CN105009678A - 用于在多个e节点b和用户设备之间提供同时连接的方法和系统 - Google Patents
用于在多个e节点b和用户设备之间提供同时连接的方法和系统 Download PDFInfo
- Publication number
- CN105009678A CN105009678A CN201480010056.3A CN201480010056A CN105009678A CN 105009678 A CN105009678 A CN 105009678A CN 201480010056 A CN201480010056 A CN 201480010056A CN 105009678 A CN105009678 A CN 105009678A
- Authority
- CN
- China
- Prior art keywords
- enb
- enode
- message
- mme
- service
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 98
- 238000005259 measurement Methods 0.000 claims abstract description 34
- 230000011664 signaling Effects 0.000 claims abstract description 11
- 241000760358 Enodes Species 0.000 claims description 127
- 230000009977 dual effect Effects 0.000 claims description 88
- 230000004044 response Effects 0.000 claims description 25
- 230000008569 process Effects 0.000 claims description 24
- 238000012790 confirmation Methods 0.000 claims description 5
- 230000001960 triggered effect Effects 0.000 claims description 2
- 230000007774 longterm Effects 0.000 abstract description 7
- 230000005540 biological transmission Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 9
- 102100039358 3-hydroxyacyl-CoA dehydrogenase type-2 Human genes 0.000 description 7
- 101001035740 Homo sapiens 3-hydroxyacyl-CoA dehydrogenase type-2 Proteins 0.000 description 7
- 238000009795 derivation Methods 0.000 description 5
- 238000012546 transfer Methods 0.000 description 5
- 230000000977 initiatory effect Effects 0.000 description 4
- 230000008859 change Effects 0.000 description 3
- 230000009471 action Effects 0.000 description 2
- 230000002776 aggregation Effects 0.000 description 2
- 238000004220 aggregation Methods 0.000 description 2
- 230000008878 coupling Effects 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000011160 research Methods 0.000 description 2
- 238000012827 research and development Methods 0.000 description 2
- 230000001413 cellular effect Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000002596 correlated effect Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005538 encapsulation Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 239000003550 marker Substances 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000001228 spectrum Methods 0.000 description 1
- GOLXNESZZPUPJE-UHFFFAOYSA-N spiromesifen Chemical compound CC1=CC(C)=CC(C)=C1C(C(O1)=O)=C(OC(=O)CC(C)(C)C)C11CCCC1 GOLXNESZZPUPJE-UHFFFAOYSA-N 0.000 description 1
- 230000009897 systematic effect Effects 0.000 description 1
- CSRZQMIRAZTJOY-UHFFFAOYSA-N trimethylsilyl iodide Substances C[Si](C)(C)I CSRZQMIRAZTJOY-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W76/00—Connection management
- H04W76/10—Connection setup
- H04W76/15—Setup of multiple wireless link connections
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/003—Arrangements for allocating sub-channels of the transmission path
- H04L5/0032—Distributed allocation, i.e. involving a plurality of allocating devices, each making partial allocation
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W40/00—Communication routing or communication path finding
- H04W40/34—Modification of an existing route
- H04W40/36—Modification of an existing route due to handover
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W36/00—Hand-off or reselection arrangements
- H04W36/0005—Control or signalling for completing the hand-off
- H04W36/0055—Transmission or use of information for re-establishing the radio link
- H04W36/0069—Transmission or use of information for re-establishing the radio link in case of dual connectivity, e.g. decoupled uplink/downlink
Landscapes
- Engineering & Computer Science (AREA)
- Signal Processing (AREA)
- Computer Networks & Wireless Communication (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
本发明提供一种用于在长期演进(LTE)网络中使能从用户设备(UE)开始跨越多个演进节点B(eNB)的同时发送和接收的方法和系统。在一个实施例中,UE向eNB-1发出测量报告。基于测量报告,eNB-1决定添加另一eNB(以下称作eNB-2)并且开始卸载过程。所述eNB-1准备eNB-2并且获得用于在UE和eNB-2之间切换E-RAB的必要的参数。因此,eNB-1通过RRC信令消息向UE发出卸载命令。UE基于卸载命令建立与eNB-2的RRC用户平面连接。然后,eNB-1通过向移动性管理实体(MME)提供与eNB-2相关的必需的信息来发起与MME的承载切换过程。然后,MME使用由eNB-1提供的与eNB-2相关的必要的信息发起和完成与服务网关(S-GW)的用户平面承载切换过程。
Description
技术领域
本发明一般涉及无线通信领域,并且更具体地,涉及从用户设备(UE)提供跨越多个演进节点B(eNB)的同时发送和接收。
背景技术
认为使用低功率节点的小型小区(small cell)有希望应对移动流量爆增,特别是对于室内和室外情景中的热点部署。低功率节点一般意味着发送(Tx)功率低于宏节点和BS类的节点。小型小区具有10米到1千米或2千米的范围,而宏小区可以具有几十千米的范围。小型小区包含毫微微小区、微微小区和微小区。用于E-UTRA和E-UTRAN的小型小区增强聚焦于针对使用低功率节点的室内和室外的热点区域中的增强的性能的附加功能。
第三代合作伙伴计划(3GPP)正在论述小型小区增强,并且预期应对其中不同频带被单独地分别分配给宏层和小型小区层的部署情景。小型小区是LTE网络的组成部分。在3G网络中,小型小区被看作卸载(offload)技术。
给定合理系统复杂性,主要关注一般的用户吞吐量,预期小型小区增强支持对于下行链路和上行链路两者的显著增大的用户吞吐量。此外,对于给定用户和小型小区分布、典型流量类型并且考虑到合理系统复杂性,预期小型小区增强达到尽可能高的每一单位面积的容量(例如,bps/km2)。还预期小型小区增强研究评价实际回程延迟的影响,并且提供以改善系统性能为目的的解决方案。其他方面,例如,VoLTE的服务质量(例如,MOS得分)和在服务(视频流,视频呼叫等等)上的延迟/抖动影响也可以在后续的研究中解决。
当存在重叠的小型小区和宏小区的较大部署时,由于UE可能将UE自身与两个或更多小区关联以用于数据流的可能的同时接收/发送,因此存在提高UE所体验的总体吞吐量的潜力。
当前,在蜂窝网络行为中,如果存在附加的演进节点B(eNB)连接请求并且当已经存在来自另一演进节点B(eNB)的现有连接时,核心网络将其看做“克隆的SIM”或者UE在先前的eNB中丢失了连接。
发明内容
技术问题
为了允许eNB之间的双连接,需要经由每个eNB同时建立一个或多个EPS承载的两个或更多eNB发起和建立用于UE的同时数据发送和接收的双连接的方法和系统。
技术方案
本发明的实施例描述一种用于在多个演进节点B(eNB)和用户设备(UE)之间提供同时连接的方法。所述方法包括:通过演进节点B(S-eNB)在用户设备(UE)和核心网络之间建立第一连接;考虑用于用户设备(UE)和分组数据网络(PDN)之间的一个或多个连接的至少另一演进节点B(T-eNB);确定至少一个目标演进节点B(T-eNB)的可用性,所述确定以在服务eNB和目标eNB为基础中的可用资源为基础触发;以及通过一个或多个演进节点B(T-eNB)、至少一个服务网关、以及至少一个分组数据网络(PDN)网关在用户设备(UE)和分组数据网络(PDN)之间建立至少一个连接。
本发明的另一实施例描述一种用于在多个演进节点B(eNB)和用户设备(UE)之间提供同时连接的方法。所述方法包括:通过服务演进节点B(S-eNB)在用户设备(UE)和核心网络之间建立第一连接;向用户设备(UE)发出测量请求以获得测量报告;向服务演进节点B(S-eNB)提供测量报告;通过服务演进节点B向移动性管理实体(MME)发出服务请求消息;以及通过至少一个目标节点(T-eNB)、至少一个服务网关、至少一个分组数据网络(PDN)网关在用户设备(UE)和PDN之间建立双连接。
本发明的又一个实施例描述一种用于在多个演进节点(eNB)和用户设备(UE)之间提供同时连接的系统。所述方法包括用于通过一个或多个目标节点(T-eNB)、至少一个服务网关和至少一个分组数据网络(PDN)网关在用户设备(UE)和分组数据网络(PDN)之间建立至少一个连接的装置。
本发明的还一实施例描述一种用于在多个演进节点B(eNB)和用户设备(UE)之间提供同时连接的系统。所述方法包括:当通过服务演进节点B(S-eNB)向移动性管理实体(MME)发出服务请求消息时通过包括目标演进节点B(T-eNB)有关的信息由服务演进节点B(S-eNB)使能双连接的装置;以及用于通过至少一个目标节点(T-eNB)、至少一个服务网关、至少一个分组数据网络(PDN)网关在用户设备(UE)和分组数据网络(PDN)之间建立双连接的装置。
本发明的再一实施例描述一种用于在多个演进节点B(eNB)和用户设备(UE)之间提供同时连接的系统。所述方法包括:当向移动性管理实体(MME)发出S1-AP消息时通过获得在X2接口上的目标演进节点B(T-eNB)并且包括该获得的目标演进节点B(T-eNB)有关的信息由服务演进节点B(S-eNB)使能双连接的装置;以及用于通过至少一个目标节点(T-eNB)、至少一个服务网关、至少一个分组数据网络(PDN)网关在用户设备(UE)和分组数据网络(PDN)之间建立双连接的装置。
附图描述
将在下面结合附图的描述中解释本发明的上述方面的和其他特征,其中:
图1示出根据一个实施例的、用于在多个演进节点(eNB)和用户设备(UE)之间提供同时连接的系统。
图2A示出根据一个实施例的长期演进(LTE)系统的高级框图,其中两个演进节点B(eNB)被配置为服务于单个用户设备(UE)。
图2B示出根据一个实施例的、能够在多个eNB和UE之间提供同时发送和接收的示例性长期演进系统的框图。
图3示出的顺序图示出根据一个实施例的在UE和多个eNB之间的同时发送和接收的方法。
图4示出的示意图示出协议栈级架构。
图5示出的顺序图示出使用X2切换过程执行部分切换的方法。
图6示出的流程图示出根据实施例的在UE和多个eNB之间的同时发送和接收的基于示例性切换的方法。
图7示出的流程图示出根据实施例的在UE和多个eNB之间的同时发送和接收的示例性UE发起的服务请求方法。
图8示出根据实施例的、用于在多个演进节点(eNB)和用户设备(UE)之间提供同时连接的方法的流程图。
图9示出根据实施例的、用于在多个演进节点(eNB)和用户设备(UE)之间提供同时连接的方法的流程图。
具体实施方式
主张以下权利:
a)2013年2月22日提交的印度临时申请第796/CHE/2013号,标题为“METHOD AND SYSTEM FOR PROVIDING SIMULTANEOUSTRANSMISSION AND RECEPTION BETWEEN MULTIPLE E-NODEBSAND AN USER EQUIPMENT”,三星研发院印度班加罗尔私有有限公司(Samsung R&D Institute India Bangalore Private Limited),其为了所有目的通过引用整体合并于此;以及
b)2013年11月8日提交的印度临时申请第5047/CHE/2013号,标题为“METHOD AND SYSTEM FOR PROVIDING SIMULTANEOUSCONNECTIVITY BETWEEN MULTIPLE E-NODEBS AND AN USEREQUIPMENT”,三星研发院印度班加罗尔私有有限公司(Samsung R&DInstitute India Bangalore Private Limited),其为了所有目的通过引用整体合并于此。
现在将参照附图详细描述本发明的实施例。然而,本发明不局限于实施例。本发明可以以多种形式修改。因此,提供本发明的实施例仅为了向本发明的技术领域的普通技术人员更清楚地解释本发明。在附图中,类似参考标记使用指示类似组件。
本说明书可以在若干位置中提及“一个”、“一”或“一些”实施例。这不一定暗示每个这种提及是用于相同的(多个)实施例,或特征仅应用于单个实施例。不同实施例的单个特征还可以被组合以提供其他实施例。
如这里使用,单数形式“一”、“一个”、“该”也意图包括复数形式,除非上下文明确地给出相反指示。还将理解,当在此说明书中使用术语“包括”和/或“包含”时,表明存在所描述的特征、整体、步骤、操作、元件和/或组件,但不排除存在或附加一个或多个其他特征、整体、步骤、操作、元件、组件和/或它们的组合。将会理解,当一个元件被称为“连接”或“耦接”到另一元件时,它可以直接连接或耦接到所述另一元件,或者也可以存在居间的元件。此外,如此处使用的“连接”或“耦接”可以包括可操作地连接或耦接。如此处使用的,术语“和/或”包括一个或多个相关列出项目中的一个或多个的任意组合和排列。
除非另外定义,否则此处使用的所有术语(包括技术术语和科学术语)所具有的含义与本公开所属领域的普通技术人员通常理解的含义相同。还将理解,术语,如通常使用的词典中定义的那些术语,应该被解释为所具有的含义与它们在相关领域上下文中的含义一致,而不应理想化地或过分形式化地对其进行解释,除非此处明确地如此定义。
本发明提供一种用于在长期演进(LTE)网络中使能从用户设备(UE)开始跨越多个演进节点B的同时发送和接收。本发明利用重叠的演进节点B(eNB)覆盖的可用性来获取频谱效率的更佳的增益。只要用户设备(UE)可以实现两个不同的演进节点B(eNB)的连接,就可以充分利用更好的负载均衡和卸载机会。本方法包括基于射频资源可用性向UE添加另一eNB(以下称为T-eNB)。此外,本方法包括由服务eNB向移动性管理实体(MME)发出卸载请求,以通过目标eNB发起用户平面承载/隧道的路径切换。此外,本方法包括由eNB-1从MME接收卸载命令。
在实施例中,附加地,本方法包括由S-eNB组合来自MME与T-eNB的HO命令,并且将其发送到UE,以使得在UE、T-eNB和服务网关(S-GW)之间建立E-UTRAN无线电接入承载(E-RAB)。此外,UE基于该切换命令导出用于T-eNB的加密地唯一密钥,并且建立与T-eNB的连接。
图1示出根据一个实施例的、用于在多个演进节点(eNB)(102)和用户设备(UE)(101)之间提供同时连接的系统。该系统包括一个或多个用户设备(UE)(101)、一个或多个演进节点B(eNB)(102)、一个或多个服务网关(S-GW)(103)、一个或多个分组数据网络(PDN)(104)。该系统还包括至少一个移动性管理实体(MME)(105)和归属订户服务器(HSS)(106)。演进节点B(eNB)还被分类为服务演进节点B或主(master)演进节点B或首要(primary)演进节点B(S-eNB)以及目标演进节点B或从(slave)演进节点B或次级(secondary)演进节点B(T-eNB)。系统通过一个或多个目标节点(T-eNB)、一个或多个服务网关、以及一个或多个分组数据网络(PDN)网关在用户设备(UE)和分组数据网络(PDN)之间建立一个或多个连接。
在另一实施例中,系统被配置为通过一个或多个演进节点B(eNB)(102)、一个或多个服务网关(103)、一个分组数据网络(PDN)网关在用户设备(UE)(101)和分组数据网络(PDN)(104)之间建立双连接。
图2A示出根据一个实施例的长期演进(LTE)系统的高级框图,其中两个演进节点B(eNB)被配置为服务于单个用户设备(UE)。图2B示出根据另一实施例的、能够在多个演进节点B(eNB)和用户设备(UE)之间提供同时发送和接收的示例性长期演进系统的框图。用户设备(UE)向第一演进节点B(eNB-1)发出测量报告。基于测量报告和/或无线电资源管理过程,第一演进节点B(eNB-1)执行小区卸载评估以确定是否添加另一演进节点B(eNB)。如果第一演进节点B(eNB-1)决定添加另一演进节点B(eNB)(以下称作eNB-2),则eNB-1准备eNB-2,从T-eNB获得必需的参数并且向移动性管理实体(MME)发出包括从T-eNB获得的必需的参数的卸载请求。卸载请求指示eNB-2上的新的EPS(E-RAB)承载是将与当前的服务演进节点B(eNB-1)一起服务于用户设备(UE)的附加的演进节点B(eNB)。以上实施例应用于这样的情景:其中eNB-2(T-eNB)和MME之间不具有S1-MME接口,并且UE和eNB-2(T-eNB)之间也不具有RRC控制平面信令。
在另一实施例中,当用户设备(UE)向服务演进节点B(S-eNB)发出测量报告时,用户设备(UE)接收指示第二小区(T-eNB)是用于后续的事务处理的合适的小区并且UE可以建立与T-eNB的新连接的响应。因此,UE知道它可以向远离S-eNB的新的合适的小区请求服务。在这种情况下,UE经由S-eNB向MME发出服务请求消息。当接收到该服务请求消息时,移动性管理实体(MME)与新的目标eNB建立资源并且指令S-eNB向UE发出部分切换命令。以上实施例适用于的情景是eNB-2(T-eNB)具有与MME的直接S1-MME接口。
在又一实施例中,UE基于用于特定服务的驻留在UE中的先前策略(ANDSF或APN配置),请求MME经由新的eNB而不是服务eNB建立EPS承载(双连接)。然后MME与T-eNB/SGW建立资源并且经由新的eNB对UE的服务请求作出响应。以上实施例适用于的情景是eNB-2(T-eNB)具有与MME的直接S1-MME接口。
当前在移动性管理实体(MME)行为中,如果存在来自UE的附加的演进节点B(eNB)连接请求并且当已经存在来自另一演进节点B(eNB)的现有的连接时,则移动性管理实体(MME)将此认作“克隆的SIM”或UE在先前的eNB中丢失了连接。为了允许在长期演进(LTE)网络中eNB之间的双连接,在本发明中,在LTE网络中的共享或非共享的(不同eNB广播不同的PLMN ID)网络配置情景中,移动性管理实体(MME)经由每个eNB同时建立一个或多个EPS承载的两个或更多eNB来发起并建立用于UE的同时的数据发送和接收的双连接。
在一些实施例中,用户设备(UE)在非接入层(NAS)消息中包括双连接指示符,以便向MME指示该请求用于双连接,并且以便同时保持先前的上下文和连接。MME基于UE能力和订阅来授权双连接。可替换地,MME基于支持双连接和部分卸载/切换的网络能力来授权双连接。
当接收到双连接请求时,MME决定多ERAB PDN连接并且导出用于eNB-2的加密地唯一密钥。在一些实施例中,MME和UE导出用于每个eNB的两个单独的AS(eNB)安全上下文密钥和值(如,密钥KeNB、下一跳(NextHop)值)。例如,从KSAME,由MME和UE对于每个eNB导出两个AS安全上下文有关的密钥和值。当eNB-1仅仅服务于该UE时,该UE具有通过eNB中的一个与MME的一个非接入层(NAS)连接。此外,MME激活利用不同eNB的EPS承载。
在一些实施例中,MME和UE对于每个eNB导出两个单独的eNB安全上下文有关的密钥和值。例如,从KSAME值,第一KeNB被导出并且下一跳值(NH)参数被MME用于第二KeNB的导出。在这种情况下,MME和UE维护用于这两个eNB的单个NH值链(AS安全上下文参数)。
在一些实施例中,MME和UE使用EPS承载标识作为用于唯一的KeNB密钥推导的输入参数中的一个,导出用于每个eNB的两个单独的KeNB安全上下文。在这种情况下,MME和UE导出用于每个eNB的单独的AS安全相关参数。
在一些实施例中,MME和UE交换随机数(Nonce)以导出用于每个eNB的两个单独的eNB安全上下文。在一个示例性实现中,MME和UE使用上行链路NAS计数(NAS COUNT)值来导出用于每个eNB的两个单独的AS安全相关参数。例如,MME和UE使用触发MME建立利用不同eNB的同时EPS承载的NAS消息的NAS计数。NAS消息是服务请求消息。可替换地,NAS消息是附着请求消息。在另一示例性实现中,MME和UE使用下行链路NAS计数值来导出用于每个eNB的两个单独的AS安全相关的参数。例如,MME和UE使用确认到该UE的双连接的NAS消息的NAS计数,来建立利用不同eNB的同时EPS承载。
在一些实施例中,每个eNB单独地与UE进行AS SMC过程,以独立地建立AS安全上下文。
在一些实施例中,MME导出和维护在不同eNB中同时有效(active)的、同时AS上下文相关参数。
在一些实施例中,MME生成用于每个AS安全上下文的新的eNB密钥集标识符(KSIASME-eNB),以连同eKSI(E-UTRAN中的密钥集标识符)一起标识被导出的用于特定eNB的AS安全相关参数。例如,在UE变换到RRC空闲模式期间,eNB向MME指示KSIASME-eNB以移除所存储的AS安全上下文细节(eNB和NH值)。在一个实施例中,MME通过S1应用协议(S1-AP)过程向eNB指示所生成的新的eNB密钥集标识符(KSIASME-eNB)。例如,S1应用协议(S1-AP)过程是INITIAL CONTEXT SETUP(初始上下文建立)。此外,eNB在执行AS安全模式命令过程时向UE指示KSIASME-eNB。在另一实施例中,MME通过NAS SMC过程向UE指示所生成的新的eNB密钥集标识符(KSIASME-eNB)。
AS安全上下文相关参数包括密钥KeNB、NH值和下一跳链计数器(Nexthop Chaining Counter,NCC)。在一个实施例中,MME将启动到UE当前附着到的eNB的KeNB的密钥更新(rekeying)。在另一实施例中,MME和UE执行单独的EPS AKA过程并且从不同eNB导出用于每个EPS承载的新的KASME。此外,MME维护用于来自不同eNB的承载连接的同时多个EPS密钥层级。
MME和UE使用在通过宏eNB或主eNB建立EPS承载时导出的NAS安全上下文。然而,MME和UE将通过小型eNB或微微eNB导出的KASME仅仅用于小型eNB或微微eNB的AS安全上下文的推导。
MME向eNB-2发出包含加密地唯一密钥(KeNB)的切换请求。eNB-2响应于该切换请求发出确认消息。一旦接收到确认,MME向eNB-1发出部分卸载/切换命令。在一个实施例中,部分卸载/切换命令包括用于双连接的指示。因此,eNB-1向UE发出部分切换命令。UE基于该部分切换命令导出用于eNB-2的加密地唯一密钥,并且建立与eNB-2的连接。可以注意到,UE可以具有与每个eNB的RRC连接以及与MME的唯一的一个NAS连接。在图3中示出在UE和多个eNB之间的同时发送和接收的方法的顺序图,其中UE具有与每个eNB的RRC控制平面信令连接,并且此外eNB具有S1-MME接口。在eNB-2被添加到在各个eNB和MME之间保持的“活动集”中之后,eNB-1不关心eNB-2上下文。在本发明中,演进节点(eNB)基于从UE接收到的测量报告和eNB负载、RRM等等提供关于其他演进节点(eNB)的卸载/添加的偏好。MME可以基于订阅、服务、服务质量(QoS)或任一其他考虑来决定用于每个UE的最终活动集。
可以注意到,如果eNB-2(T-eNB)具有与MME的直接S1-MME接口并且此外UE和eNB-2(T-eNB)之间具有直接RRC控制平面信令连接,则不做出用于双连接的eNB之间的X2依赖假设。如果S1-MME(eNB和MME之间)中的任何一个或全部两个是不可能的/不可用并且RRC控制平面信令(eNB和UE之间)是不可能的/不可用,则假定/要求eNB之间的X2接口。本发明公开了对于特定ERAB卸载的部分切换机制。一旦UP ERAB被建立,第一演进节点(eNB1)就不包含在第二演进节点(eNB2)和用户设备(UE)之间的事务中。此外,如果eNB1信号减弱,则eNB1请求切换到最好的小区。
在LTE中,还允许使用X2接口的切换。该过程用于在移动性管理实体(MME)和服务网关(SGW)不变时使用X2接口将UE从源演进节点B(S-eNB)切换到目标演进节点B(T-eNB)。执行X2切换过程而没有演进分组核(EvolvedPacket Core,EPC)参与,即,直接在S-eNB和T-eNB之间交换预备消息。由T-eNB触发在切换完成阶段期间在源侧的资源的释放。然而,如果不存在可用的S1-MME接口,则需要通过源e-NB(其具有S1-MME接口)执行卸载的方法。
在图4中描绘了协议栈层级架构的示意图,其中UE具有与每个eNB的RRC控制平面信令连接,并且此外eNB具有与MME的S1-MME接口。
在一个实施例中,经由X2切换过程实现部分切换的方法。在本实施例中,实现经由X2切换过程添加双连接的方法。如图5中所示,当S-eNB决定将现有的或新请求的ERAB的子集切换到T-eNB时,S-eNB指导UE与用于特定ERAB的T-eNB建立新的RRC连接。S-eNB向T-eNB发起指示这是双连接的X2AP部分切换请求,并且导出用于UE的新的密钥KeNB(AS安全上下文参数)。用于导出新的密钥和承载配置的细节由S-eNB在RRC消息中向UE提供。RRC消息可以是修改的RRC重新配置消息。可替换地,RRC消息可以是用于部分切换的修改的切换命令信息,其提供用于新的密钥推导以及在用于特定ERAB的目标小区中使用的承载配置的参数。
在部分切换过程期间,当T-eNB和UE已经具有用于特定承载的UE上下文时,T-eNB和UE可以重新使用现有的上下文而不是建立从S-eNB接收到的新的上下文。
当T-eNB发出S1AP路径切换请求时,T-eNB将向MME指示该路径切换是部分路径切换(即,双连接)并且仅仅可适用于列出的ERAB/EPS承载ID。然后MME建立用于T-eNB的新的S1AP上下文,并且数据路径被建立。
图6示出根据实施例的、在用户设备(UE)和多个eNB之间的同时发送和接收的基于示例性卸载过程的方法。
根据下面阐明的的一个实施例,长期演进(LTE)系统能够在多个eNB和UE之间提供同时发送和接收,其中T-eNB不具有与MME的S1-MME接口并且UE也不具有与T-eNB的RRC控制平面信令。关于下面阐明的另一个实施例,S-eNB(它是主eNB或锚eNB)是主控(host)RRC层的eNB,终止S1-MME并且因此用作去往核心网络(CN)的移动性锚。T-eNB(它是次级或辅助eNB)是提供用于UE的附加的无线电资源的eNB。下面提供的步骤的顺序是根据一个实施例的,并且顺序的变化在本发明的保护范围之内。
步骤1:UE通过S-eNB(服务eNB)执行附着过程并且网络基于UE请求建立用于APN(例如:VoIP呼叫)的EPS承载(PDN连接)。除了这个正在进行的服务之外,UE还请求用于另一APN(例如:文件下载)的另一PDN连接。网络建立用于另一APN文件下载的另一EPS承载(PDN连接)。以上过程如在3GPP TS 23.401规范中详述地那样执行。
步骤2:eNB可以向UE发出用于执行测量的RRC消息(例如,测量请求)。
步骤3:基于来自S-eNB的请求,或由于测量报告触发,UE在RRC消息(例如,测量报告)中向S-eNB发出测量报告。
步骤4:基于由S-eNB接收到的测量报告,S-eNB执行小区卸载评估以确定是否添加另一eNB(T-eNB)。如果S-eNB决定添加另一eNB(以下称作T-eNB),则执行以下步骤。在本发明中,eNB基于从UE接收到的测量报告和它的负载以及小型小区负载提供关于其他eNB的卸载/添加的偏好,作为无线电资源管理(RRM)等等的一部分。
步骤5:S-eNB可选地向T-eNB发出X2-AP消息(例如,资源请求消息),以检查T-eNB中的资源的可用性,并且将特定EPS承载(例如,文件下载PDN连接,以下称作EPS承载-2)移动到T-eNB。S-eNB可以在该请求消息中包括以下信息中的任何一个:PDN连接的无线电承载信息、请求的QoS值、分配的QoS值、UE标识信息、RRM信息。可替换地,S-eNB在新的(双连接)X2-AP消息中包括以上参数中的任何一个。
步骤6:T-eNB发出提供资源的当前状态的RRC响应消息。步骤7:S-eNB向T-eNB发出X2-AP切换请求消息(部分-1)以将特定EPS承载(例如,EPS承载-2)移动到T-eNB。在实施例中,S-eNB可以在请求消息中包括以下信息中的任何一个:(T-eNB的)目标小区的E-UTRAN小区全局标识符(ECGI)、UE聚集最大比特率(AMBR)、UE安全能力、UE的AS安全上下文(其包括密钥KeNB*),将被建立的EUTRAN无线电访问承载(E-RAB)(E-RAB ID,QoS等级标识符(QCI),分配和保留优先级(ARP),S1S-GW TEID)。在实施例中,X2-AP消息可以是用于T-eNB添加的次级小区命令。
步骤8:T-eNB一收到来自S-eNB的切换请求就执行准入控制(admissioncontrol)。此外,在实施例中,基于来自S-eNB的对于双连接的请求,T-eNB创建DL S1-U TEID并且在X2-AP消息中包括响应消息。T-eNB以X2AP切换请求确认(部分-1)做出响应。T-eNB可以在(部分-1)请求消息中包括以下信息中的任何一个:关于被接受的RAB的信息,上行链路和下行链路GTP隧道信息以及经由透明的容器发出的切换命令消息。切换命令(T-eNB分配的C-RNTI、T-eNB分配的DRB ID(UL/DL)、T-eNB AS安全算法)以及将在DL中切换的E-RAB(E-RAB ID、S1目标eNB TEID)。在实施例中,X2-AP消息可以是关于T-eNB添加的次级小区命令确认,而不是切换命令。
在实施例中,对于双连接,X2接口被用于通过S-eNB携带用于T-eNB和S-GW之间的S1-U承载建立的S1-U隧道参数。T-eNB创建DL S1-U TEID并且将它包括在X2-AP消息中,所以S-GW得到T-eNB的S1-U TE-ID并且与T-eNB建立下行链路(DL)S1-U承载。
步骤9:基于接收到的RRC响应消息(切换请求确认(部分-1)),S-eNB可以作出将EPS承载-2切换/卸载到T-eNB的决定。如果S-eNB决定执行EPS承载-2的卸载/部分切换(eNB间载波聚合),则S-eNB向移动性管理实体(MME)发出S1-AP需要切换消息(handover required message)(卸载)。S1-AP需要切换消息可以包括以下参数中的任何一个:直接转发路径可用性,从T-eNB接收到的源到目标透明容器(切换命令(T-eNB分配的C-RNTI,T-eNB分配的DRB ID(UL/DL),T-eNB AS安全算法)),目标演进节点B标识,CSGID,CSG访问模式,S-eNB TAI,S1AP原因(cause),接收到的将在DL中切换的E-RAB(E-RAB ID,S1目标eNB TEID),T-eNB的ECGI。S1AP原因指示它是双连接并且MME需要与T-eNB建立双连接。换句话说,S1AP原因指示T-eNB是将连同当前的服务S-eNB一起服务于UE的附加的eNB。在实施例中,关于S1-AP请求消息是用于双连接的指示可以使用新的参数来指示,并且它包括在S1-AP请求消息中。
可选地,代替S1-AP需要切换消息,S-eNB代表T-eNB向移动性管理实体(MME)发出S1-AP路径切换请求消息。S1-AP路径切换请求消息可以包括以下参数中的任何一个:直接转发路径可用性、T-eNB分配的C-RNTI,T-eNB分配的DRB ID(UL/DL)、T-eNB AS安全算法、目标演进节点B标识、CSG ID、CSG访问模式、S-eNB TAI、S1AP原因、接收到的将在DL中切换的E-RAB(E-RAB ID)、S1目标eNB TEID、T-eNB的ECGI。S1AP原因(例如,无线网络层原因“双连接”)指示它是双连接并且MME需要与T-eNB建立双连接。换句话说,S1AP原因指示T-eNB是将连同当前的服务S-eNB一起服务于UE的附加的eNB。在实施例中,关于S1-AP请求消息是用于双连接的指示可以使用新的参数来指示,并且它包括在S1-AP请求消息中。
S-eNB连同MME一起执行承载建立功能。当S-eNB准备T-eNB时,它使用X2接口从T-eNB获得用于S1-U承载/隧道建立的必要参数,并且使用S1-MME接口向MME发出获得的参数,以使得S-GW与T-eNB建立下行链路(DL)S1-U承载。
在实施例中,S-eNB在与双连接相关的所有RRC过程成功之后执行到T-eNB的承载路径切换。步骤9到步骤14在步骤18之后执行。
步骤10:MME可以基于订阅、服务、服务质量(QoS)或任一其他考虑决定用于每个UE的最终活动集。MME经由按照每个eNB同时建立一个或多个EPS承载的两个或更多eNB启动和建立用于UE的同时数据发送和接收的双连接。MME基于UE能力和订阅来授权双连接。可替换地,MME基于用于支持双连接和部分卸载/切换的网络能力来授权双连接。在一些实施例中,UE将双连接能力指示符包括在NAS消息中,以向MME指示UE能够进行双连接并且同时保持先前的上下文和连接。
步骤11:MME向S-GW发出GTP-C:修改承载请求,以将路径切换到T-eNB。修改承载请求可以包括以下参数中的任何一个:T-eNB地址,在T-eNB分配的用于被接受的EPS承载的S1-U接口上的下行链路流量的TEID、T-eNB ECGI、TAI(由MeNB广播)。
步骤12:SGW更新承载并且利用GTP-C:修改承载响应消息来做出响应。修改承载请求可以包括以下参数中的任何一个:EPS承载ID。SGW和T-eNB之间的DL S1承载在这个步骤中建立。SGW开始向T-eNB发出EPS承载-2的DL分组。
步骤13:MME可选地导出用于T-eNB的AS安全密钥。
步骤14:MME向S-eNB发出切换命令(可选地,目标到源透明容器,需要转移的承载(bearer subject to forwarding)(EPS承载-2))消息。需要转移的承载包括被分配用于转移的地址以及TEID的列表。
可选地,如果MME从S-eNB接收到路径切换消息,则MME向S-eNB发出路径切换请求确认消息。路径切换请求确认消息可以包括以下参数及其他可能参数中的任何一个:将在UL中切换的E-RAB(E-RAB ID)、目标到源透明容器(EPC部分和RAN部分)、用于传送的承载(EPS承载-2)。
步骤15:可选地,如果在步骤7中未完成,则S-eNB向T-eNB发出X2-AP切换请求消息(部分-2)以将特定EPS承载(文件下载PDN连接,之后称作EPS承载-2)移动到T-eNB。S-eNB可以在该请求消息中包括以下信息中的任何一个:将建立的承载包括用于用户平面的服务GW地址和上行链路TEID,以及EPS承载QoS。在实施例中,X2-AP消息可以是SN状态传递消息并且与S1-U相关的参数包括在这个消息中。在实施例中,X2-AP消息可以是携带与S1-U相关的参数的新消息,以供T-eNB建立S-GW和T-eNB之间的S1-U。
步骤16:可选地,如果T-eNB接收步骤15消息,则T-eNB在从S-eNB收到切换请求时执行准入控制。T-eNB以X2AP切换请求确认部分-2做出响应。T-eNB可以在部分-1请求消息中包括以下信息中的任何一个:关于被接受的RAB的信息、上行链路和下行链路GTP隧道信息并且经由透明的容器发出的切换命令消息。
步骤17:可选地,如果从MME接收到切换命令EPC部分,则S-eNB组合从MME和T-eNB接收到的HO命令并通过RRC消息(例如,RRC重新配置消息)将其发送到UE。如果S-eNB从T-eNB(从步骤8和/或步骤16)接收与RAN部分相关的信息,则S-eNB向UE发出RRC消息(例如,RRC重新配置消息)。到UE的RRC消息(例如,RRC重新配置消息)包括到UE的T-eNB的RAN有关的信息。
步骤18:UE以切换确认(RRC连接重新配置完成)回应S-eNB。然后UE执行随机访问以从T-eNB获得上行链路定时和资源。因此,UE和S-GW通过T-eNB建立EPS承载-2。
图7示出根据实施例的、在UE和多个eNB之间的同时发送和接收的示例性的UE发起的服务请求方法的流程图。
根据下面阐明的一个实施例,长期演进(LTE)系统能够在多个eNB和UE之间提供同时发送和接收,其中T-eNB不具有与MME的S1-MME接口并且UE也不具有与T-eNB的RRC控制平面信令。在下面阐明的另一个实施例中,S-eNB(作为主eNB或锚eNB)是主控RRC层的eNB,终止S1-MME并且因此用作去往核心网络(CN)的移动性锚。T-eNB(作为小型或者次级或辅助eNB)是提供用于UE的附加的无线电资源的eNB。下面提供的步骤的顺序是根据一个实施例的,并且顺序的变化在本发明的保护范围之内。
步骤1:UE通过S-eNB(服务eNB)执行附着过程并且网络基于UE请求建立缺省EPS承载(PDN连接)。以上过程如在3GPP TS 23.401规范中详述地那样执行。在实施例中,UE在UE能力交换过程期间(例如在UE-RadioAccessCapabilityInfo(UE-无线电访问能力信息)中)向MME指示对于双连接的支持。双连接能力意味着到宏小区和小型小区(例如,微微小区,小型小区)的同时用户平面连接。
步骤2:eNB可以向UE发出RRC消息(例如,测量请求)以执行测量。
步骤3:基于来自S-eNB的请求,或由于测量报告的触发,UE在RRC消息(例如,测量报告)中向S-eNB发出测量报告。
步骤4:UE请求服务并通过S-eNB向MME发出NAS消息:服务请求消息。UE向S-eNB发出在封装在RRC消息中的去往MME的NAS消息服务请求。
步骤5:S-eNB向MME转发NAS消息。NAS消息封装在S1-AP中。初始的UE消息可以包括以下参数中的任何一个:NAS消息(服务请求)、服务小区(S-eNB)的TAI+ECGI,S-TMSI,CSG ID,CSG访问模式。
步骤6:MME选择合适的S-GW并且向S-GW发出GTP:创建会话请求消息。GTP:创建会话请求消息可以包括以下参数中的任何一个:IMSI、MSISDN、用于控制平面的MME TEID、PDN GW地址、PDN地址、APN、RAT类型、缺省EPS承载QoS、PDN类型、APN-AMBR、EPS承载标识、协议配置选项、切换指示、ME标识(IMEISV)、用户位置信息(ECGI)、UE时区、用户CSG信息、MS信息改变报告支持指示、选择模式、充电特性、跟踪参考、跟踪类型、触发Id、OMC标识、最大APN约束、双地址承载标志、S5/S8上的协议类型、服务网络、UE的双连接能力支持。
步骤7:S-GW在它的EPS承载表中创建新条目并且向P-GW发出创建会话请求。P-GW在它的EPS承载上下文表中创建新条目并且返回创建会话响应。然后S-GW向MME返回GTP-C:创建会话响应消息。创建会话响应可以包括以下参数中的任何一个:PDN类型、PDN地址、用于用户平面的服务GW地址、用于S1-U用户平面的服务GW TEID、用于控制平面的服务GW TEID、EPS承载标识、EPS承载QoS、PDN GW地址和TEID(基于GTP的S5/S8)或者在用于上行链路流量的PDN GW处的GRE密钥(基于PMIP1S5/S8)、协议配置选项、禁止有效载荷压缩、APN约束、原因、MS信息改变报告动作(开始)、CSG信息报告动作(开始)、APN-AMBR。
步骤8:MME向S-eNB发出S1-AP初始的上下文建立请求消息。S1-AP初始的上下文建立请求消息可以包括以下参数中的任何一个:服务GW地址、S1-TEID(UL)、EPS承载QoS、安全上下文、MME信令连接ID、切换限制列表、CSG成员指示。MME可以基于以下中的至少一个决定向服务请求提供双连接:UE能力、S-eNB负载条件、请求服务、QoS要求。然后,MME在S1-AP初始的上下文建立请求消息中包括UE能力(其包括UE对于双连接的支持)并且还可以包括指示S-eNB检查可能包括的小型/微微小区的MME指示。
在步骤9中,可选地,如果在步骤8中MME没有包括UE双连接能力或者如果D-eNB需要自己探查,则eNB查询UE的双连接能力。双连接能力意味着到宏小区和小型小区(例如,微微小区)的同时用户平面连接。eNB向UE发出RRC请求消息,其包括用于指示eNB需要UE支持的双连接能力信息的参数。在实施例中,例如,作为UECapabilityEnquiry(UE能力查询)消息的RRC请求消息包括系统间PDN处理能力参数。
UE向eNB发出指示双能力的响应消息。UE向eNB发出包括UE支持的双连接能力的RRC响应消息。在实施例中,RRC响应消息是UECapabilityInformation(UE能力信息)消息。
在步骤10中,基于由S-eNB接收到的和/或在RRM过程中努力获得(bid)的测量报告,S-eNB执行小区卸载评估以确定是否添加另一eNB(T-eNB)。可选地,eNB可以执行步骤2并且从UE接收测量报告,如步骤3中提到的。如果S-eNB决定添加另一eNB(以下称作T-eNB),则执行以下步骤。在本发明中,eNB基于以下中的至少一个提供关于其他eNB的卸载/添加的偏好:从UE接收到的测量报告、执行双连接的MME指示、获得的UE能力、RRM过程以及它的负载和小型小区负载等等。
步骤11:S-eNB可选地向T-eNB发出X2-AP消息(例如,资源请求消息),以检查T-eNB中的资源的可用性,并且将特定EPS承载(例如,文件下载PDN连接,之后称作EPS承载-2)移动到T-eNB。S-eNB可以在请求消息中包括以下信息中的任何一个:PDN连接的无线电承载信息、请求的QoS值、分配的QoS值、UE标识信息、RRM信息。可替换地,S-eNB在新的(双连接)X2-AP消息中包括以上参数中的任何一个。
步骤12:T-eNB发出提供其资源的当前状态的RRC响应消息。
步骤13:S-eNB向T-eNB发出X2-AP切换请求消息以将EPS承载(具体地,E-RAB)移动到T-eNB。S-eNB可以在请求消息中包括以下信息中的任何一个:(T-eNB的)目标小区的E-UTRAN小区全局标识符(ECGI)、UE聚集最大比特率(AMBR)、UE安全能力、UE的AS安全上下文(KeNB*)、将建立的EUTRAN无线电访问承载(E-RAB)(E-RAB ID、QoS等级标识(QCI)、分配和保留优先级(ARP)、S1S-GW TEID)、接收到的S1-AP初始的上下文建立请求消息信息。在实施例中,X2-AP消息可以是用于T-eNB添加的次级小区命令。
步骤14:T-eNB在收到来自S-eNB的切换请求时执行准入控制。此外,在实施例中,基于来自S-eNB的关于双连接的请求,T-eNB创建DL S1-UTEID并且在X2-AP消息中包括响应消息。T-eNB以X2AP切换请求确认做出响应。T-eNB可以在请求消息中包括以下信息中的任何一个:关于接受的RAB的信息、上行链路和下行链路GTP隧道信息、切换命令(T-eNB分配的C-RNTI,T-eNB分配的DRB ID(UL/DL),T-eNB AS安全算法)以及将在DL中切换的EUTRAN无线电访问承载(E-RAB)(E-RAB ID、S1目标eNB TEID)。
在实施例中,对于双连接,X2接口用于通过S-eNB携带用于T-eNB和S-GW之间的S1-U承载建立的S1-U隧道参数。T-eNB创建DL S1-U TEID并且将它包括在X2-AP消息中,所以S-GW得到T-eNB的S1-U TE-ID并且与T-eNB建立下行链路(DL)S1-U承载。
步骤15:基于接收到的RRC响应消息(切换请求确认),S-eNB可以作出将EPS承载切换/卸载到T-eNB的决定。如果S-eNB决定执行EPS承载的部分卸载(eNB间载波聚合),则S-eNB向移动性管理实体(MME)发出S1-AP初始的上下文建立完成消息。S1-AP初始的上下文建立完成消息可以包括以下参数中的任何一个:直接转移路径可用性、从T-eNB接收到的源到目标透明容器(切换命令(T-eNB分配的C-RNTI、T-eNB分配的DRB ID(UL/DL)、T-eNB AS安全算法)),目标演进节点B标识、CSG ID、CSG访问模式、目标TAI,S1AP原因、接收到的将在DL中切换的E-RAB(E-RAB ID、S1T-eNBTEID(DL))、T-eNB的ECGI。S1AP原因指示它是双连接并且MME需要与T-eNB建立双连接。换句话说,S1AP原因指示T-eNB是将连同当前的服务S-eNB一起服务于UE的附加的eNB。
可选地,代替S1-AP初始的上下文建立完成消息,S-eNB代表T-eNB向移动性管理实体(MME)发出S1-AP路径切换请求消息。可替换地,S1-AP路径切换请求消息是利用S1-AP初始的上下文建立完成消息来挑选式封装的(picky-packed)。S1-AP路径切换请求消息可以包括以下参数中的任何一个:直接转发路径可用性,从T-eNB接收到的源到目标透明容器容器(切换命令(T-eNB分配的C-RNTI,T-eNB分配的DRB ID(UL/DL),T-eNB AS安全算法)),目标演进节点B标识,CSG ID,CSG访问模式,目标TAI,S1AP原因,接收到的将在DL中切换的E-RAB(E-RAB ID、S1目标eNB TEID),T-eNB的ECGI。S1AP原因(例如,无线网络层原因“双连接”)指示它是双连接并且MME需要与T-eNB建立双连接。换句话说,S1AP原因指示T-eNB是将连同当前的服务S-eNB一起服务于UE的附加的eNB。在实施例中,关于S1-AP请求消息是用于双连接的指示,可以使用新的参数来指示,并且它被包括在S1-AP请求消息中。
S-eNB连同MME一起执行承载建立功能。当S-eNB准备T-eNB时,它使用X2接口从T-eNB获得用于S1-U承载/隧道建立的必要的参数,并且使用S1-MME接口向MME发出获得的参数,以使得S-GW与T-eNB建立下行链路(DL)S1-U承载。
在实施例中,S-eNB在与双连接相关的所有RRC过程成功之后执行到T-eNB的承载路径切换。
步骤16:MME可以基于订阅、服务、服务质量(QoS)或任一其他考虑决定用于每个UE的最终活动集。MME经由按照每个eNB同时建立一个或多个EPS承载的两个或更多eNB启动和建立用于UE的同时数据发送和接收的双连接。MME基于UE能力和订阅来授权双连接(如果未在步骤8中执行)。可替换地,MME基于用于支持双连接和部分卸载/切换的网络能力来授权双连接。在一些实施例中,UE在NAS消息中包括双连接指示符,以便向MME指示该请求是针对双连接的,并且同时保持先前的上下文和连接。
步骤17:MME向S-GW发出GTP-C:修改承载请求,以将路径切换到T-eNB。修改承载请求可以包括以下参数中的任何一个:T-eNB地址,在T-eNB分配的用于在接受的EPS承载上的S1-U接口上的下行链路流量的TEID、T-eNB ECGI、TAI。
步骤18:SGW更新承载并且以GTP-C:修改承载响应消息做出响应。修改承载请求可以包括以下参数中的任何一个:EPS承载ID。SGW和T-eNB之间的DL S1承载在这个步骤中建立。SGW开始向T-eNB发出EPS承载-2的DL分组。
可选地,如果MME从S-eNB接收路径切换消息,则MME向S-eNB发出路径切换请求确认消息。路径切换请求确认消息可以包括以下参数及其他可能参数中的任何一个:将在UL中切换的E-RAB(E-RAB ID)、目标到源透明容器(EPC部分和RAN部分),需要转移的承载(EPS承载-2)。
步骤19:S-eNB执行无线电承载建立过程。使用RRC消息执行无线电承载建立过程。RRC信息交换是:RRC连接重新配置和RRC连接重新配置完成。RRC连接重新配置消息可以包括以下配置中的任何一个:测量配置、移动性控制、包括任一关联的专用NAS信息和安全配置的无线电资源配置(包括RB,MAC主配置和物理信道配置)、T-eNB无线电配置。然后UE执行随机访问以从T-eNB获得上行链路定时和资源。因此,在这个步骤中建立通过T-eNB的用于服务请求的用户平面承载。
步骤20:可选地,代替步骤19,然后S-eNB通过RRC消息向UE发出HO命令(例如,RRC重新配置消息)。
步骤21:UE以切换确认(RRC连接重新配置完成)回应S-eNB。然后UE执行随机访问以从T-eNB获得上行链路定时和资源。因此,在这个步骤中,UE和S-GW通过T-eNB建立EPS承载-2。
图8示出根据本发明的实施例的、用于在多个演进节点B(eNB)和用户设备(UE)之间提供同时连接的方法的流程图。在步骤801中,通过演进节点B(S-eNB)在用户设备(UE)和核心网络之间建立第一连接。在步骤802中,一个或多个附加的演进节点B(T-eNB)被考虑用于用户设备(UE)和分组数据网络(PDN)之间的至少一个或多个连接。在步骤803中,确定至少一个目标演进节点B(T-eNB)的可用性,所述确定是以服务eNB和目标eNB中的可用资源为基础来触发的。在步骤804中,由S-eNB通过一个或多个演进节点B(T-eNB)、至少一个服务网关和至少一个分组数据网络(PDN)网关在用户设备(UE)和分组数据网络(PDN)之间建立一个或多个连接。
图9示出根据本发明的另一实施例的、用于在多个演进节点B(eNB)和用户设备(UE)之间提供同时连接的方法的流程图。在步骤901中,通过服务演进节点B(S-eNB)在用户设备(UE)和核心网络之间建立第一连接。在步骤902中,测量请求被发送给用户设备(UE)以获得测量报告。在步骤903中,测量报告被提供给服务演进节点B(S-eNB)。在步骤904中,服务请求消息通过服务演进节点B被发送给移动性管理实体(MME)。在步骤905中由S-eNB通过至少一个目标节点(T-eNB)、至少一个服务网关、至少一个分组数据网络(PDN)网关在用户设备(UE)和PDN之间建立双连接。
虽然已经连同附图中示出的本发明的实施例描述了本发明的方法和系统,但是它不局限于此。对本领域技术人员很明显地是,可以对其做出多种替换、修改和改变而不脱离本发明的明显宽的精神和范围。
Claims (29)
1.一种用于在多个演进节点B(eNB)和用户设备(UE)之间提供同时连接的方法,所述方法包括:
通过演进节点B(S-eNB)在用户设备(UE)和核心网络之间建立第一连接;
考虑将至少一个另一演进节点B(T-eNB)用于用户设备(UE)和分组数据网络(PDN)之间的至少一个连接;
确定至少一个目标演进节点B(T-eNB)的可用性,所述确定以服务eNB和目标eNB中的可用资源为基础被触发;以及
通过一个或多个演进节点B(T-eNB)、至少一个服务网关以及至少一个分组数据网络(PDN)网关建立用户设备(UE)和分组数据网络(PDN)之间的至少一个连接。
2.如权利要求1所述的方法,还包括:
向用户设备(UE)发出测量请求消息,所述测量请求消息由服务演进节点B(S-eNB)发出;以及
在服务演进节点B(S-eNB)处从用户设备(UE)接收测量报告。
3.如权利要求1所述的方法,其中所述确定至少一个目标演进节点B(T-eNB)的可用性包括:
向目标演进节点B(T-eNB)发出资源请求消息(X2应用协议(X2-AP))以获得资源的可用性;
在服务演进节点B(S-eNB)处接收资源状态消息;
向目标演进节点B(T-eNB)发出请求消息;以及
在从服务演进节点B(S-eNB)收到请求消息时,在目标演进节点B(T-eNB)处执行准入控制。
4.如权利要求3所述的方法,其中到目标演进节点(T-eNB)的所述请求消息包括用于用户平面的服务网关(S-GW)地址和上行链路隧道端点标识符(TEID),以及EPS承载服务质量(QoS)。
5.如权利要求3所述的方法,其中所述执行准入控制包括关于被接受的RAB的信息以及上行链路和下行链路GTP隧道信息中的至少一个。
6.如权利要求3所述的方法,其中所述资源请求消息包括分组数据网络(PDN)连接的无线电承载信息、请求的服务质量(QoS)值、用户设备(UE)标识信息中的至少一个。
7.如权利要求3所述的方法,其中所述请求消息包括以下各项中的至少一个:(T-eNB的)目标小区的E-UTRAN小区全局标识符(ECGI)、UE聚集最大比特率(AMBR)、UE安全能力、AS安全上下文、将建立的EUTRAN无线电访问承载(E-RAB)(E-RAB ID、QoS等级标识(QCI),分配和保留优先级(ARP)、S1S-GW TEID)。
8.如权利要求3所述的方法,其中所述X2接口被用于携带用于目标演进节点(T-eNB)和服务网关(S-GW)之间的S1-U承载建立的下行链路(DL)S1-U隧道参数,
所述目标演进节点(T-eNB)创建DL S1-U TEID,并且将其包括在X2-AP消息中,以便服务网关(S-GW)通过服务演进节点(S-eNB)和移动性管理实体(MME)接收目标演进节点(T-eNB)的S1-U细节。
9.如权利要求3所述的方法,其中所述服务演进节点B(S-eNB)被配置为执行以下功能,所述功能包括:
连同移动性管理实体(MME)一起执行承载建立功能;
准备目标演进节点(T-eNB)以用于从目标演进节点(T-eNB)获得用于下行链路(DL)S1-U承载/隧道建立的必要的参数;以及
通过S1-AP消息向移动性管理实体(MME)发出获得的参数,以便服务网关(S-GW)与目标演进节点(T-eNB)建立下行链路(DL)S1-U承载。
10.如权利要求1所述的方法,还包括:
以接收到的测量报告、载荷条件、承载类型为基础确定用于将至少一个连接切换到目标演进节点B的条件;以及
一旦服务演进节点B决定继续进行双连接就向移动性管理实体(MME)发出S1应用协议(S1-AP)消息,所述S1-AP消息是要求切换消息、路径切换消息、双连接请求消息中的任何一个。
11.如权利要求10所述的方法,其中所述S1-AP消息包括如下各项中的至少一个:直接转发路径可用性、从目标演进节点B(T-eNB)接收到的源到目标透明容器、目标演进节点B标识、闭合用户群(CSG)ID、CSG访问模式、目标跟踪区域标识(TAI)、S1AP原因、接收到的将在DL中切换的E-RAB、T-eNB的ECGI。
12.如权利要求1所述的方法,还包括:
在通过两个或更多演进节点B建立用于同时数据发送和接收的双连接之前确定用户设备的诸如订阅、服务、服务质量(QOS)的能力。
13.如权利要求1所述的方法,还包括:
确定网络的用于支持双连接和部分切换的能力。
14.如权利要求1所述的方法,还包括:
由UE在非接入层(NAS)消息中向移动性管理实体(MME)提供用于指示双连接的指示符。
15.如权利要求1所述的方法,其中所述建立至少一个连接包括:
向服务网关发出修改承载请求;
在服务网关上更新修改的承载请求;
向移动性管理实体(MME)提供修改的承载响应消息;以及
在服务网关和目标演进节点B之间建立连接。
16.如权利要求15所述的方法,还包括:
由S-eNB发起S1-AP过程以向MME通知新的隧道端点(T-eNB)以使能双连接,所述S1-AP过程是切换信令消息和新的S1-AP信令消息中的至少一个,
在移动性管理实体(MME)处从服务演进节点B(S-eNB)接收路径切换请求消息以用于与T-eNB建立双连接,所述路径切换请求消息包括关于T-eNB的信息和在E-RAB建立过程期间从T-eNB接收到的承载建立相关参数;
由移动性管理实体(MME)向服务演进节点B(S-eNB)发出路径切换请求确认消息;以及
利用移动性管理过程执行S-eNB的会话建立过程以使能双连接。
17.如权利要求1所述的方法,其中所述建立至少一个连接包括:
由服务演进节点B(S-eNB)向目标演进节点B提供AS安全上下文。
18.一种用于在多个演进节点B(eNB)和用户设备(UE)之间提供同时连接的方法,所述方法包括:
通过服务演进节点B(S-eNB)在用户设备(UE)和核心网络之间建立第一连接;
向用户设备(UE)发出测量请求以获得测量报告;
向服务演进节点B(S-eNB)提供测量报告;
通过服务演进节点B向移动性管理实体(MME)发出服务请求消息;以及
通过至少一个目标节点(T-eNB)、至少一个服务网关、至少一个分组数据网络(PDN)网关建立用户设备(UE)和PDN之间的双连接。
19.如权利要求18所述的方法,还包括:
向所选择的服务网关(S-GW)发出创建会话请求消息,所述服务网关是基于定义的参数被选择的;
处理会话请求消息以在EPS承载表中创建新条目;
在移动性管理实体(MME)处接收确认,所述确认包括创建会话响应;以及
向服务演进节点B发出用于建立双连接的建立请求消息。
20.如权利要求18所述的方法,还包括:评价用户设备的用于使能双连接的能力。
21.如权利要求18所述的方法,还包括:
向目标演进节点B(T-eNB)发出X2-AP(资源请求)消息以检查资源的可用性,所述资源请求消息由服务演进节点B(S-eNB)发出;以及
在服务演进节点B(S-eNB)处接收资源状态消息,所述资源状态消息由目标演进节点B(T-eNB)生成。
22.如权利要求18所述的方法,还包括:
向目标演进节点B发出X2-AP消息以将EPS承载移动到目标演进节点B(T-eNB),所述X2-AP消息由服务演进节点B(S-eNB)发出并且是如下各项中的任何一个:切换请求、新的小型小区包括/添加过程;以及
在从服务演进节点B(S-eNB)收到X2-AP请求消息时,在目标演进节点B(T-eNB)处执行准入控制。
23.如权利要求18所述的方法,其中所述测量报告包括用户设备支持双连接的指示。
24.如权利要求21所述的方法,还包括:
以如下各项中的至少一个为基础确定用于使能到目标演进节点B的至少一个连接的双连接的条件:在服务演进节点B(S-eNB)处接收到的测量报告、载荷条件和服务请求(承载类型);以及
一旦服务演进节点B决定继续进行双连接就向移动性管理实体(MME)发出S1-AP消息。
25.如权利要求23所述的方法,还包括:
向移动性管理实体(MME)发出路径切换请求消息,所述请求消息由服务演进节点B(S-eNB)代表目标演进节点B(T-eNB)发出以指示到移动性管理实体(MME)的双连接。
26.如权利要求18所述的方法,还包括:
在通过两个或更多演进节点B建立用于同时数据发送和接收的双连接之前确定用户设备的诸如订阅、服务、服务质量(QOS)的能力。
27.如权利要求18所述的方法,其中所述建立双连接包括:
向服务网关发出修改承载请求;
在服务网关上更新修改的承载请求;
向移动性管理实体(MME)提供修改的承载响应消息;
在服务网关和目标演进节点B之间建立连接;以及
向服务演进节点B(S-eNB)发出响应。
28.一种用于在多个演进节点(eNB)和用户设备(UE)之间提供同时连接的系统,所述方法包括:
用于通过一个或多个目标节点(T-eNB)、至少一个服务网关(S-GW)和至少一个分组数据网络(PDN)网关在用户设备(UE)和分组数据网络(PDN)之间建立至少一个连接的装置。
29.一种用于在多个演进节点B(eNB)和用户设备(UE)之间提供同时连接的系统,所述方法包括:
用于在向移动性管理实体(MME)发出S1-AP消息时通过包括目标演进节点B(T-eNB)相关信息由服务演进节点B(S-eNB)使能双连接的装置;以及
用于通过至少一个目标节点(T-eNB)、至少一个服务网关、至少一个分组数据网络(PDN)网关在用户设备(UE)和分组数据网络(PDN)建立双连接的装置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910182037.3A CN110087272B (zh) | 2013-02-22 | 2014-02-18 | 在多个e节点b和用户设备间提供同时连接的方法和系统 |
Applications Claiming Priority (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
IN796CH2013 | 2013-02-22 | ||
IN5047CH2013 | 2013-11-08 | ||
IN5047/CHE/2013 | 2013-11-08 | ||
IN796/CHE/2013 | 2014-02-06 | ||
PCT/KR2014/001300 WO2014129783A1 (en) | 2013-02-22 | 2014-02-18 | Method and system for providing simultaneous connectivity between multiple e-nodebs and user equipment |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910182037.3A Division CN110087272B (zh) | 2013-02-22 | 2014-02-18 | 在多个e节点b和用户设备间提供同时连接的方法和系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105009678A true CN105009678A (zh) | 2015-10-28 |
CN105009678B CN105009678B (zh) | 2019-04-05 |
Family
ID=51388073
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201480010056.3A Active CN105009678B (zh) | 2013-02-22 | 2014-02-18 | 用于在多个e节点b和用户设备之间提供同时连接的方法和系统 |
CN201910182037.3A Active CN110087272B (zh) | 2013-02-22 | 2014-02-18 | 在多个e节点b和用户设备间提供同时连接的方法和系统 |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910182037.3A Active CN110087272B (zh) | 2013-02-22 | 2014-02-18 | 在多个e节点b和用户设备间提供同时连接的方法和系统 |
Country Status (6)
Country | Link |
---|---|
US (1) | US9693381B2 (zh) |
EP (2) | EP3809758A1 (zh) |
KR (1) | KR102206431B1 (zh) |
CN (2) | CN105009678B (zh) |
AU (1) | AU2014219562B2 (zh) |
WO (1) | WO2014129783A1 (zh) |
Cited By (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106535234A (zh) * | 2016-12-31 | 2017-03-22 | 中国移动通信集团江苏有限公司 | 测量报告与用户关联和上网问题的定位方法和装置 |
CN106686751A (zh) * | 2015-11-10 | 2017-05-17 | 中兴通讯股份有限公司 | 一种无线承载的配置方法及装置 |
CN108282827A (zh) * | 2017-01-06 | 2018-07-13 | 北京三星通信技术研究有限公司 | 用于网络间互操作的方法、节点及设备 |
CN109151940A (zh) * | 2017-06-16 | 2019-01-04 | 华为技术有限公司 | 一种基于dc的切换方法及设备 |
CN109196898A (zh) * | 2016-04-01 | 2019-01-11 | Idac控股公司 | 服务切片的选择和分离方法 |
CN109196835A (zh) * | 2016-05-12 | 2019-01-11 | Sk电信有限公司 | 用于异构网络环境下提供下一代网络服务的方法和设备 |
CN109219971A (zh) * | 2016-05-23 | 2019-01-15 | 日本电气株式会社 | 通信系统 |
CN109417705A (zh) * | 2016-08-11 | 2019-03-01 | 捷开通讯(深圳)有限公司 | Lte wlan聚合的安全性增强 |
WO2019105056A1 (en) * | 2017-11-30 | 2019-06-06 | Guangdong Oppo Mobile Telecommunications Corp., Ltd. | Method and apparatus for system information |
CN109937590A (zh) * | 2016-11-09 | 2019-06-25 | Lg电子株式会社 | 切换方法和用户设备 |
CN110050481A (zh) * | 2016-12-12 | 2019-07-23 | 三星电子株式会社 | 控制无线通信系统中的数据流的设备和方法 |
CN110351889A (zh) * | 2018-04-03 | 2019-10-18 | 维沃移动通信有限公司 | 一种连接建立方法和设备 |
CN110352625A (zh) * | 2016-05-17 | 2019-10-18 | 诺基亚技术有限公司 | Lte与5g节点之间的路径切换方法 |
CN110651497A (zh) * | 2017-03-23 | 2020-01-03 | 瑞典爱立信有限公司 | 用于系统间切换的技术 |
CN110771204A (zh) * | 2017-06-23 | 2020-02-07 | 英国电讯有限公司 | 语音服务切换 |
CN111345074A (zh) * | 2017-11-17 | 2020-06-26 | 瑞典爱立信有限公司 | 与ue非活动有关的方法、装置和系统 |
CN111417110A (zh) * | 2019-01-04 | 2020-07-14 | 大唐移动通信设备有限公司 | 一种基于nsa的小区配置方法及装置 |
WO2021017755A1 (zh) * | 2019-08-01 | 2021-02-04 | 维沃移动通信有限公司 | 数据发送方法及用户设备 |
US20210105734A1 (en) * | 2017-01-06 | 2021-04-08 | Samsung Electronics Co., Ltd. | Method and apparatus for data transport control between wireless network systems |
CN112655245A (zh) * | 2018-09-19 | 2021-04-13 | Oppo广东移动通信有限公司 | 一种数据传输方法、设备及存储介质 |
CN113163515A (zh) * | 2018-04-04 | 2021-07-23 | 中兴通讯股份有限公司 | 用于在无线电网络中交换消息的方法和系统 |
CN113170521A (zh) * | 2018-11-27 | 2021-07-23 | 三星电子株式会社 | 用于管理承载的电子装置以及其操作方法 |
Families Citing this family (85)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3512297A1 (en) | 2013-02-22 | 2019-07-17 | HTC Corporation | Method for simultaneous communication device with multiple base stations and related communication device |
US9386619B2 (en) * | 2013-02-22 | 2016-07-05 | Htc Corporation | Method of handling a cell addition for dual connectivity and related communication device |
US9713142B2 (en) * | 2013-07-14 | 2017-07-18 | Lg Electronics Inc. | Method and apparatus for managing data radio bearers for dual connectivity in wireless communication system |
EP3154307B1 (en) | 2013-08-09 | 2018-04-11 | HTC Corporation | Method and device for radio network temporary identifier allocation in dual connectivity |
EP3787363B1 (en) * | 2013-10-31 | 2024-02-07 | NEC Corporation | Radio communication system, base station apparatus, and radio terminal |
JP2017502571A (ja) * | 2014-03-06 | 2017-01-19 | 日本電気株式会社 | モバイル通信システム、基地局、及びそれらの方法 |
US9565567B2 (en) * | 2014-03-14 | 2017-02-07 | Nokia Technologies Oy | Method and apparatus to coordinate simultaneous transmission in overlapping wireless networks |
WO2015136122A1 (en) * | 2014-03-14 | 2015-09-17 | Nec Europe Ltd. | Method, user equipment, master evolved node b and communication system for dual connectivity |
KR20190107170A (ko) * | 2014-03-28 | 2019-09-18 | 후지쯔 가부시끼가이샤 | 베어러 관리 장치, 방법 및 통신 시스템 |
US20150289224A1 (en) * | 2014-04-03 | 2015-10-08 | Samsung Electronics Co., Ltd. | METHOD AND SYSTEM TO IMPROVE REGISTRATION FOR VoLTE DEVICES IN LTE NETWORKS |
US20170034709A1 (en) * | 2014-04-09 | 2017-02-02 | Ntt Docomo, Inc. | Measurement control method and base station |
JP6303743B2 (ja) * | 2014-04-10 | 2018-04-04 | 富士通株式会社 | 無線基地局 |
US10141983B2 (en) * | 2014-05-08 | 2018-11-27 | Samsung Electronics Co., Ltd. | Method for activating pSCell and SCell in mobile communication system supporting dual connectivity |
EP3141016A1 (en) * | 2014-05-08 | 2017-03-15 | Telefonaktiebolaget LM Ericsson (publ) | Triggering performance level re-configuration in radio base stations |
JP6434055B2 (ja) * | 2014-06-11 | 2018-12-05 | コンヴィーダ ワイヤレス, エルエルシー | ローカルコンテンツリダイレクトのためのマッピングサービス |
US9590962B2 (en) * | 2014-07-07 | 2017-03-07 | Alcatel-Lucent Usa Inc. | Using cookies to identify security contexts for connectionless service |
US10142965B2 (en) * | 2014-08-01 | 2018-11-27 | Alcatel Lucent | Methods and devices for providing application services to users in communications network |
US10142799B2 (en) | 2014-08-19 | 2018-11-27 | Qualcomm Incorporated | Multicasting traffic using multi-connectivity |
JP2017528993A (ja) * | 2014-09-19 | 2017-09-28 | 日本電気株式会社 | デュアルコネクティビティ(dual connectivity)のための装置 |
CN105517043A (zh) * | 2014-09-26 | 2016-04-20 | 中兴通讯股份有限公司 | 终端能力的上报、获取方法及装置 |
WO2016050261A1 (en) * | 2014-09-29 | 2016-04-07 | Nokia Solutions And Networks Oy | Local breakout in small cell architecture |
EP3205172A4 (en) * | 2014-10-08 | 2018-05-16 | LG Electronics Inc. | Method and apparatus for handling duplicated e-rabs for dual connectivity in wireless communication system |
US10244580B2 (en) | 2014-10-16 | 2019-03-26 | Nokia Of America Corporation | Methods and devices for providing application services to users in communications network |
WO2016064215A1 (en) * | 2014-10-22 | 2016-04-28 | Lg Electronics Inc. | Method and apparatus for optimizing ue-ambr for dual connectivity in wireless communication system |
CN110167142B (zh) * | 2014-10-23 | 2020-12-25 | 华为技术有限公司 | 无线资源控制rrc连接方法、重连接方法和装置 |
EP3210429A1 (en) * | 2014-10-23 | 2017-08-30 | Nokia Solutions and Networks Oy | Tracking area update enhancement in dual connectivity |
US10104705B2 (en) * | 2014-11-05 | 2018-10-16 | Intel IP Corporation | Apparatus, system and method of communicating between a cellular manager and a user equipment (UE) via a WLAN access device |
EP3222072B1 (en) * | 2014-11-17 | 2022-04-20 | Nokia Solutions and Networks Oy | Capability signaling for dual connectivity |
US10772021B2 (en) * | 2014-12-05 | 2020-09-08 | Qualcomm Incorporated | Low latency and/or enhanced component carrier discovery for services and handover |
WO2016095115A1 (en) * | 2014-12-17 | 2016-06-23 | Qualcomm Incorporated | Handover using dual active connections |
CN105848222B (zh) * | 2015-01-16 | 2021-05-28 | 北京三星通信技术研究有限公司 | 用于切换的方法和基站设备 |
WO2016117505A1 (ja) * | 2015-01-20 | 2016-07-28 | シャープ株式会社 | 基地局装置、端末装置、及び通信制御方法 |
WO2016117491A1 (ja) * | 2015-01-20 | 2016-07-28 | シャープ株式会社 | 基地局装置、端末装置、及び通信制御方法 |
CN105873133B (zh) * | 2015-01-23 | 2021-10-29 | 北京三星通信技术研究有限公司 | 双连接架构下支持业务本地分流的方法及设备 |
WO2016126238A1 (en) * | 2015-02-03 | 2016-08-11 | Nokia Solutions And Networks Oy | Improvements in dual connectivity for different access networks |
KR102306823B1 (ko) * | 2015-03-11 | 2021-09-29 | 삼성전자 주식회사 | 무선 통신 시스템에서 면허 도움 접속 기술 활용 시 기지국의 데이터 스케쥴링을 위한 장치 및 방법 |
CN107211473B (zh) * | 2015-03-31 | 2021-01-29 | 华为技术有限公司 | 通信方法、用户设备和基站 |
US10575360B2 (en) | 2015-04-03 | 2020-02-25 | Samsung Electronics Co., Ltd. | Apparatus and method for providing multi-connection using different wireless connection technologies in wireless communication system |
WO2016163032A1 (ja) * | 2015-04-10 | 2016-10-13 | 富士通株式会社 | 無線通信システム、基地局、移動局および処理方法 |
US9730120B2 (en) * | 2015-06-01 | 2017-08-08 | Intel Corporation | Handover using group evolved packet system (EPS) bearers |
CN106658492A (zh) * | 2015-07-23 | 2017-05-10 | 中兴通讯股份有限公司 | 密钥更新方法及装置 |
US10349329B2 (en) * | 2015-07-28 | 2019-07-09 | Qualcomm Incorporated | Mechanisms for differentiated treatment of offloaded traffic |
CN107925905B (zh) * | 2015-08-19 | 2021-09-28 | 三星电子株式会社 | 用于处理向wlan载波卸载drb的方法和无线通信系统 |
US10652786B2 (en) * | 2015-10-06 | 2020-05-12 | Apple Inc. | Dual radio operation between access systems using 3GPP radio access technology |
WO2017078794A1 (en) * | 2015-11-06 | 2017-05-11 | Intel IP Corporation | Solution for proxy-call session control function |
CN108353295A (zh) * | 2015-11-28 | 2018-07-31 | 华为技术有限公司 | 一种s1消息的传输方法和中间设备 |
US20170171752A1 (en) * | 2015-12-14 | 2017-06-15 | Qualcomm Incorporated | Securing signaling interface between radio access network and a service management entity to support service slicing |
US10433238B2 (en) | 2015-12-23 | 2019-10-01 | Telefonaktiebolaget Lm Ericsson (Publ) | Traffic characteristic indication for connection establishment control |
EP3393159B1 (en) | 2016-01-05 | 2020-09-30 | Huawei Technologies Co., Ltd. | Avoiding a man-in-the-middle attack on an attach request message |
US10278100B1 (en) * | 2016-03-16 | 2019-04-30 | Sprint Communications Company L.P. | Long term evolution (LTE) mobility management entity (MME) management of an internet protocol multimedia subsystem (IMS) media session service level for a user equipment (UE) |
US20190141769A1 (en) * | 2016-05-10 | 2019-05-09 | Huawei Technologies Co., Ltd. | Data Transmission Method and Device |
MX2018014508A (es) * | 2016-05-26 | 2019-05-23 | Nec Corp | Sistema de comunicacion, dispositivo de control, terminal de comunicacion, dispositivo de comunicacion y metodo de comunicacion. |
US10772144B2 (en) | 2016-06-28 | 2020-09-08 | Nokia Technologies Oy | Switching of flow separation for new radio in dual connectivity |
US9756597B1 (en) | 2016-07-27 | 2017-09-05 | Sprint Communications Company L.P. | User equipment (UE) attachment to multiple mobility management entities (MMES) for multiple data services |
US10582523B2 (en) * | 2016-08-13 | 2020-03-03 | Qualcomm Incorporated | Method and apparatus for secondary base station mobility |
DE112017004736T5 (de) * | 2016-09-21 | 2019-06-19 | Mavenir Systems, Inc. | Verfahren und System zur Sitzungs-Belastbarkeit in Paket-Gateways |
MX2019003307A (es) * | 2016-09-28 | 2019-09-09 | Sharp Kk | Equipo de usuario, estaciones base y metodos. |
KR102325344B1 (ko) | 2016-09-30 | 2021-11-12 | 삼성전자주식회사 | 신규 무선 통신 아키텍쳐에서 듀얼-커넥티비티를 성립하여 데이터를 송신하는 방법 및 장치 |
WO2018062949A1 (en) * | 2016-09-30 | 2018-04-05 | Samsung Electronics Co., Ltd. | Method and apparatus for establishing dual-connectivity to transmit data in new radio communication architecture |
EP3529935B1 (en) * | 2016-10-18 | 2022-02-23 | Telefonaktiebolaget LM Ericsson (publ) | Determining module and method performed therein for handling dual connectivity in a communication network |
WO2018083369A1 (en) * | 2016-11-02 | 2018-05-11 | Nokia Technologies Oy | Enhanced reactivation for light connection |
US10462837B2 (en) * | 2016-11-04 | 2019-10-29 | Qualcomm Incorporated | Method, apparatus, and system for reestablishing radio communication links due to radio link failure |
US10797731B2 (en) * | 2017-03-10 | 2020-10-06 | Microsoft Technology Licensing, Llc | Software defined radio for auxiliary receiver |
EP3923615B1 (en) * | 2017-05-04 | 2023-08-16 | Huawei Technologies Co., Ltd. | Key obtaining method and device, and communications system |
CN110771191B (zh) * | 2017-06-23 | 2023-07-04 | 摩托罗拉移动有限责任公司 | 用于实现承载特定改变的方法和装置 |
EP3691317A4 (en) * | 2017-09-27 | 2021-06-02 | Nec Corporation | COMMUNICATION TERMINAL, CENTRAL NETWORK DEVICE, CENTRAL NETWORK NODE, NETWORK NODE AND KEY BYPASS PROCESS |
KR102352156B1 (ko) * | 2017-10-26 | 2022-01-17 | 삼성전자주식회사 | Arp를 수행하는 슬레이브 장치 및 이의 동작 방법 |
CN109819483B (zh) * | 2017-11-21 | 2020-09-11 | 电信科学技术研究院 | 专用承载创建方法、移动性管理实体及分组数据网络网关 |
US11382004B2 (en) * | 2018-01-19 | 2022-07-05 | Sony Corporation | Method and apparatus for handoff of multiple bearers with differing quality of service levels in a wireless communication system |
CN110099417B (zh) * | 2018-01-30 | 2021-07-23 | 中国移动通信有限公司研究院 | 切换方法、信息交互方法、设备及计算机可读存储介质 |
WO2019190372A1 (en) | 2018-03-29 | 2019-10-03 | Telefonaktiebolaget Lm Ericsson (Publ) | Slicing of network resources for dual connectivity using nr |
US11540280B2 (en) | 2018-05-11 | 2022-12-27 | Lg Electronics Inc. | Method for transmitting and receiving signal by terminal supporting dual connectivity between E-UTRA and NR and terminal for performing same method |
CN111108774B (zh) | 2018-08-28 | 2023-02-21 | 苹果公司 | 蜂窝通信的移动性增强 |
US10827395B2 (en) * | 2018-09-18 | 2020-11-03 | Cisco Technology, Inc. | Methods and apparatus for selecting a serving gateway for a session of a user equipment (UE) in a mobile network having 5G non-standalone (NSA) architecture deployments |
EP3821644A4 (en) * | 2018-09-27 | 2021-11-10 | Apple Inc. | PDCP AND ROHC HANDLING FOR MULTICONNECTIVITY HANDOVER |
FR3088792A1 (fr) * | 2018-11-19 | 2020-05-22 | Orange | Gestion de transfert intercellulaire sans latence pour terminal mobile à attachement multiple |
US12089096B2 (en) * | 2019-04-04 | 2024-09-10 | Apple Inc. | User equipment capability for dual connectivity based handover |
US11444980B2 (en) | 2020-04-15 | 2022-09-13 | T-Mobile Usa, Inc. | On-demand wireless device centric security for a 5G wireless network |
US11824881B2 (en) | 2020-04-15 | 2023-11-21 | T-Mobile Usa, Inc. | On-demand security layer for a 5G wireless network |
US11799878B2 (en) | 2020-04-15 | 2023-10-24 | T-Mobile Usa, Inc. | On-demand software-defined security service orchestration for a 5G wireless network |
US11070982B1 (en) | 2020-04-15 | 2021-07-20 | T-Mobile Usa, Inc. | Self-cleaning function for a network access node of a network |
US11206542B2 (en) | 2020-05-14 | 2021-12-21 | T-Mobile Usa, Inc. | 5G cybersecurity protection system using personalized signatures |
US11115824B1 (en) | 2020-05-14 | 2021-09-07 | T-Mobile Usa, Inc. | 5G cybersecurity protection system |
US11057774B1 (en) | 2020-05-14 | 2021-07-06 | T-Mobile Usa, Inc. | Intelligent GNODEB cybersecurity protection system |
US11910448B2 (en) * | 2021-12-28 | 2024-02-20 | T-Mobile Innovations Llc | Random access channel preamble assignments for dual connectivity |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090061878A1 (en) * | 2007-08-12 | 2009-03-05 | Lg Electronics Inc. | Handover method with link failure recovery, wireless device and base station for implementing such method |
US20110269465A1 (en) * | 2010-04-28 | 2011-11-03 | Beijing Samsung Telecom R & D Center | Handover method and apparatus in mobile communication system |
US20120021749A1 (en) * | 2007-08-22 | 2012-01-26 | Huawei Technologies Co., Ltd. | Communication System, Network Handover Processing Method and Apparatus |
CN102823296A (zh) * | 2010-03-26 | 2012-12-12 | 松下电器产业株式会社 | 移动无线系统、访问点装置及切换处理方法 |
WO2013009892A1 (en) * | 2011-07-11 | 2013-01-17 | Interdigital Patent Holdings, Inc. | Systems and methods for establishing and maintaining multiple cellular connections and/or interfaces |
WO2013010005A1 (en) * | 2011-07-12 | 2013-01-17 | Interdigital Patent Holdings, Inc. | Method and apparatus for multi-rat access mode operation |
US20130021929A1 (en) * | 2011-07-12 | 2013-01-24 | Electronics And Telecommunications Research Institute | Method of mobility management for mobile terminal in a heterogeneous network environment |
US20130044730A1 (en) * | 2011-08-19 | 2013-02-21 | Hitachi, Ltd. | Optimized Home Evolved NodeB (eNB) Handover in an LTE Network |
Family Cites Families (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FI20075631A0 (fi) * | 2007-09-10 | 2007-09-10 | Nokia Siemens Networks Oy | Menetelmä, radiojärjestelmä ja tukiasema |
US8477719B2 (en) * | 2007-10-01 | 2013-07-02 | Qualcomm Incorporated | Systems and methods for in-order delivery in downlink during handover |
JP4452315B2 (ja) * | 2008-02-04 | 2010-04-21 | 株式会社エヌ・ティ・ティ・ドコモ | 移動通信方法及び無線基地局 |
CN101635962B (zh) * | 2008-07-24 | 2012-01-04 | 电信科学技术研究院 | 一种用户设备切换时获取承载状况的方法和mme |
US8243725B2 (en) * | 2008-08-13 | 2012-08-14 | Interdigital Patent Holdings, Inc. | Maintaining circuit switched continuity in an enhanced universal terrestrial radio access network |
US20100067604A1 (en) * | 2008-09-17 | 2010-03-18 | Texas Instruments Incorporated | Network multiple antenna transmission employing an x2 interface |
JP5035191B2 (ja) * | 2008-09-18 | 2012-09-26 | 富士通株式会社 | 基地局装置、通信制御システム、通信制御方法、局間制御方法および局間制御プログラム |
KR101692720B1 (ko) * | 2009-02-08 | 2017-01-04 | 엘지전자 주식회사 | 핸드오버 방법 |
KR101313357B1 (ko) * | 2009-03-12 | 2013-10-02 | 인터디지탈 패튼 홀딩스, 인크 | 요소 반송파 특유의 재구성을 수행하는 방법 및 장치 |
JP5164939B2 (ja) * | 2009-07-04 | 2013-03-21 | 株式会社エヌ・ティ・ティ・ドコモ | 移動通信方法及び無線基地局 |
US8406192B2 (en) * | 2009-10-02 | 2013-03-26 | Research In Motion Limited | Handover mechanisms with synchronous PDCP protocol under various relay architectures |
US8687590B2 (en) * | 2009-10-02 | 2014-04-01 | Blackberry Limited | System and method for handover between relays |
US8570963B2 (en) * | 2009-10-26 | 2013-10-29 | Qualcomm Incorporated | Coordinated multi-point (CoMP) network and protocol architecture |
CA2779492C (en) * | 2009-10-30 | 2016-03-22 | Interdigital Patent Holdings, Inc. | Method and apparatus for efficient signaling and usage of resources for wireless communications supporting circuit switched and packet switched sessions |
EP4009733A1 (en) * | 2010-02-12 | 2022-06-08 | InterDigital Technology Corporation | Data split between multiple sites |
US8885545B2 (en) * | 2010-04-09 | 2014-11-11 | Nec Corporation | Radio communication system, communication apparatus, method for controlling simultaneous transmission from multiple base stations, and non-transitory computer readable medium |
JP5447119B2 (ja) * | 2010-04-12 | 2014-03-19 | 富士通株式会社 | 無線通信システム、基地局および無線通信方法 |
KR101699023B1 (ko) * | 2010-07-14 | 2017-01-23 | 주식회사 팬택 | 다중 요소 반송파 시스템에서 핸드오버의 수행장치 및 방법 |
CN102118808B (zh) * | 2011-03-03 | 2014-11-12 | 电信科学技术研究院 | 触发切换及移动管理实体池标识信息的传递方法和设备 |
CN102892162B (zh) * | 2011-07-20 | 2017-04-12 | 中兴通讯股份有限公司 | 一种宿主基站、中继节点设备及增强路径转换的方法 |
US9008018B2 (en) * | 2011-11-04 | 2015-04-14 | Intel Corporation | Dynamic point selection via a coordinating set of base stations |
US9544927B2 (en) * | 2012-07-02 | 2017-01-10 | Alcatel Lucent | System, method and computer readable medium for bearer activation in a core network for wireless devices |
EP3220685B1 (en) * | 2012-08-02 | 2020-05-27 | Telefonaktiebolaget LM Ericsson (publ) | Base stations and methods for handling over a sub-set of bearers to enable multiple connectivity of a terminal towards several base stations |
-
2014
- 2014-02-18 CN CN201480010056.3A patent/CN105009678B/zh active Active
- 2014-02-18 KR KR1020157026190A patent/KR102206431B1/ko active IP Right Grant
- 2014-02-18 CN CN201910182037.3A patent/CN110087272B/zh active Active
- 2014-02-18 AU AU2014219562A patent/AU2014219562B2/en active Active
- 2014-02-18 WO PCT/KR2014/001300 patent/WO2014129783A1/en active Application Filing
- 2014-02-24 US US14/188,274 patent/US9693381B2/en active Active
- 2014-02-24 EP EP20211081.3A patent/EP3809758A1/en active Pending
- 2014-02-24 EP EP14156380.9A patent/EP2787763B1/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090061878A1 (en) * | 2007-08-12 | 2009-03-05 | Lg Electronics Inc. | Handover method with link failure recovery, wireless device and base station for implementing such method |
US20120021749A1 (en) * | 2007-08-22 | 2012-01-26 | Huawei Technologies Co., Ltd. | Communication System, Network Handover Processing Method and Apparatus |
CN102823296A (zh) * | 2010-03-26 | 2012-12-12 | 松下电器产业株式会社 | 移动无线系统、访问点装置及切换处理方法 |
US20110269465A1 (en) * | 2010-04-28 | 2011-11-03 | Beijing Samsung Telecom R & D Center | Handover method and apparatus in mobile communication system |
WO2013009892A1 (en) * | 2011-07-11 | 2013-01-17 | Interdigital Patent Holdings, Inc. | Systems and methods for establishing and maintaining multiple cellular connections and/or interfaces |
WO2013010005A1 (en) * | 2011-07-12 | 2013-01-17 | Interdigital Patent Holdings, Inc. | Method and apparatus for multi-rat access mode operation |
US20130021929A1 (en) * | 2011-07-12 | 2013-01-24 | Electronics And Telecommunications Research Institute | Method of mobility management for mobile terminal in a heterogeneous network environment |
US20130044730A1 (en) * | 2011-08-19 | 2013-02-21 | Hitachi, Ltd. | Optimized Home Evolved NodeB (eNB) Handover in an LTE Network |
Cited By (43)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106686751A (zh) * | 2015-11-10 | 2017-05-17 | 中兴通讯股份有限公司 | 一种无线承载的配置方法及装置 |
CN106686751B (zh) * | 2015-11-10 | 2021-08-17 | 中兴通讯股份有限公司 | 一种无线承载的配置方法及装置 |
CN109196898B (zh) * | 2016-04-01 | 2021-08-20 | Idac控股公司 | 服务切片的选择和分离方法 |
CN109196898A (zh) * | 2016-04-01 | 2019-01-11 | Idac控股公司 | 服务切片的选择和分离方法 |
CN109196835A (zh) * | 2016-05-12 | 2019-01-11 | Sk电信有限公司 | 用于异构网络环境下提供下一代网络服务的方法和设备 |
CN113452786A (zh) * | 2016-05-12 | 2021-09-28 | Sk电信有限公司 | 用于异构网络环境下提供下一代网络服务的方法和设备 |
CN110352625A (zh) * | 2016-05-17 | 2019-10-18 | 诺基亚技术有限公司 | Lte与5g节点之间的路径切换方法 |
CN109219971A (zh) * | 2016-05-23 | 2019-01-15 | 日本电气株式会社 | 通信系统 |
CN109417705A (zh) * | 2016-08-11 | 2019-03-01 | 捷开通讯(深圳)有限公司 | Lte wlan聚合的安全性增强 |
US11153788B2 (en) | 2016-11-09 | 2021-10-19 | Lg Electronics Inc. | Handover method and user equipment |
CN109937590A (zh) * | 2016-11-09 | 2019-06-25 | Lg电子株式会社 | 切换方法和用户设备 |
CN110050481B (zh) * | 2016-12-12 | 2023-03-07 | 三星电子株式会社 | 控制无线通信系统中的数据流的设备和方法 |
CN110050481A (zh) * | 2016-12-12 | 2019-07-23 | 三星电子株式会社 | 控制无线通信系统中的数据流的设备和方法 |
US11665579B2 (en) | 2016-12-12 | 2023-05-30 | Samsung Electronics Co., Ltd. | Apparatus and method for controlling data flow in wireless communication system |
US12004004B2 (en) | 2016-12-12 | 2024-06-04 | Samsung Electronics Co., Ltd. | Apparatus and method for controlling data flow in wireless communication system |
CN106535234B (zh) * | 2016-12-31 | 2019-09-17 | 中国移动通信集团江苏有限公司 | 用户上网问题的定位方法和装置 |
CN106535234A (zh) * | 2016-12-31 | 2017-03-22 | 中国移动通信集团江苏有限公司 | 测量报告与用户关联和上网问题的定位方法和装置 |
US20210105734A1 (en) * | 2017-01-06 | 2021-04-08 | Samsung Electronics Co., Ltd. | Method and apparatus for data transport control between wireless network systems |
CN108282827A (zh) * | 2017-01-06 | 2018-07-13 | 北京三星通信技术研究有限公司 | 用于网络间互操作的方法、节点及设备 |
CN114125964B (zh) * | 2017-01-06 | 2024-04-05 | 北京三星通信技术研究有限公司 | 用于无线网络系统之间的数据传送控制的方法及设备 |
US11818679B2 (en) * | 2017-01-06 | 2023-11-14 | Samsung Electronics Co., Ltd. | Method and apparatus for data transport control between wireless network systems |
CN114125964A (zh) * | 2017-01-06 | 2022-03-01 | 北京三星通信技术研究有限公司 | 用于无线网络系统之间的数据传送控制的方法及设备 |
US11395191B2 (en) | 2017-03-23 | 2022-07-19 | Telefonaktiebolaget Lm Ericsson (Publ) | Technique for inter-system handover |
CN110651497B (zh) * | 2017-03-23 | 2022-04-19 | 瑞典爱立信有限公司 | 用于系统间切换的方法和装置 |
CN110651497A (zh) * | 2017-03-23 | 2020-01-03 | 瑞典爱立信有限公司 | 用于系统间切换的技术 |
CN109151940B (zh) * | 2017-06-16 | 2021-12-03 | 华为技术有限公司 | 一种基于dc的切换方法及设备 |
CN109151940A (zh) * | 2017-06-16 | 2019-01-04 | 华为技术有限公司 | 一种基于dc的切换方法及设备 |
US11252615B2 (en) | 2017-06-16 | 2022-02-15 | Huawei Technologies Co., Ltd. | Handover method that is based on DC and device |
CN110771204A (zh) * | 2017-06-23 | 2020-02-07 | 英国电讯有限公司 | 语音服务切换 |
CN111345074A (zh) * | 2017-11-17 | 2020-06-26 | 瑞典爱立信有限公司 | 与ue非活动有关的方法、装置和系统 |
CN110115098A (zh) * | 2017-11-30 | 2019-08-09 | Oppo广东移动通信有限公司 | 用于系统信息的方法和装置 |
WO2019105056A1 (en) * | 2017-11-30 | 2019-06-06 | Guangdong Oppo Mobile Telecommunications Corp., Ltd. | Method and apparatus for system information |
CN110351889A (zh) * | 2018-04-03 | 2019-10-18 | 维沃移动通信有限公司 | 一种连接建立方法和设备 |
CN110351889B (zh) * | 2018-04-03 | 2022-02-01 | 维沃移动通信有限公司 | 一种连接建立方法和设备 |
CN113163515A (zh) * | 2018-04-04 | 2021-07-23 | 中兴通讯股份有限公司 | 用于在无线电网络中交换消息的方法和系统 |
CN113163515B (zh) * | 2018-04-04 | 2022-12-06 | 中兴通讯股份有限公司 | 用于在无线电网络中交换消息的方法和系统 |
US11558849B2 (en) | 2018-04-04 | 2023-01-17 | Zte Corporation | Method and systems for exchanging messages in a wireless network |
CN112655245A (zh) * | 2018-09-19 | 2021-04-13 | Oppo广东移动通信有限公司 | 一种数据传输方法、设备及存储介质 |
US11902839B2 (en) | 2018-09-19 | 2024-02-13 | Guangdong Oppo Mobile Telecommunications Corp., Ltd. | Data transmission method and device, and storage medium |
CN113170521A (zh) * | 2018-11-27 | 2021-07-23 | 三星电子株式会社 | 用于管理承载的电子装置以及其操作方法 |
CN113170521B (zh) * | 2018-11-27 | 2024-05-31 | 三星电子株式会社 | 用于管理承载的电子装置以及其操作方法 |
CN111417110A (zh) * | 2019-01-04 | 2020-07-14 | 大唐移动通信设备有限公司 | 一种基于nsa的小区配置方法及装置 |
WO2021017755A1 (zh) * | 2019-08-01 | 2021-02-04 | 维沃移动通信有限公司 | 数据发送方法及用户设备 |
Also Published As
Publication number | Publication date |
---|---|
US20140241317A1 (en) | 2014-08-28 |
EP2787763B1 (en) | 2020-12-02 |
WO2014129783A1 (en) | 2014-08-28 |
KR20150120514A (ko) | 2015-10-27 |
CN110087272A (zh) | 2019-08-02 |
US9693381B2 (en) | 2017-06-27 |
CN105009678B (zh) | 2019-04-05 |
EP2787763A1 (en) | 2014-10-08 |
AU2014219562A1 (en) | 2015-07-30 |
KR102206431B1 (ko) | 2021-01-22 |
CN110087272B (zh) | 2021-10-08 |
AU2014219562B2 (en) | 2017-09-21 |
EP3809758A1 (en) | 2021-04-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3589069B1 (en) | Method and apparatus for improving procedure for lte/nr interworking in wireless communication system | |
CN105009678A (zh) | 用于在多个e节点b和用户设备之间提供同时连接的方法和系统 | |
US20220159533A1 (en) | Communication system | |
US11792892B2 (en) | Method and device for managing interface for supporting LTE/NR interworking in wireless communication system | |
US11044655B2 (en) | Method and apparatus for performing inter-MeNB handover without SeNB change in wireless communication system | |
US9648520B2 (en) | Method for processing data associated with handover in a wireless network | |
CN104349419B (zh) | 终端多连接的管理方法、装置和系统 | |
US10652785B2 (en) | Method and apparatus for enhancing mobility for 3GPP LTE-WLAN aggregation in wireless communication system | |
US11653246B2 (en) | Method and device for configuring and reporting measurement for LTE/NR interworking in wireless communication system | |
JP2020504518A (ja) | 無線通信システムにおいてビームを支援する方法及び装置 | |
EP2906008B1 (en) | Radio communication system, first and second radio station, radio terminal, network apparatus and corresponding methods to implement inter-enb carrier aggregation | |
WO2015062643A1 (en) | Keeping user equipment in a state attached to a cellular communication network during offloading of cellular data to another communication network | |
US20200120736A1 (en) | Method and apparatus for supporting bearer type change in wireless communication system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |