[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN104879649B - Method for transferring tank by using LNG low-pressure external pipeline - Google Patents

Method for transferring tank by using LNG low-pressure external pipeline Download PDF

Info

Publication number
CN104879649B
CN104879649B CN201510240743.0A CN201510240743A CN104879649B CN 104879649 B CN104879649 B CN 104879649B CN 201510240743 A CN201510240743 A CN 201510240743A CN 104879649 B CN104879649 B CN 104879649B
Authority
CN
China
Prior art keywords
lng
low
low pressure
operated valve
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510240743.0A
Other languages
Chinese (zh)
Other versions
CN104879649A (en
Inventor
林素辉
黎晖
林晓东
王海伟
徐雷红
张远杰
刘浩
庄楚平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNOOC Fujian Gas Co Ltd
Original Assignee
CNOOC Fujian Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNOOC Fujian Gas Co Ltd filed Critical CNOOC Fujian Gas Co Ltd
Priority to CN201510240743.0A priority Critical patent/CN104879649B/en
Publication of CN104879649A publication Critical patent/CN104879649A/en
Application granted granted Critical
Publication of CN104879649B publication Critical patent/CN104879649B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention relates to a method for transferring a tank by using an LNG low-pressure outward pipeline, which comprises the following steps: 1) before the LNG tank is inverted, the pneumatic valve interlock of the outlet of the low-pressure pump is released; 2) opening a pneumatic valve on an outlet pipeline of the low-pressure pump; 3) the control valve on the minimum return line of the low-pressure pump is used for regulating the pouring flow. The method of the invention can reduce the generation of BOG of the LNG receiving station, improve the tank-dumping efficiency, and simultaneously improve the controllability and the like by shortening the distance and utilizing the minimum return line of the low-pressure pump to perform the tank-dumping operation.

Description

A kind of method that the LNG of utilization low pressure external transport pipeline carries out tank switching
Technical field
The present invention relates to a kind of method that the LNG of utilization low pressure external transport pipeline carries out tank switching.
Background technology
LNG just applies in large scale investment market as a kind of clean energy resource, and LNG typically uses low temperature resistant Containers store, because of the absorption of outside energy during storing, or the new LNG density injected is different, LNG in storage tank is likely to occur layering, after layering occurs, if not taking mixed liquid or tank switching measure, and may Rolling occurs, affects storage tank and operations staff's safety.Existing tank switching method operation during because of pipe Track pitch is from longer, and the BOG amount of generation is relatively big, and tank switching speed is relatively slow, it addition, because not having on main pipeline There is regulation valve uncontrollable tank switching flow.
Summary of the invention
The technical problem to be solved is to provide a kind of utilization improving tank switching efficiency and controllability The method that LNG low pressure external transport pipeline carries out tank switching.
The technical scheme is that one utilizes LNG low pressure external transport pipeline The method carrying out tank switching, comprises the following steps:
1) LNG is poured into before the second storage tank from the first storage tank, first release on LNG low pressure external transport pipeline The interlocking of the second low pressure pump outlet pneumatic operated valve;
2) the first discharging pipeline hand-operated valve of being then shut off on discharging pipeline, the second discharging pipeline hand-operated valve, 3rd discharging pipeline hand-operated valve and the 4th discharging pipeline hand-operated valve, close on the first low-lift pump minimum reflux line The first minimum reflux linear flow rate control valve, close the first harbour pipeloop gas on harbour pipeloop Dynamic valve and the second harbour pipeloop pneumatic operated valve;
3) start the first low-lift pump, open the first low pressure pump outlet pneumatic operated valve, the second low pressure pump outlet gas Dynamic valve, opens the second minimum reflux linear flow rate control valve on the second low-lift pump minimum reflux line;
4) the LNG defeated pipe outside described LNG low pressure got by the first low-lift pump in the first storage tank Line, the most again by described second low-lift pump minimum reflux line, and utilizes described second minimum reflux line stream Control valve regulation tank switching flow, pours into described LNG in the second storage tank.
The invention has the beneficial effects as follows:
The method of the present invention is shortened by distance, utilizes low-lift pump minimum reflux line to carry out tank switching operation, just The generation of LNG receiving station BOG can be reduced, improve tank switching efficiency, improve controllability etc. simultaneously.
On the basis of technique scheme, the present invention can also do following improvement.
Further, in step 4) in, utilize described second minimum reflux linear flow rate control valve regulation tank switching Flow is 370 cubes ms/h.
Accompanying drawing explanation
Fig. 1 is that the present invention utilizes LNG low pressure external transport pipeline to carry out the schematic flow sheet of method of tank switching;
In accompanying drawing, the list of parts representated by each label is as follows:
1, the first storage tank, the 2, first discharging pipeline hand-operated valve, the 3, second discharging pipeline hand-operated valve, 4, First low pressure pump outlet check valve, the 5, first minimum reflux linear flow rate control valve, the 6, first low pressure pumps out Mouth pneumatic operated valve, the 7, second storage tank, the 8, the 3rd discharging pipeline hand-operated valve, the 9, the 4th discharging pipeline is manual Valve, the 10, second low pressure pump outlet check valve, the 11, second minimum reflux linear flow rate control valve, 12, Two low pressure pump outlet pneumatic operated valves, the 13, first harbour pipeloop pneumatic operated valve, the 14, second harbour circulation pipe Line pneumatic operated valve, 15, flow control valve, 16, discharging pipeline, 17, harbour pipeloop, 18, LNG Low pressure external transport pipeline, the 19, first low-lift pump, the 20, second low-lift pump.
Detailed description of the invention
Being described principle and the feature of the present invention below in conjunction with accompanying drawing, example is served only for explaining this Invention, is not intended to limit the scope of the present invention.
As it is shown in figure 1, discharging pipeline 16 is provided with the first discharging pipeline hand-operated valve 2, the second discharging pipeline Hand-operated valve 3, the 3rd discharging pipeline hand-operated valve 8, the 4th discharging pipeline hand-operated valve 9, discharging pipeline 16 In termination inserts the first storage tank 1 respectively and in the second storage tank 7;LNG low pressure external transport pipeline is provided with first Low pressure pump outlet check valve 4, the first low pressure pump outlet pneumatic operated valve 6, the second low pressure pump outlet pneumatic operated valve 12, Second low pressure pump outlet check valve 10 and flow control valve 15;Harbour pipeloop 17 is provided with first yard Head pipeloop pneumatic operated valve 13, the second harbour pipeloop pneumatic operated valve 14;It is provided with in first storage tank 1 It is provided with the second low-lift pump 20 in one low-lift pump 19 and the second storage tank 7;First minimum reflux linear flow rate controls Valve 5 is located on the first minimum reflux line, and the first minimum reflux line is low with discharging pipeline 16 and LNG respectively Pressure external transport pipeline 18 is connected;Second minimum reflux linear flow rate control valve 11 is located at the second minimum reflux line On, the second minimum reflux line is connected with discharging pipeline 16 and LNG low pressure external transport pipeline 18 respectively;Code Head pipeloop 17 is connected with LNG low pressure external transport pipeline 18;The two ends of LNG low pressure external transport pipeline 18 It is connected with the first low-lift pump 19 in the first storage tank 1 and the second low-lift pump 20 in the second storage tank 7 respectively Connect.
A kind of method that the LNG of utilization low pressure external transport pipeline carries out tank switching, (direction of arrow is as shown in Figure 1 The idiographic flow of tank switching), comprise the following steps:
1) LNG is poured into before the second storage tank 7 from the first storage tank 1, first release the outer defeated pipe of LNG low pressure The interlocking of the second low pressure pump outlet pneumatic operated valve 12 on line 18;
2) first discharging pipeline hand-operated valve the 2, the second discharging pipeline hands being then shut off on discharging pipeline 16 Dynamic valve the 3, the 3rd discharging pipeline hand-operated valve 8 and the 4th discharging pipeline hand-operated valve 9, close the first low-lift pump The first minimum reflux linear flow rate control valve 5 on minimum reflux line, closes the on harbour pipeloop 17 One harbour pipeloop pneumatic operated valve 13 and the second harbour pipeloop pneumatic operated valve 14,;
3) start the first low-lift pump 19, open first low pressure pump outlet pneumatic operated valve the 6, second low pressure and pump out Mouth pneumatic operated valve 12, opens the second minimum reflux linear flow rate control valve on the second low-lift pump minimum reflux line 11;
4) LNG got by the first low-lift pump 19 in the first storage tank 1 is outside described LNG low pressure Defeated pipeline 18, the most again by described second low-lift pump minimum reflux line, and utilizes described second minimum time Streamline flow control valve 11 regulates tank switching flow and is 370 cubes ms/h, pours described LNG into second In storage tank 7.
Hereinafter again by actual mechanical process, LNG low pressure external transport pipeline is utilized further illustrating the present invention The method carrying out tank switching:
XX province LNG, in 20XX XX day month XX, because 4# tank discharging pipeline cannot come into operation, uses LNG Low pressure external transport pipeline carries out tank switching, utilizes low pressure pump outlet minimum reflux linear flow rate control valve FV to control stream Amount, three low pressure external transport pipeline aggregate flows reach 1110m3/ h, does not carries out BOG emptying during tank switching, Reach Expected Results.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all in the present invention Spirit and principle within, any modification, equivalent substitution and improvement etc. made, should be included in this Within bright protection domain.

Claims (2)

1. one kind utilizes the method that LNG low pressure external transport pipeline carries out tank switching, it is characterised in that include with Lower step:
1) LNG is poured into before the second storage tank from the first storage tank, first release on LNG low pressure external transport pipeline The interlocking of the second low pressure pump outlet pneumatic operated valve;
2) the first discharging pipeline hand-operated valve of being then shut off on discharging pipeline, the second discharging pipeline hand-operated valve, 3rd discharging pipeline hand-operated valve and the 4th discharging pipeline hand-operated valve, close on the first low-lift pump minimum reflux line The first minimum reflux linear flow rate control valve, close the first harbour pipeloop gas on harbour pipeloop Dynamic valve and the second harbour pipeloop pneumatic operated valve;
3) start the first low-lift pump, open the first low pressure pump outlet pneumatic operated valve, the second low pressure pump outlet gas Dynamic valve, opens the second minimum reflux linear flow rate control valve on the second low-lift pump minimum reflux line;
4) the LNG defeated pipe outside described LNG low pressure got by the first low-lift pump in the first storage tank Line, the most again by described second low-lift pump minimum reflux line, and utilizes described second minimum reflux line stream Control valve regulation tank switching flow, pours into described LNG in the second storage tank.
The method that the LNG of utilization low pressure external transport pipeline the most according to claim 1 carries out tank switching, its It is characterised by, in step 4) in, utilize described second minimum reflux linear flow rate control valve regulation tank switching stream Amount is 370 cubes ms/h.
CN201510240743.0A 2015-05-13 2015-05-13 Method for transferring tank by using LNG low-pressure external pipeline Expired - Fee Related CN104879649B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510240743.0A CN104879649B (en) 2015-05-13 2015-05-13 Method for transferring tank by using LNG low-pressure external pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510240743.0A CN104879649B (en) 2015-05-13 2015-05-13 Method for transferring tank by using LNG low-pressure external pipeline

Publications (2)

Publication Number Publication Date
CN104879649A CN104879649A (en) 2015-09-02
CN104879649B true CN104879649B (en) 2017-01-04

Family

ID=53947254

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510240743.0A Expired - Fee Related CN104879649B (en) 2015-05-13 2015-05-13 Method for transferring tank by using LNG low-pressure external pipeline

Country Status (1)

Country Link
CN (1) CN104879649B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109163216B (en) * 2018-09-26 2024-02-09 苏州市创优净化科技有限公司 Safe intelligent liquid ammonia vaporization system

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH656694A5 (en) * 1982-08-16 1986-07-15 Bruno A Mock CONTROL ARM TO BE INSERTED INTO THE FLOW PATHS OF A PLANT FOR REFILLING GAS-SHAPED AND / OR LIQUID-GAS SHAPED PRESSURE MEDIA.
JP2001226684A (en) * 2000-02-17 2001-08-21 Air Liquide Japan Ltd Gas supply facility
JP2006275134A (en) * 2005-03-29 2006-10-12 Osaka Gas Co Ltd Liquefied gas transfer system
CN101709708A (en) * 2009-12-14 2010-05-19 江苏双轮泵业机械制造有限公司 Automatically-controlling liquid-unloading pump
CN202852423U (en) * 2012-09-27 2013-04-03 鞍钢股份有限公司 Acid liquor storage system convenient for tank switching operation
CN203628254U (en) * 2013-12-13 2014-06-04 自贡通达机器制造有限公司 LNG (liquefied natural gas) dual-pump dual-tank rapidly liquid adding device
CN203979869U (en) * 2014-07-28 2014-12-03 北京长征天民高科技有限公司 LNG gas station has the liquid system of unloading that reduces discharging BOG

Also Published As

Publication number Publication date
CN104879649A (en) 2015-09-02

Similar Documents

Publication Publication Date Title
CN101720489A (en) Nuclear power plant using nanoparticles in emergency systems and related method
CN104964161B (en) BOG (boil off gas) recovery processing method and system for LNG (liquid natural gas) receiving terminal
CN104879649B (en) Method for transferring tank by using LNG low-pressure external pipeline
CN104165266B (en) A kind of pressure reduction formula liquefied natural gas filling station adds injection system and method thereof
CN205118653U (en) LNG is from pressure boost device of unloading
CN202432245U (en) Natural gas control device for compressor instrument air
CN208535560U (en) Compressed gas recovery system in a kind of cryogenic liquid transport tank car
CN204829271U (en) LNG receiving terminal BOG recycling processed system
CN206295794U (en) Limestone-gypsum wet desulfuration one is with three for lime stone pulp feeding system
CN202203461U (en) Excess high pressure safety valve
CN205156674U (en) Closed -system cooling tower system of preventing frostbite
CN211011317U (en) Deaerator exhaust steam recovery device
CN207569544U (en) Liquid reagent filling device for normal pressure pipeline system
CN201672243U (en) Device of LNG filling station with automatic pressure reducing function
CN202352453U (en) On-site oil storage tank of transformer
CN206904574U (en) A kind of natural gas in low temperature tank economy is depressured pipeline
CN104697290B (en) The recovery system and application method of the unnecessary nitrogen of fractionating column in oxygen generating plant
CN204268068U (en) A kind of recovering device for liquid argon
CN210950796U (en) Chloroethylene spherical tank safety control system
CN105465377B (en) A kind of dismountable LNG storage tank shaft bottom valve
CN203819486U (en) Cabin cleaning equipment
CN204083792U (en) A kind of tank car is detained LNG collecting device
CN204328473U (en) A kind of valve integrated device of liquefied natural gas (LNG) tank
CN105223005B (en) A kind of nozzle endurance testing device
CN221183258U (en) Concrete repair liquid spraying device capable of considering saline corrosion

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170104

Termination date: 20190513