CN104675179B - Jack up head tower installation hanger device and head tower construction method - Google Patents
Jack up head tower installation hanger device and head tower construction method Download PDFInfo
- Publication number
- CN104675179B CN104675179B CN201510092573.6A CN201510092573A CN104675179B CN 104675179 B CN104675179 B CN 104675179B CN 201510092573 A CN201510092573 A CN 201510092573A CN 104675179 B CN104675179 B CN 104675179B
- Authority
- CN
- China
- Prior art keywords
- head tower
- jack
- suspension bracket
- head
- component
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/34—Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/163—Jacks specially adapted for working-up building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention relates to a kind of jack up head tower installation hanger device and head tower construction method, belong to traffic engineering technical applications.Jack up head tower installation hanger device, including: suspension bracket body;Hoisting machine tool;The facility that vertically climb can make suspension bracket body be mounted opposite the axial vertical lifting of middle head tower;Longitudinally adjusted facility can adjust the component front and back position of the head tower lifted;With laterally adjust facility, it is possible to adjust the component right position of head tower lifted.The construction method of a kind of head tower, comprises the following steps: install jack up head tower installation hanger device;Utilize hoisting machine tool to hang the component of head tower, and slowly promote;The component of head tower is transported to design and installation position, and it carries out with the head tower sections constructed coupling is connected;Repeat the above steps, until installing the component of whole head towers.
Description
Technical field
The present invention relates to a kind of jack up head tower installation hanger device and head tower construction method, belong to traffic engineering technology
Application.
Background technology
The most domestic generally use the lifting machine such as tower crane or crawler crane when the lifting component such as head tower or steel anchor box.Adopt
Needing that tower crane arranges firm attachment device with tower crane installation and guarantee that tower crane is stable, using crawler crane to install needs to arrange
Enough counterweights carry out balancing hoisting machine center of gravity, and field operation labor intensity is relatively big, and field operation danger coefficient is big, simultaneously more than employing
Technique all uses hoister in large tonnage tool, and mounting cost is high.
Summary of the invention
The invention provides one of purpose and there is provided a kind of simple in construction, the installation of easy to operate jack up head tower with hanging
Rack device.
The technical solution used in the present invention is as follows:
A kind of jack up head tower installation hanger device, including:
Suspension bracket body, is arranged on mounted head tower, has 4 vertically arranged suspension bracket columns, the top of suspension bracket column
End is provided with the crossbeam of horizontally set;
Hoisting machine tool, arranges on crossbeam, for lifting the component of head tower;
Vertically climb facility, including identical four groups of structure, is correspondingly arranged at respectively on suspension bracket column, and with suspension bracket body
It is connected, it is possible to make suspension bracket body be mounted opposite the axial vertical lifting of middle head tower;
Longitudinally adjusted facility, including identical two groups of structure, are separately positioned on crossbeam, and are connected with hoisting machine tool, energy
Enough adjust the component front and back position of the head tower lifted;With
Laterally adjust facility, including identical two groups of structure, it is possible to adjust the component right position of the head tower lifted.
Above-mentioned jack up head tower installation hanger device preferred version, often organizes the facility that vertically climb and includes balladeur train and vertical thousand
Jin top, balladeur train one end connects in an installation on head tower, and the other end is connected to suspension bracket column, and vertical jack one end is with balladeur train even
Connecing, during the other end is installed, head tower connects, and vertical jack is connected with head tower in installation with balladeur train junction and vertical jack
Place is equipped with rotatable spine block.
Above-mentioned jack up head tower installation hanger device preferred version, often organize longitudinally adjusted facility include longitudinal jack and
Longitudinal spine block, longitudinal jack one end is connected with hoisting machine tool, and the other end is connected with longitudinal spine block, and longitudinal spine block can be at crossbeam
Upper slip.
Above-mentioned jack up head tower installation hanger device preferred version, often group laterally adjust facility include traversing jack and
Bearing beam, bearing beam is fixed on crossbeam end face, and traversing jack two ends connect bearing beam and hoisting machine tool respectively.
Above-mentioned jack up head tower installation hanger device preferred version, suspension bracket body uses 4 vertically arranged suspension bracket columns,
Vertically and horizontally be welded between suspension bracket column tower structure.
The two of the object of the invention there is provided the head tower construction method that a kind of efficiency is high.
The technical solution used in the present invention is as follows:
The construction method of a kind of head tower, comprises the following steps:
1) according to conventional construction method construction steel tower base, jack up head tower peace described in any one of Claims 1-4 is installed
Dress hanger device;The component of head tower is transported to below jack up head tower installation hanger device;
2) utilize hoisting machine tool to hang the component of head tower, and slowly promote, until being promoted to design height position;
3) utilize longitudinally adjusted facility and laterally adjust facility adjustment hoisting machine tool position on crossbeam, by the structure of head tower
Part is transported to design and installation position, and it carries out with the head tower sections constructed coupling is connected, saves until completing this head tower
Section construction;
4) repeat the above steps, until installing the component of whole head towers.
Beneficial effects of the present invention:
1, on suspension bracket column, there are the facility that vertically climb, it is achieved certainly climb, hanging of head tower component under various operating mode can be met
Dress, strong adaptability, improves work efficiency;
2, on crossbeam top arrange longitudinally adjusted facility and laterally adjust facility, it is achieved the quick position matching of head tower.
3, compare tradition hoisting, it is not necessary to other attachment devices, there is simple in construction, easy to operate, efficiency of construction
High feature.
Accompanying drawing explanation
Fig. 1 is schematic front view of the present invention.
Fig. 2 is left view schematic diagram of the present invention.
Fig. 3 is longitudinally adjusted facility and crossbeam and hoisting machine tool connection diagram.
Fig. 4 is the implement structure schematic diagram that vertically climbs.
Fig. 5 is for laterally adjusting facility and crossbeam and hoisting machine tool connection diagram.
Fig. 6 is head tower preparation of construction schematic diagram.
Fig. 7 is the component schematic diagram that hoisting machine tool promotes head tower.
Fig. 8 is for adjusting hoisting machine tool relative to crossbeam front and back position schematic diagram.
Fig. 9 is for adjusting hoisting machine tool relative to crossbeam right position schematic diagram.
1. suspension bracket body, 2. crossbeam, 3. hoisting machine tool in figure, 4. longitudinal spine block, 5. longitudinal jack, the most vertical
Jack, 7. spine block, 8. slide rail, 9. component, 10. head tower, 11. laterally adjust facility, and 12. head tower bases, 13. hang
Erect post.
Detailed description of the invention
In conjunction with the accompanying drawing in the embodiment of the present invention, the present invention is done and the most clearly and completely describes, described enforcement
Example is only a part of embodiment of the present invention rather than whole embodiments.
With reference to accompanying drawing 1, Fig. 2, a kind of jack up head tower installation hanger device, including suspension bracket body, hoisting machine tool 3, erects
To the facility that climb, longitudinally adjusted facility with laterally adjust facility 11.Wherein suspension bracket body 1 has suspension bracket column 13, suspension bracket column
13 are arranged on head tower base 12, and the top of suspension bracket column 13 is provided with the crossbeam 2 of horizontally set;Hoisting machine tool 3 arranges crossbeam 2
On, for lifting the component 9 of head tower;The facility that vertically climb include four groups that structure is identical, it is correspondingly arranged at suspension bracket respectively
On column 13, and with and be connected with suspension bracket body, it is possible to make suspension bracket body be mounted opposite the axial vertical lifting of middle head tower;Longitudinally adjust
Complete machine tool includes two groups that structure is identical, is separately positioned on crossbeam 2, and is connected with hoisting machine tool, it is possible to adjustment is lifted
The component front and back position of head tower;Laterally adjust that facility include that structure is identical two groups, it is possible to adjust the component of the head tower lifted
Right position.
With reference to accompanying drawing 4, often organizing the facility that vertically climb and include slide rail 8, vertical jack 6 and spine block 7, slide rail 8 is fixed on steel
On tower, vertical jack 6 one end is connected with slide rail 8, and the other end is connected with suspension bracket body, vertical jack 6 and slide rail 8 junction
And vertically jack 6 and suspension bracket body junction are equipped with spine block 7.
Often organize longitudinally adjusted facility with reference to accompanying drawing 3 and include longitudinal jack 5 and longitudinal spine block 4, longitudinal jack 5 one end with
Hoisting machine tool 3 connects, and the other end is connected with longitudinal spine block 4, and longitudinal spine block 4 can slide on crossbeam 2.
Laterally adjusting facility with reference to accompanying drawing 5 often group and include traversing jack 14 and bearing beam 15, bearing beam 15 is fixed on crossbeam 2 and pushes up
On face, traversing jack 14 two ends connect bearing beam 15 and hoisting machine tool 3 respectively.
In the present embodiment, suspension bracket body 1 uses 4 vertically arranged suspension bracket columns, between suspension bracket column vertically and horizontally welding and
Become tower structure.
The construction method of a kind of head tower, it is characterised in that comprise the following steps:
1) with reference to accompanying drawing 6, according to conventional construction method construction steel tower base, jack up head tower installation suspension bracket is installed and fills
Put, and the component 9 of head tower is transported to below jack up head tower installation hanger device;
2) with reference to accompanying drawing 7, hoisting machine tool 3 is utilized to hang the structure of head tower, 9, and slowly promote, until being promoted to design height
Position;
3) with reference to accompanying drawing 8, Fig. 9, utilize longitudinally adjusted facility and laterally adjust facility adjustment hoisting machine tool 3 on crossbeam 2
Position, the component 9 of head tower is transported to design and installation position, and carries out it with the head tower sections constructed mating even
Connect, until completing this head tower segmental construction;
4) repeat the above steps, until installing the component 9 of whole head towers.
Above only describes ultimate principle and the preferred implementation of the present invention, those skilled in the art can be according to foregoing description
Many changes may be made and improves, and these changes and improvements should belong to protection scope of the present invention.
Claims (6)
1. a jack up head tower installation hanger device, it is characterised in that including:
Suspension bracket body, is arranged on mounted head tower, has 4 vertically arranged suspension bracket columns, and the top of suspension bracket column sets
There is the crossbeam of horizontally set;
Hoisting machine tool, arranges on crossbeam, for lifting the component of head tower;
Vertically climb facility, including identical four groups of structure, is correspondingly arranged at respectively on suspension bracket column, and with suspension bracket body phase
Even, it is possible to make suspension bracket body be mounted opposite the axial vertical lifting of middle head tower;
Longitudinally adjusted facility, including identical two groups of structure, are separately positioned on crossbeam, and are connected with hoisting machine tool, it is possible to adjust
The component front and back position of the whole head tower lifted;With
Laterally adjust facility, including identical two groups of structure, it is possible to adjust the component right position of the head tower lifted.
Jack up head tower installation hanger device the most according to claim 1, it is characterised in that: often organize the facility bag that vertically climbs
Including slide rail, vertical jack and spine block, slide rail is fixed on head tower, and vertical jack one end is connected with slide rail, the other end with hang
Frame body connects, and vertical jack is equipped with spine block with slide rail junction and vertical jack with suspension bracket body junction.
Jack up head tower installation hanger device the most according to claim 1, it is characterised in that: often organize longitudinally adjusted facility bag
Including longitudinal jack and longitudinal spine block, longitudinal jack one end is connected with hoisting machine tool, and the other end is connected with longitudinal spine block, longitudinally
Spine block can slide on crossbeam.
Jack up head tower installation hanger device the most according to claim 1, it is characterised in that: often group laterally adjusts facility bag
Including traversing jack and bearing beam, bearing beam is fixed on crossbeam end face, and traversing jack two ends connect bearing beam and hoisting machine tool respectively.
5. according to jack up head tower installation hanger device described in any one of Claims 1-4, it is characterised in that: suspension bracket body
Using 4 vertically arranged suspension bracket columns, be vertically and horizontally welded between suspension bracket column tower structure.
6. the construction method of a head tower, it is characterised in that comprise the following steps:
1) according to conventional construction method construction steel tower base, jack up head tower described in any one of Claims 1-4 is installed use is installed
Hanger device;The component of head tower is transported to below jack up head tower installation hanger device;
2) utilize hoisting machine tool to hang the component of head tower, and slowly promote, until being promoted to design height position;
3) utilize longitudinally adjusted facility and laterally adjust facility adjustment hoisting machine tool position on crossbeam, the component of head tower is transported
To design and installation position, and it is carried out with the head tower sections constructed coupling be connected, execute until completing this head tower sections
Work;
4) repeat the above steps, until installing the component of whole head towers.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510092573.6A CN104675179B (en) | 2015-03-02 | 2015-03-02 | Jack up head tower installation hanger device and head tower construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510092573.6A CN104675179B (en) | 2015-03-02 | 2015-03-02 | Jack up head tower installation hanger device and head tower construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104675179A CN104675179A (en) | 2015-06-03 |
CN104675179B true CN104675179B (en) | 2016-11-16 |
Family
ID=53310723
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510092573.6A Active CN104675179B (en) | 2015-03-02 | 2015-03-02 | Jack up head tower installation hanger device and head tower construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104675179B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2821378C1 (en) * | 2020-09-04 | 2024-06-21 | Роуд Энд Бридж Интернешнл Ко., Лтд. | Method of lifting and mounting steel pylon |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112160243B (en) * | 2020-09-04 | 2022-02-11 | 中交路桥华南工程有限公司 | Steel tower lifting installation method |
CN112160244B (en) * | 2020-09-04 | 2022-08-30 | 中交路桥华南工程有限公司 | Method for mounting steel cross beam |
CN112030767A (en) * | 2020-09-04 | 2020-12-04 | 中交路桥华南工程有限公司 | Steel tower unilateral climbing type lifting formwork and application to inclined single-column steel cable tower |
CN112160245B (en) * | 2020-09-04 | 2022-06-07 | 中交路桥华南工程有限公司 | Method for mounting variable cross-section tower section |
CN112030766A (en) * | 2020-09-04 | 2020-12-04 | 中交路桥华南工程有限公司 | Hydraulic self-elevating integrated cable-stayed bridge lifting formwork |
CN112681144B (en) * | 2020-12-21 | 2023-08-18 | 中交路桥华南工程有限公司 | Self-climbing installation method of steel cable tower |
CN113857707B (en) * | 2021-09-22 | 2023-04-18 | 中铁宝桥(扬州)有限公司 | Welding deviation rectifying method for mounting axis of all-welded polygonal steel tower |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2133563Y (en) * | 1992-05-27 | 1993-05-19 | 建设部长沙建筑机械研究所 | External climbing tower crane |
CN2171651Y (en) * | 1993-07-16 | 1994-07-13 | 朱永奋 | Auto-lift climbing tower crane |
JP3732414B2 (en) * | 2001-02-15 | 2006-01-05 | 株式会社巴技研 | Method and apparatus for constructing tower structure |
CN101906878A (en) * | 2010-07-27 | 2010-12-08 | 沈阳三环机械厂 | Material-distributing mechanism fixed on tower crane |
CN103352598A (en) * | 2013-06-19 | 2013-10-16 | 中交四航局第三工程有限公司 | Positioning tower used for mounting multilayer cubic blocks in deep water |
CN204457048U (en) * | 2015-03-02 | 2015-07-08 | 山东省路桥集团有限公司 | Self lift type head tower installation hanger device |
-
2015
- 2015-03-02 CN CN201510092573.6A patent/CN104675179B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2133563Y (en) * | 1992-05-27 | 1993-05-19 | 建设部长沙建筑机械研究所 | External climbing tower crane |
CN2171651Y (en) * | 1993-07-16 | 1994-07-13 | 朱永奋 | Auto-lift climbing tower crane |
JP3732414B2 (en) * | 2001-02-15 | 2006-01-05 | 株式会社巴技研 | Method and apparatus for constructing tower structure |
CN101906878A (en) * | 2010-07-27 | 2010-12-08 | 沈阳三环机械厂 | Material-distributing mechanism fixed on tower crane |
CN103352598A (en) * | 2013-06-19 | 2013-10-16 | 中交四航局第三工程有限公司 | Positioning tower used for mounting multilayer cubic blocks in deep water |
CN204457048U (en) * | 2015-03-02 | 2015-07-08 | 山东省路桥集团有限公司 | Self lift type head tower installation hanger device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2821378C1 (en) * | 2020-09-04 | 2024-06-21 | Роуд Энд Бридж Интернешнл Ко., Лтд. | Method of lifting and mounting steel pylon |
Also Published As
Publication number | Publication date |
---|---|
CN104675179A (en) | 2015-06-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104675179B (en) | Jack up head tower installation hanger device and head tower construction method | |
CN106662075A (en) | Assembly system and method for assembling a tower for a wind generator | |
CN104632088A (en) | Petroleum drilling machine tower-shaped derrick sleeving mounting method | |
CN210528248U (en) | Hoisting tool for silicone oil shock absorber | |
CN107178203A (en) | A kind of planar dimension and adjustable for height operating platform | |
CN105019664A (en) | High-altitude sliding installation method for box room type electric room | |
CN104291222A (en) | Rigid protection and crane integration system inside super high-rise building core tube | |
CN104989111A (en) | Construction method for steel structure high-rise hoisting | |
CN104836161A (en) | Hanger frame of fixed-steering pulley | |
CN207863871U (en) | A kind of derrick for repairing equipment for petroleum drilling | |
CN104947598A (en) | Large tonnage girder hydraulic synchronization lifting-up construction equipment and method | |
CN103434933B (en) | Large member hoisting in-position device and in-position method | |
CN206580492U (en) | Movable lifting and positioning device for pipeline of pipe gallery | |
CN205863852U (en) | The installation auxiliary of a kind of enclosed busbar adjusts frock | |
CN107642049A (en) | A kind of device and its installation method changed for main rope of suspension bridge cord clip | |
CN204038921U (en) | Wall-attached device for super high-rise tower crane | |
CN204457048U (en) | Self lift type head tower installation hanger device | |
CN103318745A (en) | Lightweight special-purposed spreader and mounting method thereof | |
CN110097807A (en) | Hv cable termination experiment porch | |
CN207960496U (en) | Be easily installed drilling tool from hoisting type horizontal boring machine | |
CN206957175U (en) | A kind of planar dimension and adjustable for height operating platform | |
CN204470882U (en) | The positioning welding bracing or strutting arrangement of steel construction railing crossbeam | |
CN205766057U (en) | A kind of circular magnesium alloy die casting hitch | |
CN205132926U (en) | Special well word hoist of hydroelectric set tail water ell | |
CN106545170B (en) | Rod piece hoisting method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200429 Address after: 250000 Tiancheng Road, Tianqiao District, Jinan City, Shandong Province Patentee after: SHANDONG HIGHWAY & BRIDGE CONSTRUCTION Co.,Ltd. Address before: Huaiyin District of Ji'nan City, Shandong province 250021 five road No. 330 Patentee before: SHANDONG LUQIAO GROUP Co.,Ltd. |