CN104646932A CN201310597036.8A CN201310597036A CN104646932A CN 104646932 A CN104646932 A CN 104646932A CN 201310597036 A CN201310597036 A CN 201310597036A CN 104646932 A CN104646932 A CN 104646932A
Authority
CN
China
Prior art keywords
welded tube
cold
tube
drawn
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310597036.8A
Other languages
Chinese (zh)
Inventor
许卫东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI DAJIN HIGH-PRECISION COLD-DRAWN STEEL TUBE Co Ltd
Original Assignee
WUXI DAJIN HIGH-PRECISION COLD-DRAWN STEEL TUBE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI DAJIN HIGH-PRECISION COLD-DRAWN STEEL TUBE Co Ltd filed Critical WUXI DAJIN HIGH-PRECISION COLD-DRAWN STEEL TUBE Co Ltd
Priority to CN201310597036.8A priority Critical patent/CN104646932A/en
Publication of CN104646932A publication Critical patent/CN104646932A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)

Abstract

The invention relates to a manufacturing method for high-precision cold-drawing welded pipe. The manufacturing method for the high-precision cold-drawing welded pipe includes steps of longitudinal shearing, roll-bending forming, high-frequency welding, weld joint treatment, sizing, online eddy current inspection, pre-straightening treatment, pipe cutting, stress relief annealing, pinching, acid dipping, phosphating, saponification treatment, cold drawing, induction furnace quenching treatment, tempering treatment in a box type furnace, straightening treatment, honing, magnetic leakage detection and pipe cutting measurement. The product obtained through the manufacturing method for the high-precision cold-drawing welded pipe is high in yield strength, high in tensile strength, precise in size, smooth in surface, fast in processing forming speed and high in yield, the manufacturing precision is obviously improved, the cold-drawn welded pipe is good in surface smoothness and low in roughness, the subsequent gold processing amount is reduced, the steel material use ratio is improved, the manufacturing cost is lowered, and the energy conservation and environment protection are boosted.

Description

A kind of manufacture method of high-accuracy cold drawing welded tube
Technical field
The invention belongs to steel pipe preparing technical field, be specifically related to a kind of manufacture method of high-accuracy cold drawing welded tube.
Background technology
In prior art, the production technology of cylinder body of hydraulic oil cylinder, generally with hot rolled seamless steel tube, the Cutting Process of bore hole one roll extrusion associating is adopted to produce, because one of seamless steel pipe maximum defect is that wall unevenness is even, its producing cause is mainly that heating of pipe blank is uneven, rolled by piercing mill line does not correct that the Centering Roll caused is unstable, top wearing and tearing, top metapore are eccentric, pipe internal point not just, the many reasons such as pipe flexibility is excessive, need the technical difficulty removing above-mentioned whole reason one by one larger, therefore, the yield rate of seamless steel pipe is relatively low; Seamless steel pipe also easily produce infolding, in scab, stick up skin, interior straight way, interior bulge, draw the defects such as recessed, this just causes becoming in the process of oil cylinder in following process, need to carry out machining, a large amount of metals is cut into chip and wastes, and also consumes mass energy simultaneously; The blank of seamless steel pipe is that continuous casting forms, and easily there are sand holes, therefore, easily causes steel pipe parent defect.Have again, non-metallic inclusion (mainly sulfide and the oxide of steel inside, also have silicate) be easily pressed into thin slice, there is lamination, the performance of steel through-thickness tension is deteriorated significantly, in addition, the precision of seamless steel pipe is difficult to control, there will be certain minus tolerance after the cooling period, this minus tolerance hem width is wider, the thicker performance of thickness more obvious.So all cannot require too accurate for the hem width of seamless steel pipe, thickness, length, angle and sideline.Adopt this kind of method to manufacture the cylinder body of hydraulic jack, speed of production is slow, energy waste is large, using rate of metal is low, yield rate is also low.
In prior art, process for producing welded pipe is the production technology of relative maturity, but, welded tube generally can not be used as the cylinder body manufacture of hydraulic jack, mainly contain some problem following and limit its application on hydraulic jack manufactures: 1), the precision of welded tube itself is relatively low, and its circularity is difficult to obtain Reliable guarantee; 2), welded tube weld time, its surface weld be easy to process, but the weld seam of inwall be difficult to process, especially on continual tinuous production, if do not processed the weld seam of its inwall, and being directly used in the man-hour that adds of oil cylinder, there is the problem that cutting output is large equally; 3), weld seam without heat treatment, cause internal stress large, be easy in using occur cracking phenomena; 4) even if weld seam is through Overheating Treatment, because welded tube is without drawing, the bearing capacity on its axial direction is relatively low, for improving its bearing capacity, needing to amplify, causing the waste of metal material.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, a kind of manufacture method of high-accuracy cold drawing welded tube is provided, the high-accuracy cold drawing welded tube that the method obtains, yield strength is high, tensile strength is high, precision size, smooth surface, improve the production efficiency of high-accuracy cold drawing welded tube simultaneously, reduce manufacturing cost, propulsion energy-saving environmental protection.
According to technical scheme provided by the invention, a kind of manufacture method of high-accuracy cold drawing welded tube comprises the steps:
(1), slitting: be that the wide coil of strip of 27SiMn carries out slitting, according to the width of coil of strip after the diameter determination slitting of welded tube on slitter by material;
(2), roll bending formation: the coil of strip after slitting is placed on exhibition bin, by feed mechanism, the termination of coil of strip is extracted out, send in continuous pressure roller shaping mechanism and carry out roll bending formation processing, described pressure roller shaping mechanism comprises continuous print many groups pressure roller pair, often organize pressure roller to two pressure rollers comprising misfortune conjunction mutually, gap is left between described two pressure rollers, the gap of adjacent pressure roller to correspondence is out of shape gradually, make the coil of strip through respective clearance become curved surface by plane, then become conglobate body by curved surface;
(3), the coil of strip of high-frequency welding: Cheng Yuanhou adopts high-frequency welding, and the vertical masonry joint docked its side carries out induction welding, forms welded tube;
(4), weld seam process: when welded tube not yet cools, adopt the weld seam of burring knife milling downhand welding pipe, described burring knife comprises and is arranged on removing outer deburring cutter and being arranged on outside welded tube and removes internal hair bayonet inside welded tube, go internal hair bayonet axially to insert in body from the opening part not yet becoming conglobate body, and reach the front of welding position; Because roll bending formation and welding are carried out continuously, the weld seam of inner wall of welded pipe is made to be treated as a difficult problem, welded tube before cutting, its length can continue tens meters on a production line, after welding fabrication, conventional means is utilized to be to cut the weld seam of inwall or to polish process, the present invention adopts and is axially inserted in body by the body open going internal hair bayonet from Cheng Yuanqian, cross high-frequency welding position, again deburring is carried out to the weld seam in pipe, make inner wall of welded pipe smooth, for follow-up cold-drawn provides guarantee; In addition, deburring carries out in time after tube-welding, and now welded tube not yet cools, and can reduce difficulty of processing, improves deburring speed;
(5), sizing: the welded tube formed after weld seam process is again through sizing mill sizing, and form steel pipe, temperature during sizing controls at 800 ~ 850 DEG C;
(6), online eddy current inspection: pop one's head in and to move in metal surface, when running into defect or the change such as material, size, make eddy current magnetism different to the reaction of coil, cause coil impedance to change, measure this variable quantity by eddy detecting instrument and just can differentiate that there are zero defect or other change in physical in metal surface;
(7), pre-straightening process: straightening temperature 400 ~ 450 DEG C, to reduce residual stress;
(8), Pipe Cutting: the welded tube feeding turned off in synchronization device through pre-straightening process cuts off, and turned off in synchronization device overall rectilinear motion of following welded tube in cutting-off process is synchronized with the movement, and when both move at the uniform velocity, is cut off by welded tube; The program adopts the method for synchronization to be cut off by welding pipe fixed length, ensure that welding, roll bending formation, weld seam process are carried out continuously in non-stop-machine situation, can improve speed of production;
(9), stress relief annealing: welded tube introduced heating in heating furnace and be incubated, come out of the stove with after stove cooling, obtain welded tube of annealing, object is the intensity guaranteeing welded tube, when annealing temperature is too high, processing strain recovers, the effect of work hardening can not be obtained, annealing temperature is 650 ~ 750 DEG C, the effect of work hardening can be obtained, this annealing in process is the annealing in process of entire body, ensure welding region and neighboring area consistent with all the other regions of welded tube in metallographic structure and mechanical performance, in order to remove the strength variance of welded tube, in the stove of welded tube, the retention time is 30 ~ 40 minutes,
(10), pinching: the welded tube after annealing carries out pinching process, make welded tube termination diametric shrinkage after extrusion die extruding, described extrusion die comprises the active section that two sections of diameters do not wait, seamlessly transit between two sections of active sections, welded tube termination enters from bigger diameter end and extrudes, the termination of extrusion die and welded tube is carrying out extruding front lubricant sprayer, with avoid extrude time wearing and tearing and surface tear, after the extrusion die extruding that 1 ~ 4 diameter reduces gradually, the external diameter of welded tube termination is punctured into 81 ~ 85% of original diameter;
(11), pickling processes: welded tube is carried out pickling, removes the scale on surface, concentration of hydrochloric acid: 7 ~ 19%, pickling time: 35 ~ 60 minutes, then neutralization pond rolling, rolling number of times: 2 ~ 3 times, neutralizer pH value: 9 ~ 10, then through clear water reserviors rolling, rolling number of times: 2 ~ 3 times;
(12), phosphorating treatment: the chemistry forming trbasic zinc phosphate on the surface of welded tube generates overlay film, trbasic zinc phosphate concentration: 20 ~ 30%, Phosphating Solution temperature: 68 ~ 75 DEG C, phosphating time: 10 ~ 20 minutes, Phosphating Solution free acidity: 4 ~ 7, General Acidity in Phosphating Solution: 45 ~ 75;
(13), saponification process: form the lubricating film coateds such as metallic soap on overlay film, for follow-up cold-drawn is ready, drawn tube surface can be made brighter and cleaner, saponification temperature: 55 ~ 75 DEG C, saponification time: 8 ~ 15 minutes, saponification liquor pH value: 8 ~ 9;
(14), cold-drawn: will treat that cold drawing welded tube carries out cold-drawn processing, obtain drawn tube, cold-drawing technology, mould chock plug and bore spacing: 3 ~ 5mm, pull out machine draft: 300 ~ 400t, cold-drawn speed: 5 ~ 30m/min, opening speed: 10 ~ 50m/min, drawn tube length: maximum 20m, drawn tube external diameter: 85 ~ 250mm, drawn tube wall thickness: 3 ~ 20mm;
(15), induction furnace Quenching Treatment: induction furnace hardening heat is 500 ~ 550 DEG C, and hardening media is water, reduces the residual stress of steel pipe;
(16), temper in batch-type furnace: the temperature of tempering air cooling is 350 ~ 380 DEG C, to reduce residual stress;
(17), straightening processing: be incubated 30 ~ 45 minutes in low-temp temper furnace, then carry out thermal straightening process, thermal straightening temperature 500 ~ 600 DEG C, to reduce residual stress;
(18), honing: select numerical control honing machine, workpiece turns round, and the form processing that honing head is reciprocating, reaches cylindricity: 0.01 ~ 0.02mm, Aperture deviation: 0.01 ~ 0.02mm;
(19), magnetic leakage detection: under suitable lift-off gap, inspection speed and the intensity of magnetization, to steel pipe vertical, horizontal defects detection;
(20), Pipe Cutting is measured: carry out fixed length cutting to steel pipe, after cutting, pipe is smooth.
Compared with prior art, beneficial effect of the present invention is:
1), machine-shaping speed is fast, output is high, and not injured surface during cold-drawn, can make the pipe fitting of multiple different size, process needs to adapt to client, wall thickness from 1 ~ 16mm, caliber 10 ~ 254mm; The product of size not within the scope of hot finished steel pipe standardized product can be obtained;
2), the accuracy of manufacture significantly improves, and after cold-drawn, welded tube external diameter and internal diameter precision all can be guaranteed, and eccentricity is 3% to the maximum, be less than the eccentricity of seamless steel pipe 7.5%, its dimensional accuracy reaches H10 ~ H8, and linearity reaches less than 1/500, and surface roughness is less than Ra1.6; When not processing further, the cylinder body of this type of steel pipe as high-accuracy hydraulic oil cylinder can be used;
3), when having identical chemical composition product, obtain higher mechanical performance, cold-drawn can make welded tube radial-axial direction produces plastic deformation, thus improve the yield point of steel, mechanical strength is balanced everywhere on radial-axial direction to make welded tube, bearing capacity is improved 60%, has the percentage elongation that high tensile strength is become reconciled;
4) the surface of welded pipe fineness, after cold-drawn is good, and roughness is low;
5), decrease follow-up metalworking amount, improve the utilization rate of steel, reduce manufacturing cost.The cold drawing welded tube that the present invention produces, can be directly used in the manufacture of high-accuracy hydraulic oil cylinder.
Detailed description of the invention:
Below in conjunction with specific embodiment, the invention will be further described.
Embodiment one: the manufacture method of a kind of high-accuracy cold drawing welded tube of the present invention comprises the steps:
(1), slitting: be that the wide coil of strip of 27SiMn carries out slitting, according to the width of coil of strip after the diameter determination slitting of welded tube on slitter by material; The welded tube diameter such as needed is 100mm, due in roll-forming process, the width of coil of strip has certain elongation, the developed width of coil of strip is calculated according to this percentage elongation, carry out slitting by this width again, this width should be less than 314mm, changes according to molding curve difference;
(2), roll bending formation: the coil of strip after slitting is placed on exhibition bin, by feed mechanism, the termination of coil of strip is extracted out, send in continuous pressure roller shaping mechanism and carry out roll bending formation processing, described pressure roller shaping mechanism comprises continuous print many groups pressure roller pair, often organize pressure roller to two pressure rollers comprising misfortune conjunction mutually, gap is left between described two pressure rollers, the gap of adjacent pressure roller to correspondence is out of shape gradually, make the coil of strip through respective clearance become curved surface by plane, then become conglobate body by curved surface;
(3), the coil of strip of high-frequency welding: Cheng Yuanhou adopts high-frequency welding, and the vertical masonry joint docked its side carries out induction welding, forms welded tube;
(4), weld seam process: when welded tube not yet cools, adopt the weld seam of burring knife milling downhand welding pipe, described burring knife comprises and is arranged on removing outer deburring cutter and being arranged on outside welded tube and removes internal hair bayonet inside welded tube, go internal hair bayonet axially to insert in body from the opening part not yet becoming conglobate body, and reach the front of welding position;
(5), sizing: the welded tube formed after weld seam process is again through sizing mill sizing, and form steel pipe, temperature during sizing controls at 800 DEG C;
(6), online eddy current inspection: pop one's head in and to move in metal surface, when running into defect or the change such as material, size, make eddy current magnetism different to the reaction of coil, cause coil impedance to change, measure this variable quantity by eddy detecting instrument and just can differentiate that there are zero defect or other change in physical in metal surface;
(7), pre-straightening process: straightening temperature 400 DEG C, to reduce residual stress;
(8), Pipe Cutting: the welded tube feeding turned off in synchronization device through pre-straightening process cuts off, and turned off in synchronization device overall rectilinear motion of following welded tube in cutting-off process is synchronized with the movement, and when both move at the uniform velocity, is cut off by welded tube; It is long that welded tube can cut into 5 ~ 16m, and therefore, synchronized stroke is also that 5 ~ 16m is long, and the speed of following during cut-out is 8 ~ 160m/min;
(9), stress relief annealing: welded tube introduced heating in heating furnace and be incubated, come out of the stove with after stove cooling, obtain welded tube of annealing, object is the intensity guaranteeing welded tube, when annealing temperature is too high, processing strain recovers, the effect of work hardening can not be obtained, annealing temperature is 650 DEG C, the effect of work hardening can be obtained, this annealing in process is the annealing in process of entire body, ensure welding region and neighboring area consistent with all the other regions of welded tube in metallographic structure and mechanical performance, in order to remove the strength variance of welded tube, in the stove of welded tube, the retention time is 30 minutes,
(10), pinching: the welded tube after annealing carries out pinching process, make welded tube termination diametric shrinkage after extrusion die extruding, described extrusion die comprises the active section that two sections of diameters do not wait, seamlessly transit between two sections of active sections, welded tube termination enters from bigger diameter end and extrudes, the termination of extrusion die and welded tube is carrying out extruding front lubricant sprayer, with avoid extrude time wearing and tearing and surface tear, after the extrusion die extruding that 1 diameter reduces gradually, the external diameter of welded tube termination is punctured into 81% of original diameter;
(11), pickling processes: welded tube is carried out pickling, removes the scale on surface, concentration of hydrochloric acid: 7%, pickling time: 35 minutes, then neutralization pond rolls, rolling number of times: 2 times, neutralizer pH value: 9, then roll through clear water reserviors, rolling number of times: 2 times;
(12), phosphorating treatment: the chemistry forming trbasic zinc phosphate on the surface of welded tube generates overlay film, trbasic zinc phosphate concentration: 20%, Phosphating Solution temperature: 68 DEG C, phosphating time: 10 minutes, Phosphating Solution free acidity: 4, General Acidity in Phosphating Solution: 45;
(13), saponification process: form the lubricating film coateds such as metallic soap on overlay film, for follow-up cold-drawn is ready, drawn tube surface can be made brighter and cleaner, saponification temperature: 55 DEG C, saponification time: 8 minutes, saponification liquor pH value: 8;
(14), cold-drawn: will treat that cold drawing welded tube carries out cold-drawn processing, obtain drawn tube, cold-drawing technology, mould chock plug and bore spacing: 3mm, pull out machine draft: 300t, cold-drawn speed: 5m/min, opening speed: 10m/min, drawn tube length: maximum 20m, drawn tube external diameter: 85mm, drawn tube wall thickness: 3mm;
(15), induction furnace Quenching Treatment: induction furnace hardening heat is 500 DEG C, and hardening media is water, reduces the residual stress of steel pipe;
(16), temper in batch-type furnace: the temperature of tempering air cooling is 350 DEG C, to reduce residual stress;
(17), straightening processing: be incubated 30 minutes in low-temp temper furnace, then carry out thermal straightening process, thermal straightening temperature 500 DEG C, to reduce residual stress;
(18), honing: select numerical control honing machine, workpiece turns round, and the form processing that honing head is reciprocating, reaches cylindricity: 0.01mm, Aperture deviation: 0.01mm;
(19), magnetic leakage detection: under suitable lift-off gap, inspection speed and the intensity of magnetization, to steel pipe vertical, horizontal defects detection, underproof welded tube is rejected, and makes mark at rejected region;
(20), Pipe Cutting is measured: carry out fixed length cutting to steel pipe, after cutting, pipe is smooth.
After testing, institute's inspection project meets GB/T3639-2009 standard to the product that the present embodiment obtains, and product is qualified, meets the requirement of user.
The contrast in technical performance of a kind of high-accuracy cold drawing welded tube and conventional steel pipe
Embodiment two: the manufacture method of a kind of high-accuracy cold drawing welded tube of the present invention comprises the steps:
(1), slitting: be that the wide coil of strip of 27SiMn carries out slitting, according to the width of coil of strip after the diameter determination slitting of welded tube on slitter by material; The welded tube diameter such as needed is 200mm, due in roll-forming process, the width of coil of strip has certain elongation, the developed width of coil of strip is calculated according to this percentage elongation, carry out slitting by this width again, this width should be less than 628mm, changes according to molding curve difference;
(2), roll bending formation: the coil of strip after slitting is placed on exhibition bin, by feed mechanism, the termination of coil of strip is extracted out, send in continuous pressure roller shaping mechanism and carry out roll bending formation processing, described pressure roller shaping mechanism comprises continuous print many groups pressure roller pair, often organize pressure roller to two pressure rollers comprising misfortune conjunction mutually, gap is left between described two pressure rollers, the gap of adjacent pressure roller to correspondence is out of shape gradually, make the coil of strip through respective clearance become curved surface by plane, then become conglobate body by curved surface;
(3), the coil of strip of high-frequency welding: Cheng Yuanhou adopts high-frequency welding, and the vertical masonry joint docked its side carries out induction welding, forms welded tube;
(4), weld seam process: when welded tube not yet cools, adopt the weld seam of burring knife milling downhand welding pipe, described burring knife comprises and is arranged on removing outer deburring cutter and being arranged on outside welded tube and removes internal hair bayonet inside welded tube, go internal hair bayonet axially to insert in body from the opening part not yet becoming conglobate body, and reach the front of welding position;
(5), sizing: the welded tube formed after weld seam process is again through sizing mill sizing, and form steel pipe, temperature during sizing controls at 850 DEG C;
(6), online eddy current inspection: pop one's head in and to move in metal surface, when running into defect or the change such as material, size, make eddy current magnetism different to the reaction of coil, cause coil impedance to change, measure this variable quantity by eddy detecting instrument and just can differentiate that there are zero defect or other change in physical in metal surface;
(7), pre-straightening process: straightening temperature 450 DEG C, to reduce residual stress;
(8), Pipe Cutting: the welded tube feeding turned off in synchronization device through pre-straightening process cuts off, and turned off in synchronization device overall rectilinear motion of following welded tube in cutting-off process is synchronized with the movement, and when both move at the uniform velocity, is cut off by welded tube; It is long that welded tube can cut into 5 ~ 16m, and therefore, synchronized stroke is also that 5 ~ 16m is long, and the speed of following during cut-out is 8 ~ 160m/min;
(9), stress relief annealing: welded tube introduced heating in heating furnace and be incubated, come out of the stove with after stove cooling, obtain welded tube of annealing, object is the intensity guaranteeing welded tube, when annealing temperature is too high, processing strain recovers, the effect of work hardening can not be obtained, annealing temperature is 750 DEG C, the effect of work hardening can be obtained, this annealing in process is the annealing in process of entire body, ensure welding region and neighboring area consistent with all the other regions of welded tube in metallographic structure and mechanical performance, in order to remove the strength variance of welded tube, in the stove of welded tube, the retention time is 40 minutes,
(10), pinching: the welded tube after annealing carries out pinching process, make welded tube termination diametric shrinkage after extrusion die extruding, described extrusion die comprises the active section that two sections of diameters do not wait, seamlessly transit between two sections of active sections, welded tube termination enters from bigger diameter end and extrudes, the termination of extrusion die and welded tube is carrying out extruding front lubricant sprayer, with avoid extrude time wearing and tearing and surface tear, after the extrusion die extruding that 4 diameters reduce gradually, the external diameter of welded tube termination is punctured into 85% of original diameter;
(11), pickling processes: welded tube is carried out pickling, removes the scale on surface, concentration of hydrochloric acid: 19%, pickling time: 60 minutes, then neutralization pond rolls, rolling number of times: 3 times, neutralizer pH value: 10, then roll through clear water reserviors, rolling number of times: 3 times;
(12), phosphorating treatment: the chemistry forming trbasic zinc phosphate on the surface of welded tube generates overlay film, trbasic zinc phosphate concentration: 30%, Phosphating Solution temperature: 75 DEG C, phosphating time: 20 minutes, Phosphating Solution free acidity: 7, General Acidity in Phosphating Solution: 75;
(13), saponification process: form the lubricating film coateds such as metallic soap on overlay film, for follow-up cold-drawn is ready, drawn tube surface can be made brighter and cleaner, saponification temperature: 75 DEG C, saponification time: 15 minutes, saponification liquor pH value: 9;
(14), cold-drawn: will treat that cold drawing welded tube carries out cold-drawn processing, obtain drawn tube, cold-drawing technology, mould chock plug and bore spacing: 5mm, pull out machine draft: 400t, cold-drawn speed: 30m/min, opening speed: 50m/min, drawn tube length: maximum 20m, drawn tube external diameter: 250mm, drawn tube wall thickness: 20mm;
(15), induction furnace Quenching Treatment: induction furnace hardening heat is 550 DEG C, and hardening media is water, reduces the residual stress of steel pipe;
(16), temper in batch-type furnace: the temperature of tempering air cooling is 380 DEG C, to reduce residual stress;
(17), straightening processing: be incubated 45 minutes in low-temp temper furnace, then carry out thermal straightening process, thermal straightening temperature 600 DEG C, to reduce residual stress;
(18), honing: select numerical control honing machine, workpiece turns round, and the form processing that honing head is reciprocating, reaches cylindricity: 0.02mm, Aperture deviation: 0.02mm;
(19), magnetic leakage detection: under suitable lift-off gap, inspection speed and the intensity of magnetization, to steel pipe vertical, horizontal defects detection, underproof welded tube is rejected, and makes mark at rejected region;
(20), Pipe Cutting is measured: carry out fixed length cutting to steel pipe, after cutting, pipe is smooth.
Embodiment three: the manufacture method of a kind of high-accuracy cold drawing welded tube of the present invention comprises the steps:
(1), slitting: be that the wide coil of strip of 27SiMn carries out slitting, according to the width of coil of strip after the diameter determination slitting of welded tube on slitter by material; The welded tube diameter such as needed is 150mm, due in roll-forming process, the width of coil of strip has certain elongation, the developed width of coil of strip is calculated according to this percentage elongation, carry out slitting by this width again, this width should be less than 471mm, changes according to molding curve difference;
(2), roll bending formation: the coil of strip after slitting is placed on exhibition bin, by feed mechanism, the termination of coil of strip is extracted out, send in continuous pressure roller shaping mechanism and carry out roll bending formation processing, described pressure roller shaping mechanism comprises continuous print many groups pressure roller pair, often organize pressure roller to two pressure rollers comprising misfortune conjunction mutually, gap is left between described two pressure rollers, the gap of adjacent pressure roller to correspondence is out of shape gradually, make the coil of strip through respective clearance become curved surface by plane, then become conglobate body by curved surface;
(3), the coil of strip of high-frequency welding: Cheng Yuanhou adopts high-frequency welding, and the vertical masonry joint docked its side carries out induction welding, forms welded tube;
(4), weld seam process: when welded tube not yet cools, adopt the weld seam of burring knife milling downhand welding pipe, described burring knife comprises and is arranged on removing outer deburring cutter and being arranged on outside welded tube and removes internal hair bayonet inside welded tube, go internal hair bayonet axially to insert in body from the opening part not yet becoming conglobate body, and reach the front of welding position;
(5), sizing: the welded tube formed after weld seam process is again through sizing mill sizing, and form steel pipe, temperature during sizing controls at 820 DEG C;
(6), online eddy current inspection: pop one's head in and to move in metal surface, when running into defect or the change such as material, size, make eddy current magnetism different to the reaction of coil, cause coil impedance to change, measure this variable quantity by eddy detecting instrument and just can differentiate that there are zero defect or other change in physical in metal surface;
(7), pre-straightening process: straightening temperature 420 DEG C, to reduce residual stress;
(8), Pipe Cutting: the welded tube feeding turned off in synchronization device through pre-straightening process cuts off, and turned off in synchronization device overall rectilinear motion of following welded tube in cutting-off process is synchronized with the movement, and when both move at the uniform velocity, is cut off by welded tube; It is long that welded tube can cut into 5 ~ 16m, and therefore, synchronized stroke is also that 5 ~ 16m is long, and the speed of following during cut-out is 8 ~ 160m/min;
(9), stress relief annealing: welded tube introduced heating in heating furnace and be incubated, come out of the stove with after stove cooling, obtain welded tube of annealing, object is the intensity guaranteeing welded tube, when annealing temperature is too high, processing strain recovers, the effect of work hardening can not be obtained, annealing temperature is 700 DEG C, the effect of work hardening can be obtained, this annealing in process is the annealing in process of entire body, ensure welding region and neighboring area consistent with all the other regions of welded tube in metallographic structure and mechanical performance, in order to remove the strength variance of welded tube, in the stove of welded tube, the retention time is 35 minutes,
(10), pinching: the welded tube after annealing carries out pinching process, make welded tube termination diametric shrinkage after extrusion die extruding, described extrusion die comprises the active section that two sections of diameters do not wait, seamlessly transit between two sections of active sections, welded tube termination enters from bigger diameter end and extrudes, the termination of extrusion die and welded tube is carrying out extruding front lubricant sprayer, with avoid extrude time wearing and tearing and surface tear, after the extrusion die extruding that 2 diameters reduce gradually, the external diameter of welded tube termination is punctured into 83% of original diameter;
(11), pickling processes: welded tube is carried out pickling, removes the scale on surface, concentration of hydrochloric acid: 10%, pickling time: 45 minutes, then neutralization pond rolling, rolling number of times: 2.5 times, neutralizer pH value: 9.5, then through clear water reserviors rolling, rolling number of times: 2.5 times;
(12), phosphorating treatment: the chemistry forming trbasic zinc phosphate on the surface of welded tube generates overlay film, trbasic zinc phosphate concentration: 25%, Phosphating Solution temperature: 70 DEG C, phosphating time: 15 minutes, Phosphating Solution free acidity: 6, General Acidity in Phosphating Solution: 60;
(13), saponification process: form the lubricating film coateds such as metallic soap on overlay film, for follow-up cold-drawn is ready, drawn tube surface can be made brighter and cleaner, saponification temperature: 60 DEG C, saponification time: 10 minutes, saponification liquor pH value: 8.5;
(14), cold-drawn: will treat that cold drawing welded tube carries out cold-drawn processing, obtain drawn tube, cold-drawing technology, mould chock plug and bore spacing: 4mm, pull out machine draft: 350t, cold-drawn speed: 20m/min, opening speed: 30m/min, drawn tube length: maximum 20m, drawn tube external diameter: 200mm, drawn tube wall thickness: 15mm;
(15), induction furnace Quenching Treatment: induction furnace hardening heat is 520 DEG C, and hardening media is water, reduces the residual stress of steel pipe;
(16), temper in batch-type furnace: the temperature of tempering air cooling is 370 DEG C, to reduce residual stress;
(17), straightening processing: be incubated 40 minutes in low-temp temper furnace, then carry out thermal straightening process, thermal straightening temperature 550 DEG C, to reduce residual stress;
(18), honing: select numerical control honing machine, workpiece turns round, and the form processing that honing head is reciprocating, reaches cylindricity: 0.015mm, Aperture deviation: 0.015mm;
(19), magnetic leakage detection: under suitable lift-off gap, inspection speed and the intensity of magnetization, to steel pipe vertical, horizontal defects detection, underproof welded tube is rejected, and makes mark at rejected region;
(20), Pipe Cutting is measured: carry out fixed length cutting to steel pipe, after cutting, pipe is smooth.

Claims (1)

1. the manufacture method of a high-accuracy cold drawing welded tube comprises the steps:
(1), slitting: be that the wide coil of strip of 27SiMn carries out slitting, according to the width of coil of strip after the diameter determination slitting of welded tube on slitter by material;
(2), roll bending formation: the coil of strip after slitting is placed on exhibition bin, by feed mechanism, the termination of coil of strip is extracted out, send in continuous pressure roller shaping mechanism and carry out roll bending formation processing, described pressure roller shaping mechanism comprises continuous print many groups pressure roller pair, often organize pressure roller to two pressure rollers comprising misfortune conjunction mutually, gap is left between described two pressure rollers, the gap of adjacent pressure roller to correspondence is out of shape gradually, make the coil of strip through respective clearance become curved surface by plane, then become conglobate body by curved surface;
(3), the coil of strip of high-frequency welding: Cheng Yuanhou adopts high-frequency welding, and the vertical masonry joint docked its side carries out induction welding, forms welded tube;
(4), weld seam process: when welded tube not yet cools, adopt the weld seam of burring knife milling downhand welding pipe, described burring knife comprises and is arranged on removing outer deburring cutter and being arranged on outside welded tube and removes internal hair bayonet inside welded tube, go internal hair bayonet axially to insert in body from the opening part not yet becoming conglobate body, and reach the front of welding position; Because roll bending formation and welding are carried out continuously, the weld seam of inner wall of welded pipe is made to be treated as a difficult problem, welded tube before cutting, its length can continue tens meters on a production line, after welding fabrication, conventional means is utilized to be to cut the weld seam of inwall or to polish process, the present invention adopts and is axially inserted in body by the body open going internal hair bayonet from Cheng Yuanqian, cross high-frequency welding position, again deburring is carried out to the weld seam in pipe, make inner wall of welded pipe smooth, for follow-up cold-drawn provides guarantee; In addition, deburring carries out in time after tube-welding, and now welded tube not yet cools, and can reduce difficulty of processing, improves deburring speed;
(5), sizing: the welded tube formed after weld seam process is again through sizing mill sizing, and form steel pipe, temperature during sizing controls at 800 ~ 850 DEG C;
(6), online eddy current inspection: pop one's head in and to move in metal surface, when running into defect or the change such as material, size, make eddy current magnetism different to the reaction of coil, cause coil impedance to change, measure this variable quantity by eddy detecting instrument and just can differentiate that there are zero defect or other change in physical in metal surface;
(7), pre-straightening process: straightening temperature 400 ~ 450 DEG C, to reduce residual stress;
(8), Pipe Cutting: the welded tube feeding turned off in synchronization device through pre-straightening process cuts off, and turned off in synchronization device overall rectilinear motion of following welded tube in cutting-off process is synchronized with the movement, and when both move at the uniform velocity, is cut off by welded tube; The program adopts the method for synchronization to be cut off by welding pipe fixed length, ensure that welding, roll bending formation, weld seam process are carried out continuously in non-stop-machine situation, can improve speed of production;
(9), stress relief annealing: welded tube introduced heating in heating furnace and be incubated, come out of the stove with after stove cooling, obtain welded tube of annealing, object is the intensity guaranteeing welded tube, when annealing temperature is too high, processing strain recovers, the effect of work hardening can not be obtained, annealing temperature is 650 ~ 750 DEG C, the effect of work hardening can be obtained, this annealing in process is the annealing in process of entire body, ensure welding region and neighboring area consistent with all the other regions of welded tube in metallographic structure and mechanical performance, in order to remove the strength variance of welded tube, in the stove of welded tube, the retention time is 30 ~ 40 minutes,
(10), pinching: the welded tube after annealing carries out pinching process, make welded tube termination diametric shrinkage after extrusion die extruding, described extrusion die comprises the active section that two sections of diameters do not wait, seamlessly transit between two sections of active sections, welded tube termination enters from bigger diameter end and extrudes, the termination of extrusion die and welded tube is carrying out extruding front lubricant sprayer, with avoid extrude time wearing and tearing and surface tear, after the extrusion die extruding that 1 ~ 4 diameter reduces gradually, the external diameter of welded tube termination is punctured into 81 ~ 85% of original diameter;
(11), pickling processes: welded tube is carried out pickling, removes the scale on surface, concentration of hydrochloric acid: 7 ~ 19%, pickling time: 35 ~ 60 minutes, then neutralization pond rolling, rolling number of times: 2 ~ 3 times, neutralizer pH value: 9 ~ 10, then through clear water reserviors rolling, rolling number of times: 2 ~ 3 times;
(12), phosphorating treatment: the chemistry forming trbasic zinc phosphate on the surface of welded tube generates overlay film, trbasic zinc phosphate concentration: 20 ~ 30%, Phosphating Solution temperature: 68 ~ 75 DEG C, phosphating time: 10 ~ 20 minutes, Phosphating Solution free acidity: 4 ~ 7, General Acidity in Phosphating Solution: 45 ~ 75;
(13), saponification process: form the lubricating film coateds such as metallic soap on overlay film, for follow-up cold-drawn is ready, drawn tube surface can be made brighter and cleaner, saponification temperature: 55 ~ 75 DEG C, saponification time: 8 ~ 15 minutes, saponification liquor pH value: 8 ~ 9;
(14), cold-drawn: will treat that cold drawing welded tube carries out cold-drawn processing, obtain drawn tube, cold-drawing technology, mould chock plug and bore spacing: 3 ~ 5mm, pull out machine draft: 300 ~ 400t, cold-drawn speed: 5 ~ 30m/min, opening speed: 10 ~ 50m/min, drawn tube length: maximum 20m, drawn tube external diameter: 85 ~ 250mm, drawn tube wall thickness: 3 ~ 20mm;
(15), induction furnace Quenching Treatment: induction furnace hardening heat is 500 ~ 550 DEG C, and hardening media is water, reduces the residual stress of steel pipe;
(16), temper in batch-type furnace: the temperature of tempering air cooling is 350 ~ 380 DEG C, to reduce residual stress;
(17), straightening processing: be incubated 30 ~ 45 minutes in low-temp temper furnace, then carry out thermal straightening process, thermal straightening temperature 500 ~ 600 DEG C, to reduce residual stress;
(18), honing: select numerical control honing machine, workpiece turns round, and the form processing that honing head is reciprocating, reaches cylindricity: 0.01 ~ 0.02mm, Aperture deviation: 0.01 ~ 0.02mm;
(19), magnetic leakage detection: under suitable lift-off gap, inspection speed and the intensity of magnetization, to steel pipe vertical, horizontal defects detection;
(20), Pipe Cutting is measured: carry out fixed length cutting to steel pipe, after cutting, pipe is smooth.
CN201310597036.8A 2013-11-16 2013-11-16 Manufacturing method for high-precision cold-drawing welded pipe Pending CN104646932A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310597036.8A CN104646932A (en) 2013-11-16 2013-11-16 Manufacturing method for high-precision cold-drawing welded pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310597036.8A CN104646932A (en) 2013-11-16 2013-11-16 Manufacturing method for high-precision cold-drawing welded pipe

Publications (1)

Publication Number Publication Date
CN104646932A true CN104646932A (en) 2015-05-27

Family

ID=53238845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310597036.8A Pending CN104646932A (en) 2013-11-16 2013-11-16 Manufacturing method for high-precision cold-drawing welded pipe

Country Status (1)

Country Link
CN (1) CN104646932A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106181261A (en) * 2016-08-18 2016-12-07 无锡苏嘉法斯特汽车零配件有限公司 The manufacture method of thin-wall high intensity frame tube
CN106239054A (en) * 2016-08-26 2016-12-21 嘉兴永信精密钢管有限公司 A kind of play drum cylinder barrel the manufacturing process of amortisseur
CN106736601A (en) * 2017-04-17 2017-05-31 江苏立万精密制管有限公司 A kind of cold drawing accurate welded pipe product line and production method
CN107838221A (en) * 2017-11-07 2018-03-27 浙江义腾特种钢管有限公司 A kind of steel tube seamless handling process
CN110052792A (en) * 2019-05-09 2019-07-26 江苏淮龙装备科技有限公司 A kind of manufacturing method of hydraulic cylinder cylinder barrel
CN110434560A (en) * 2019-08-19 2019-11-12 扬州吉星机械有限公司 A kind of abnormity welded tube process equipment and its processing technology
CN111958177A (en) * 2020-07-07 2020-11-20 北京赛亿科技有限公司 Manufacturing method of bridge cable internal ventilating steel pipe
CN112059540A (en) * 2020-08-11 2020-12-11 浙江晶日科技股份有限公司 Cold-drawn lamp pole and manufacturing process thereof
CN113118232A (en) * 2021-04-21 2021-07-16 中冶赛迪技术研究中心有限公司 Closed-type steel hot roll bending production process
CN113560980A (en) * 2021-07-20 2021-10-29 四川岷河管道建设工程有限公司 Pipe polishing and detecting integrated production line
CN114210761A (en) * 2021-12-30 2022-03-22 武汉市博钛新材料科技有限公司 High-frequency induction seamless titanium welded pipe and production method thereof
CN114406616A (en) * 2022-01-24 2022-04-29 武汉市博钛新材料科技有限公司 Seamless titanium vacuum cup welded pipe and production method thereof
CN115091147A (en) * 2022-08-25 2022-09-23 江苏立万精密制管有限公司 Cold-drawing forming method of precision welded pipe
CN115122053A (en) * 2022-07-22 2022-09-30 隆昌山川机械有限责任公司 Processing technology for pickling-free phosphating of metal pipe of working cylinder of automobile shock absorber

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87104077A (en) * 1987-06-03 1988-12-14 李振明 Cold-drawing technology of high-frequency welded thin-wall steel pipe
EP0387425A1 (en) * 1989-03-12 1990-09-19 MARCEGAGLIA S.p.A. Apparatus for the continuous production of small-diameter welded pipes
CN1554892A (en) * 2003-12-26 2004-12-15 庄建新 U-shaped seamless stainless steel pipe and its preocessing process
CN102527767A (en) * 2011-11-22 2012-07-04 玛切嘉利(中国)有限责任公司 Cold drawing welded tube manufacture process for high-accuracy hydraulic oil cylinder
CN102764958A (en) * 2012-07-13 2012-11-07 江苏中友精密制管有限公司 Process for manufacturing cold-rolled/cold-drawn precise welded steel pipe
CN102825437A (en) * 2012-08-15 2012-12-19 山东泰丰钢业有限公司 ERW (electrical resistance welding) process of high-strength automobile transmission shaft pipe

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87104077A (en) * 1987-06-03 1988-12-14 李振明 Cold-drawing technology of high-frequency welded thin-wall steel pipe
EP0387425A1 (en) * 1989-03-12 1990-09-19 MARCEGAGLIA S.p.A. Apparatus for the continuous production of small-diameter welded pipes
CN1554892A (en) * 2003-12-26 2004-12-15 庄建新 U-shaped seamless stainless steel pipe and its preocessing process
CN102527767A (en) * 2011-11-22 2012-07-04 玛切嘉利(中国)有限责任公司 Cold drawing welded tube manufacture process for high-accuracy hydraulic oil cylinder
CN102764958A (en) * 2012-07-13 2012-11-07 江苏中友精密制管有限公司 Process for manufacturing cold-rolled/cold-drawn precise welded steel pipe
CN102825437A (en) * 2012-08-15 2012-12-19 山东泰丰钢业有限公司 ERW (electrical resistance welding) process of high-strength automobile transmission shaft pipe

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106181261A (en) * 2016-08-18 2016-12-07 无锡苏嘉法斯特汽车零配件有限公司 The manufacture method of thin-wall high intensity frame tube
CN106181261B (en) * 2016-08-18 2018-05-11 无锡苏嘉法斯特汽车零配件有限公司 The manufacture method of thin-wall high intensity frame tube
CN106239054A (en) * 2016-08-26 2016-12-21 嘉兴永信精密钢管有限公司 A kind of play drum cylinder barrel the manufacturing process of amortisseur
CN106239054B (en) * 2016-08-26 2019-03-01 嘉兴永信精密钢管有限公司 A kind of manufacturing process for playing drum cylinder barrel of damper
CN106736601A (en) * 2017-04-17 2017-05-31 江苏立万精密制管有限公司 A kind of cold drawing accurate welded pipe product line and production method
CN106736601B (en) * 2017-04-17 2019-03-19 江苏立万精密制管有限公司 A kind of cold drawing accurate welded pipe product line and production method
CN107838221A (en) * 2017-11-07 2018-03-27 浙江义腾特种钢管有限公司 A kind of steel tube seamless handling process
CN110052792A (en) * 2019-05-09 2019-07-26 江苏淮龙装备科技有限公司 A kind of manufacturing method of hydraulic cylinder cylinder barrel
CN110434560A (en) * 2019-08-19 2019-11-12 扬州吉星机械有限公司 A kind of abnormity welded tube process equipment and its processing technology
CN111958177A (en) * 2020-07-07 2020-11-20 北京赛亿科技有限公司 Manufacturing method of bridge cable internal ventilating steel pipe
CN112059540A (en) * 2020-08-11 2020-12-11 浙江晶日科技股份有限公司 Cold-drawn lamp pole and manufacturing process thereof
CN113118232A (en) * 2021-04-21 2021-07-16 中冶赛迪技术研究中心有限公司 Closed-type steel hot roll bending production process
CN113560980A (en) * 2021-07-20 2021-10-29 四川岷河管道建设工程有限公司 Pipe polishing and detecting integrated production line
CN113560980B (en) * 2021-07-20 2023-08-29 四川岷河管道建设工程有限公司 Pipe polishing and detecting integrated production line
CN114210761A (en) * 2021-12-30 2022-03-22 武汉市博钛新材料科技有限公司 High-frequency induction seamless titanium welded pipe and production method thereof
CN114406616A (en) * 2022-01-24 2022-04-29 武汉市博钛新材料科技有限公司 Seamless titanium vacuum cup welded pipe and production method thereof
CN115122053A (en) * 2022-07-22 2022-09-30 隆昌山川机械有限责任公司 Processing technology for pickling-free phosphating of metal pipe of working cylinder of automobile shock absorber
CN115091147A (en) * 2022-08-25 2022-09-23 江苏立万精密制管有限公司 Cold-drawing forming method of precision welded pipe

Similar Documents

Publication Publication Date Title
CN104646932A (en) Manufacturing method for high-precision cold-drawing welded pipe
CN104646449A (en) Manufacturing method for cold drawn welded pipe used for hydraulic oil cylinders
CN102527767B (en) Cold drawing welded tube manufacture process for high-accuracy hydraulic oil cylinder
CN104646931A (en) Manufacturing method of cold drawn welded pipe for precision oil cylinder
CN104647037A (en) Method for manufacturing cold-drawn welded pipe for precision inner hole honing pipe
CN102873512B (en) The manufacture method of thick-walled seamless steel pipes in used in nuclear power station heavy caliber
CN101829745B (en) Cold ring rolling forming method for double-flute section ring
CN102615224B (en) The method that inner step profile section ring parts radial-axial rolling is shaped
CN103316926B (en) Cold rolling forming method for automotive hub bearing ring part with L-shaped cross section
CN102294379B (en) Method for manufacturing seamless steel pipe for high-pressure gas cylinder with large caliber
CN102615223B (en) The method of rolling two trapezoid cross section flange ring forging parts simultaneously
CN103921065B (en) A kind of manufacture method of automobile specified seamless steel pipe
CN102179681B (en) Pipe mold manufacturing process adopting continuous-casting blank to forge and roll rough blank periodically
CN102601278B (en) Method for radially and axially rolling and forming large-sized double-edge stepped ring parts
CN110052792B (en) Manufacturing method of cylinder barrel for hydraulic cylinder
CN102039313B (en) Method for producing large-diameter seamless steel pipe for gas cylinder
CN102303065B (en) Method for manufacturing seamless steel tube for vehicle-mounted large-diameter high pressure gas cylinder
WO2005068098A9 (en) Method for producing seamless pipe
CN104338777A (en) Production method of cold-drawn precision seamless steel pipes
CN104174691A (en) High-precision automobile stabilizer bar welded cold drawn tube production process
CN102069104A (en) Method for producing seamless steel tube for big-caliber long tube air bottle in hot rolling mode
CN104551669A (en) Production method of cold-drawn high-precision seamless steel tube
CN104338778A (en) Method for manufacturing precise inner hole honing tube
CN102873126B (en) Manufacturing method of large-aperture thin-walled seamless steel tube for nuclear power plant
CN104368621A (en) Manufacturing method of metal plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150527

WD01 Invention patent application deemed withdrawn after publication