[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN105162617A - Background management device with project backup function - Google Patents

Background management device with project backup function Download PDF

Info

Publication number
CN105162617A
CN105162617A CN201510460820.3A CN201510460820A CN105162617A CN 105162617 A CN105162617 A CN 105162617A CN 201510460820 A CN201510460820 A CN 201510460820A CN 105162617 A CN105162617 A CN 105162617A
Authority
CN
China
Prior art keywords
project
server
standby
load balancing
software
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510460820.3A
Other languages
Chinese (zh)
Inventor
黄其
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu E-Trust Standard Certification Group Co Ltd
Original Assignee
Chengdu E-Trust Standard Certification Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu E-Trust Standard Certification Group Co Ltd filed Critical Chengdu E-Trust Standard Certification Group Co Ltd
Priority to CN201510460820.3A priority Critical patent/CN105162617A/en
Publication of CN105162617A publication Critical patent/CN105162617A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • H04L41/0654Management of faults, events, alarms or notifications using network fault recovery
    • H04L41/0668Management of faults, events, alarms or notifications using network fault recovery by dynamic selection of recovery network elements, e.g. replacement by the most appropriate element after failure
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/22Arrangements for detecting or preventing errors in the information received using redundant apparatus to increase reliability
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • H04L63/20Network architectures or network communication protocols for network security for managing network security; network security policies in general
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/10Protocols in which an application is distributed across nodes in the network
    • H04L67/1001Protocols in which an application is distributed across nodes in the network for accessing one among a plurality of replicated servers

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Computer Security & Cryptography (AREA)
  • Computer Hardware Design (AREA)
  • Computing Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Hardware Redundancy (AREA)

Abstract

A background management device with a project backup function comprises a primary server and a standby server which are connected to the Internet at the same time. The primary server and the standby server are connected by an intranet. The primary server and the standby server respectively comprise an identity authentication module for authenticating the identity of platform management personnel, a project monitoring module for regularly monitoring projects, and a storage module for storing project data, wherein the identity authentication module, the project monitoring module and the storage module are connected in sequence. The primary server and the standby server are respectively equipped with load balancing software which is used for realizing load balancing of the primary server and the standby server. According to the invention, load balancing of the primary server and the standby server is realized by the load balancing software, hot-standby is realized by primary and standby high-availability software, the function of load-balanced dual machines is achieved, load balancing single-point failure is eliminated, and safe storage of project data and normal operation of the servers are ensured.

Description

There is the background management device of project backup function
Technical field
The present invention relates to computer management system field, particularly, relate to a kind of background management device with project backup function.
Background technology
In recent years the develop rapidly of computer science and technology, people all the more notice that in office, transactional business operation and development of computer are separated, the maturation along with network communications technology, computer technology and database technology there has been proposed office automation new ideas.The business of usual office, mainly carry out the process of heap file, draft the file, notify, miscellaneous service text, accept external documents file, inquiry file, the basic services such as hard-copy file also comprise leading body and make a policy, and issue instruction, except the contact on document, the more work of deep layer, be actually the collection of information, storage, retrieval, process, analysis, thus make a policy, and give feedback using decision-making as information.
Along with the development of office automation, the more project management of current enterprise is also adopted and is electronically managed, and for the server of project management once go wrong, gently then causes and uses inconvenience, heavy then cause loss of data, project data is backed up to being necessary very much.
Summary of the invention
Object of the present invention is just the shortcoming and defect overcoming above-mentioned prior art, a kind of background management device with project backup function is provided, this background management device is by the fusion of load balancing and two-node cluster hot backup two kinds of technology, utilize load balancing software to realize the load balancing of server, utilize main, standby two-shipper High Availabitity software simulating two-node cluster hot backup, load balancing two-node cluster hot backup function is realized by the balanced software of running load in Dual-Computer Hot-Standby System, reach and realize load balancing dual-machine function from software view, eliminate load balancing Single Point of Faliure, ensure the normal use of project data safe storage and server.
The present invention's adopted technical scheme that solves the problem is:
There is the background management device of project backup function, comprise simultaneously accessing Internet master server and and standby server, described master server and being connected by Intranet with standby server; Described master server and include the memory module of the authentication module that platform management personnel identity is verified, the project monitoring module regularly project monitored, stored items data with standby server, authentication module, project monitoring module, memory module are connected successively; Described master server and with standby server on load balancing software is all installed, load balancing software is for realizing master server and the load balancing with standby server.
As a further improvement on the present invention, described load balancing software adopts Apache software; Described master server and with standby server on two-node cluster hot backup software HA is also installed.
Further, described master server and standby server all also comprise according to project monitoring module monitors to project information platform end project management module that project is classified, this platform end project management module is connected with memory module, and the classification of project comprises project, finished item in new projects, execution.
Further, described master server and being connected by heartbeat with standby server.
Further, described master server and with router, hardware firewall, the switch accessing Internet of standby server all by being connected successively.
The invention has the beneficial effects as follows: the fusion by load balancing and two-node cluster hot backup two kinds of technology of the present invention, utilize load balancing software to realize the load balancing of server, utilize the two-node cluster hot backup of active and standby two-shipper High Availabitity software simulating, load balancing two-node cluster hot backup function is realized by the balanced software of running load in Dual-Computer Hot-Standby System, reach and realize load balancing dual-machine function from software view, eliminate load balancing Single Point of Faliure, ensure the normal use of project data safe storage and server.
Accompanying drawing explanation
Fig. 1 is structured flowchart of the present invention.
Embodiment
Below in conjunction with embodiment and accompanying drawing, to the detailed description further of the present invention's do, but embodiments of the present invention are not limited thereto.
As shown in Figure 1, there is the background management device of project backup function, comprise simultaneously accessing Internet master server and and standby server, described master server and being connected by Intranet with standby server; Described master server and include the memory module of the authentication module that platform management personnel identity is verified, the project monitoring module regularly project monitored, stored items data with standby server, authentication module, project monitoring module, memory module are connected successively; Described master server and with standby server on load balancing software is all installed, load balancing software is for realizing master server and the load balancing with standby server.
Described load balancing software adopts Apache software; Described master server and with standby server on two-node cluster hot backup software HA is also installed.Described master server and being connected by heartbeat with standby server.
Apache is a kind of load balancing software of increasing income free, the load distribution that can realize server by http_proxy, ajp_proxy, mod_jk tri-kinds of modes, and configuration is simple, easy to operate, compatible good; Simultaneously, by two-shipper High Availabitity HA(RoseHA) software realizes the two-node cluster hot backup of active and standby two-server, two-shipper High Availabitity HA software utilizes heartbeat to detect the ruuning situation between active and standby two-server, then analyze and determine whether main frame breaks down, realized the business of standby host taking over fault main frame again by Two-channel switching, realize the continuous operation of operation system with low cost; Load balancing two-node cluster hot backup function is realized by the balanced software of running load in Dual-Computer Hot-Standby System.
Described master server and standby server all also comprise according to project monitoring module monitors to project information platform end project management module that project is classified, this platform end project management module is connected with memory module, and the classification of project comprises project, finished item in new projects, execution.
Described master server and with router, hardware firewall, the switch accessing Internet of standby server all by being connected successively, namely master server is connected with router with standby server, and then router, hardware firewall, switch connect successively and realize linking Internet.
The present invention is by the fusion of load balancing and two-node cluster hot backup two kinds of technology, load balancing software is utilized to carry out the load balancing of implementation platform management server group server, utilize the two-node cluster hot backup of active and standby two-shipper High Availabitity software simulating, load balancing two-node cluster hot backup function is realized by the balanced software of running load in Dual-Computer Hot-Standby System, reach and realize load balancing dual-machine function from software view, eliminate load balancing Single Point of Faliure, ensure the normal use of project data safe storage and server.
Below be only the preferred embodiment of the present invention, protection scope of the present invention be not only confined to above-described embodiment, all technical schemes belonged under thinking of the present invention all belong to protection scope of the present invention.It should be pointed out that for those skilled in the art, some improvements and modifications without departing from the principles of the present invention, should be considered as protection scope of the present invention.

Claims (5)

1. there is the background management device of project backup function, it is characterized in that, comprise simultaneously accessing Internet master server and and standby server, described master server and being connected by Intranet with standby server;
Described master server and include the memory module of the authentication module that platform management personnel identity is verified, the project monitoring module regularly project monitored, stored items data with standby server, authentication module, project monitoring module, memory module are connected successively;
Described master server and with standby server on load balancing software is all installed, load balancing software is for realizing master server and the load balancing with standby server.
2. the background management device with project backup function according to claim 1, is characterized in that, described load balancing software adopts Apache software; Described master server and with standby server on two-node cluster hot backup software HA is also installed.
3. the background management device with project backup function according to claim 1 and 2, it is characterized in that, described master server and standby server all also comprise according to project monitoring module monitors to project information platform end project management module that project is classified, this platform end project management module is connected with memory module.
4. the background management device with project backup function according to claim 1 and 2, is characterized in that, described master server and being connected by heartbeat with standby server.
5. the background management device with project backup function according to claim 1 and 2, is characterized in that, described master server and with router, hardware firewall, the switch accessing Internet of standby server all by being connected successively.
CN201510460820.3A 2015-07-31 2015-07-31 Background management device with project backup function Pending CN105162617A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510460820.3A CN105162617A (en) 2015-07-31 2015-07-31 Background management device with project backup function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510460820.3A CN105162617A (en) 2015-07-31 2015-07-31 Background management device with project backup function

Publications (1)

Publication Number Publication Date
CN105162617A true CN105162617A (en) 2015-12-16

Family

ID=54803381

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510460820.3A Pending CN105162617A (en) 2015-07-31 2015-07-31 Background management device with project backup function

Country Status (1)

Country Link
CN (1) CN105162617A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6295605B1 (en) * 1998-09-10 2001-09-25 International Business Machines Corporation Method and apparatus for multi-level security evaluation
CN1485746A (en) * 2002-09-27 2004-03-31 鸿富锦精密工业(深圳)有限公司 Management system and method for user safety authority limit
CN202068438U (en) * 2010-09-08 2011-12-07 檀朝东 Engineering calculation system
CN104580502A (en) * 2015-01-26 2015-04-29 浪潮电子信息产业股份有限公司 Method for achieving load balance dual-unit hot standby

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6295605B1 (en) * 1998-09-10 2001-09-25 International Business Machines Corporation Method and apparatus for multi-level security evaluation
CN1485746A (en) * 2002-09-27 2004-03-31 鸿富锦精密工业(深圳)有限公司 Management system and method for user safety authority limit
CN202068438U (en) * 2010-09-08 2011-12-07 檀朝东 Engineering calculation system
CN104580502A (en) * 2015-01-26 2015-04-29 浪潮电子信息产业股份有限公司 Method for achieving load balance dual-unit hot standby

Similar Documents

Publication Publication Date Title
CN107465721B (en) Global load balancing method and system based on double-active architecture and scheduling server
CN112817791B (en) Mobile terminal monitoring method for working face cluster mining state
CN102591717B (en) Method, device and system for processing service information of access device and virtual device
CN102411533A (en) Log-management optimizing method for clustered storage system
CN103729280A (en) High availability mechanism for virtual machine
CN105915405A (en) Large-scale cluster node performance monitoring system
CN102761528A (en) System and method for data management
CN103441863A (en) Double-server hot standby system in blank pipe automatic system and control method thereof
KR101586354B1 (en) Communication failure recover method of parallel-connecte server system
CN102082733A (en) Portal system and access method thereof
CN108173964A (en) A kind of client information management center based on cloud storage
CN102662788A (en) Computer system fault diagnosis decision and processing method
CN103457802A (en) Information transmission system and method
CN105117824A (en) Cloud service system used for project management
CN107135097A (en) The disaster tolerance system and disaster recovery method filed based on bookkeeping
CN106525030A (en) Navigation system dual-redundancy control and display method
CN102185717A (en) Service processing equipment, method and system
CN110912755A (en) System and method for network card fault monitoring and automatic recovery in cloud environment
CN105162617A (en) Background management device with project backup function
CN202364244U (en) Processing device of distributed log analysis system
CN206237424U (en) A kind of Dual-Computer Hot-Standby System for monitoring central station
CN207053551U (en) A kind of big data information management system
CN104978603A (en) Hot-standby project management platform with load balance
CN105117823A (en) Project supervising system supporting mobile terminals
CN207833492U (en) A kind of disaster tolerant backup system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20151216

WD01 Invention patent application deemed withdrawn after publication