[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN105094120A - Testing device capable of simulating action behaviors of primary equipment - Google Patents

Testing device capable of simulating action behaviors of primary equipment Download PDF

Info

Publication number
CN105094120A
CN105094120A CN201510575176.4A CN201510575176A CN105094120A CN 105094120 A CN105094120 A CN 105094120A CN 201510575176 A CN201510575176 A CN 201510575176A CN 105094120 A CN105094120 A CN 105094120A
Authority
CN
China
Prior art keywords
parsing module
full model
simulation
module
primary equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510575176.4A
Other languages
Chinese (zh)
Other versions
CN105094120B (en
Inventor
曹海鸥
杨毅
刘韶俊
高翔
高磊
袁宇波
管益斌
徐宁
吴奕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI YIHAO AUTOMATION CO Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
SHANGHAI YIHAO AUTOMATION CO Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI YIHAO AUTOMATION CO Ltd, State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd filed Critical SHANGHAI YIHAO AUTOMATION CO Ltd
Priority to CN201510575176.4A priority Critical patent/CN105094120B/en
Publication of CN105094120A publication Critical patent/CN105094120A/en
Application granted granted Critical
Publication of CN105094120B publication Critical patent/CN105094120B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0208Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the configuration of the monitoring system
    • G05B23/0213Modular or universal configuration of the monitoring system, e.g. monitoring system having modules that may be combined to build monitoring program; monitoring system that can be applied to legacy systems; adaptable monitoring system; using different communication protocols

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Debugging And Monitoring (AREA)

Abstract

The invention discloses a testing device capable of simulating action behaviors of primary equipment. The device comprises an intelligent processing module, a full-model type SCD parsing module and a primary equipment simulation module, wherein the intelligent processing module is connected with the full-model type SCD parsing module, control commands and state information are received and transmitted through MMS messages, the full-model type SCD parsing module is connected with the primary equipment simulation module to construct and simulate corresponding relations of primary states and the model of SCD, so tests on consistency functions of a simulation system and operation equipment are realized, the primary equipment simulation module accomplishes on-load voltage regulation behavior states of a breaker, a disconnecting link and a transformer, and correctness tests on monitoring software are accomplished. Site test problems of monitoring software of intelligent transformer stations in the prior art are solved, and necessary conditions are provided for upgrade of the monitoring software and tests after upgrade.

Description

The proving installation of simulation primary equipment action behavior
Technical field
The present invention relates to a kind of proving installation of simulating primary equipment action behavior, specifically a kind of primary equipment control loop simulating test device for supervisory system, belongs to technical field of power systems.
Background technology
Transformer station is an important component part of Substation control to the loop that electrical primary operate controls.After transformer station puts into operation, watchdog routine is changed requirement and is taked that primary equipment is not out of service respectively to be tested, the intelligent substation that present stage is generally applied, and because not having the proving installation of correspondence, therefore can not meet above-mentioned test request.
Summary of the invention
Object: in order to overcome the deficiencies in the prior art, the invention provides a kind of proving installation of simulating primary equipment action behavior, for the test of intelligent substation supervisory system, at the functional module of proving installation embedding simulation primary equipment action behavior, by resolving full model SCD file, generate simulation system, the state of simulation primary equipment, when supervisory system is tested and supervisory system closed loop, by the state of control simulation isolating switch, disconnecting link, transformer on-load voltage regulating, complete the test of monitoring software correctness.Solve existing intelligent substation monitoring software on-the-spot test problem, thus for realizing the upgrading of monitoring software, the test after upgrading creates necessary condition.
Technical scheme: for solving the problems of the technologies described above, the technical solution used in the present invention is:
Simulate a proving installation for primary equipment action behavior, it is characterized in that, comprising: intelligent processing module, full model SCD parsing module and simulation primary equipment module;
Wherein: intelligent processing module is connected with full model SCD parsing module and is received by MMS message and transmit control command and status information, full model SCD parsing module is connected with simulation primary equipment module and builds the model corresponding relation of simulation one next state and SCD, realizes the consistency function of test simulation system and operational outfit; Simulation primary equipment module completes the behavior state of mimic-disconnecting switch, disconnecting link, transformer on-load voltage regulating.
Described intelligent processing module comprises: MMS network interface unit and logic function unit, wherein: MMS network interface unit receives the MMS message of outer monitoring main frame, logic function unit complete operation logical process, by differentiating MMS message and completing corresponding function from the relevant information of full model SCD parsing module.
Described full model SCD parsing module comprises: detect enable logic unit and testing result automatic discrimination logical block, wherein: detect the MMS Message Service that enable logic unit receives external monitoring systems, detect startup command to realize detecting startup command and to receive outside artificial simultaneously, after logic discrimination, detection is started result and be directly connected with transmission monitoring modular.
Described simulation primary equipment module comprises: mimic-disconnecting switch unit, simulation disconnecting link unit and simulation on-load voltage regulation gear unit;
Wherein: mimic-disconnecting switch unit, after passing through full model SCD parsing module reception operating breaker breaker tripping and closing order, makes its RS software toggle reverse, and exports RS software toggle current state by full model SCD parsing module;
Simulation disconnecting link unit, after received the order of operation switch operation by full model SCD parsing module, makes its RS software toggle reverse, and exports RS software toggle current state by full model SCD parsing module;
Simulation on-load voltage regulation gear unit, after receiving gear shifting operation order by full model SCD parsing module, makes its software counter change, and by full model SCD parsing module output software counter current value.
The method of work of the proving installation of above-mentioned simulation primary equipment action behavior, comprises the following steps:
1) precondition of supervisory system host test differentiates: according to test needs, first imports full model SCD parsing module to proving installation, then disconnects the connecting line of tested monitoring host computer and MMS switch, be secondly connected by netting twine with proving installation;
2) intelligent processing module can receive tripping operation that tested monitoring host computer sent here by MMS message, switch operation signal; If receive signal when testing, signal exports to full model SCD parsing module;
3) full model SCD parsing module resolves MMS message, and intelligent processing module is connected by full model SCD parsing module logic with simulation primary equipment module;
3a) test both opens device control loop: after receiving operating breaker breaker tripping and closing order, its RS software toggle is reversed, and export RS software toggle current state by full model SCD parsing module;
3b) test disconnecting link control loop: after receiving the order of operation switch operation, its RS software toggle is reversed, and export RS software toggle current state by full model SCD parsing module;
3c) test control loop of transferring the files: after receiving gear shifting operation order, its software counter is changed, and by full model SCD parsing module output software counter current value.
Beneficial effect: the proving installation of simulation primary equipment action behavior provided by the invention, compared with prior art, analog simulation is carried out by the isolating switch loop to intelligence, disconnecting link loop, on-load voltage regulation loop etc., can test with actual primary equipment decoupling zero, and testing procedure is rationally effective, meet the requirement of electric substation automation system test completely.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Embodiment
Below in conjunction with specific embodiment, the present invention is further described.
As shown in Figure 1, a kind of proving installation of simulating primary equipment action behavior, comprising: intelligent processing module, full model SCD parsing module and simulation primary equipment module;
Wherein: intelligent processing module is connected with full model SCD parsing module and is received by MMS message and transmit control command and status information, full model SCD parsing module is connected with simulation primary equipment module and builds the model corresponding relation of simulation one next state and SCD, realizes the consistency function of test simulation system and operational outfit; Simulation primary equipment module completes the behavior state of mimic-disconnecting switch, disconnecting link, transformer on-load voltage regulating.
Described intelligent processing module comprises: MMS network interface unit and logic function unit, wherein: MMS network interface unit receives the MMS message of outer monitoring main frame, logic function unit complete operation logical process, by differentiating MMS message and completing corresponding function from the relevant information of full model SCD parsing module.
Described full model SCD parsing module comprises: detect enable logic unit and testing result automatic discrimination logical block, wherein: detect the MMS Message Service that enable logic unit receives external monitoring systems, detect startup command to realize detecting startup command and to receive outside artificial simultaneously, after software logic differentiates, detection is started result and be directly connected with transmission monitoring modular.
Described simulation primary equipment module comprises: mimic-disconnecting switch unit, simulation disconnecting link unit and simulation on-load voltage regulation gear unit;
Wherein: mimic-disconnecting switch unit, after passing through full model SCD parsing module reception operating breaker breaker tripping and closing order, makes its RS software toggle reverse, and exports RS software toggle current state by full model SCD parsing module;
Simulation disconnecting link unit, after received the order of operation switch operation by full model SCD parsing module, makes its RS software toggle reverse, and exports RS software toggle current state by full model SCD parsing module;
Simulation on-load voltage regulation gear unit, after receiving gear shifting operation order by full model SCD parsing module, makes its software counter change, and by full model SCD parsing module output software counter current value.
The method of work of the proving installation of above-mentioned simulation primary equipment action behavior, comprises the following steps:
1) precondition of supervisory system host test differentiates: according to test needs, first full model SCD parsing module is imported to proving installation, then disconnect tested monitoring host computer (transformer station can a job, a test) and the connecting line of MMS switch, be secondly connected by netting twine with proving installation;
2) intelligent processing module can receive tripping operation that tested monitoring host computer sent here by MMS message, switch operation signal; If receive signal when testing, signal exports to full model SCD parsing module;
3) full model SCD parsing module resolves MMS message, and intelligent processing module is connected by full model SCD parsing module logic with simulation primary equipment module;
3a) test both opens device control loop: after receiving operating breaker breaker tripping and closing order, its RS software toggle is reversed, and export RS software toggle current state by full model SCD parsing module;
3b) test disconnecting link control loop: after receiving the order of operation switch operation, its RS software toggle is reversed, and export RS software toggle current state by full model SCD parsing module;
3c) test control loop of transferring the files: after receiving gear shifting operation order, its software counter is changed, and by full model SCD parsing module output software counter current value.
Be completed.
So far, the Overall Steps of the control loop test of an intelligent apparatus is completed.
The implementation case compared with prior art, when primary equipment is not out of service, a monitoring host computer can be exited and carry out simulation test, solve the control loop test problem of intelligent substation monitoring host computer software upgrading, thus create necessary condition for realizing intelligent substation supervisory system upgrading pattern.
The above is only the preferred embodiment of the present invention; be noted that for those skilled in the art; under the premise without departing from the principles of the invention, can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (5)

1. simulate a proving installation for primary equipment action behavior, it is characterized in that, comprising: intelligent processing module, full model SCD parsing module and simulation primary equipment module;
Wherein: intelligent processing module is connected with full model SCD parsing module and is received by MMS message and transmit control command and status information, full model SCD parsing module is connected with simulation primary equipment module and builds the model corresponding relation of simulation one next state and SCD, realizes the consistency function of test simulation system and operational outfit; Simulation primary equipment module completes the behavior state of mimic-disconnecting switch, disconnecting link, transformer on-load voltage regulating.
2. the proving installation of simulation primary equipment action behavior according to claim 1, it is characterized in that: described intelligent processing module comprises: MMS network interface unit and logic function unit, wherein: MMS network interface unit receives the MMS message of outer monitoring main frame, logic function unit complete operation logical process, by differentiating MMS message and completing corresponding function from the relevant information of full model SCD parsing module.
3. the proving installation of simulation primary equipment action behavior according to claim 1, it is characterized in that: described full model SCD parsing module comprises: detect enable logic unit and testing result automatic discrimination logical block, wherein: detect the MMS Message Service that enable logic unit receives external monitoring systems, detect startup command to realize detecting startup command and to receive outside artificial simultaneously, after logic discrimination, detection is started result and be directly connected with transmission monitoring modular.
4. the proving installation of simulation primary equipment action behavior according to claim 1, is characterized in that: described simulation primary equipment module comprises: mimic-disconnecting switch unit, simulation disconnecting link unit and simulation on-load voltage regulation gear unit;
Wherein: mimic-disconnecting switch unit, after passing through full model SCD parsing module reception operating breaker breaker tripping and closing order, makes its RS software toggle reverse, and exports RS software toggle current state by full model SCD parsing module;
Simulation disconnecting link unit, after received the order of operation switch operation by full model SCD parsing module, makes its RS software toggle reverse, and exports RS software toggle current state by full model SCD parsing module;
Simulation on-load voltage regulation gear unit, after receiving gear shifting operation order by full model SCD parsing module, makes its software counter change, and by full model SCD parsing module output software counter current value.
5. the method for work of the proving installation of the simulation primary equipment action behavior according to any one of claim 1-4, comprises the following steps:
1) precondition of supervisory system host test differentiates: according to test needs, first imports full model SCD parsing module to proving installation, then disconnects the connecting line of tested monitoring host computer and MMS switch, be secondly connected by netting twine with proving installation;
2) intelligent processing module can receive tripping operation that tested monitoring host computer sent here by MMS message, switch operation signal; If receive signal when testing, signal exports to full model SCD parsing module;
3) full model SCD parsing module resolves MMS message, and intelligent processing module is connected by full model SCD parsing module logic with simulation primary equipment module;
3a) test both opens device control loop: after receiving operating breaker breaker tripping and closing order, its RS software toggle is reversed, and export RS software toggle current state by full model SCD parsing module;
3b) test disconnecting link control loop: after receiving the order of operation switch operation, its RS software toggle is reversed, and export RS software toggle current state by full model SCD parsing module;
3c) test control loop of transferring the files: after receiving gear shifting operation order, its software counter is changed, and by full model SCD parsing module output software counter current value.
CN201510575176.4A 2015-09-11 2015-09-11 Simulate the test device of primary equipment action behavior Expired - Fee Related CN105094120B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510575176.4A CN105094120B (en) 2015-09-11 2015-09-11 Simulate the test device of primary equipment action behavior

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510575176.4A CN105094120B (en) 2015-09-11 2015-09-11 Simulate the test device of primary equipment action behavior

Publications (2)

Publication Number Publication Date
CN105094120A true CN105094120A (en) 2015-11-25
CN105094120B CN105094120B (en) 2019-01-15

Family

ID=54574797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510575176.4A Expired - Fee Related CN105094120B (en) 2015-09-11 2015-09-11 Simulate the test device of primary equipment action behavior

Country Status (1)

Country Link
CN (1) CN105094120B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105548746A (en) * 2015-12-04 2016-05-04 国家电网公司华东分部 Device and method for simulating action behavior of protective devices
CN108649698A (en) * 2018-06-05 2018-10-12 国网江苏省电力有限公司苏州供电分公司 Conventional substation telemechanical simulation checking system
CN108694291A (en) * 2018-06-05 2018-10-23 国网江苏省电力有限公司苏州供电分公司 Substation's background computer simulation checking system
CN108694514A (en) * 2018-06-05 2018-10-23 国网江苏省电力有限公司苏州供电分公司 Full digital trigger technique verifies the verification method of system and its use
CN110750437A (en) * 2018-07-23 2020-02-04 阿里巴巴集团控股有限公司 Equipment debugging method, device, equipment and system
CN116132343A (en) * 2023-02-13 2023-05-16 国网四川省电力公司电力科学研究院 Online monitoring terminal simulation test system and method for primary equipment of intelligent substation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102291277A (en) * 2011-08-09 2011-12-21 上海思源弘瑞自动化有限公司 Automatic test system and method for intelligent substation spacing apparatus
CN103364663A (en) * 2013-07-16 2013-10-23 上海毅昊自动化有限公司 Intelligent device for simulating transformer substation primary equipment behavior
CN103439612A (en) * 2013-09-02 2013-12-11 上海毅昊自动化有限公司 Intelligent transformer substation automatic testing system based on SCD
CN104090194A (en) * 2014-07-31 2014-10-08 上海毅昊自动化有限公司 Intelligent substation relay protection noninvasive test system and method
CN104868599A (en) * 2015-05-29 2015-08-26 国网河南省电力公司电力科学研究院 Intelligent substation message simulation test and association analysis system, and simulation method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102291277A (en) * 2011-08-09 2011-12-21 上海思源弘瑞自动化有限公司 Automatic test system and method for intelligent substation spacing apparatus
CN103364663A (en) * 2013-07-16 2013-10-23 上海毅昊自动化有限公司 Intelligent device for simulating transformer substation primary equipment behavior
CN103439612A (en) * 2013-09-02 2013-12-11 上海毅昊自动化有限公司 Intelligent transformer substation automatic testing system based on SCD
CN104090194A (en) * 2014-07-31 2014-10-08 上海毅昊自动化有限公司 Intelligent substation relay protection noninvasive test system and method
CN104868599A (en) * 2015-05-29 2015-08-26 国网河南省电力公司电力科学研究院 Intelligent substation message simulation test and association analysis system, and simulation method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
罗皎虹: "智能变电站SCD在线应用探索", 《供用电》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105548746A (en) * 2015-12-04 2016-05-04 国家电网公司华东分部 Device and method for simulating action behavior of protective devices
CN105548746B (en) * 2015-12-04 2018-12-14 国家电网公司华东分部 Simulate the device and method of protective device action behavior
CN108649698A (en) * 2018-06-05 2018-10-12 国网江苏省电力有限公司苏州供电分公司 Conventional substation telemechanical simulation checking system
CN108694291A (en) * 2018-06-05 2018-10-23 国网江苏省电力有限公司苏州供电分公司 Substation's background computer simulation checking system
CN108694514A (en) * 2018-06-05 2018-10-23 国网江苏省电力有限公司苏州供电分公司 Full digital trigger technique verifies the verification method of system and its use
CN108694514B (en) * 2018-06-05 2021-08-31 国网江苏省电力有限公司苏州供电分公司 Full-digital simulation verification system and verification method adopted by same
CN110750437A (en) * 2018-07-23 2020-02-04 阿里巴巴集团控股有限公司 Equipment debugging method, device, equipment and system
CN110750437B (en) * 2018-07-23 2023-12-22 阿里巴巴集团控股有限公司 Equipment debugging method, device, equipment and system
CN116132343A (en) * 2023-02-13 2023-05-16 国网四川省电力公司电力科学研究院 Online monitoring terminal simulation test system and method for primary equipment of intelligent substation
CN116132343B (en) * 2023-02-13 2024-06-04 国网四川省电力公司电力科学研究院 Online monitoring terminal simulation test system and method for primary equipment of intelligent substation

Also Published As

Publication number Publication date
CN105094120B (en) 2019-01-15

Similar Documents

Publication Publication Date Title
CN105094120A (en) Testing device capable of simulating action behaviors of primary equipment
CN105788227B (en) Fault diagnosis equipment for electricity consumption information acquisition system
CN101980418B (en) System for detecting secondary wiring of relay protection system in transformer substation on line
CN101887269B (en) Five-prevention logic test method and system for 61850 transformer substation
CN202218067U (en) Automated intelligent information pointing system of electric power system
CN102447305B (en) Topological anti-misoperation system for power grid
CN103713214A (en) Intelligent transformer station relay protection closed loop test system
CN202735834U (en) Test system for double measurement and control device in intelligent substation of power system
CN106329720B (en) Detection and debugging method for secondary system of reconstruction and extension project of intelligent substation
CN113364120B (en) Method, device and equipment for checking control process of intelligent substation and storage medium
CN105978159A (en) Telecontrol testing online execution-free check method for transformer station
CN111458586B (en) Batch synchronous detection method and system for multi-interval in-situ line protection device of intelligent substation
CN110932406B (en) Remote signaling information checking method and device for intelligent substation scheduling master station
CN105388416A (en) Intelligent substation relay protection remote test system
CN105137958A (en) Railway under-vehicle power supply main control board detection device and detection method
CN104638761B (en) Packet sensing and packet simulation verification based GOOSE (generic object oriented substation event) virtual terminal connection method
CN110611312B (en) On-line simulation system and method for panoramic data of substation bay level
CN109633345B (en) Secondary equipment on-line monitoring and analyzing device
CN104730397A (en) Interoperation test system and method between distribution automation terminals
CN204065322U (en) For the failure diagnosis apparatus of ring main unit distribution terminal
CN114397528B (en) Logic action test method and device for remote spare power automatic switching device
CN105006891A (en) On-line visual remote control terminal and method used for transformer station background upgrading
CN205139323U (en) Distant examination testing system of intelligent substation relay protection
CN104133125A (en) Onsite uninterrupted power automatic test method for feeder automation (FA)
CN115051475B (en) Multi-terminal closed-loop joint debugging system and method based on analog state device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Cao Haiou

Inventor after: Yang Yi

Inventor after: Liu Shaojun

Inventor after: Gao Xiang

Inventor after: Gao Lei

Inventor after: Yuan Yubo

Inventor after: Guan Yibin

Inventor after: Xu Ning

Inventor after: Wu Yi

Inventor before: Cao Haiou

Inventor before: Yang Yi

Inventor before: Liu Shaojun

Inventor before: Gao Xiang

Inventor before: Gao Lei

Inventor before: Yuan Yubo

Inventor before: Guan Yibin

Inventor before: Xu Ning

Inventor before: Wu Yi

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190115

Termination date: 20190911