CN104967534B - A kind of Grid Central and distribution substation's cable resource unified management and planing method - Google Patents
A kind of Grid Central and distribution substation's cable resource unified management and planing method Download PDFInfo
- Publication number
- CN104967534B CN104967534B CN201510287495.5A CN201510287495A CN104967534B CN 104967534 B CN104967534 B CN 104967534B CN 201510287495 A CN201510287495 A CN 201510287495A CN 104967534 B CN104967534 B CN 104967534B
- Authority
- CN
- China
- Prior art keywords
- port
- management
- line
- cable
- equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 28
- 238000004088 simulation Methods 0.000 claims abstract description 14
- 230000005540 biological transmission Effects 0.000 claims description 8
- 230000003287 optical effect Effects 0.000 claims description 8
- 238000012546 transfer Methods 0.000 claims description 4
- 230000000007 visual effect Effects 0.000 claims description 3
- 238000010586 diagram Methods 0.000 abstract description 2
- 238000007726 management method Methods 0.000 description 36
- 238000004891 communication Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 230000008676 import Effects 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000013461 design Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000012800 visualization Methods 0.000 description 1
Landscapes
- Electric Cable Installation (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The invention discloses a kind of Grid Central and distribution substation's cable resource unified management and planing methods, including the following steps: first, by fixed form by existing EXCEL, the formats such as WORD record the data of cable connection relationship: then, forming a text connection relationship about cable original equipment, initial port and end device, destination port in system by line ralation method and record;Finally, being presented in systems with graphic model by three-dimensional simulation technique, true building, true cabinet, the line relationship of real ports is shown in real equipment.The present invention by platform to fixed form by existing EXCEL, the formats such as WORD carry out record importing to the data of cable connection relationship and data are extracted and sorted out, then by pair so data port is marked, it is reproduced finally by 3-D image, so that forming one can be to module all in distribution system, component, device simulation state diagram.
Description
Technical field
The present invention relates to power grid and distributing cable resource management field more particularly to a kind of Grid Centrals and distribution substation's cable
Resource unified management and planing method.
Background technique
Existing Grid Central lacks a unified management platform, this platform can meet centring machine room and change simultaneously
All kinds of communication information cable resources in power station are uniformly managed;
Because existing various optical cables, core equipment, PCM and light matches, count match, net is matched and sound with etc. Wiring modules, network
Equipment, server apparatus assets lack effective management platform can not intuitively show mostly also in artificial controlled state
The currently used state of related resource, connection relationship, utilization rate etc.;
PCM equipment, as a node of service bearer, the business that the port on board is carried is to manage and maintain people
The object that member is concerned about the most lacks a management platform realization to the system of substation's bearer service in current management means
One management and intuitive displaying.
For Wiring module, current most management work requires artificial to carry out by way of excel table
Maintenance, lacks unified management and Naming conventions, as the mode of connection changes, variation to Wiring module and it includes respectively match
The state of line terminals all would become hard to effectively be safeguarded, data missing.
Between all kinds of communication resources, there is a large amount of connection relationship, the presence of these connection relationships still lacks at present
One effective intuitive management means.The upper peer end of the connection and this connection for how showing current device port are used for
Which kind of business carried? it is all the hang-up for perplexing communication information operation maintenance personnel.
Summary of the invention
The object of the present invention is to provide a kind of Grid Central and distribution substation's cable resource unified management and planing methods, can
Huge database deposit platform is established, power grid special equipment knowledge base is established by professional level, is run and is established by platform
Unified management specification, thoroughly reverses state unordered in the past.
The present invention adopts the following technical solutions:
A kind of Grid Central and distribution substation's cable resource unified management and planing method, including the following steps:
Firstly, the formats such as WORD record the data of cable connection relationship by fixed form by existing EXCEL:
Text is become into computer recognizable character by the importing of system platform, export function and is stored in the database;
Then, one is formed in system by line ralation method about cable original equipment, initial port and terminal
Equipment, the text connection relationship of destination port record;
Finally, true building, true cabinet, real equipment is presented with graphic model in systems by three-dimensional simulation technique
The line relationship of upper real ports is shown: three-dimensional simulation technique carries out cable bend by backstage algorithm, refraction calculates, and presentation is patrolled
Collect line.
The line ralation method specifically includes the following steps:
Firstly, doing a label in each port;Secondly, wherein the line relationship between every two port determines it
Afterwards, two ports connected with line
Line rule in wiring algorithm are as follows:
A1, after the line relationship between any two port comes out, first outward the connecting line level of one of port
A distance is walked, simulation goes to cabinet edge;Then A2 starts to be walked upwards, go to a fixed height (mould in space
Varioloid plate height) after, carry out the horizontal position for finding second port with its line;A3 passes through horizontal x-axis and y-axis
Searching twice, find the upright position of second port;A4, then line starts to walk downward, and goes to the water of second port
Prosposition is set;A5, line link up a port and second port.
According to the above method, a management platform can be formed, following function may be implemented in the management platform:
1, macroscopic visual displaying is carried out to substation in some urban district core computer room and institute's scope;
2, the cable resource displaying between different substation and attributes edit;
3, (including core transmission equipment, PCM are set for the three-dimensional display of all kinds of transfer resources in computer room and substation and management
Standby, number is with equipment and light with Wiring modules, server apparatus, the network equipments such as equipment etc.);
4, all kinds of resource informations described above are directed to, user can visually be checked in system, can
To define the information such as its underlying assets attribute, including number, title, manufacturer and opposite end connectivity port in systems;
5, user's custom field can be increased simultaneously, user flexibility is facilitated to manage the resource object.
The management platform can also realize following management:
Number is matched, light carries out the grouping management of Wiring module with equipment;
The management of cable resource;
The management of optical transmission device, PCM equipment;
The management of link;
The management of data switched network.
The present invention by platform to fixed form by existing EXCEL, data of the formats such as WORD to cable connection relationship
Carry out that record imports and data are extracted and sorted out, then by pair so data port is marked, again finally by 3-D image
It is existing, so that forming one can be to module all in distribution system, component, device simulation state diagram, in all modules above
It is provided with visualization interface, platform is managed by this, operator can in time, accurately increase, delete, changes, look into.
Detailed description of the invention
Fig. 1 is flow chart of the invention.
Specific embodiment
As shown in Figure 1, firstly, passing through fixed form for existing EXCEL, data of the formats such as WORD to cable connection relationship
It is recorded: text being become by computer recognizable character by the importing of system platform, export function and is stored in database
In;
Then, one is formed in system by line ralation method about cable original equipment, initial port and terminal
Equipment, the text connection relationship of destination port record;Firstly, doing a label in each port;
The label can use bar code, two dimensional code or other marks with the certain information of storage.Such as number, name
The information such as title, manufacturer and opposite end connectivity port.User's custom field can be increased simultaneously, facilitate user flexibility management should
Resource object.Secondly, wherein after the line relationship between every two port determines, two ports are carried out with line repeatedly
It connects;It is specific as follows:
A1, after the line relationship between any two port comes out, first outward the connecting line level of one of port
A distance is walked, simulation goes to cabinet edge;Then A2 starts to be walked upwards, go to a fixed height (mould in space
Varioloid plate height) after, carry out the horizontal position for finding second port with its line;A3 passes through horizontal x-axis and y-axis
Searching twice, find the upright position of second port;A4, then line starts to walk downward, and goes to the water of second port
Prosposition is set;A5, line link up a port and second port.It repeats the above steps, the port of label is passed through
Line connection.
Finally, true building, true cabinet, real equipment is presented with graphic model in systems by three-dimensional simulation technique
The line relationship of upper real ports is shown: three-dimensional simulation technique carries out cable bend by backstage algorithm, refraction calculates, and presentation is patrolled
Collect line.
It, can be with real simulation field device situation, to make management, operation by three-dimensional simulation technique treated image
Personnel are very clear, cable resource situation, the planning situation, service condition, work in the place such as existing computer room, cabinet, power distribution room
State etc..The three-dimensional artificial image processing techniques is existing mature technology, and details are not described herein.
Previous center and distribution substation's cable resource do not unify effective way to manage and platform, and reason has substantially such as
Under:
1. cable resource quantity is excessively huge, growth rate is too fast
2. unconventional equipment it is excessive (such as all kinds of PCM and light matches, count match, net is matched and sound is with Wiring module)
Cable resource deployment is without unified standard standard (each province and city unit at county level is independently built)
The present invention can be very good to solve the above problems, and by the above method, can be with one virtual management of stroke
Platform, entire Platform Designing is to show and manage computer room, cabinet, equipment and end where Grid Central and distribution substation's cable resource
The resource objects such as mouth are target to design, and main contents are described as follows:
1, it realizes and macroscopic visual displaying is carried out to substation in some urban district core computer room and institute's scope;
2, the cable resource displaying between different substation and attributes edit;
3, (including core transmission equipment, PCM are set for the three-dimensional display of all kinds of transfer resources in computer room and substation and management
Standby, number is with equipment and light with Wiring modules, server apparatus, the network equipments such as equipment etc.);
4, all kinds of resource informations described above are directed to, user can visually be checked in system, can
To define the information such as its underlying assets attribute, including number, title, manufacturer and opposite end connectivity port in systems.Simultaneously
User's custom field can be increased, user flexibility is facilitated to manage the resource object.
It can also specifically realize following management:
Number is matched, light carries out the grouping management of Wiring module with equipment:
A) selects one or more numbers to match the creation for carrying out Wiring module with module with light;
B) is directed to the distribution terminal management of Wiring module, and user can intuitively check current wiring mould in three-dimensional scenic
The state (used, be not used) of distribution terminal included in block, while the attribute and wound of each configuration terminal can be edited
Build a connection management relevant to the distribution terminal.
The management of cable resource
A) system can import all cable resources currently existed with user, while cable resource occurring afterwards
When variation, system can permit user and increase and delete;
B) system can show that two substation informations that an optical cable is connected, while can show the current light
The service condition (for example the optical cable of 72 cores is used for 48 cores, is in unused state there are also 24 cores) of cable.
The management of optical transmission device, PCM equipment
A) intuitively shows position of the relevant device in computer room scene, and user can check and modify
The attribute of relevant device;
B) is directed to optical transmission device, PCM equipment board equipment that may be present, and system supports the independence to board equipment
Inquiry and editor, and user is supported voluntarily to increase related board resource;
C) is for all of the port resource in relevant device, the attribute of the customized each port of system supports user, and
Connection relationship is created for the port.
D) is for there are the port object (po)s of connection management, and system can intuitively relevant line moves towards with three-dimensional mode
With opposite equip. and port.
E) user can allow system completely to go out the list of the current port in three dimension system by specifying a port
It jumps or link moves towards end to end, and can be with the information of each connecting node in real-time query end-to-end path.
If f) port of some PCM equipment of or the port of optical transmission device are directly connected to some specific business, it is
System allows the relating attribute of user's increase business and port;
The management of link
Link as the direct object in port is relied on, mainly examine from link displaying when managing it by system
Amount, thus facilitate user in a numerous and complicated port and the link world, the reality for finding certain link of quicklook
It moves towards and by way of node.
After some PCM multi-port connection terminal business, when check its arrive core computer room end-to-end path when effect, system
In realization, on the one hand allow the intuitive brief displaying full link figure of user, while user being allowed to click each node, system
The 3 d effect graph and related port information of the current node will intuitively be shown
The management of data switched network
Intuitively show the use state and location information of each port in distributing frame in cabinet, and its company is inquired in energy quicklook
The opposite equip. connect.
Some switch port is selected, it is chosen to occupy port, system can intuitively show walking for designated port link
To distribution, system can be supported to show that the link of interchanger multiplex roles moves towards information simultaneously.
Claims (3)
1. a kind of Grid Central and distribution substation's cable resource unified management and planing method, it is characterised in that: including following
Step:
Firstly, WORD format records the data of cable connection relationship by fixed form by existing EXCEL: passing through and be
Text is become computer recognizable character and stored in the database by the importing of system platform, export function;
Then, formed in system by line ralation method one about cable original equipment, initial port and end device,
The text connection relationship of destination port records;
The line ralation method specifically includes the following steps:
Firstly, doing a label in each port;Secondly, wherein after the line relationship between every two port determines,
Two ports connected with line;
Line rule in wiring algorithm are as follows:
The connecting line level of one of port after the line relationship between any two port comes out, is first walked toward outside one by A1
Section distance, simulation go to cabinet edge;Then A2 starts to be walked upwards, a fixed height for going to space simulates day
After card height, the horizontal position for finding second port with its line is carried out;A3 passes through the two of horizontal x-axis and y-axis
The upright position of second port is found in secondary searching;A4, then line starts to walk downward, and goes to the horizontal position of second port
It sets;A5, line link up a port and second port;
Finally, by three-dimensional simulation technique in systems with true in the true building of graphic model presentation, true cabinet, real equipment
The line relationship of real port is shown: three-dimensional simulation technique carries out cable bend by backstage algorithm, refraction calculates, and logic is presented and connects
Line.
2. Grid Central according to claim 1 and distribution substation's cable resource unified management and planing method, feature exist
In: according to the above method, a management platform can be formed, following function may be implemented in the management platform:
1, macroscopic visual displaying is carried out to substation in some urban district core computer room and institute's scope;
2, the cable resource displaying between different substation and attributes edit;
3, the three-dimensional display of all kinds of transfer resources in computer room and substation and management, all kinds of transfer resources include that core transmission is set
Standby, PCM equipment, number match Wiring module, server apparatus, the network equipment of equipment with equipment and light;
4, all kinds of resource informations described above are directed to, user can visually be checked in system, Ke Yi
Its underlying assets attribute, including number, title, manufacturer and opposite end connectivity port information are defined in system;
5, user's custom field can be increased simultaneously, user flexibility is facilitated to manage the resource object.
3. Grid Central according to claim 2 and distribution substation's cable resource unified management and planing method, feature exist
In:
The management platform can also realize following management:
Number is matched, light carries out the grouping management of Wiring module with equipment;
The management of cable resource;
The management of optical transmission device, PCM equipment;
The management of link;
The management of data switched network.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510287495.5A CN104967534B (en) | 2015-05-29 | 2015-05-29 | A kind of Grid Central and distribution substation's cable resource unified management and planing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510287495.5A CN104967534B (en) | 2015-05-29 | 2015-05-29 | A kind of Grid Central and distribution substation's cable resource unified management and planing method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104967534A CN104967534A (en) | 2015-10-07 |
CN104967534B true CN104967534B (en) | 2019-02-15 |
Family
ID=54221482
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510287495.5A Active CN104967534B (en) | 2015-05-29 | 2015-05-29 | A kind of Grid Central and distribution substation's cable resource unified management and planing method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104967534B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105488283B (en) * | 2015-11-30 | 2019-01-11 | 中国能源建设集团广东省电力设计研究院有限公司 | The modeling method and system of computer room data transmission cable |
CN107451222B (en) * | 2017-07-17 | 2020-02-07 | 中国电子科技集团公司第二十八研究所 | Vehicle model data management system |
CN110737962B (en) * | 2018-07-02 | 2024-01-30 | 中国科学院沈阳计算技术研究所有限公司 | Intelligent judging method and system for network wiring |
CN109815301A (en) * | 2018-12-21 | 2019-05-28 | 平安科技(深圳)有限公司 | Wire label management method, device, computer equipment and storage medium |
EP3893434B1 (en) * | 2018-12-28 | 2024-03-13 | Huawei Technologies Co., Ltd. | Method and apparatus for establishing optical cable connection |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102254251A (en) * | 2011-07-18 | 2011-11-23 | 广东省电力设计研究院 | Power grid three-dimensional design result data management system and digital management method thereof |
CN102262758A (en) * | 2011-08-17 | 2011-11-30 | 国电南瑞科技股份有限公司 | Method for unified modeling and management of space-time multidimensional power grid model based on CIME (certified internet marketing engineer) file |
CN102508989A (en) * | 2011-09-27 | 2012-06-20 | 福建省电力有限公司 | Dynamic power grid panorama display system on basis of virtual reality |
CN102798802A (en) * | 2012-08-07 | 2012-11-28 | 广州供电局有限公司 | Cable fault locating visual simulation experimental method |
CN103577930A (en) * | 2013-10-25 | 2014-02-12 | 深圳供电局有限公司 | System for evaluating influence of electric construction project on reliability of power distribution network |
-
2015
- 2015-05-29 CN CN201510287495.5A patent/CN104967534B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102254251A (en) * | 2011-07-18 | 2011-11-23 | 广东省电力设计研究院 | Power grid three-dimensional design result data management system and digital management method thereof |
CN102262758A (en) * | 2011-08-17 | 2011-11-30 | 国电南瑞科技股份有限公司 | Method for unified modeling and management of space-time multidimensional power grid model based on CIME (certified internet marketing engineer) file |
CN102508989A (en) * | 2011-09-27 | 2012-06-20 | 福建省电力有限公司 | Dynamic power grid panorama display system on basis of virtual reality |
CN102798802A (en) * | 2012-08-07 | 2012-11-28 | 广州供电局有限公司 | Cable fault locating visual simulation experimental method |
CN103577930A (en) * | 2013-10-25 | 2014-02-12 | 深圳供电局有限公司 | System for evaluating influence of electric construction project on reliability of power distribution network |
Also Published As
Publication number | Publication date |
---|---|
CN104967534A (en) | 2015-10-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104967534B (en) | A kind of Grid Central and distribution substation's cable resource unified management and planing method | |
CN103955789B (en) | Power supply path analysis method based on allocation-used integrated model | |
CN102411764B (en) | The data management system of grid equipment and management method | |
CN112698953A (en) | Power grid intelligent operation and detection platform based on micro-service | |
CN109150640A (en) | A kind of method for discovering network topology and system based on double layer network agreement | |
CN104767642B (en) | ODN wiring based on GIS platform manages method and system | |
CN101820532A (en) | Method for realizing full three-dimensional intelligent virtual computer room | |
CN109889358B (en) | 3D visual IT monitoring management system | |
CN104102790B (en) | Power supply figure automatic mapping system and method based on GIS | |
CN102622463A (en) | Drawing-model uniformity based method for automatic check of design drawings | |
CN104133943A (en) | Distribution network pattern automatic generating method based on target guide | |
US20070220451A1 (en) | Method for modeling and documenting a network | |
CN109887068B (en) | 3D visual computer lab | |
CN109245923A (en) | Communications optical cable route resource management method and system | |
CN104866613A (en) | Method for establishing three-dimensional component model database of power grid equipment and facility | |
CN107194533A (en) | A kind of power distribution network full information model building method and system | |
CN103093007A (en) | Power transmission iron tower three-dimensional virtual assembly method | |
CN109617732A (en) | A kind of electric power wireless private network integration mixed networking and integrated management approach | |
WO2020098553A1 (en) | Optical fiber network node management method and system | |
CN107452063A (en) | A kind of construction method and device of cloud data center three-dimensional 3D intelligent monitoring computer rooms | |
CN109933634B (en) | Power system graph drawing method based on power radiation range | |
CN106452887A (en) | Electric power communication system visual display system based on diagram-model-data integration | |
CN112862232A (en) | Integrated monitoring method and device for power wireless heterogeneous network | |
CN114049427A (en) | Intelligent substation secondary circuit information roaming method based on VR scene | |
CN110287508A (en) | A kind of visualization emerging system of multi-source D Urban model |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |