CN104407680A - Management system based on complete cabinet nodes - Google Patents
Management system based on complete cabinet nodes Download PDFInfo
- Publication number
- CN104407680A CN104407680A CN201410716368.8A CN201410716368A CN104407680A CN 104407680 A CN104407680 A CN 104407680A CN 201410716368 A CN201410716368 A CN 201410716368A CN 104407680 A CN104407680 A CN 104407680A
- Authority
- CN
- China
- Prior art keywords
- node
- plate
- power supply
- management
- mainboard
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000004606 Fillers/Extenders Substances 0.000 claims description 6
- 238000010586 diagram Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/16—Constructional details or arrangements
- G06F1/18—Packaging or power distribution
- G06F1/183—Internal mounting support structures, e.g. for printed circuit boards, internal connecting means
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Power Engineering (AREA)
- Human Computer Interaction (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Cooling Or The Like Of Electrical Apparatus (AREA)
Abstract
The invention discloses a management system based on a node of a whole cabinet, which comprises: 1) complete machine cabinet server, 2) associated collaborative management board card: the management system comprises an RMC management main board, an MP NODE middle board, a PDB power supply back board and an FCB fan control board, 3) connecting cables among board cards, and 4) a server NODE NODE to be managed. Compared with the prior art, the invention defines the concept of centralized management from the perspective of the whole cabinet, and manages various information in the node in a centralized way through the management design of the whole cabinet. The management efficiency is improved, the management complexity is reduced, the practicability is high, the application range is wide, and the popularization is easy.
Description
Technical field
The present invention relates to computer software wall calendar technical field, be specifically related to a kind of management system based on whole machine cabinet node.
Background technology
So-called server is exactly the highdensity low cost server platform of a kind of High Availabitity, is be special applications industry and the design of high density computer environment specially.They can start oneself operating system by local hard drive, as Windows NT/2000/2003, Linux, Solaris etc., be similar to one by one independently server.In such a mode, the system of each mainboard operation oneself, serves the different user group specified, does not associate each other.But these mainboards still can be assembled a server cluster with system software by us.
Server is used and debugging by being installed to the enterprising enforcement of rack at majority at present.In the face of growing server product, the management for node becomes an emphasis difficult problem for on-the-spot O&M, and node is distributed on different racks more, adds a lot of difficulty from different rack enterprising line pipe reason.The present invention is foothold from rack, manages for the server node of whole machine cabinet by developing attached coordinated management board.Improve the efficiency of management of server node.
A kind of management system method for designing based on whole machine cabinet node is now provided, can manages the server node in whole machine cabinet, improve the efficiency of server admin.
Summary of the invention
The technical problem to be solved in the present invention is: technical assignment of the present invention solves the deficiencies in the prior art, provides a kind of management system based on whole machine cabinet node.
The technical solution adopted in the present invention is:
A kind of management system based on whole machine cabinet node, described management system comprises: 1) whole machine cabinet server, 2) relevant coordinated management board: comprise RMC and manage mainboard, plate, PDB power supply backplane, FCB fan control board in MP node, 3) the server node NODE connection cable between board, 4) to be managed; Wherein:
Whole machine cabinet server, comprises whole machine cabinet and is arranged on the server node in whole machine cabinet;
RMC manages the core control mainboard that mainboard is whole management system, carries out overall control to the management of whole rack;
MP is plate in node, accepts the connection work managing plate in mainboard and node, manages mainboard and be connected, control respectively for unit by cable with RMC;
PDB is power supply backplane, is connected the management information of power supply aspect by this;
FCB is fan control board, and one end connects fan, and one end is connected in node on plate by cable in addition, controls respectively for the fan on each unit;
NODE is server node specifically to be managed.
Described management system take RMC as general supervision unit, connects PDB control power unit by golden finger; By plate in cable connection MP node as classify management unit; In MP node, plate is connected to FCB fan control board by cable, control FCB fan control board, and FCB fan control board connects fan control fan; In node, plate connection server unit controls for server node simultaneously.
In described management system, management mainboard, by power supply backplane, with logic control signal cable, by plate in node, connects fan control board; By golden finger, with power supply backplane PMBUS signal cable, connect PUS power module;
Power supply backplane is by BUSBAR(bus) to power for fan control module, fan control module is connected with fan by power cable; BUSBAR, by secondary power supply plate, through power supply card extender, is connected with node mainboard by service cable, and secondary power supply plate also by golden mobile phone, through node backboard, is connected with plate in node by service cable;
Secondary power supply plate, also by logic control signal cable, is connected with node mainboard through power supply card extender; And by node backboard, with plate in golden finger and node, connect with logic control signal cable.
RMC manages mainboard by PMBUS, through PDB power supply backplane, is connected with PSU power supply;
RMC is managed mainboard and is connected by plate in I2C and MP node, and in MP node, plate is again by I2C, is connected, is connected to fan with FCB fan control board;
In MP node, plate is by IPMB Intelligent Platform Management Bus, is connected with server node NODE to be managed through MBP.
Beneficial effect of the present invention: prior art of the present invention is compared, defines the concept of centralized management from whole machine cabinet angle, manage concentrated for various information for the management design of the information in node by whole machine cabinet.Improve the complexity that the efficiency of management reduces management, practical, applied widely, be easy to promote.
Accompanying drawing explanation
Fig. 1 is holistic management configuration diagram of the present invention;
Fig. 2 is that connection line mark illustrates schematic diagram;
Fig. 3 is the schematic diagram of board of the present invention connection and topological structure.
Embodiment
Below according to Figure of description, in conjunction with specific embodiments, the present invention is further described:
Embodiment 1:
As shown in Figure 1 and Figure 2, a kind of management system based on whole machine cabinet node, described management system comprises: 1) whole machine cabinet server, 2) relevant coordinated management board: comprise RMC and manage mainboard, plate, PDB power supply backplane, FCB fan control board in MP node, 3) the server node NODE connection cable between board, 4) to be managed; Wherein:
Whole machine cabinet server, comprises whole machine cabinet and is arranged on the server node in whole machine cabinet;
RMC manages the core control mainboard that mainboard is whole management system, carries out overall control to the management of whole rack;
MP is plate in node, accepts the connection work managing plate in mainboard and node, manages mainboard and be connected, control respectively for unit by cable with RMC;
PDB is power supply backplane, is connected the management information of power supply aspect by this;
FCB is fan control board, and one end connects fan, and one end is connected in node on plate by cable in addition, controls respectively for the fan on each unit;
NODE is server node specifically to be managed.
Embodiment 2:
On the basis of embodiment 1, management system described in the present embodiment take RMC as general supervision unit, connects PDB control power unit by golden finger; By plate in cable connection MP node as classify management unit; In MP node, plate is connected to FCB fan control board by cable, control FCB fan control board, and FCB fan control board connects fan control fan; In node, plate connection server unit controls for server node simultaneously.
Embodiment 3:
On the basis of embodiment 1 or 2, in management system described in the present embodiment, management mainboard, by power supply backplane, with logic control signal cable, by plate in node, connects fan control board; By golden finger, with power supply backplane PMBUS signal cable, connect PUS power module;
Power supply backplane is by BUSBAR(bus) to power for fan control module, fan control module is connected with fan by power cable; BUSBAR, by secondary power supply plate, through power supply card extender, is connected with node mainboard by service cable, and secondary power supply plate also by golden mobile phone, through node backboard, is connected with plate in node by service cable;
Secondary power supply plate, also by logic control signal cable, is connected with node mainboard through power supply card extender; And by node backboard, with plate in golden finger and node, connect with logic control signal cable.
Embodiment 4:
As shown in Figure 3, on the basis of embodiment 3, the present embodiment RMC manages mainboard by PMBUS, through PDB power supply backplane, is connected with PSU power supply;
RMC is managed mainboard and is connected by plate in I2C and MP node, and in MP node, plate is again by I2C, is connected, is connected to fan with FCB fan control board;
In MP node, plate is by IPMB Intelligent Platform Management Bus, is connected with server node NODE to be managed through MBP.
The present invention, by carrying out detailed design for each cloth office point in rack, achieves the design of each administrative unit board in whole machine cabinet, when reality uses, and can according to designing the complete exploitation carrying out each board in node.
Above embodiment is only for illustration of the present invention; and be not limitation of the present invention; the those of ordinary skill of relevant technical field; without departing from the spirit and scope of the present invention; can also make a variety of changes and modification; therefore all equivalent technical schemes also belong to category of the present invention, and scope of patent protection of the present invention should be defined by the claims.
Claims (4)
1. the management system based on whole machine cabinet node, it is characterized in that, described management system comprises: 1) whole machine cabinet server, 2) relevant coordinated management board: comprise RMC and manage mainboard, plate, PDB power supply backplane, FCB fan control board in MP node, 3) the server node NODE connection cable between board, 4) to be managed; Wherein:
Whole machine cabinet server, comprises whole machine cabinet and is arranged on the server node in whole machine cabinet;
RMC manages the core control mainboard that mainboard is whole management system, carries out overall control to the management of whole rack;
MP is plate in node, accepts the connection work managing plate in mainboard and node, manages mainboard and be connected, control respectively for unit by cable with RMC;
PDB is power supply backplane, is connected the management information of power supply aspect by this;
FCB is fan control board, and one end connects fan, and one end is connected in node on plate by cable in addition, controls respectively for the fan on each unit;
NODE is server node specifically to be managed.
2. a kind of management system based on whole machine cabinet node according to claim 1, is characterized in that: described management system take RMC as general supervision unit, connects PDB control power unit by golden finger; By plate in cable connection MP node as classify management unit; In MP node, plate is connected to FCB fan control board by cable, control FCB fan control board, and FCB fan control board connects fan control fan; In node, plate connection server unit controls for server node simultaneously.
3. a kind of management system based on whole machine cabinet node according to claim 1 and 2, is characterized in that: in described management system, and management mainboard, by power supply backplane, with logic control signal cable, by plate in node, connects fan control board; By golden finger, with power supply backplane PMBUS signal cable, connect PUS power module;
Power supply backplane is that fan control module is powered by BUSBAR, and fan control module is connected with fan by power cable; BUSBAR, by secondary power supply plate, through power supply card extender, is connected with node mainboard by service cable, and secondary power supply plate also by golden mobile phone, through node backboard, is connected with plate in node by service cable;
Secondary power supply plate, also by logic control signal cable, is connected with node mainboard through power supply card extender; And by node backboard, with plate in golden finger and node, connect with logic control signal cable.
4. a kind of management system based on whole machine cabinet node according to claim 3, is characterized in that:
RMC manages mainboard by PMBUS, through PDB power supply backplane, is connected with PSU power supply;
RMC is managed mainboard and is connected by plate in I2C and MP node, and in MP node, plate is again by I2C, is connected, is connected to fan with FCB fan control board;
In MP node, plate is by IPMB Intelligent Platform Management Bus, is connected with server node NODE to be managed through MBP.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410716368.8A CN104407680A (en) | 2014-12-02 | 2014-12-02 | Management system based on complete cabinet nodes |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410716368.8A CN104407680A (en) | 2014-12-02 | 2014-12-02 | Management system based on complete cabinet nodes |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104407680A true CN104407680A (en) | 2015-03-11 |
Family
ID=52645317
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410716368.8A Pending CN104407680A (en) | 2014-12-02 | 2014-12-02 | Management system based on complete cabinet nodes |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104407680A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105119746A (en) * | 2015-08-27 | 2015-12-02 | 浪潮电子信息产业股份有限公司 | Intelligent monitoring method for SMARTRACK whole cabinet server configuration based on RMC management |
CN105302690A (en) * | 2015-10-14 | 2016-02-03 | 浪潮电子信息产业股份有限公司 | Whole cabinet server monitoring and management method |
CN105302276A (en) * | 2015-10-14 | 2016-02-03 | 浪潮电子信息产业股份有限公司 | Design method for limiting power consumption of SmartRack whole cabinet |
CN105353860A (en) * | 2015-12-09 | 2016-02-24 | 浪潮电子信息产业股份有限公司 | BBU interconnection management method |
CN106774725A (en) * | 2017-01-12 | 2017-05-31 | 郑州云海信息技术有限公司 | A kind of equipment cabinet server |
CN106919233A (en) * | 2017-02-25 | 2017-07-04 | 郑州云海信息技术有限公司 | A kind of high density storage server architecture system |
CN109032299A (en) * | 2018-07-19 | 2018-12-18 | 郑州云海信息技术有限公司 | A kind of 6u high-density server system power supply structure |
CN111314159A (en) * | 2018-12-11 | 2020-06-19 | 英业达科技有限公司 | Cabinet, and system and method for testing electronic device arranged in cabinet |
CN111625079A (en) * | 2020-05-28 | 2020-09-04 | 浪潮电子信息产业股份有限公司 | Complete cabinet server and multiplexing type power module thereof |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102594602A (en) * | 2012-02-23 | 2012-07-18 | 浪潮电子信息产业股份有限公司 | Location management design method of multi-node cloud computing server |
CN102799225A (en) * | 2012-07-20 | 2012-11-28 | 浪潮电子信息产业股份有限公司 | High density server design method |
CN103970632A (en) * | 2014-05-27 | 2014-08-06 | 浪潮电子信息产业股份有限公司 | Method for restoring default fan rotating speed of Smart Rack cabinet |
-
2014
- 2014-12-02 CN CN201410716368.8A patent/CN104407680A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102594602A (en) * | 2012-02-23 | 2012-07-18 | 浪潮电子信息产业股份有限公司 | Location management design method of multi-node cloud computing server |
CN102799225A (en) * | 2012-07-20 | 2012-11-28 | 浪潮电子信息产业股份有限公司 | High density server design method |
CN103970632A (en) * | 2014-05-27 | 2014-08-06 | 浪潮电子信息产业股份有限公司 | Method for restoring default fan rotating speed of Smart Rack cabinet |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105119746A (en) * | 2015-08-27 | 2015-12-02 | 浪潮电子信息产业股份有限公司 | Intelligent monitoring method for SMARTRACK whole cabinet server configuration based on RMC management |
CN105302690A (en) * | 2015-10-14 | 2016-02-03 | 浪潮电子信息产业股份有限公司 | Whole cabinet server monitoring and management method |
CN105302276A (en) * | 2015-10-14 | 2016-02-03 | 浪潮电子信息产业股份有限公司 | Design method for limiting power consumption of SmartRack whole cabinet |
US11140024B2 (en) | 2015-10-14 | 2021-10-05 | Inspur Electronic Information Industry Co., Ltd | Monitoring and management method for complete machine cabinet server |
CN105353860A (en) * | 2015-12-09 | 2016-02-24 | 浪潮电子信息产业股份有限公司 | BBU interconnection management method |
CN106774725A (en) * | 2017-01-12 | 2017-05-31 | 郑州云海信息技术有限公司 | A kind of equipment cabinet server |
CN106919233A (en) * | 2017-02-25 | 2017-07-04 | 郑州云海信息技术有限公司 | A kind of high density storage server architecture system |
CN109032299A (en) * | 2018-07-19 | 2018-12-18 | 郑州云海信息技术有限公司 | A kind of 6u high-density server system power supply structure |
CN111314159A (en) * | 2018-12-11 | 2020-06-19 | 英业达科技有限公司 | Cabinet, and system and method for testing electronic device arranged in cabinet |
CN111314159B (en) * | 2018-12-11 | 2022-12-23 | 英业达科技有限公司 | Cabinet, and system and method for testing electronic device arranged in cabinet |
CN111625079A (en) * | 2020-05-28 | 2020-09-04 | 浪潮电子信息产业股份有限公司 | Complete cabinet server and multiplexing type power module thereof |
CN111625079B (en) * | 2020-05-28 | 2022-04-22 | 浪潮电子信息产业股份有限公司 | Complete cabinet server and multiplexing type power module thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104407680A (en) | Management system based on complete cabinet nodes | |
US8750393B1 (en) | Determining the configuration of a power distribution system | |
US9965442B2 (en) | Node card management in a modular and large scalable server system | |
US7917792B2 (en) | System for modulating signals over power lines to understand the power distribution tree | |
US20090189774A1 (en) | Power Topology Determination | |
US20140240909A1 (en) | Adapter facilitating blind-mate electrical connection of field replaceable units with virtual backplane of computing rack | |
CN103135682B (en) | Blade server | |
US20080266077A1 (en) | Fault Tolerant Closed System Control Using Power Line Communication | |
CN104615401A (en) | FPGA (field programmable gate array) based KVM (kernel-based virtual machine) implementing method | |
CN103944739A (en) | Intelligent POE power source supplying system and efficient POE power source managing method thereof | |
CN102594602A (en) | Location management design method of multi-node cloud computing server | |
US9261922B2 (en) | Harness for implementing a virtual backplane in a computing rack for field replaceable units | |
EP2830257B1 (en) | Atca backplane | |
KR20110009769A (en) | Structure of rackmount computer | |
CN211628241U (en) | PCIE bus structure switching topology through software | |
CN105095142A (en) | System and method for controlling expander card | |
CN205721583U (en) | A kind of big data server | |
CN203786606U (en) | Cabinet type server device | |
CN203554493U (en) | Server remote management interface system | |
CN204117069U (en) | A kind of server backplanes | |
CN102073365A (en) | MicroTCA standard-based media server | |
CN103095739A (en) | Cabinet server system and node communication method thereof | |
CN209821817U (en) | Electronic equipment and cluster server system | |
CN106294062A (en) | A kind of method by computing function in server with management function separate design | |
CN109683676B (en) | Expansion card |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150311 |