A kind of modularization mobile house installation method
Technical field
The present invention relates to mobile house mounting process, specifically, a kind of especially modularization mobile house installation method.
Background technology
In the evolution of housing industrialization, the room industrialization that builds a house soon is gradually risen, and lightweight steel construction gradually replaces tradition
Brick is mixed, steel and concrete structure, and lightweight steel construction also has the advantages that antidetonation, wind resistance, environmental protection and energy saving, but uses lightweight steel construction mistake at present
Cheng Zhong, it is necessary first to build the foundation that next step can be just carried out after a framework for light steel, this process it is more rigorous complicated and
The required time is long, causes to delay the duration, does not meet and build a house soon room industrialization demand.
The content of the invention
The present invention is directed to above-mentioned problem, there is provided a kind of modularization mobile house installation method, the installation method can be quick
Set up house.
The technical proposal of the invention is realized in this way:A kind of modularization mobile house installation method, comprises the following steps:
S1:The surrounding of the base of packaging box shape is outwards overturn, until parallel to the ground;
S2:Left wall mechanism and right wall mechanism are moved into precalculated position to both sides respectively, while roof side plate is rotated up,
The support bar of middle wallboard both sides moves forward to precalculated position;
S3:The expansion board of middle wallboard both sides is overturn, until expansion board with middle wallboard at grade, left wall telephone
Structure and right wall mechanism, by shifting, make it vertical with expansion board be connected to centre;
S4:After movable plate on the inside of middle wallboard is moved upwards up to precalculated position, connecting plate is turned to movable plate same
In one plane, roof intermediate plate both sides flip out roofing board is extended;
S5:Supporting plate in front of intermediary agency is rotated up after vertical with middle wallboard, and they sup-port is risen into branch
Fagging;
S6:Roof intermediate plate is ridden over supporting plate top, while roof side plate is ridden in expansion board.
In a kind of above-mentioned modularization mobile house installation method, described expansion board is consolidated by rivet with seat is mounted
Fixed connection.
In a kind of above-mentioned modularization mobile house installation method, described connecting plate is turned to movable plate same flat
After on face, by bearing pin by connecting plate latched position.
The present invention has the following advantages that compared with prior art:Implement modularization mobile house provided by the present invention to install
During method, after only need to each extending left wall mechanism, right wall mechanism and these three modules of intermediary agency, interconnect, its
Operating process is simple and convenient, and the time is short, effectively shortens the construction period, has met and build a house soon room industrialization demand.
Brief description of the drawings
Fig. 1 is flow chart of the invention.
Fig. 2 is mobile status figure of the invention.
Fig. 3 is movable plate installment state figure of the present invention.
Fig. 4 is the side view that connecting plate is folded.
Fig. 5 is supporting plate holding state figure.
Fig. 6 is installation figure of the present invention.
In figure:Intermediary agency 1, left wall mechanism 2, right wall mechanism 3, roof side plate 4, framed side wallboard 5, the first cylinder mechanism 6, limit
Position mounting seat 7, support bar 8, middle wallboard 9, roof intermediate plate 10, base 11, extension roofing board 12, connecting plate 13, expansion board
14th, movable plate 15, supporting plate 16, the second cylinder 17.
Specific embodiment
A kind of modularization mobile house installation method with reference to shown in Fig. 1 to Fig. 6, comprises the following steps:
S1:The surrounding of the base 11 of packaging box shape is outwards overturn, until parallel to the ground, the plate of the surrounding of base 11
Block can be connected by Hinge, so that can 90 degree of selections up or down.
S2:Left wall mechanism 2 and right wall mechanism 3 are moved into precalculated position to both sides respectively again, while roof side plate 4 is upward
Rotate, the support bar 8 of the both sides of middle wallboard 9 moves forward to precalculated position.
As shown in Fig. 2 roof side plate 4 is connected by the first cylinder mechanism 6 with framed side wallboard 5, first cylinder mechanism 6 it is upper
Lower end is rotatable, and support bar 8 is arranged on the both sides of intermediary agency 1, and the support bar 8 can directly take out and move to precalculated position.
S3:The expansion board 14 of the both sides of middle wallboard 9 is overturn, until expansion board 14 with middle wallboard 9 at grade,
Left wall mechanism 2 and right wall mechanism 3, by shifting, make it vertical with expansion board 14 be connected to centre.
As shown in Fig. 2 and Fig. 3 is combined, the described both sides of middle wallboard 9 are provided with expansion board 14, and described expansion board 14 passes through
Rivet be mounted seat 7 be fixedly connected, the expansion board 14 can coaxial type device with centre wallboard 9 be connected, so as to both sides can be made
Expansion board 14 rotate forward or backward.
S4:After the movable plate 15 of the inner side of middle wallboard 9 is moved upwards up to precalculated position, connecting plate 13 is turned to and movable plate
15 at grade, and the both sides of roof intermediate plate 10 flip out roofing board 12 is extended.
Such as Fig. 3 and Fig. 4, described connecting plate 13 turn to movable plate 15 at grade after, will be even by bearing pin
The latched position of fishplate bar 13, the described both sides of movable plate 15 are connected by cylinder with the middle inner side of wallboard 9, and the cylinder can drive shifting
Dynamic plate 15 is moved up and down, and the described lower end of connecting plate 13 rotates with the upper end of movable plate 15 and is connected, in the upper end of connecting plate 13 and roof
Between the lower end of plate 10 rotate connection, described both sides of roof intermediate plate 10 rotate connection extension roofing board 12 triangular in shape.
S5:The supporting plate 16 in the front of intermediary agency 1 is rotated up after vertical with middle wallboard 9, and support bar 8 is supported
Play supporting plate 16.
As shown in Fig. 2 and Fig. 5 is combined, described supporting plate 16 is arranged on the front of roof intermediate plate 10, and the supporting plate 16 is led to
Cross the second cylinder 17 to be connected with middle wallboard 9, by second cylinder 17 supporting plate 16 can be driven to rotate upwardly and downwardly, described support
Railing can be provided with bar 8, the upper end of support bar 8 supports supporting plate 16, and lower end is connected with base 11.
S6:Roof intermediate plate 10 is ridden over the top of supporting plate 16, while roof side plate 4 is ridden in expansion board 14.
After the present invention only need to each extend left wall mechanism, right wall mechanism and these three modules of intermediary agency, interconnect
, its operating process is simple and convenient, and the time is short, effectively shortens the construction period, has met and build a house soon room industrialization demand.