[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN104695863B - Method for correcting track of horizontal well - Google Patents

Method for correcting track of horizontal well Download PDF

Info

Publication number
CN104695863B
CN104695863B CN201510041083.3A CN201510041083A CN104695863B CN 104695863 B CN104695863 B CN 104695863B CN 201510041083 A CN201510041083 A CN 201510041083A CN 104695863 B CN104695863 B CN 104695863B
Authority
CN
China
Prior art keywords
horizontal well
pilot hole
drilling trajectory
track
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510041083.3A
Other languages
Chinese (zh)
Other versions
CN104695863A (en
Inventor
程喜平
李安兵
史风月
杨钢铁
肖国福
刁志阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ENN Science and Technology Development Co Ltd
Original Assignee
ENN Science and Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ENN Science and Technology Development Co Ltd filed Critical ENN Science and Technology Development Co Ltd
Priority to CN201510041083.3A priority Critical patent/CN104695863B/en
Publication of CN104695863A publication Critical patent/CN104695863A/en
Application granted granted Critical
Publication of CN104695863B publication Critical patent/CN104695863B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • E21B7/046Directional drilling horizontal drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/295Gasification of minerals, e.g. for producing mixtures of combustible gases

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention relates to a method for correcting track of a horizontal well. The method for correcting the track of the horizontal well is used for mutually butting the horizontal well with butting guiding holes, wherein a practical drilling track position of the horizontal well and a designed gasification tunnel track of the horizontal well are approximately the same, and the practical drilling track is regulated by forming two symmetrical guiding holes in the two sides of a ground horizontal projection of the gasification tunnel track, so that the practical drilling track is consistent with the gasification tunnel track. According to the method for correcting the track of the horizontal well, the smoothness of a well track can be ensured, and the drilling frictional resistance is reduced, so that the construction difficulty of a horizontal section is reduced, the safety construction of well drilling is facilitated, and the construction target hitting rate is improved.

Description

Horizontal well path bearing calibration
Technical field
The present invention relates to a kind of coal underground gasification technology field, refers in particular to horizontal well path bearing calibration.
Background technology
Coal underground gasification technology be primarily referred to as coal, coke either the solid fuel such as semicoke high-temperature pressure or add press strip React with gasifying agent under part, be converted into the process of gaseous product or a small amount of residue.The gasifying agent is mainly vapor, sky Gas (either oxygen) or their gaseous mixture.Coal gasification processes can be used to produce fuel gas, used as industrial kiln gas Or town gas, it can also be used to gaseous mixture is manufactured, as the raw material of synthesis ammonia, synthesizing methanol and synthetic liquid fuel, therefore Coal gasification is one of important technology of Coal Chemical Industry.
Prevailing peupendicular hole, but peupendicular hole is often utilized to yield poorly, develop in China's coal seam gasification exploitation at this stage High cost, therefore seriously constrain the increasing the storage in coal seam and open yield, bring severe challenge to the high-efficiency and economic exploitation in coal seam;And water Especially extended horizontal well is a kind of important channel for realizing coal seam gasification Efficient Development to horizontal well, but horizontal well is difficult to lower rafting Equipment is adopted, therefore generally then subdrilling gas production Vertical Well is mutually butted with horizontal well, using the strong of drill bit rear end setting during docking Magnetic joint is completed.Current both at home and abroad near-end docking technique relative maturity, the field signal that the strong magnetic joint is produced it is effective Distance is typically between 50 to 60 meters, but the development developed with coal seam gasification, occurs in that the new coal bed gas such as U-shaped well, E type wells The well type of horizontal well, and these well type are the characteristics of have horizontal range long.Conventional measurement while drilling mode can be produced with well depth increase Accumulated error, accumulated error is excessive, and butt-joint operation may be made to need the well section of adjustment more than 60 meters, so as to cause well docking to be lost Lose, the accident of landfill well occur, it is also possible to cause horizontal well larger track adjustment occur, so as to be difficult to decentralization production supporting Sleeve pipe, affects the whole structure of coal seam gasification exploitation.
In order to overcome the problems referred to above, a kind of existing method is the pipe nipple structure by changing the strong magnetic joint of docking, will be right Connect measured distance and increase to 90 to 95 meters, so as to realize being mutually butted for Vertical Well and horizontal well;Another kind of method such as Fig. 1 institutes Show, docking pilot hole 120 is set at the position for meeting design requirement, then by changing the pipe nipple structure for docking strong magnetic joint Vertical Well is transitted on horizontal well design track 130, realize that the horizontal well is mutually butted with the pilot hole 120 that docks.
No matter which kind of docking mode is adopted, for extended horizontal well, because horizontal segment distance is longer, bored in actual monitoring During head signal, because the apparatus measures of early stage can produce cumulative errors, make drill bit may substantial deviation planned course, seriously When cause to miss the target;In order to avoid above-mentioned situation, it may be necessary to significantly adjust drilling trajectory in the hope of hitting.What is either occurred is de- Target situation or the significantly situation of adjustment drilling trajectory, can cause gasification tunnel extremely irregular, logical to underground gasification The construction in road brings and has a strong impact on.
The content of the invention
For this purpose, the technical problem to be solved be dock when overcoming horizontal well construction in prior art it is inaccurate Result in the need for significantly adjusting drilling trajectory and provide a kind of docking success rate of improving to prevent the problems such as missing the target Horizontal well path bearing calibration.
To solve above-mentioned technical problem, a kind of horizontal well path bearing calibration of the present invention, for by the level Well is mutually butted with pilot hole is docked, wherein the gasification tunnel rail that the drilling trajectory position of the horizontal well has been designed with horizontal well Mark is roughly the same, comprises the steps:Step S1:Two are arranged according to the gasification tunnel track in the both sides that ground level is projected Individual symmetrical pilot hole;Step S2:Led relative to described by the drilling trajectory position of horizontal well described in the guiding hole measurement To hole shaft bottom relatively accurate position;Step S3:The reality of the horizontal well obtained according to the relatively accurate position and measurement Bore the actual position that track position determines drilling trajectory;Step S4:Constantly adjusting drilling trajectory according to the actual position makes It is consistent with the gasification tunnel track.
In one embodiment of the invention, in step S1, what the gasification tunnel track projected in ground level When both sides arrange pilot hole, the distance of the pilot hole and the gasification tunnel track between ground level projection need to meet conjunction Suitable distance, so that the pilot hole can monitor drilling trajectory.
In one embodiment of the invention, in step S2, by the reality of horizontal well described in the guiding hole measurement Bore track position as follows the step of the relatively accurate position in shaft bottom relative to the pilot hole:The pilot hole is determined first Shaft bottom coordinate;Then the coordinate of the drilling trajectory position of the horizontal well is detected in the pilot hole;Finally, led according to described Determine the coordinate of the relative position to the coordinate of the drilling trajectory position of the shaft bottom coordinate and the horizontal well in hole.
In one embodiment of the invention, the shaft bottom coordinate of the pilot hole is measured by gyroscope.
In one embodiment of the invention, the coordinate of the drilling trajectory position of the horizontal well is by the pilot hole Interior decentralization monitoring inserting tube measures respectively hole deviation, orientation and the vertical depth of the drilling trajectory position of the horizontal well.
In one embodiment of the invention, in step S3, the drilling trajectory position of the horizontal well is according to described Horizontal well itself Survey Software is calculated.
In one embodiment of the invention, in step S4, according to the actual position, analyzed using software for calculation The orientation of construction in later period, constantly adjusting drilling trajectory makes it be consistent with the gasification tunnel track designed.
Present invention also offers another embodiment, a kind of horizontal well path bearing calibration, for by the horizontal well It is mutually butted with pilot hole is docked, wherein the gasification tunnel track that the drilling trajectory position of the horizontal well has been designed with horizontal well It is roughly the same, comprise the steps:Step S1:Two are arranged according to the gasification tunnel track in the both sides that ground level is projected Symmetrical pilot hole;Step S2:By the drilling trajectory position of horizontal well described in the guiding hole measurement relative to the guiding Relatively accurate position of the hole in shaft bottom;Step S3:The real of the horizontal well obtained according to the relatively accurate position and measurement is bored Track position determines the actual position of drilling trajectory;Step S4:Drilling trajectory is constantly adjusted according to the actual position to complete Once adjust;Step S5:Continue to arrange two symmetrical guiding in the both sides that ground level is projected in the gasification tunnel track Hole, through above-mentioned identical step secondary adjustment is completed, and constantly adjustment is circulated successively, finally makes drilling trajectory and the gas for designing Change channel traces to be consistent.
In another embodiment of the present invention, the pilot hole is sequentially arranged in the drilling trajectory position of the horizontal well Dock between pilot hole with described.
In another embodiment of the present invention, the particular number of the pilot hole is determined by the horizontal section length of horizontal well It is fixed.
The above-mentioned technical proposal of the present invention has compared to existing technology advantages below:
Instant invention overcomes traditional single pilot hole timing causes the low problem of butt hole correction accuracy, data are reduced Measurement cumulative errors, it is to avoid well drilling trajectory adjustment amplitude is excessive and " S " the type track effect that formed, improves CBM Drainage Adopt effect;Meanwhile, the present invention keeps well track to smooth, and reduces drilling frictional resistance, reduces horizontal segment difficulty of construction, profit In drilling safety construction, improve construction and hit rate.
Description of the drawings
In order that present disclosure is more likely to be clearly understood, the specific embodiment below according to the present invention is simultaneously combined Accompanying drawing, the present invention is further detailed explanation, wherein
Fig. 1 is the schematic diagram of existing level well trajectory corrector;
Fig. 2 is the trajectory corrector schematic diagram of horizontal well of the present invention;
Fig. 3 is the concrete schematic diagram of trajectory corrector of horizontal well of the present invention.
Specific embodiment
Embodiment one:
As shown in Figures 2 and 3, a kind of horizontal well path bearing calibration is present embodiments provided, for by the horizontal well Docking pilot hole 12 is mutually butted, wherein the gasification tunnel rail that the drilling trajectory position 11 of the horizontal well has been designed with horizontal well Mark 13 is roughly the same, comprises the steps:Step S1:Set in the both sides that ground level is projected according to the gasification tunnel track 13 Put one group of totally two symmetrical pilot hole 14A and 14B;Step S2:The horizontal well is measured by the pilot hole 14A and 14B Drilling trajectory position 11 relative to the pilot hole 14A and 14B shaft bottom relatively accurate position 11A and 11B;Step S3: Determine real brill rail in the drilling trajectory position 11 of the horizontal well obtained according to the relatively accurate position 11A and 11B and measurement The actual position 11C of mark;Step S4:Constantly adjusting drilling trajectory according to the actual position 11C makes it with the gasification tunnel Track 13 is consistent.
Horizontal well path bearing calibration of the present invention, for by the horizontal well with to dock pilot hole 12 mutually right Connect, wherein the drilling trajectory position 11 of the horizontal well is roughly the same with the gasification tunnel track 13 that horizontal well has been designed, it is described In step S1, one group of totally two pilot hole is arranged in the both sides that ground level is projected according to the gasification tunnel track 13, respectively For pilot hole 14A and pilot hole 14B, the distance phase of the pilot hole 14A and pilot hole 14B to the gasification tunnel track 13 Together, so that the pilot hole 14A and pilot hole 14B are symmetrically distributed in the both sides of the gasification tunnel track 13, in order to sentence The drilling trajectory position of the disconnected horizontal well;In step S2, the real of the horizontal well is measured by the pilot hole 14A and is bored Track position 11 is measured relative to the pilot hole 14A in the relatively accurate position 11A in shaft bottom and by the pilot hole 14B , in the relatively accurate position 11B in shaft bottom, it is easy to into one relative to the pilot hole 14B drilling trajectory position 11 of the horizontal well Step judges the drilling trajectory position 11 of the horizontal well, due to Survey Software precision problem and operating personnel's method of operating problem, The data for finally measuring are made all to deposit certain error, therefore the well track position measured respectively according to two pilot holes 14A and 14B Put 11A and 11B and misaligned;In step S3, obtained according to the relatively accurate position 11A and 11B and actual measurement The drilling trajectory position 11 of horizontal well determine the actual position 11C of drilling trajectory;In step S4, according to described true Position 11C constantly adjusts drilling trajectory makes it be consistent with the gasification tunnel track 13 designed, it is achieved thereby that real bore rail Mark with dock being mutually butted for pilot hole 12.The present invention due in actual monitoring bit signal, by constantly adjusting by a small margin Drilling trajectory, therefore DATA REASONING cumulative errors are reduced, overcome the big problem of single pilot hole correction time error, it is to avoid " S " the type track effect that well drilling trajectory adjustment amplitude is excessive and is formed, improves coal bed gas extraction effect, and formed Gasification tunnel is smoothed, and reduces drilling frictional resistance, so that horizontal segment difficulty of construction is reduced, is applied beneficial to follow-up drilling safety Work, effectively increases construction and hits rate.
In step S1, the gasification tunnel track 13 arranges pilot hole 14A and 14B in the both sides that ground level is projected When, the distance of the pilot hole 14A and 14B and the gasification tunnel track 13 between ground level projection need to meet suitably Distance so that the pilot hole 14A and 14B can monitor drilling trajectory, in practice of construction, when the pilot hole 14A and 14B with When distance of the gasification tunnel track 13 between ground level projection is in the range of 50 meters, drilling trajectory can be monitored. Specifically, the distance of the pilot hole 14A and 14B and the gasification tunnel track 13 between ground level projection at 5 meters extremely When 10 meters, the effect of the pilot hole 14A and 14B monitoring drilling trajectories is more preferable.Meanwhile, the pilot hole 14A and the gasification Distance of the channel traces 13 between ground level projection is equal to the pilot hole 14B with the gasification tunnel track 13 on ground The distance between floor projection.Wherein, horizontal displacement length of the spacing of two pilot holes according to the gasification tunnel track 13 To determine, in order to ensure the rounding and docking success rate of gasification tunnel track, with reference to practical construction experience, horizontal displacement length It is easy to construction when typically between 200 meters to 300 meters.
In step S2, the drilling trajectory position 11 for measuring the horizontal well by the pilot hole 14A and 14B is relative It is specific as follows the step of relatively accurate position in shaft bottom in the pilot hole 14A and 14B:The pilot hole 14A is determined first With the shaft bottom coordinate of pilot hole 14B;Then the real of the horizontal well is detected in the pilot hole 14A and pilot hole 14B and bores rail The coordinate of mark position 11;Finally, according to the shaft bottom coordinate and the reality of the horizontal well of the pilot hole 14A and pilot hole 14B The coordinate for boring track position 11 determines the coordinate of the relatively accurate position.
Specifically, the shaft bottom coordinate of the pilot hole 14A and pilot hole 14B is measured by gyroscope;The horizontal well The coordinate of drilling trajectory position 11 is bored by the decentralization monitoring inserting tube in the pilot hole 14A so as to measure the real of the horizontal well The hole deviation of track position 11, orientation and vertical depth, the drilling trajectory position 11 of the horizontal well is by under in the pilot hole 14B Monitoring inserting tube is put so as to measure hole deviation, orientation and the vertical depth of the drilling trajectory position 11 of the horizontal well.Due to obtaining institute The shaft bottom coordinate of pilot hole 14A and pilot hole 14B is stated, by monitoring inserting tube the drilling trajectory position of the horizontal well can be measured The vertical depth of 11 shaft bottom grid bearing coordinate, well track and monitoring inserting tube position, calculates hence with Survey Software The drilling trajectory position 11 of the horizontal well is relative to the pilot hole 14A in the relatively accurate position 11A in shaft bottom and described The drilling trajectory position 11 of horizontal well relative to the pilot hole 14B shaft bottom relatively accurate position 11B.
In order to pilot hole 14A and 14B described in utility can be with the drilling trajectory positions 11 of horizontal well described in accurate measurements Drilling trajectory, the pilot hole 14A and 14B is Vertical Well, and the vertical depth of the pilot hole 14A and 14B sets with described The vertical depth of the gasification tunnel track 13 of meter is identical.
In step S3, the reality of the horizontal well for obtaining is measured according to the relatively accurate position 11A and 11B and actually The actual position 11C that track position 11 determines drilling trajectory is bored, wherein itself Survey Software can be counted according to the horizontal well Calculation draws the drilling trajectory position 11 of the horizontal well, the actual position 11C can by the mean values of three or according to Specific formula is calculated.
In step S4, according to the actual position 11C, the orientation of construction in later period is analyzed using software for calculation, constantly Adjusting orientation, left-right deviation and the vertical depth of drilling trajectory makes it be consistent with the gasification tunnel track 13 designed.
Embodiment two:
The present embodiment two is identical with the method and step part of embodiment one, and embodiment one is with two symmetrical guiding in a group The bearing calibration of horizontal well path is illustrated as a example by hole, is wanted because the length of the horizontal segment of the horizontal well needs to meet to construct Ask, in the construction of actual seam mining, in order to ensure that drilling trajectory is consistent with the gasification tunnel track 13 designed, generally Some groups of pilot holes are set in the both sides that ground level is projected in the gasification tunnel track 13, and every group of pilot hole includes two Symmetrical pilot hole, its particular number determines by the horizontal section length of horizontal well, by the continuous of some groups of pilot holes Repeatedly adjustment drilling trajectory is so that it is consistent with the gasification tunnel track 13 designed.
The step of describing horizontal well path bearing calibration in detail by taking two groups of totally four pilot holes as an example below, step S1:Root Two symmetrical pilot hole 14A and pilot hole 14B are set in the both sides that ground level is projected according to the gasification tunnel track 13; Step S2:Lead relative to described the drilling trajectory position 11 that the horizontal well is measured by the pilot hole 14A and pilot hole 14B To hole 14A and pilot hole 14B in the relatively accurate position 11A and 11B in shaft bottom, specifically, institute is measured by the pilot hole 14A The drilling trajectory position 11 of horizontal well is stated relative to the pilot hole 14A in the relatively accurate position 11A in shaft bottom and by institute State pilot hole 14B and measure the drilling trajectory position 11 of the horizontal well relative to the pilot hole 14B in the relatively accurate of shaft bottom Position 11B;Step S3:The drilling trajectory position of the horizontal well obtained according to the relatively accurate position 11A and 11B and measurement The 11 actual position 11C for determining drilling trajectory;Step S4:Drilling trajectory is constantly adjusted according to the actual position 11C to complete Once adjust;Step S5:Continue that the both sides setting two that project in ground level in the gasification tunnel track 13 is symmetrical to be led Xiang Kong, through above-mentioned identical step secondary adjustment is completed, and by constantly adjustment drilling trajectory and the gasification for designing are finally made Channel traces are consistent.
For the horizontal well of big displacement, it may be necessary to arrange more pilot holes to correct drilling trajectory, now each two Pilot hole is respectively arranged on the both sides that the gasification tunnel track 13 designed projects in ground level, respectively through once adjusting And after secondary adjustment, constantly adjust repeatedly successively, control drilling trajectory meets design requirement, it is ensured that gasification tunnel horizontal segment rail Mark is round and smooth steady, and completes final docking construction, so as to the gasification tunnel track for being always ensured that drilling trajectory Yu design It is consistent.
It is to be noted that:Described two symmetrical pilot holes be sequentially arranged in the drilling trajectory position of the horizontal well with Between the docking pilot hole so that pilot hole drilling trajectory position successively away from the horizontal well and move closer to it is described right Pilot hole is connect, so as to be beneficial to detect drilling trajectory, it is to avoid drilling trajectory deviates on a large scale with the gasification tunnel track designed.
No matter embodiment one or embodiment two, drilling well of the present invention in construction, based on geological conditions and construction The reason for aspect, the drilling trajectory position 11 of the horizontal well is caused to occur differing with the gasification tunnel track 13 designed Cause;The pilot hole 14A and 14B occurs different degrees of inclination and distortion, cause bottom hole location ground floor projection with There is deviation in the position of well head, therefore in trimming process, needs to be drilled in the physical location in shaft bottom, so as to profit after calculating deformation In the actual position for determining drilling trajectory.In addition, the present invention not only can be in the gasification tunnel of removable air injection pipe be built Using can be applying in having well formula gasification tunnel construction.
To sum up, above technical scheme of the present invention has advantages below:
1. in horizontal well path bearing calibration of the present invention, for by the horizontal well with to dock pilot hole mutually right Connect, wherein the drilling trajectory position of the horizontal well is roughly the same with the gasification tunnel track that horizontal well has been designed, the step In S1, two symmetrical pilot holes are arranged in the both sides that ground level is projected according to the gasification tunnel track, in order to judge State the drilling trajectory position of horizontal well;In step S2, by the drilling trajectory position of horizontal well described in the guiding hole measurement The relatively accurate position in shaft bottom relative to the pilot hole is put, is easy to determine whether the drilling trajectory position of the horizontal well Put;In step S3, the drilling trajectory position of the horizontal well obtained according to the relatively accurate position and measurement is determined The actual position of drilling trajectory;In step S4, constantly adjusting drilling trajectory according to the actual position makes it and designs Gasification tunnel track be consistent, it is achieved thereby that drilling trajectory with dock being mutually butted for pilot hole.The present invention due to During actual monitoring bit signal, by constantly adjusting drilling trajectory by a small margin, therefore DATA REASONING cumulative errors are reduced, it is to avoid " S " the type track effect that well drilling trajectory adjustment amplitude is excessive and is formed, improves coal bed gas extraction effect, and is formed Gasification tunnel smooth, reduce drilling frictional resistance so that horizontal segment difficulty of construction reduce, beneficial to drilling safety construction, Effectively increase construction to hit rate.
2. gasification tunnel track of the present invention is provided with some groups of pilot holes in the both sides that ground level is projected, wherein often Group includes two symmetrical pilot holes, the horizontal well of big displacement is corrected due to needing more multigroup pilot hole to real brill rail Mark, now respectively through the once adjustment and the secondary adjustment of second group of pilot hole of first group of pilot hole after, circulate successively not Disconnected adjustment, finally makes drilling trajectory be consistent with the gasification tunnel track designed.
Obviously, above-described embodiment is only intended to clearly illustrate example, not to the restriction of embodiment.For For those of ordinary skill in the art, the change or change of other multi-forms can also be made on the basis of the above description It is dynamic.There is no need to be exhaustive to all of embodiment.And the obvious change thus extended out or change Move still in the protection domain of the invention.

Claims (10)

1. a kind of horizontal well path bearing calibration, for the horizontal well to be mutually butted with pilot hole (12) is docked, wherein institute The drilling trajectory position (11) for stating horizontal well is roughly the same with the gasification tunnel track (13) that horizontal well has been designed, including following step Suddenly:
Step S1:Two symmetrical pilot holes are arranged in the both sides that ground level is projected according to the gasification tunnel track (13) (14A,14B);
Step S2:The drilling trajectory position (11) of the horizontal well is measured relative to described by the pilot hole (14A, 14B) Relatively accurate position (11A, 11B) of the pilot hole (14A, 14B) in shaft bottom;
Step S3:The drilling trajectory position of the horizontal well obtained according to the relatively accurate position (11A, 11B) and measurement (11) actual position (11C) of drilling trajectory is determined;
Step S4:According to the actual position (11C), constantly adjustment drilling trajectory makes it protect with the gasification tunnel track (13) Hold consistent.
2. horizontal well path bearing calibration according to claim 1, it is characterised in that:In step S1, the gasification Channel traces (13) when both sides that ground level is projected arrange pilot hole (14A, 14B), the pilot hole (14A, 14B) and institute Stating distance of the gasification tunnel track (13) between ground level projection need to meet suitable distance, so that the pilot hole (14A, 14B) can monitor drilling trajectory.
3. horizontal well path bearing calibration according to claim 1, it is characterised in that:In step S2, by described Pilot hole (14A, 14B) measures the drilling trajectory position (11) of the horizontal well relative to the pilot hole (14A, 14B) in well The step of relatively accurate position (11A, 11B) at bottom, is as follows:The shaft bottom coordinate of the pilot hole (14A, 14B) is determined first;So Detect the coordinate of the drilling trajectory position (11) of the horizontal well in the pilot hole (14A, 14B) afterwards;Finally, according to described The coordinate of the shaft bottom coordinate of pilot hole (14A, 14B) and the drilling trajectory position (11) of the horizontal well is aligned described in determining The coordinate of true position (11A, 11B).
4. horizontal well path bearing calibration according to claim 3, it is characterised in that:The pilot hole (14A, 14B) Shaft bottom coordinate is measured by gyroscope.
5. horizontal well path bearing calibration according to claim 3, it is characterised in that:The drilling trajectory position of the horizontal well The coordinate for putting (11) measures respectively the real brill rail of the horizontal well by the decentralization monitoring inserting tube in the pilot hole (14A, 14B) The hole deviation of mark position (11), orientation and vertical depth.
6. horizontal well path bearing calibration according to claim 1, it is characterised in that:In step S3, the level According to the horizontal well, itself Survey Software is calculated for the drilling trajectory position (11) of well.
7. horizontal well path bearing calibration according to claim 1, it is characterised in that:In step S4, according to described Actual position (11C), using software for calculation the orientation of construction in later period is analyzed, and constantly adjustment drilling trajectory makes it with the gas for designing Change channel traces (13) to be consistent.
8. a kind of horizontal well path bearing calibration, for the horizontal well to be mutually butted with pilot hole (12) is docked, wherein institute The drilling trajectory position (11) for stating horizontal well is roughly the same with the gasification tunnel track (13) that horizontal well has been designed, including following step Suddenly:
Step S1:Two symmetrical pilot holes are arranged in the both sides that ground level is projected according to the gasification tunnel track (13) (14A,14B);
Step S2:The drilling trajectory position (11) of the horizontal well is measured relative to described by the pilot hole (14A, 14B) Relatively accurate position (11A, 11B) of the pilot hole (14A, 14B) in shaft bottom;
Step S3:The drilling trajectory position of the horizontal well obtained according to the relatively accurate position (11A, 11B) and measurement (11) actual position (11C) of drilling trajectory is determined;
Step S4:According to the actual position (11C), constantly adjustment drilling trajectory completes once to adjust;
Step S5:Continue to arrange two symmetrical guiding in the both sides that ground level is projected in the gasification tunnel track (13) Hole, through above-mentioned identical step secondary adjustment is completed, and constantly adjustment is circulated successively, finally makes drilling trajectory and the gas for designing Change channel traces to be consistent.
9. horizontal well path bearing calibration according to claim 8, it is characterised in that:The pilot hole is sequentially arranged in institute Dock between pilot hole with described the drilling trajectory position for stating horizontal well.
10. horizontal well path bearing calibration according to claim 8 or claim 9, it is characterised in that:The concrete number of the pilot hole Amount is determined by the horizontal section length of horizontal well.
CN201510041083.3A 2015-01-27 2015-01-27 Method for correcting track of horizontal well Active CN104695863B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510041083.3A CN104695863B (en) 2015-01-27 2015-01-27 Method for correcting track of horizontal well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510041083.3A CN104695863B (en) 2015-01-27 2015-01-27 Method for correcting track of horizontal well

Publications (2)

Publication Number Publication Date
CN104695863A CN104695863A (en) 2015-06-10
CN104695863B true CN104695863B (en) 2017-05-10

Family

ID=53343369

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510041083.3A Active CN104695863B (en) 2015-01-27 2015-01-27 Method for correcting track of horizontal well

Country Status (1)

Country Link
CN (1) CN104695863B (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8418782B2 (en) * 2004-11-30 2013-04-16 General Electric Company Method and system for precise drilling guidance of twin wells
CN101424166A (en) * 2008-12-01 2009-05-06 中国石油集团长城钻探工程有限公司 Method for controlling borehole trajectory of special horizontal well of side-top water reservoir
CN102900366B (en) * 2012-10-26 2015-03-04 东南大学 Free trajectory planning and deviation correcting method of horizontal directional drill
CN103867180B (en) * 2013-09-11 2015-08-12 华北石油管理局 A kind of coal bed gas horizontal well method for controlling trajectory

Also Published As

Publication number Publication date
CN104695863A (en) 2015-06-10

Similar Documents

Publication Publication Date Title
WO2018201714A1 (en) Accurate extraction method for coal mine gas
CN110057324B (en) Method for monitoring straightness of coal face hydraulic support and scraper conveyor
CN110595367B (en) Method for finely detecting deformation and displacement of existing tunnel structure
CN106918326A (en) A kind of movable inclinometer and the method for measurement stratum horizontal displacement
CN105134181A (en) Method for multi-section blocking of covering rock damage band and synchronous leakage measuring
Navarro et al. Assessment of drilling deviations in underground operations
CN102445710A (en) A survey device of creeping into that is used for overburden water flowing fractured zone monitoring system
CN110107284B (en) Drilling and testing system and method for detecting height of water flowing fractured zone through water pressure
CN102230376A (en) Azimuth gamma well-logging device
CN108894771B (en) Positioning error measurement system and method for experimental coiled tubing fracturing tool
CN104895499B (en) Horizontal well path bearing calibration
CN104695863B (en) Method for correcting track of horizontal well
CN110145301A (en) One kind is with brill density imaging logging instrument environmental correction method
CN103742143B (en) Mining overburden destroys the dual probe detection method of horizontal distortion
CN103883326A (en) Height-regulating method of roller of coal mining machine based on coal-seam seismic survey and geo-science information
CN107060642A (en) Horizontal well track control method being connected trona deep-thin layer more
CN113338804A (en) Guide hole track control method for slow inclined shaft
CN105628001A (en) Extension measuring orientation method of mine shaft well under separating layer
CN114909119A (en) Drilling method for converting original vertical well or inclined well into U-shaped geothermal well with ultra-short radius
CN109973011A (en) A kind of boring method and drilling equipment improving bench blasting presplitting hole drill hole precision
CN103352687B (en) The method of keyhole hole deviation
CN117328843A (en) Oil pipe conveying type precise secondary perforating device and working method thereof
CN105588539A (en) Device for monitoring coal body transverse deformation on line and monitoring method thereof
CN210317390U (en) Experimental simulation device for cross hole stringing of coal seam gas extraction
CN105587309A (en) Drilling method of horizontal well

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20170204

Address after: 065001 Hebei economic and Technological Development Zone, Langfang science and Technology Park in the Southern District of B building, room 522

Applicant after: ENN SCIENCE & TECHNOLOGY DEVELOPMENT Co.,Ltd.

Address before: The 065001 Hebei economic and Technological Development Zone of Langfang Huaxiang Xinyuan host new Austrian Science and Technology Park in Southern District

Applicant before: ENN Coal Gasification Co., Ltd.

GR01 Patent grant
GR01 Patent grant