接。Further, the transformer overload warning system further includes a display circuit; the display circuit is respectively connected to the power supply circuit and the communication circuit.
本发明实施例提供的一种变压器过负荷预警的方法、装置及系统,通过确定配网变压器的实时功率,从而在实时功率超出安全功率阈值时,能够生成预警信息,并上传到用电信息采集系统服务器,以使得所述用电信息采集系统服务器将所述预警信息传输到营销业务应用系统服务器以及生产PMS2.0系统服务器,从而使生产PMS2.0系统服务器能够及时获取到配网变压器的负荷信息,便于生产PMS2.0系统服务器处能够及时获取用户电力异常情况。并且在过负荷时间大于预先设置的时间阈值时,控制所述配网变压器通路中的负荷保护断路器将配网变压器通路断开,从而使得在配网发生故障时,本发明能够对配网变压器及时保护,避免配网变压器过负荷而损坏。可见,本发明可以解决当前电网系统中的设备(资产)运维精益管理系统(PMS2.0系统)还没有与营销系统贯通,不能获取到配网变压器的负荷信息,当配网发生故障时,无法实现对配网变压器的过负荷预警及配网变压器的保护的问题。The embodiment of the present invention provides a method, device and system for early warning of transformer overload. By determining the real-time power of the distribution network transformer, when the real-time power exceeds the safe power threshold, early warning information can be generated and uploaded to the power consumption information collection. system server, so that the power consumption information collection system server transmits the early warning information to the marketing business application system server and the production PMS2.0 system server, so that the production PMS2.0 system server can obtain the load of the distribution network transformer in time information, which is convenient for the server of the production PMS2.0 system to obtain the abnormal situation of the user's power in time. And when the overload time is greater than the preset time threshold, the load protection circuit breaker in the distribution network transformer passage is controlled to disconnect the distribution network transformer passage, so that when the distribution network fails, the present invention can protect the distribution network transformer Timely protection to avoid damage to the distribution network transformer due to overload. It can be seen that the present invention can solve the problem that the equipment (asset) operation and maintenance lean management system (PMS2.0 system) in the current power grid system has not been connected with the marketing system, and the load information of the distribution network transformer cannot be obtained. When the distribution network fails, It is impossible to realize the overload warning of the distribution network transformer and the protection of the distribution network transformer.
附图说明Description of drawings
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only These are some embodiments of the present invention. For those skilled in the art, other drawings can also be obtained according to these drawings without any creative effort.
图1为本发明实施例提供的一种变压器过负荷预警的方法的流程图一;Fig. 1 is a flow chart 1 of a method for early warning of transformer overload provided by an embodiment of the present invention;
图2为本发明实施例提供的一种变压器过负荷预警的方法的流程图二;Fig. 2 is a flow chart 2 of a method for early warning of transformer overload provided by an embodiment of the present invention;
图3为本发明实施例提供的一种变压器过负荷预警的装置的结构示意图一;Fig. 3 is a structural schematic diagram 1 of a transformer overload early warning device provided by an embodiment of the present invention;
图4为本发明实施例提供的一种变压器过负荷预警的装置的结构示意图二;Fig. 4 is a structural schematic diagram II of a transformer overload early warning device provided by an embodiment of the present invention;
图5为本发明实施例提供的一种变压器过负荷预警的系统的结构示意图。Fig. 5 is a schematic structural diagram of a transformer overload warning system provided by an embodiment of the present invention.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
如图1所示,本发明实施例提供一种变压器过负荷预警的方法,包括:As shown in Figure 1, an embodiment of the present invention provides a method for early warning of transformer overload, including:
步骤101、实时监测电网中的配网变压器的电压信号和电流信号。Step 101, monitor the voltage signal and current signal of the distribution network transformer in the power grid in real time.
步骤102、根据电压信号和电流信号,确定配网变压器的实时功率。Step 102. Determine the real-time power of the distribution network transformer according to the voltage signal and the current signal.
步骤103、监测实时功率是否大于一预先设置的安全功率阈值。Step 103, monitoring whether the real-time power is greater than a preset safe power threshold.
步骤104、若实时功率大于安全功率阈值,生成预警信息,并将预警信息上传到用电信息采集系统服务器,以使得用电信息采集系统服务器将预警信息传输到营销业务应用系统服务器以及生产PMS2.0系统服务器。Step 104: If the real-time power is greater than the safe power threshold, generate early warning information and upload the early warning information to the server of the power consumption information collection system, so that the server of the power consumption information collection system transmits the early warning information to the marketing business application system server and the production PMS2. 0 system server.
当生产PMS2.0系统服务器获取得到预警信息后,可以由生产PMS2.0系统发出告警,从而供生产PMS2.0系统进行配网抢修管控,并进行故障判断、定位,辅助PMS2.0分析配变、以及分析用户异常情况,支撑生产PMS2.0系统进行线损分析计算等。After the production PMS2.0 system server obtains the early warning information, the production PMS2.0 system can issue an alarm, so that the production PMS2.0 system can perform emergency repair management and control of the distribution network, and perform fault judgment and location, and assist PMS2.0 to analyze distribution transformers , and analyze the abnormal situation of users, support the production PMS2.0 system for line loss analysis and calculation, etc.
步骤105、判断实时功率大于安全功率阈值的过负荷时间是否大于一预先设置的时间阈值。Step 105, judging whether the overload time during which the real-time power is greater than the safe power threshold is greater than a preset time threshold.
步骤106、若过负荷时间大于时间阈值,控制配网变压器通路中的负荷保护断路器将配网变压器通路断开。Step 106. If the overload time is greater than the time threshold, control the load protection circuit breaker in the distribution network transformer path to disconnect the distribution network transformer path.
本发明实施例提供的一种变压器过负荷预警的方法,通过确定配网变压器的实时功率,从而在实时功率超出安全功率阈值时,能够生成预警信息,并上传到用电信息采集系统服务器,以使得用电信息采集系统服务器将预警信息传输到营销业务应用系统服务器以及生产PMS2.0系统服务器,从而使生产PMS2.0系统服务器能够及时获取到配网变压器的负荷信息,便于生产PMS2.0系统服务器处能够及时获取用户电力异常情况。并且在过负荷时间大于预先设置的时间阈值时,控制配网变压器通路中的负荷保护断路器将配网变压器通路断开,从而使得在配网发生故障时,本发明能够对配网变压器及时保护,避免配网变压器过负荷而损坏。可见,本发明可以解决当前电网系统中的设备(资产)运维精益管理系统(PMS2.0系统)还没有与营销系统贯通,不能获取到配网变压器的负荷信息,当配网发生故障时,无法实现对配网变压器的过负荷预警及配网变压器的保护的问题。The embodiment of the present invention provides a transformer overload early warning method. By determining the real-time power of the distribution network transformer, when the real-time power exceeds the safe power threshold, early warning information can be generated and uploaded to the server of the power consumption information collection system. Make the power consumption information collection system server transmit the early warning information to the marketing business application system server and the production PMS2.0 system server, so that the production PMS2.0 system server can obtain the load information of the distribution network transformer in time, which is convenient for the production of the PMS2.0 system The server can obtain the abnormal situation of the user's electric power in time. And when the overload time is greater than the preset time threshold, the load protection circuit breaker in the path of the distribution network transformer is controlled to disconnect the path of the distribution network transformer, so that when the distribution network fails, the present invention can protect the distribution network transformer in time , to avoid damage to the distribution network transformer due to overload. It can be seen that the present invention can solve the problem that the equipment (asset) operation and maintenance lean management system (PMS2.0 system) in the current power grid system has not been connected with the marketing system, and the load information of the distribution network transformer cannot be obtained. When the distribution network fails, It is impossible to realize the overload warning of the distribution network transformer and the protection of the distribution network transformer.
为了使本领域的技术人员更好的了解本发明,下面列举一个更为详细的实施例来说明本发明,如图2所示,本发明实施例提供一种变压器过负荷预警的方法包括:In order for those skilled in the art to better understand the present invention, a more detailed embodiment is listed below to illustrate the present invention. As shown in FIG. 2, the embodiment of the present invention provides a transformer overload early warning method including:
步骤201、实时监测电网中的配网变压器的电压信号和电流信号。Step 201, monitor the voltage signal and current signal of the distribution network transformer in the power grid in real time.
步骤202、将电压信号和电流信号分别缩小,以使得电压信号和电流信号分别为缩小后的电压信号和缩小后的电流信号的一预设倍数。Step 202. Respectively reduce the voltage signal and the current signal, so that the voltage signal and the current signal are respectively a preset multiple of the reduced voltage signal and the reduced current signal.
将电压信号和电流信号分别缩小是为了避免大电压和大电流对整个负荷预警装置的损害。The purpose of reducing the voltage signal and the current signal is to avoid damage to the entire load warning device by high voltage and high current.
步骤203、根据缩小后的电压信号和缩小后的电路信号,确定配网变压器的实时功率。Step 203: Determine the real-time power of the distribution network transformer according to the reduced voltage signal and the reduced circuit signal.
步骤204、监测实时功率是否大于一预先设置的安全功率阈值。Step 204, monitoring whether the real-time power is greater than a preset safe power threshold.
若实时功率大于安全功率阈值,执行步骤205;若实时功率小于等于安全功率阈值,返回执行步骤201。If the real-time power is greater than the safe power threshold, go to step 205; if the real-time power is less than or equal to the safe power threshold, go back to step 201.
步骤205、生成预警信息,将预警信息存储于本地数据库中,并将预警信息上传到用电信息采集系统服务器,以使得用电信息采集系统服务器将预警信息传输到营销业务应用系统服务器以及生产PMS2.0系统服务器。Step 205, generate early warning information, store the early warning information in the local database, and upload the early warning information to the server of the electricity consumption information collection system, so that the server of the electricity consumption information collection system transmits the early warning information to the marketing business application system server and the production PMS2 .0 system server.
步骤206、从预警信息中获取配网变压器的历史最大功率、当前实际功率,并将历史最大功率和当前实际功率通过一显示电路进行显示。Step 206: Obtain the historical maximum power and current actual power of the distribution network transformer from the warning information, and display the historical maximum power and current actual power through a display circuit.
具体的,该显示电路可以运行历史运行负荷记录,例如历史最大功率、平均功率、历史最低功率等,但不仅局限于此。Specifically, the display circuit can run historical operating load records, such as historical maximum power, average power, historical minimum power, etc., but is not limited thereto.
步骤207、判断实时功率大于安全功率阈值的过负荷时间是否大于一预先设置的时间阈值。Step 207, judging whether the overload time during which the real-time power is greater than the safe power threshold is greater than a preset time threshold.
若过负荷时间大于时间阈值,执行步骤208;否则,若过负荷时间小于等于时间阈值,返回步骤207重新计时,以判断过负荷时间是否大于一预先设置的时间阈值。If the overload time is greater than the time threshold, execute step 208; otherwise, if the overload time is less than or equal to the time threshold, return to step 207 to re-time to determine whether the overload time is greater than a preset time threshold.
步骤208、控制配网变压器通路中的负荷保护断路器将配网变压器通路断开。Step 208, controlling the load protection circuit breaker in the path of the distribution network transformer to disconnect the path of the distribution network transformer.
本发明实施例提供的一种变压器过负荷预警的方法,通过确定配网变压器的实时功率,从而在实时功率超出安全功率阈值时,能够生成预警信息,并上传到用电信息采集系统服务器,以使得用电信息采集系统服务器将预警信息传输到营销业务应用系统服务器以及生产PMS2.0系统服务器,从而使生产PMS2.0系统服务器能够及时获取到配网变压器的负荷信息,便于生产PMS2.0系统服务器处能够及时获取用户电力异常情况。并且在过负荷时间大于预先设置的时间阈值时,控制配网变压器通路中的负荷保护断路器将配网变压器通路断开,从而使得在配网发生故障时,本发明能够对配网变压器及时保护,避免配网变压器过负荷而损坏。可见,本发明可以解决当前电网系统中的设备(资产)运维精益管理系统(PMS2.0系统)还没有与营销系统贯通,不能获取到配网变压器的负荷信息,当配网发生故障时,无法实现对配网变压器的过负荷预警及配网变压器的保护的问题。The embodiment of the present invention provides a transformer overload early warning method. By determining the real-time power of the distribution network transformer, when the real-time power exceeds the safe power threshold, early warning information can be generated and uploaded to the server of the power consumption information collection system. Make the power consumption information collection system server transmit the early warning information to the marketing business application system server and the production PMS2.0 system server, so that the production PMS2.0 system server can obtain the load information of the distribution network transformer in time, which is convenient for the production of the PMS2.0 system The server can obtain the abnormal situation of the user's electric power in time. And when the overload time is greater than the preset time threshold, the load protection circuit breaker in the path of the distribution network transformer is controlled to disconnect the path of the distribution network transformer, so that when the distribution network fails, the present invention can protect the distribution network transformer in time , to avoid damage to the distribution network transformer due to overload. It can be seen that the present invention can solve the problem that the equipment (asset) operation and maintenance lean management system (PMS2.0 system) in the current power grid system has not been connected with the marketing system, and the load information of the distribution network transformer cannot be obtained. When the distribution network fails, It is impossible to realize the overload warning of the distribution network transformer and the protection of the distribution network transformer.
对应于上述图1和图2的方法实施例,如图3所示,本发明实施例还提供一种变压器过负荷预警的装置,包括:Corresponding to the above method embodiments in Figures 1 and 2, as shown in Figure 3, the embodiment of the present invention also provides a transformer overload warning device, including:
第一监测单元31,可以实时监测电网中的配网变压器的电压信号和电流信号。The first monitoring unit 31 can monitor the voltage signal and current signal of the distribution transformer in the power grid in real time.
实时功率确定单元32,可以根据第一监测单元31监测的电压信号和电流信号,确定配网变压器的实时功率。The real-time power determination unit 32 can determine the real-time power of the distribution network transformer according to the voltage signal and current signal monitored by the first monitoring unit 31 .
第二监测单元33,可以监测实时功率确定单元32确定的实时功率是否大于一预先设置的安全功率阈值。The second monitoring unit 33 can monitor whether the real-time power determined by the real-time power determining unit 32 is greater than a preset safe power threshold.
预警单元34,可以在第二监测单元33监测到实时功率大于安全功率阈值时,生成预警信息,并将预警信息上传到用电信息采集系统服务器,以使得用电信息采集系统服务器将预警信息传输到营销业务应用系统服务器以及生产PMS2.0系统服务器。The early warning unit 34 can generate early warning information when the second monitoring unit 33 detects that the real-time power is greater than the safe power threshold, and upload the early warning information to the power consumption information collection system server, so that the power consumption information collection system server transmits the early warning information To the marketing business application system server and the production PMS2.0 system server.
判断单元35,可以判断第二监测单元33监测到的实时功率大于安全功率阈值的过负荷时间是否大于一预先设置的时间阈值。The judging unit 35 may judge whether the overload time during which the real-time power monitored by the second monitoring unit 33 is greater than the safe power threshold is greater than a preset time threshold.
过负荷保护单元36,可以在判断单元35判断到过负荷时间大于时间阈值时,控制配网变压器通路中的负荷保护断路器将配网变压器通路断开。The overload protection unit 36 can control the load protection circuit breaker in the distribution network transformer path to disconnect the distribution network transformer path when the judging unit 35 judges that the overload time is greater than the time threshold.
进一步的,如图4所示,该变压器过负荷预警的装置,还包括:Further, as shown in Figure 4, the transformer overload warning device also includes:
存储单元37,可以将预警单元34生成的预警信息存储于本地数据库中。The storage unit 37 can store the warning information generated by the warning unit 34 in a local database.
进一步的,如图4所示,该变压器过负荷预警的装置,还包括:Further, as shown in Figure 4, the transformer overload warning device also includes:
显示单元38,可以从预警单元34生成的预警信息中获取配网变压器的历史最大功率、当前实际功率,并将历史最大功率和当前实际功率通过一显示电路进行显示。The display unit 38 can obtain the historical maximum power and current actual power of the distribution network transformer from the early warning information generated by the early warning unit 34, and display the historical maximum power and current actual power through a display circuit.
具体的,如图4所示,该实时功率确定单元32,可以包括:Specifically, as shown in FIG. 4, the real-time power determination unit 32 may include:
信号缩小模块321,可以将电压信号和电流信号分别缩小,以使得电压信号和电流信号分别为缩小后的电压信号和缩小后的电流信号的一预设倍数。The signal reduction module 321 can reduce the voltage signal and the current signal respectively, so that the voltage signal and the current signal are respectively a preset multiple of the reduced voltage signal and the reduced current signal.
实时功率确定模块322,可以根据缩小后的电压信号和缩小后的电路信号,确定配网变压器的实时功率。The real-time power determination module 322 can determine the real-time power of the distribution network transformer according to the reduced voltage signal and the reduced circuit signal.
本发明实施例提供的一种变压器过负荷预警的装置,通过确定配网变压器的实时功率,从而在实时功率超出安全功率阈值时,能够生成预警信息,并上传到用电信息采集系统服务器,以使得用电信息采集系统服务器将预警信息传输到营销业务应用系统服务器以及生产PMS2.0系统服务器,从而使生产PMS2.0系统服务器能够及时获取到配网变压器的负荷信息,便于生产PMS2.0系统服务器处能够及时获取用户电力异常情况。并且在过负荷时间大于预先设置的时间阈值时,控制配网变压器通路中的负荷保护断路器将配网变压器通路断开,从而使得在配网发生故障时,本发明能够对配网变压器及时保护,避免配网变压器过负荷而损坏。可见,本发明可以解决当前电网系统中的设备(资产)运维精益管理系统(PMS2.0系统)还没有与营销系统贯通,不能获取到配网变压器的负荷信息,当配网发生故障时,无法实现对配网变压器的过负荷预警及配网变压器的保护的问题。The embodiment of the present invention provides a transformer overload early warning device. By determining the real-time power of the distribution network transformer, when the real-time power exceeds the safe power threshold, early warning information can be generated and uploaded to the server of the power consumption information collection system. Make the power consumption information collection system server transmit the early warning information to the marketing business application system server and the production PMS2.0 system server, so that the production PMS2.0 system server can obtain the load information of the distribution network transformer in time, which is convenient for the production of the PMS2.0 system The server can obtain the abnormal situation of the user's electric power in time. And when the overload time is greater than the preset time threshold, the load protection circuit breaker in the path of the distribution network transformer is controlled to disconnect the path of the distribution network transformer, so that when the distribution network fails, the present invention can protect the distribution network transformer in time , to avoid damage to the distribution network transformer due to overload. It can be seen that the present invention can solve the problem that the equipment (asset) operation and maintenance lean management system (PMS2.0 system) in the current power grid system has not been connected with the marketing system, and the load information of the distribution network transformer cannot be obtained. When the distribution network fails, It is impossible to realize the overload warning of the distribution network transformer and the protection of the distribution network transformer.
对应于上述的方法实施例,本发明实施例还提供一种变压器过负荷预警的系统,如图5所示,包括信号采集电路41、运算处理芯片电路42、电源电路43、通信电路44、负荷控制电路45以及用电信息采集系统服务器46、营销业务应用系统服务器47以及生产PMS2.0系统服务器48。Corresponding to the above method embodiment, the embodiment of the present invention also provides a transformer overload early warning system, as shown in Figure 5, including a signal acquisition circuit 41, an arithmetic processing chip circuit 42, a power supply circuit 43, a communication circuit 44, a load The control circuit 45, the server 46 of the power consumption information collection system, the server 47 of the marketing business application system, and the server 48 of the production PMS2.0 system.
信号采集电路41一端与配网变压器40连接,信号采集电路41的另一端与运算处理芯片电路42连接,以向运算处理芯片电路42传输信号采集电路41所采集的配网变压器40的电压信号和电流信号。运算处理芯片电路42与通信电路44连接。通信电路44还分别连接负荷控制电路45和用电信息采集系统服务器46。用电信息采集系统服务器46还连接负荷控制电路45和营销业务应用系统服务器47。营销业务应用系统服务器47还与生产PMS2.0系统服务器48连接。One end of the signal acquisition circuit 41 is connected to the distribution network transformer 40, and the other end of the signal acquisition circuit 41 is connected to the operation processing chip circuit 42, so as to transmit the voltage signal and the voltage signal of the distribution network transformer 40 collected by the signal acquisition circuit 41 to the operation processing chip circuit 42. current signal. The arithmetic processing chip circuit 42 is connected to the communication circuit 44 . The communication circuit 44 is also respectively connected to the load control circuit 45 and the server 46 of the power consumption information collection system. The power consumption information collection system server 46 is also connected to the load control circuit 45 and the marketing business application system server 47 . The marketing business application system server 47 is also connected with the production PMS2.0 system server 48 .
电源电路43分别连接信号采集电路41、运算处理芯片电路42、通信电路44以及负荷控制电路45的供电输入接口,以为信号采集电路41、运算处理芯片电路42、通信电路44以及负荷控制电路45供电。The power supply circuit 43 is respectively connected to the power supply input interface of the signal acquisition circuit 41, the arithmetic processing chip circuit 42, the communication circuit 44 and the load control circuit 45, so as to supply power for the signal acquisition circuit 41, the arithmetic processing chip circuit 42, the communication circuit 44 and the load control circuit 45 .
进一步的,如图5所示,变压器过负荷预警的系统还包括显示电路49。显示电路49分别与电源电路43及通信电路44连接。Further, as shown in FIG. 5 , the transformer overload warning system further includes a display circuit 49 . The display circuit 49 is connected to the power supply circuit 43 and the communication circuit 44, respectively.
值得说明的是,信号采集电路41包括电压互感器和电流互感器,通过电压互感器和电流互感器可以分别采集上述的电压信号和电流信号,并将电压信号和电流信号分别缩小。It is worth noting that the signal acquisition circuit 41 includes a voltage transformer and a current transformer, through which the above-mentioned voltage signal and current signal can be collected respectively, and the voltage signal and the current signal can be reduced respectively.
该运算处理芯片电路42可以通过内部的A/D转换器将电压信号和电流信号转换为数字信号,然后通过内部的数字乘法器进行功率计算。数字乘法器相比于模拟乘法器的优点在于可以在功率因数为0~1的全范围内保证测量的准确度。选用高精度的A/D转换器,采样时间间隔越小,电压、电流测量的准确度就越高,功率计算结果也越精确。此外,根据数字乘法器工作原理,还可以测量电压、电流、相位、频率、正反向有功功率和四象限无功功率等。The arithmetic processing chip circuit 42 can convert voltage signals and current signals into digital signals through an internal A/D converter, and then perform power calculation through an internal digital multiplier. Compared with the analog multiplier, the advantage of the digital multiplier is that the accuracy of the measurement can be guaranteed in the full range of power factor 0-1. Choose a high-precision A/D converter, the smaller the sampling time interval, the higher the accuracy of voltage and current measurement, and the more accurate the power calculation result. In addition, according to the working principle of the digital multiplier, it can also measure voltage, current, phase, frequency, forward and reverse active power and four-quadrant reactive power, etc.
另外,通信电路44可以配置有存储器,完成变压器负荷数据、过负荷预警信息、跳闸信息等内容的本地存储。另外,该通信电路44可以配置常用的通信接口,包括光纤接口、网络接口、RS-485接口、RS-232接口、扩展USB接口等,通过通信接口完成变压器负荷数据、过负荷预警信息、跳闸信息等内容的上传。In addition, the communication circuit 44 may be configured with a memory to complete local storage of transformer load data, overload warning information, trip information and the like. In addition, the communication circuit 44 can be configured with commonly used communication interfaces, including optical fiber interface, network interface, RS-485 interface, RS-232 interface, extended USB interface, etc., through which the transformer load data, overload warning information, and tripping information can be completed. and other content upload.
另外,负荷控制电路45可以由开关、断路器等保护设备组成。In addition, the load control circuit 45 may be composed of protective devices such as switches and circuit breakers.
本发明实施例提供的一种变压器过负荷预警的系统,通过确定配网变压器的实时功率,从而在实时功率超出安全功率阈值时,能够生成预警信息,并上传到用电信息采集系统服务器,以使得用电信息采集系统服务器将预警信息传输到营销业务应用系统服务器以及生产PMS2.0系统服务器,从而使生产PMS2.0系统服务器能够及时获取到配网变压器的负荷信息,便于生产PMS2.0系统服务器处能够及时获取用户电力异常情况。并且在过负荷时间大于预先设置的时间阈值时,控制配网变压器通路中的负荷保护断路器将配网变压器通路断开,从而使得在配网发生故障时,本发明能够对配网变压器及时保护,避免配网变压器过负荷而损坏。可见,本发明可以解决当前电网系统中的设备(资产)运维精益管理系统(PMS2.0系统)还没有与营销系统贯通,不能获取到配网变压器的负荷信息,当配网发生故障时,无法实现对配网变压器的过负荷预警及配网变压器的保护的问题。The embodiment of the present invention provides a transformer overload early warning system. By determining the real-time power of the distribution network transformer, when the real-time power exceeds the safe power threshold, early warning information can be generated and uploaded to the server of the power consumption information collection system. Make the power consumption information collection system server transmit the early warning information to the marketing business application system server and the production PMS2.0 system server, so that the production PMS2.0 system server can obtain the load information of the distribution network transformer in time, which is convenient for the production of the PMS2.0 system The server can obtain the abnormal situation of the user's electric power in time. And when the overload time is greater than the preset time threshold, the load protection circuit breaker in the path of the distribution network transformer is controlled to disconnect the path of the distribution network transformer, so that when the distribution network fails, the present invention can protect the distribution network transformer in time , to avoid damage to the distribution network transformer due to overload. It can be seen that the present invention can solve the problem that the equipment (asset) operation and maintenance lean management system (PMS2.0 system) in the current power grid system has not been connected with the marketing system, and the load information of the distribution network transformer cannot be obtained. When the distribution network fails, It is impossible to realize the overload warning of the distribution network transformer and the protection of the distribution network transformer.
本领域内的技术人员应明白,本发明的实施例可提供为方法、系统、或计算机程序产品。因此,本发明可采用完全硬件实施例、完全软件实施例、或结合软件和硬件方面的实施例的形式。而且,本发明可采用在一个或多个其中包含有计算机可用程序代码的计算机可用存储介质(包括但不限于磁盘存储器、CD-ROM、光学存储器等)上实施的计算机程序产品的形式。Those skilled in the art should understand that the embodiments of the present invention may be provided as methods, systems, or computer program products. Accordingly, the present invention can take the form of an entirely hardware embodiment, an entirely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, the present invention may take the form of a computer program product embodied on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) having computer-usable program code embodied therein.
本发明是参照根据本发明实施例的方法、设备(系统)、和计算机程序产品的流程图和/或方框图来描述的。应理解可由计算机程序指令实现流程图和/或方框图中的每一流程和/或方框、以及流程图和/或方框图中的流程和/或方框的结合。可提供这些计算机程序指令到通用计算机、专用计算机、嵌入式处理机或其他可编程数据处理设备的处理器以产生一个机器,使得通过计算机或其他可编程数据处理设备的处理器执行的指令产生用于实现在流程图一个流程或多个流程和/或方框图一个方框或多个方框中指定的功能的装置。The present invention is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the invention. It should be understood that each procedure and/or block in the flowchart and/or block diagram, and a combination of procedures and/or blocks in the flowchart and/or block diagram can be realized by computer program instructions. These computer program instructions may be provided to a general purpose computer, special purpose computer, embedded processor, or processor of other programmable data processing equipment to produce a machine such that the instructions executed by the processor of the computer or other programmable data processing equipment produce a An apparatus for realizing the functions specified in one or more procedures of the flowchart and/or one or more blocks of the block diagram.
这些计算机程序指令也可存储在能引导计算机或其他可编程数据处理设备以特定方式工作的计算机可读存储器中,使得存储在该计算机可读存储器中的指令产生包括指令装置的制造品,该指令装置实现在流程图一个流程或多个流程和/或方框图一个方框或多个方框中指定的功能。These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing apparatus to operate in a specific manner, such that the instructions stored in the computer-readable memory produce an article of manufacture comprising instruction means, the instructions The device realizes the function specified in one or more procedures of the flowchart and/or one or more blocks of the block diagram.
这些计算机程序指令也可装载到计算机或其他可编程数据处理设备上,使得在计算机或其他可编程设备上执行一系列操作步骤以产生计算机实现的处理,从而在计算机或其他可编程设备上执行的指令提供用于实现在流程图一个流程或多个流程和/或方框图一个方框或多个方框中指定的功能的步骤。These computer program instructions can also be loaded onto a computer or other programmable data processing device, causing a series of operational steps to be performed on the computer or other programmable device to produce a computer-implemented process, thereby The instructions provide steps for implementing the functions specified in the flow chart or blocks of the flowchart and/or the block or blocks of the block diagrams.
本发明中应用了具体实施例对本发明的原理及实施方式进行了阐述,以上实施例的说明只是用于帮助理解本发明的方法及其核心思想;同时,对于本领域的一般技术人员,依据本发明的思想,在具体实施方式及应用范围上均会有改变之处,综上所述,本说明书内容不应理解为对本发明的限制。In the present invention, specific examples have been applied to explain the principles and implementation methods of the present invention, and the descriptions of the above examples are only used to help understand the method of the present invention and its core idea; meanwhile, for those of ordinary skill in the art, according to this The idea of the invention will have changes in the specific implementation and scope of application. To sum up, the contents of this specification should not be construed as limiting the present invention.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510683334.8A CN105203887A (en) | 2015-10-20 | 2015-10-20 | Prewarning method, device and system for overload of transformer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510683334.8A CN105203887A (en) | 2015-10-20 | 2015-10-20 | Prewarning method, device and system for overload of transformer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105203887A true CN105203887A (en) | 2015-12-30 |
Family
ID=54951669
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510683334.8A Pending CN105203887A (en) | 2015-10-20 | 2015-10-20 | Prewarning method, device and system for overload of transformer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105203887A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106658443A (en) * | 2016-10-20 | 2017-05-10 | 国网山东省电力公司菏泽供电公司 | Internet-based load short message prompting system and method |
CN109444576A (en) * | 2018-10-24 | 2019-03-08 | 国网河南省电力公司濮阳供电公司 | A kind of more transformer operation state monitoring devices |
CN109687384A (en) * | 2018-12-29 | 2019-04-26 | 苏州路之遥科技股份有限公司 | A kind of high-power excision protection and repositioning method based on calculating reactive power |
CN110555573A (en) * | 2018-05-30 | 2019-12-10 | 中国电力科学研究院有限公司 | Distribution transformer burnout risk early warning method and system |
CN112185071A (en) * | 2020-09-16 | 2021-01-05 | 山东莱钢永锋钢铁有限公司 | Electrical equipment load early warning method and device and storage equipment |
CN112611931A (en) * | 2020-12-23 | 2021-04-06 | 南方电网电力科技股份有限公司 | Method, system and storage medium for identifying and processing malignant load based on discrete waveform |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4329169A1 (en) * | 1993-08-30 | 1995-03-02 | Siemens Ag | Device for monitoring voltages across capacitors for filtering harmonics and/or reactive-power compensation in power networks |
CN202166905U (en) * | 2011-07-20 | 2012-03-14 | 上海海能信息科技有限公司 | Novel transformer control system |
CN202260644U (en) * | 2011-07-20 | 2012-05-30 | 上海海能信息科技有限公司 | Transformer load intelligent management system |
CN202362089U (en) * | 2011-12-05 | 2012-08-01 | 华东电力试验研究院有限公司 | Overload pre-warning system for transformer |
CN102890520A (en) * | 2011-07-20 | 2013-01-23 | 上海海能信息科技有限公司 | Method for controlling energy saving and benefit increasing of transformer |
CN104063756A (en) * | 2014-05-23 | 2014-09-24 | 国网辽宁省电力有限公司本溪供电公司 | Electric power utilization information remote control system |
CN104240139A (en) * | 2013-06-19 | 2014-12-24 | 国家电网公司 | Multi-service system information fusion power grid comprehensive visualization method based on three-dimensional GIS |
CN204205601U (en) * | 2014-11-14 | 2015-03-11 | 国网辽宁省电力有限公司检修分公司 | Transformer loads device for controlling dynamically |
CN104407260A (en) * | 2014-12-16 | 2015-03-11 | 国网电力科学研究院武汉南瑞有限责任公司 | Latent fault pre-warning method and device for distribution transformer |
-
2015
- 2015-10-20 CN CN201510683334.8A patent/CN105203887A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4329169A1 (en) * | 1993-08-30 | 1995-03-02 | Siemens Ag | Device for monitoring voltages across capacitors for filtering harmonics and/or reactive-power compensation in power networks |
CN202166905U (en) * | 2011-07-20 | 2012-03-14 | 上海海能信息科技有限公司 | Novel transformer control system |
CN202260644U (en) * | 2011-07-20 | 2012-05-30 | 上海海能信息科技有限公司 | Transformer load intelligent management system |
CN102890520A (en) * | 2011-07-20 | 2013-01-23 | 上海海能信息科技有限公司 | Method for controlling energy saving and benefit increasing of transformer |
CN202362089U (en) * | 2011-12-05 | 2012-08-01 | 华东电力试验研究院有限公司 | Overload pre-warning system for transformer |
CN104240139A (en) * | 2013-06-19 | 2014-12-24 | 国家电网公司 | Multi-service system information fusion power grid comprehensive visualization method based on three-dimensional GIS |
CN104063756A (en) * | 2014-05-23 | 2014-09-24 | 国网辽宁省电力有限公司本溪供电公司 | Electric power utilization information remote control system |
CN204205601U (en) * | 2014-11-14 | 2015-03-11 | 国网辽宁省电力有限公司检修分公司 | Transformer loads device for controlling dynamically |
CN104407260A (en) * | 2014-12-16 | 2015-03-11 | 国网电力科学研究院武汉南瑞有限责任公司 | Latent fault pre-warning method and device for distribution transformer |
Non-Patent Citations (2)
Title |
---|
乔琦: "大力推进营配调贯通 实施专业化协同运作-专访国家电网公司营销部", 《中国电力企业管理》 * |
赵岩等: "基于用电信息采集的配网在线监控预警系统", 《农村电工》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106658443A (en) * | 2016-10-20 | 2017-05-10 | 国网山东省电力公司菏泽供电公司 | Internet-based load short message prompting system and method |
CN110555573A (en) * | 2018-05-30 | 2019-12-10 | 中国电力科学研究院有限公司 | Distribution transformer burnout risk early warning method and system |
CN109444576A (en) * | 2018-10-24 | 2019-03-08 | 国网河南省电力公司濮阳供电公司 | A kind of more transformer operation state monitoring devices |
CN109687384A (en) * | 2018-12-29 | 2019-04-26 | 苏州路之遥科技股份有限公司 | A kind of high-power excision protection and repositioning method based on calculating reactive power |
CN112185071A (en) * | 2020-09-16 | 2021-01-05 | 山东莱钢永锋钢铁有限公司 | Electrical equipment load early warning method and device and storage equipment |
CN112185071B (en) * | 2020-09-16 | 2023-02-17 | 山东莱钢永锋钢铁有限公司 | Electrical equipment load early warning method and device and storage equipment |
CN112611931A (en) * | 2020-12-23 | 2021-04-06 | 南方电网电力科技股份有限公司 | Method, system and storage medium for identifying and processing malignant load based on discrete waveform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105203887A (en) | Prewarning method, device and system for overload of transformer | |
CN103715767B (en) | Intelligent grid information integerated and display platform | |
CN108573350B (en) | A method for simultaneous calculation and multidimensional analysis of line loss in distribution network | |
CN110071579A (en) | Power grid power supply based on ubiquitous electric power Internet of Things ensures and intelligent managing and control system | |
CN107167704B (en) | Distribution network fault diagnosis system and method based on CIM model | |
CN103607042B (en) | The distribution network failure processing method of long fault indicator for overhead lines towards outskirts of a town | |
JP5833530B2 (en) | EMS power outage management apparatus and method | |
CN103852744A (en) | Distributed online monitoring system and method for electric energy metering device | |
CN102063651A (en) | Urban power grid risk evaluation system based on on-line data acquisition | |
CN107147215A (en) | Distribution network fault location system and method combined with line overload data analysis | |
CN104463696A (en) | Power grid operating risk recognition and prevention method and system | |
CN104269844B (en) | A kind of state of electric distribution network estimation abnormality recognition method and its device | |
CN103683511A (en) | Method and system for processing fault of integrated monitoring platform based on power distribution network | |
CN109242722B (en) | Online monitoring method and system for line loss of transformer area and terminal equipment | |
CN102938106A (en) | Power network power-cut scheme based major network N-1 risk assessment method and system | |
CN102393929A (en) | State overhauling control method of distribution network equipment state assessment system | |
CN103926891B (en) | Mobile Telecommunication Equipment Room environment in mobile stations equipment monitoring system and method | |
CN104539051A (en) | Online evaluation system of secondary equipment of intelligent substation | |
CN201926727U (en) | Power quality monitor | |
CN105186524A (en) | Method, device, and system for exceeded capacity of power consumer | |
CN106841726A (en) | A kind of decompression anti-electricity-theft early warning analysis method of disconnected facies analysis | |
CN211124131U (en) | Power distribution station topology and asset management system | |
CN104007337A (en) | Three-phase load monitoring device, system and power distribution cabinet | |
CN203366114U (en) | Relay protection and secondary loop state on-line maintenance system based on SOA | |
Wang et al. | Implementation of state-wide power quality monitoring and analysis system in China |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20151230 |