CN105155856A - 一种利用预制装配式外围护墙体的建筑方法 - Google Patents

一种利用预制装配式外围护墙体的建筑方法 Download PDF

Info

Publication number
CN105155856A
CN105155856A CN201510477850.5A CN201510477850A CN105155856A CN 105155856 A CN105155856 A CN 105155856A CN 201510477850 A CN201510477850 A CN 201510477850A CN 105155856 A CN105155856 A CN 105155856A
Authority
CN
China
Prior art keywords
panel unit
hung panel
prefabricated
external wall
wall panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510477850.5A
Other languages
English (en)
Inventor
宣景伟
苏奇
王洪山
施伟伟
王亚红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI TONNIENERGY-EFFICIENCY HIGH-TECH Co Ltd
Original Assignee
SHANGHAI TONNIENERGY-EFFICIENCY HIGH-TECH Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI TONNIENERGY-EFFICIENCY HIGH-TECH Co Ltd filed Critical SHANGHAI TONNIENERGY-EFFICIENCY HIGH-TECH Co Ltd
Priority to CN201510477850.5A priority Critical patent/CN105155856A/zh
Publication of CN105155856A publication Critical patent/CN105155856A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

本发明公开一种利用预制装配式外围护墙体的建筑方法,包括以下步骤:①制作预制外挂墙板单元;②完成建筑物的楼板现浇后对楼板的边缘进行弹线规划,确定需要装配的预制外挂墙板的具体布置;③将所述预制外挂墙板单元通过垂直运输设备吊装到各个楼层;④根据所述预制外挂墙板单元的尺寸设置同一水平线上相连的所述预制外挂墙板单元间的钢连接件,同一水平线上的各所述预制外挂墙板单元与相邻的所述钢连接件装配在一起;⑤将第二块预制外挂墙板单元通过钢连接件固定于第一块预制外挂墙板单元上,依次层层叠加连接;⑥将各所述预制外挂墙板单元上的钢预埋件与所述建筑物的主体通过焊接或者螺栓的方式固定在一起即可。

Description

一种利用预制装配式外围护墙体的建筑方法
技术领域
本发明涉及一种建筑方法,更具体地说,是一种利用预制装配式外围护墙体的建筑方法。
背景技术
通常建筑外围护墙体的材料为加气混凝土砌块和混凝土空心砖等小型块状材料,其砌筑方法按砌体要求进行砌筑,砌块尺寸较小,砌块之间粘结采用建筑砌筑砂浆,对施工人员的砌筑砂浆技术要求高,砌块间的砌筑砂浆需要密实,如有空隙则会导致外墙渗水和漏水情况发生,另,由于材料多工序复杂,导致施工质量不稳定,施工环节复杂,不利于机械化施工。
发明内容
由于现有技术存在着上述问题,本发明提出一种利用预制装配式外围护墙体的建筑方法,其能有效的解决现有技术中存在的问题。
本发明通过以下技术方案解决上述问题:
一种利用预制装配式外围护墙体的建筑方法,包括以下步骤:
①制作预制外挂墙板单元,所述预制外挂墙板单元是以水平和竖直方向的钢筋为骨架后填注混凝土构成,该预制外挂墙板单元的截面呈U型,所述预制外挂墙板单元内设有钢连接件和钢预埋件;
②完成建筑物的楼板现浇后对楼板的边缘进行弹线规划,确定需要装配的预制外挂墙板的具体布置;
③将所述预制外挂墙板单元通过垂直运输设备吊装到各个楼层;
④根据所述预制外挂墙板单元的尺寸设置同一水平线上相连的所述预制外挂墙板单元间的钢连接件,同一水平线上的各所述预制外挂墙板单元与相邻的所述钢连接件装配在一起;
⑤将第二块预制外挂墙板单元通过钢连接件固定于第一块预制外挂墙板单元上,依次层层叠加连接;
⑥将各所述预制外挂墙板单元上的预埋件与所述建筑物的主体通过焊接或者螺栓的方式固定在一起即可。
所述预制外挂墙板单元相连的两个边上分别设有一加强钢筋。
所述混凝土强度等级为C30~C40。
所述预制外挂墙板单元长为1000~3000mm,厚为200~1000mm,宽为400~2000mm,壁厚为50~90mm。
本发明的利用预制装配式外围护墙体的建筑方法使得楼层主体结构与预制外挂墙板之间通过柔性连接,不需要砌筑砂浆,不会发生渗水和漏水情况;同时,墙体采用预制外挂墙板单元,本身防水性能极佳,属于较大性构件,采用机械化安装工序,具有施工方便,防水性能强等特点。
附图说明
图1为本发明的一预制外挂墙板单元的截面示意图;
图2为本发明的预制外挂墙板单元的组装示意图。
具体实施方式
下面结合具体实施方式,详细描述本发明。
一种利用预制装配式外围护墙体的建筑方法,包括以下步骤:
①制作预制外挂墙板单元,参见图1所示,图1为本发明的一预制外挂墙板单元的截面示意图。所述预制外挂墙板单元1是以水平方向的钢筋11和竖直方向的钢筋12为骨架后填注混凝土构成。该预制外挂墙板单元的截面呈U型。所述预制外挂墙板单元内设有钢连接件和钢预埋件2。所述预制外挂墙板单元相连的两个边上分别设有一加强钢筋13,起到加强预制外挂墙板单元的承重性能。所述混凝土强度等级为C30~C40。所述预制外挂墙板单元长为1000~3000mm,厚为200~1000mm,宽为400~2000mm,壁厚为50~90mm,整个预制外挂墙板单元形成一个标准件。预制外挂墙板单元可以在施工前就先加工后储存起来,避免将施工地环境弄得脏乱,且可以实现批量化大规模生产,节省大量人工和材料。
②完成建筑物的楼板现浇后对楼板的边缘进行弹线规划,确定需要装配的预制外挂墙板的具体布置;
③将所述预制外挂墙板单元通过垂直运输设备吊装到各个楼层;
④根据所述预制外挂墙板单元的尺寸设置同一水平线上相连的所述预制外挂墙板单元间的钢连接件,同一水平线上的各所述预制外挂墙板单元与相邻的所述钢连接件装配在一起;
⑤将第二块预制外挂墙板单元通过钢连接件固定于第一块预制外挂墙板单元上,依次层层叠加连接;
⑥将各所述预制外挂墙板单元上的预埋件与所述建筑物的主体通过焊接或者螺栓的方式固定在一起即可。楼层主体结构与预制外挂墙板之间通过柔性连接,具有较强的对应地震作用下楼层变形的能力。
应理解,这些实施方式仅用于说明本发明而不用于限制本发明的范围。此外应理解,在阅读了本发明讲授的内容之后,本领域技术人员可以对本发明作各种改动或修改,这些等价形式同样落于本申请所附权利要求书所限定的范围。

Claims (4)

1.一种利用预制装配式外围护墙体的建筑方法,其特征在于,包括以下步骤:
①制作预制外挂墙板单元,所述预制外挂墙板单元是以水平和竖直方向的钢筋为骨架后填注混凝土构成,该预制外挂墙板单元的截面呈U型,所述预制外挂墙板单元内设有钢连接件和钢预埋件;
②完成建筑物的楼板现浇后对楼板的边缘进行弹线规划,确定需要装配的预制外挂墙板的具体布置;
③将所述预制外挂墙板单元通过垂直运输设备吊装到各个楼层;
④根据所述预制外挂墙板单元的尺寸设置同一水平线上相连的所述预制外挂墙板单元间的钢连接件,同一水平线上的各所述预制外挂墙板单元与相邻的所述钢连接件装配在一起;
⑤将第二块预制外挂墙板单元通过钢连接件固定于第一块预制外挂墙板单元上,依次层层叠加连接;
⑥将各所述预制外挂墙板单元上的钢预埋件与所述建筑物的主体通过焊接或者螺栓的方式固定在一起即可。
2.根据权利要求1所述的利用预制装配式外围护墙体的建筑方法,其特征在于,所述预制外挂墙板单元相连的两个边上分别设有一加强钢筋。
3.根据权利要求1所述的利用预制装配式外围护墙体的建筑方法,其特征在于,所述混凝土强度等级为C30~C40。
4.根据权利要求1所述的利用预制装配式外围护墙体的建筑方法,其特征在于,所述预制外挂墙板单元长为1000~3000mm,厚为200~1000mm,宽为400~2000mm,壁厚为50~90mm。
CN201510477850.5A 2015-08-06 2015-08-06 一种利用预制装配式外围护墙体的建筑方法 Pending CN105155856A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510477850.5A CN105155856A (zh) 2015-08-06 2015-08-06 一种利用预制装配式外围护墙体的建筑方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510477850.5A CN105155856A (zh) 2015-08-06 2015-08-06 一种利用预制装配式外围护墙体的建筑方法

Publications (1)

Publication Number Publication Date
CN105155856A true CN105155856A (zh) 2015-12-16

Family

ID=54796865

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510477850.5A Pending CN105155856A (zh) 2015-08-06 2015-08-06 一种利用预制装配式外围护墙体的建筑方法

Country Status (1)

Country Link
CN (1) CN105155856A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836824A (zh) * 2016-12-27 2017-06-13 章麒 一种装配式混凝土预制围护墙的建筑方法
CN107700697A (zh) * 2017-09-27 2018-02-16 刘国红 一种外墙预制装配式结构

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4864792A (en) * 1984-11-08 1989-09-12 Sismo International Prefabricated modules, and the use thereof in the building industry
CN1408970A (zh) * 2002-09-28 2003-04-09 朱维高 预制混凝土剪力墙楼房建筑结构及其施工方法
WO2011021151A1 (en) * 2009-08-17 2011-02-24 Kailas Kenjale Method and system for in-situ construction of civil structures
CN102312481A (zh) * 2010-06-29 2012-01-11 湖南华廷筑邦建材有限公司 钢筋砼预制构件
CN103510723A (zh) * 2013-09-23 2014-01-15 安徽宇泰建筑科技集团有限公司 一种装配整体式框架结构住宅体系
CN103541463A (zh) * 2013-11-01 2014-01-29 王睿敏 墙板及其构成的楼层位置设后浇带的剪力墙及剪力墙施工方法
CN203684523U (zh) * 2013-12-31 2014-07-02 宝钢建筑系统集成有限公司 一种装配式自保温混凝土外挂组合墙体
CN104790564A (zh) * 2014-12-01 2015-07-22 中国建筑股份有限公司 一种装配式混凝土楼梯间外墙构造及其施工方法

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4864792A (en) * 1984-11-08 1989-09-12 Sismo International Prefabricated modules, and the use thereof in the building industry
CN1408970A (zh) * 2002-09-28 2003-04-09 朱维高 预制混凝土剪力墙楼房建筑结构及其施工方法
WO2011021151A1 (en) * 2009-08-17 2011-02-24 Kailas Kenjale Method and system for in-situ construction of civil structures
CN102312481A (zh) * 2010-06-29 2012-01-11 湖南华廷筑邦建材有限公司 钢筋砼预制构件
CN103510723A (zh) * 2013-09-23 2014-01-15 安徽宇泰建筑科技集团有限公司 一种装配整体式框架结构住宅体系
CN103541463A (zh) * 2013-11-01 2014-01-29 王睿敏 墙板及其构成的楼层位置设后浇带的剪力墙及剪力墙施工方法
CN203684523U (zh) * 2013-12-31 2014-07-02 宝钢建筑系统集成有限公司 一种装配式自保温混凝土外挂组合墙体
CN104790564A (zh) * 2014-12-01 2015-07-22 中国建筑股份有限公司 一种装配式混凝土楼梯间外墙构造及其施工方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836824A (zh) * 2016-12-27 2017-06-13 章麒 一种装配式混凝土预制围护墙的建筑方法
CN107700697A (zh) * 2017-09-27 2018-02-16 刘国红 一种外墙预制装配式结构
CN107700697B (zh) * 2017-09-27 2019-04-19 刘国红 一种外墙预制装配式结构

Similar Documents

Publication Publication Date Title
CN203834739U (zh) 端部钢板连接定位装配式剪力墙结构
CN103225423B (zh) 一种既有建筑围套式加层结构及其施工方法
CN105113665B (zh) 装配式建筑物的预制吊装墙体
CN105256838B (zh) 管廊预制件及预制式综合管廊
CN108729564A (zh) 装配式建筑体系
CN205171549U (zh) 管廊预制件及预制式综合管廊
CN203334270U (zh) 一种可装配埋入式预制空心地下连续墙
CN203213344U (zh) 工业化率高的装配整体式钢筋混凝土剪力墙结构体
CN105155856A (zh) 一种利用预制装配式外围护墙体的建筑方法
CN208534081U (zh) 一种老建筑构造柱的改造结构
CN104141358A (zh) 无砂浆自嵌固砌体结构体系及包括该体系的建筑物
CN103470268A (zh) 零间距不对称双洞隧道结构及其施工方法
CN203247698U (zh) 能够水平连接的预制混凝土结构构件
CN204940608U (zh) 装配式建筑物的预制吊装墙体
CN103334441B (zh) 一种公路边坡防护结构及其施工方法
CN204940585U (zh) 装配式住宅的预制墙体
CN205934722U (zh) 一种接缝螺栓连接预制混凝土桥面板
CN204551897U (zh) 带有关节型连接装置的钢框柱
CN104153460A (zh) 预制混凝土结构构件及构件间建筑施工水平连接方法
CN105113701B (zh) 装配式建筑物的预制墙体
CN103437349B (zh) 钢筋混凝土灌注异形桩的施工方法
CN203891301U (zh) 两层四块相邻砌块的连接结构及其配筋砌体
CN203546944U (zh) 一种装配式剪力墙
CN206503601U (zh) 临海高水压隧道单层钢板混凝土组合衬砌结构
CN205116221U (zh) 管廊预制件及装配式综合管廊

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151216