CN104891745B - Upgrading and reconstruction method based on constructed rapid infiltration sewage treatment facility - Google Patents

Upgrading and reconstruction method based on constructed rapid infiltration sewage treatment facility Download PDF

Info

Publication number
CN104891745B
CN104891745B CN201510320565.2A CN201510320565A CN104891745B CN 104891745 B CN104891745 B CN 104891745B CN 201510320565 A CN201510320565 A CN 201510320565A CN 104891745 B CN104891745 B CN 104891745B
Authority
CN
China
Prior art keywords
pond
infiltration
sewage treatment
treatment facility
manpower rapid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510320565.2A
Other languages
Chinese (zh)
Other versions
CN104891745A (en
Inventor
王舜和
刘鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510320565.2A priority Critical patent/CN104891745B/en
Publication of CN104891745A publication Critical patent/CN104891745A/en
Application granted granted Critical
Publication of CN104891745B publication Critical patent/CN104891745B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Physical Water Treatments (AREA)
  • Biological Treatment Of Waste Water (AREA)

Abstract

An upgrading and reconstruction method based on a constructed rapid infiltration sewage treatment facility is an improved method for the constructed rapid infiltration sewage treatment facility, and comprises the following steps: calculating the volume of constructed rapid infiltration tanks in the constructed rapid infiltration sewage treatment facility; respectively reconstructing a plurality of constructed rapid infiltration tank bodies into multiple stages of AO tanks connected in series, and meanwhile, reserving original water outlets in the AO tanks arranged in an even stage; directly communicating water outlet ends of an original coarse screen and a pumping station with water inlets of reconstructed multiple stages of AO tanks through pipelines; correspondingly taking a presedimentation basin and a sand filter, which are sequentially communicated with water outlet ends of the original coarse screen and the pumping station in the constructed rapid infiltration sewage treatment facility, as a secondary sedimentation basin and an advanced treatment sand filter, which are sequentially communicated, and communicating an output opening of the advanced treatment sand filter with an UV disinfection pool, communicated with a main water outlet pipe in the constructed rapid infiltration sewage treatment facility, through a pipeline; communicating each stage of AO tank with an air blower arranged outside through an aeration pipeline. The upgrading and reconstruction method can meet the reconstruction requirement of most constructed rapid infiltration sewage treatment factories, and is low in investment.

Description

A kind of upgrading method based on manpower rapid-infiltration sewage treatment facility
Technical field
The present invention relates to a kind of sewage disposal system.More particularly to a kind of liter based on manpower rapid-infiltration sewage treatment facility Level remodeling method.
Background technology
Manual controlled infusion is a type of land treatment systems, and it refers to controlledly to be invested in sewage manually constructs The surface of filtration media, so as to experience different physics, chemistry and biological agent during downward infiltration, is finally reached net Change the process of sewage.Typical manual controlled infusion is made up of pretreatment unit and manpower rapid-infiltration unit.The work(of pretreatment unit The ss in sewage can mainly be reduced, to improve the infiltration rate oozing pond, preventing from blocking, generally including preformed precipitate pond, sand filtration Pond etc.;The main body of manpower rapid-infiltration unit is rapid infiltration pool, and this system is filled with the filter of certain thickness sandstone filler by least two The manpower rapid-infiltration pond of pond composition, wherein, the dry spell continuous filter major part that falls is aerobic environment, and waterflooding phase continuous filter is anaerobic environment, By the drive manner of alternation of wetting and drying, the aerobic, anaerobism in filter tank and and oxygen microorganism progressively degradation of contaminant, reach purification The purpose of sewage.
As shown in figure 1, existing manual controlled infusion, including coarse rack and lift pump room 21, preformed precipitate pond 22, sand filter 23, by pipeline 210 even into four manpower rapid-infiltration ponds 24~27, four manpower rapid-infiltration ponds are parallel relationship.Subsequently sewage Flow out and pass through pipeline 211 and converge entrance ultraviolet disinfection pond 28, and be discharged to outside factory eventually through total outlet pipe 212.
Based on sanitary sewage, its feature includes the sewage of early stage China small towns and the generation of vast rural area: pollutant Concentration is relatively low, is substantially free of heavy metal and poisonous and harmful substance;Sewage network is not yet popularized, and residential density is little and disperses, Sewage quantity is less.In order to build and run conveniently, it is widely applied based on the manpower rapid-infiltration technique of land treatment systems.Through practice Prove, this technique relies on the features such as construction and operating cost are low, and operation maintenance is simple, has played significantly in small towns and rural area Effect, be local environment and Regional Economic Development provides and provides powerful support for.
But the continuous development with Chinese society economy, industry and large-scale production progressively extend into small towns and rural area ground Area, is that the environment in above-mentioned area brings notable impact.So far, the manpower rapid-infiltration technique with land treatment systems as core start to manifest with Lower problem:
1st, the sewage water yield significantly increases so that the saturating technique of the manpower rapid-infiltration of alternate run cannot meet the sewage of continuous growth Process demand;
2nd, sewage quality significantly deteriorates, and small towns has assumed the feature based on production waste, and every water quality index significantly surpasses Cross the limit value that manually fast cementation process can bear;
3rd, float and poisonous and harmful substance entrance so that manpower rapid-infiltration pond blocking and filtrate pollution situation significantly Increase, operation maintenance is very loaded down with trivial details, and leads to some areas manpower rapid-infiltration pond to paralyse it is impossible to play disposal ability.
And country requires all the more strictly to the control of water pollution, one-level a processes standard and has implemented in full at home, at this Under background, manpower rapid-infiltration technique can not meet use requirement, it is desirable to provide new process and solution.If will be using people The facility of the fast cementation process of work is removed, and again builds sewage treatment facility, not only produces and greatly waste, and because this technique is big Multiposition is remote, and the difficulty of engineering construction and cost are very high, can bring larger burden for the economy of country and place.Therefore urgent Need to develop the stable technology of a kind of economy, energy-conservation, convenience, treatment effect, with meet manpower rapid-infiltration technique propose mark transformation will Ask.
Content of the invention
The technical problem to be solved is to provide a kind of facility that can utilize the fast cementation process of protoplast's work completely, The upgrading method based on manpower rapid-infiltration sewage treatment facility transformed just for some equipment.
The technical solution adopted in the present invention is: a kind of upgrading method based on manpower rapid-infiltration sewage treatment facility, The improvement to manpower rapid-infiltration sewage treatment facility, by manpower rapid-infiltration sewage treatment facility be used for pretreatment preformed precipitate pond and Sand filter is changed to secondary sedimentation tank and advanced treating filter tank, transform manpower rapid-infiltration cell body as ao pond, and is connected in parallel by former Mode is changed to the multistage ao pond of running of pumps in series parallel connection, specifically includes following steps:
1) calculate the volume in the manpower rapid-infiltration pond in manpower rapid-infiltration sewage treatment facility, judge whether to meet needed for pollutant The volume in ao pond, meets and carries out next step, otherwise abandons transforming;
2) respectively multiple manpower rapid-infiltration ponds cell body is transform as multistage ao pond, and by the parallel connection in former multiple manpower rapid-infiltration ponds even Connected to open up water hole between the cell body in adjacent ao pond and transform multistage ao pond as and be connected in series, be arranged as even level simultaneously The outlet in former manpower rapid-infiltration pond is retained in ao pond;
3) water side of coarse rack and lift pump room in manpower rapid-infiltration sewage treatment facility is directly connected to change by pipeline The water inlet in the multistage ao pond after making;
4) will be sequentially connected with the water side of described coarse rack and lift pump room in manpower rapid-infiltration sewage treatment facility Preformed precipitate pond and sand filter corresponding as the secondary sedimentation tank being sequentially connected and advanced treating sand filter, wherein, described two The input port of secondary sedimentation tank connects the water outlet end in the ao pond being arranged as even level, described advanced treating sand filter by pipeline Output port by pipeline (12) connect manpower rapid-infiltration sewage treatment facility in the ultraviolet disinfection pond being connected with total outlet pipe;
5) aerated conduit connect setting is all passed through in outside aerator in every one-level ao pond.
The depth of water in described improved ao pond is 2.2m.
All it is divided into the anoxic pond being connected and Aerobic Pond, setting diving wherein in anoxic pond inside described every one-level ao pond Agitator, described connect setting is laid in Aerobic Pond in the aerated conduit of outside aerator.
A kind of upgrading method based on manpower rapid-infiltration sewage treatment facility of the present invention, utilizes former manpower rapid-infiltration completely The facility of technique, reduces construction investment and transformation difficulty to greatest extent, and provides multiple flexible methods of operation.This Bright shallow pond multistage ao technique, can meet the transformation demand of most of manpower rapid-infiltration sewage treatment plants, and investment is low, energy consumption is low, Easily implement, conveniently manage, be with a wide range of applications.Have the following characteristics that
1st, improvement project no demolishes structures, significantly reduces construction investment and transformation difficulty;
2nd, the layout feature according to four manpower rapid-infiltration cell body, is transform as multistage ao technique, can retain major part and enter Outlet pipeline, and this PROCESS FOR TREATMENT effect is good, operation energy consumption is low, can meet the processing requirement to sewage for the country at present.
3rd, because manpower rapid-infiltration cell body is shallower, after transformation, form shallow pond aeration, have that energy consumption is low, stable, maintenance side Just feature.
4th, it is retained in second level ao pond after transforming and fourth stage ao Chi Chu sets ao pond outlet pipe, you can so that first order ao Pond, second level ao pond, third level ao pond and fourth stage ao pond cascade run, and can make first order ao pond and second level ao again Pond, third level ao pond and fourth stage ao pond parallel form run, and can improve technique fortune according to water quantity and quality situation real-time adjustment The motility of row, and save operation energy consumption further.
Brief description
Fig. 1 is the composition schematic diagram (taking four ponds as a example) of manpower rapid-infiltration sewage treatment system
Wherein:
21: coarse rack and lift pump room 22: preformed precipitate pond
23: sand filter 24: First manpower rapid-infiltration pond
25: the second 26: the three, manpower rapid-infiltration ponds manpower rapid-infiltration pond
27: the four manpower rapid-infiltration ponds 28: ultraviolet disinfection pond
29: water inlet manifold 210: manpower rapid-infiltration pond water inlet pipe
211: manpower rapid-infiltration pond outlet pipe 212: total outlet pipe
Fig. 2 is the composition schematic diagram of the sewage disposal system being obtained using the method for the present invention
Wherein:
1: coarse rack and lift pump room 2: secondary sedimentation tank
3: advanced treating sand filter 4: first order ao pond
5: second level ao pond 6: third level ao pond
7: fourth stage ao pond 8: ultraviolet disinfection pond
9: water inlet manifold 10:ao pond water inlet pipe
11: elevator pump export pipeline 12: outlet pipe
13: total outlet pipe 14: aerator
15: aerated conduit
Specific embodiment
With reference to a kind of embodiment and accompanying drawing upgrading based on manpower rapid-infiltration sewage treatment facility to the present invention Method is described in detail.
A kind of upgrading method based on manpower rapid-infiltration sewage treatment facility of the present invention, be to manpower rapid-infiltration sewage at The transformation of reason facility, by manpower rapid-infiltration sewage treatment facility be used for the preformed precipitate pond of pretreatment and sand filter be changed to secondary heavy Shallow lake pond and advanced treating filter tank, manpower rapid-infiltration cell body is transform as ao pond, and former parallel is changed to running of pumps in series parallel connection Multistage ao pond, specifically include following steps (with reference to Fig. 1, Fig. 2):
1) calculate the volume in the manpower rapid-infiltration pond (24,25,26,27) in manpower rapid-infiltration sewage treatment facility, judge whether Meet the volume in ao pond 4,5,6,7 needed for pollutant, meet and carry out next step, otherwise abandon transforming;
2) there is conventional ao in ao pond, is inverted the kinds of schemes such as ao, improvement ao, and the present invention arranges according to the present situation in manpower rapid-infiltration pond Feature it is considered to it is arranged side by side, each group of people's work ooze soon pond all have pipeline access, therefore treatment in accordance with local conditions transform as multistage ao Technique, so can retain technique major part inlet and outlet pipe, and multistage ao PROCESS FOR TREATMENT effect is good, operation energy consumption is low, can meet The processing requirement to sewage for the country.It is deep, wherein: packing layer thickness about 120cm, bottom 60cm that manpower rapid-infiltration cell body is usually 2.5m It is used for laying collecting conduit and collecting oozing pond water outlet soon for stone layer, form is used for similar to conventional rapid filter structure, top 40cm Water distribution water, separately has 30cm to be superelevation.Filler in manpower rapid-infiltration pond etc. is all removed by the present invention, only retains concrete basin. That is, respectively multistage manpower rapid-infiltration pond 24,25,26,27 cell body is transform as multistage ao pond, i.e. first order ao pond 4, second level ao pond 5th, third level ao pond 6, fourth stage ao pond 7, described improved first order ao pond 4, second level ao pond 5, third level ao pond 6, The depth of water in fourth stage ao pond 7 is 2.2m, and being connected in parallel former multistage manpower rapid-infiltration pond 24,25,26,27 by adjacent ao Open up water hole between the cell body in pond and transform multistage ao pond as and be connected in series so that four former cell body in parallel are changed to cloth of connecting Put, make reaction more abundant.Retain the outlet in former manpower rapid-infiltration pond in the ao pond being arranged as even level, described is every simultaneously All it is divided into the anoxic pond being connected and Aerobic Pond, setting submersible agitator, connect setting wherein in anoxic pond inside one-level ao pond It is laid in Aerobic Pond in the aerated conduit of outside aerator, after transformation, forms the feature of shallow pond aeration, low blast may be selected Aerator, have energy consumption low, stable, easy to maintenance the features such as;Can so that first order ao pond 4, second level ao pond 5, the Three-level ao pond 6 and fourth stage ao pond 7 cascade run, and can make first order ao pond 4 and second level ao pond 5, third level ao again Pond 6 and fourth stage ao pond 7 parallel form run, and can improve the mutation feelings to the water yield according to water quantity and quality situation real-time adjustment The adaptability of condition, saves operation energy consumption further.
3) water side of coarse rack and lift pump room 21 in manpower rapid-infiltration sewage treatment facility is directly connected by pipeline 10 Connect the water inlet in improved multistage ao pond 4,5,6,7;
4) will connect successively with the water side of described coarse rack and lift pump room 21/1 in manpower rapid-infiltration sewage treatment facility The preformed precipitate pond 22 connecing and sand filter 23 corresponding as the secondary sedimentation tank 2 being sequentially connected and advanced treating sand filter 3, its In, the input port of described secondary sedimentation tank 2 passes through elevator pump export pipeline 11 and connects going out of the ao pond being arranged as even level Mouth of a river end, the output port of described advanced treating sand filter 3 by pipeline 12 connect in manpower rapid-infiltration sewage treatment facility with The ultraviolet disinfection pond 8 that total outlet pipe is connected;
5) aerated conduit connect setting is all passed through in outside aerator in every one-level ao pond.
As shown in Fig. 2 water inlet end is included using the improved sewage disposal system of the inventive method connect water inlet manifold 9 Coarse rack and lift pump room 1, ultraviolet disinfection pond 8, advanced treating sand filter 3, the water outlet of described coarse rack and lift pump room 1 End connects first order ao pond 4, second level ao pond 5, third level ao pond 6 and fourth stage ao pond 7 respectively by ao pond water inlet pipe 10 Water inlet end, described first order ao pond 4, second level ao pond 5, third level ao pond 6 and fourth stage ao pond 7 are to be sequentially connected in series, its Described in the water side in second level ao pond 5 and fourth stage ao pond 7 pass through the entering of elevator pump export pipeline 11 connecting secondary sedimentation tank 2 Water end (W.E.), the water side of described secondary sedimentation tank 2 connects the water inlet end of described advanced treating sand filter 3, described advanced treating sand filtration The water side in pond 3 connects the water inlet end in described ultraviolet disinfection pond 8 by outlet pipe 12, and the water side in described ultraviolet disinfection pond 8 is even Connect total outlet pipe 13.Described first order ao pond 4, second level ao pond 5, third level ao pond 6 and fourth stage ao pond 7 are also passed through respectively Aerated conduit 15 connects aerator 14.
A kind of upgrading method based on manpower rapid-infiltration sewage treatment facility of the present invention, retains at manpower rapid-infiltration sewage Reason system whole prior art structures, but equipment in technological process and part structures is transformed.Improved shallow pond Multistage ao technique includes coarse rack and lift pump room 1, and it is improved even into four that subsequent sewage passes through ao pond water inlet pipe 10 For being sequentially connected in series first order ao pond 4, second level ao pond 5, third level ao pond 6 and the fourth stage ao pond 7 of relation, and in second level ao Pond 5 and fourth stage ao Chi7Chu set elevator pump export pipeline 11, and sewage is accessed the secondary sedimentation tank 2 being transformed into by preformed precipitate pond, Subsequently access advanced treating sand filter 3 and do further filtration treatment, after process, ultraviolet disinfection pond 8 is accessed by outlet pipe 12, and It is discharged to outside factory eventually through total outlet pipe 13.For meeting the aeration requirement of ao pond, construct aerator 14, and lay aerating pipelines 15 and connect Enter each ao pond.
The present invention sets ao pond outlet pipe in second level ao pond and fourth stage ao Chi Chu, you can so that first order ao pond, second Level ao pond, third level ao pond and fourth stage ao pond cascade run, can make again first order ao pond and second level ao pond, the 3rd Level ao pond and fourth stage ao pond parallel form run, and can improve the spirit of process operation according to water quantity and quality situation real-time adjustment Activity, and save operation energy consumption further.

Claims (3)

1. a kind of upgrading method based on manpower rapid-infiltration sewage treatment facility is it is characterised in that be to manpower rapid-infiltration sewage The improvement for the treatment of facility, by manpower rapid-infiltration sewage treatment facility be used for the preformed precipitate pond of pretreatment and sand filter be changed to secondary Sedimentation tank and advanced treating sand filter, manpower rapid-infiltration cell body is transform as ao pond, and connection in series-parallel is changed to by former parallel The multistage ao pond run, specifically includes following steps:
1) calculate the volume in the manpower rapid-infiltration pond in manpower rapid-infiltration sewage treatment facility, judge whether to meet ao pond needed for pollutant Volume, meet carry out next step, otherwise abandon transform;
2) respectively multiple manpower rapid-infiltration ponds cell body is transform as multistage ao pond, and will be logical for being connected in parallel of former multiple manpower rapid-infiltration ponds Cross to open up water hole between the cell body in adjacent ao pond and transform multistage ao pond as and be connected in series, simultaneously in the ao pond being arranged as even level The middle outlet retaining former manpower rapid-infiltration pond;
3) water side of coarse rack and lift pump room in manpower rapid-infiltration sewage treatment facility is directly connected to after transformation by pipeline Multistage ao pond water inlet;
4) preliminary sedimentation being sequentially connected with the water side of described coarse rack and lift pump room in manpower rapid-infiltration sewage treatment facility , accordingly as the secondary sedimentation tank being sequentially connected and advanced treating sand filter, wherein, described is secondary heavy for shallow lake pond and sand filter The input port in shallow lake pond by pipeline connect be arranged as even level ao pond water outlet end, described advanced treating sand filter defeated Exit port connects the ultraviolet disinfection pond being connected with total outlet pipe in manpower rapid-infiltration sewage treatment facility by pipeline (12);
5) aerated conduit connect setting is all passed through in outside aerator in every one-level ao pond.
2. a kind of upgrading method based on manpower rapid-infiltration sewage treatment facility according to claim 1, its feature exists In the depth of water in described improved ao pond is 2.2m.
3. a kind of upgrading method based on manpower rapid-infiltration sewage treatment facility according to claim 1, its feature exists In being all divided into the anoxic pond being connected and Aerobic Pond inside described every one-level ao pond, setting submersible agitating wherein in anoxic pond Device, described connect setting is laid in Aerobic Pond in the aerated conduit of outside aerator.
CN201510320565.2A 2015-06-11 2015-06-11 Upgrading and reconstruction method based on constructed rapid infiltration sewage treatment facility Expired - Fee Related CN104891745B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510320565.2A CN104891745B (en) 2015-06-11 2015-06-11 Upgrading and reconstruction method based on constructed rapid infiltration sewage treatment facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510320565.2A CN104891745B (en) 2015-06-11 2015-06-11 Upgrading and reconstruction method based on constructed rapid infiltration sewage treatment facility

Publications (2)

Publication Number Publication Date
CN104891745A CN104891745A (en) 2015-09-09
CN104891745B true CN104891745B (en) 2017-01-18

Family

ID=54024781

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510320565.2A Expired - Fee Related CN104891745B (en) 2015-06-11 2015-06-11 Upgrading and reconstruction method based on constructed rapid infiltration sewage treatment facility

Country Status (1)

Country Link
CN (1) CN104891745B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105417866A (en) * 2015-12-03 2016-03-23 重庆甘泰环保设备有限公司 Constructed rapid infiltration sewage treatment system
CN105293741A (en) * 2015-12-03 2016-02-03 重庆甘泰环保设备有限公司 Market town domestic sewage treatment method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5100837A (en) * 1989-05-30 1992-03-31 Lanxide Technology Company, Lp Method of making ceramic composite bodies incorporating filler material and bodies produced thereby
US20060029472A1 (en) * 2004-08-09 2006-02-09 Blackwood Charles R Subsurface drainage system
CN101597126B (en) * 2009-07-07 2012-05-23 重庆大学 Sewage treatment method suitable for small mountainous towns
CN102616985A (en) * 2012-03-16 2012-08-01 张国臣 Ecological type manual fast-permeability sewage processing system
CN102583747B (en) * 2012-03-20 2016-04-06 哈尔滨工业大学 A kind of high ammonia nitrogen leather-making waste water biochemical denitrification treatment unit and technique
CN104176882B (en) * 2014-08-12 2016-03-16 中国科学院水生生物研究所 A kind of inlet method and device improving artificial filtration system nitric efficiency

Also Published As

Publication number Publication date
CN104891745A (en) 2015-09-09

Similar Documents

Publication Publication Date Title
CN204824550U (en) A device for rural domestic sewage treatment
CN108249573A (en) A kind of biologic purifying pot for sewage disposal
CN108503136A (en) River regulation system
CN104891745B (en) Upgrading and reconstruction method based on constructed rapid infiltration sewage treatment facility
CN203668118U (en) Integrated reclaimed water treatment equipment adopting compound circulating biochemical membrane
CN107445304B (en) Enhanced denitrification method and enhanced denitrification wetland system suitable for subsurface flow constructed wetland
CN103755027B (en) Composite circular biochemical film reclaimed water integral treatment equipment and process
CN104961297A (en) Integrated sewage bio-treatment column
CN108483649A (en) A kind of Orbal/MBR integrated reactors of processing Rural Waste Water
CN205367870U (en) Dark bed bioreactor of denitrification
CN204958649U (en) No pump formula degree of depth sewage treatment integration equipment
CN106746379A (en) A kind of high concentration organic sewage treating system
CN202924854U (en) Flocculation rotary table filter tank of sewage treatment
CN208345857U (en) Ardealite storage yard percolate biochemical treatment apparatus
CN203295324U (en) Novel integrated sewage treatment machine
CN205528247U (en) Field town domestic sewage purification system
CN206408065U (en) The modular integrated processing equipment of complex media
CN202022825U (en) Sewage treating appliance
CN207685083U (en) A kind of high efficiency sewage treatment facility
CN207313222U (en) A kind of intermittent aerating circular form biochemical reactor
CN207047064U (en) A kind of environmentally friendly, intelligent rural domestic sewage treatment equipment
CN206881528U (en) A kind of MBR films on-line cleaning system and its reaction tank
CN206654773U (en) The device of vertical internal-external double circulation continuous flow process Treating Municipal Sewage
CN213623765U (en) AO coupling SBBR rural tubule net integration sewage treatment plant
CN205367873U (en) Denitrification filtering pond device of granule diatomaceous earth has been used

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170118

Termination date: 20200611

CF01 Termination of patent right due to non-payment of annual fee