CN104338779A CN201310339378.XA CN201310339378A CN104338779A CN 104338779 A CN104338779 A CN 104338779A CN 201310339378 A CN201310339378 A CN 201310339378A CN 104338779 A CN104338779 A CN 104338779A
Authority
CN
China
Prior art keywords
pipe
cold
annealing
drawn
rolling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310339378.XA
Other languages
Chinese (zh)
Inventor
许卫东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI DAJIN HIGH-PRECISION COLD-DRAWN STEEL TUBE Co Ltd
Original Assignee
WUXI DAJIN HIGH-PRECISION COLD-DRAWN STEEL TUBE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI DAJIN HIGH-PRECISION COLD-DRAWN STEEL TUBE Co Ltd filed Critical WUXI DAJIN HIGH-PRECISION COLD-DRAWN STEEL TUBE Co Ltd
Priority to CN201310339378.XA priority Critical patent/CN104338779A/en
Publication of CN104338779A publication Critical patent/CN104338779A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Heat Treatment Of Articles (AREA)
  • Heat Treatment Of Steel (AREA)

Abstract

The invention relates to a method for manufacturing a high-precision cold-drawn steel pipe. The method comprises the following steps: heating: heating a pipe blank in a circular furnace for guaranteeing that the pipe blank is evenly heated; perforating: perforating the heated pipe blank with a perforator; annealing: annealing the pipe blank; cold rolling: introducing the annealed pipe blank into a pipe mill for cold rolling to obtain a rolled pipe; stress relief annealing: introducing the rolled pipe into a heating furnace for heating and preserving heat to obtain an annealed pipe blank; acid washing treatment: performing acid washing to the annealed pipe blank to remove rust scale on the surface; phosphating treatment: forming a chemically generated coating of zinc phosphate on the surface of the pipe blank; saponifying treatment: forming a lubricant coating like metallic soap on the coating; cold drawing: cold drawing the pipe blank to be cold drawn to obtain a cold-drawn pipe; heat treatment for finished product: applying a heat treatment process for first quenching and then tempering to reduce residual stress of the cold-drawn pipe; and hot straightening treatment: obtaining a high-precision cold-drawn steel pipe. The method of the invention provides steel pipes with high precision and superior surface performance used for a mechanical structure.

Description

A kind of manufacture method of Hi-precision cold-drawn tube
Technical field
The invention belongs to steel pipe preparing technical field, be specifically related to a kind of manufacture method of Hi-precision cold-drawn tube.
Background technology
As the cold process of the steel for mechanical structure pipes such as carbon steel, alloy steel or stainless steel, there are known the drawing processing method of being undertaken by drawbench and the rolling processing method of being undertaken by Pierre's form milling train.Wherein, the drawing processing method of being undertaken by drawbench, compared with the rolling processing method of carrying out with machine of being pricked by Pierre's form, can manufacture cold working steel pipe expeditiously, but Product Precision can not be guaranteed.The technical difficult points that current restriction cold drawing steel tube precision improves has: Technology for Heating Processing and method for aligning is unreasonable causes that cold drawing steel tube residual stress is too high, geometric accuracy is poor.These problems cause current cold drawing steel tube unstable properties, constrain the development of China's cold drawing steel tube.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, provide a kind of manufacture method of Hi-precision cold-drawn tube, the method obtains the steel for mechanical structure pipe that precision is high, surface property is excellent.
According to technical scheme provided by the invention, a kind of manufacture method of Hi-precision cold-drawn tube comprises the steps:
(1), heating: 33Mn2V pipe is heated to 1300 ~ 1380 DEG C in annular furnace, and the heat time is 4 ~ 5 hours, thus ensures that heating of pipe blank is even;
(2), bore a hole: heat pipe base perforated machine is bored a hole, the temperature of the hollow billet formed after perforation controls at 1250 ~ 1350 DEG C, and order control punch eccentricity and control pipe surface quality;
(3), annealing: introduced in continuous annealing furnace by pipe and anneal, and order control annealing temperature is 600 ~ 700 DEG C, annealing time is 70 ~ 90min, obtains the annealing pipe that annealing hardness (HV) is 210 ~ 217;
(4), cold rolling: it is cold rolling that pipe of annealing introduces pipe mill, and the reciprocal time of the headstock of pipe mill is 50 ~ 60 times/min, and the length of at every turn sending to of pipe is 6 ~ 7mm/ time, obtains rolled pipe;
(5), stress relief annealing: rolled pipe introduced heating in heating furnace and be incubated, come out of the stove with after stove cooling, obtain pipe of annealing, object is the intensity guaranteeing steel pipe, when annealing temperature is too high, processing strain recovers, can not obtain the effect of work hardening, annealing temperature is 550 ~ 650 DEG C, can obtain the effect of work hardening, in order to remove the strength variance of cold tube rolling, in the stove of cold tube rolling, the retention time is 10 ~ 20 minutes;
(6), pickling processes: annealing pipe is carried out pickling, removes the scale on surface, concentration of hydrochloric acid: 7 ~ 19%, pickling time: 35 ~ 60 minutes, then neutralization pond rolling, rolling number of times: 2 ~ 3 times, neutralizer pH value: 9 ~ 10, then through clear water reserviors rolling, rolling number of times: 2 ~ 3 times;
(7), phosphorating treatment: the chemistry forming trbasic zinc phosphate on the surface of pipe generates overlay film, trbasic zinc phosphate concentration: 20 ~ 30%, Phosphating Solution temperature: 68 ~ 75 DEG C, phosphating time: 10 ~ 20 minutes, Phosphating Solution free acidity: 4 ~ 7, General Acidity in Phosphating Solution: 45 ~ 75;
(8), saponification process: form the lubricating film coateds such as metallic soap on overlay film, saponification temperature: 55 ~ 75 DEG C, saponification time: 8 ~ 15 minutes, saponification liquor pH value: 8 ~ 9;
(9), cold-drawn: will treat that cold-drawn pipe carries out cold-drawn processing, and obtain drawn tube, cold-drawing technology, mould chock plug and bore spacing: 3 ~ 5mm, pull out machine draft: 350 ~ 450t, and saponification pipe pulls out the front storage period: 72 ~ 96h;
(10), finished product heat treatment: the Technology for Heating Processing adopting tempering again after quenching, hardening heat is 800 ~ 900 DEG C, and hardening media is water, and temperature, at 550 ~ 650 DEG C, reduces the residual stress of drawn tube;
(11), thermal straightening process: be incubated 45 ~ 60 minutes in low-temp temper furnace, carry out thermal straightening process again, thermal straightening temperature 450 ~ 480 DEG C, obtain outer diameter tolerance: be less than+1.0%, wall thickness tolerance: be less than 10%, external diameter out-of-roundness: be less than 0.4%, eccentricity: be less than the Hi-precision cold-drawn tube of 10%.
Method of the present invention obtains the steel for mechanical structure pipe that precision is high, surface property is excellent.
Detailed description of the invention:
Below in conjunction with specific embodiment, the invention will be further described.
Embodiment one:
To prepare diameter for 114.3mm and the hole wall wall thickness 33Mn2V steel pipe that is 6.3mm, comprise the following steps:
(1), heating: 33Mn2V pipe is heated to 1300 DEG C in annular furnace, and the heat time is 4 hours, thus ensures that heating of pipe blank is even;
(2), bore a hole: heat pipe base perforated machine is bored a hole, the temperature of the hollow billet formed after perforation controls at 1250 DEG C, and order control punch eccentricity is 4%, visualize is carried out to pipe, use remove pipe surface burr, stick up skin, if pipe surface occurs or there is pit that significantly namely naked eyes are obvious, runs over and injure and crackle, then should reject, avoid flowing into subsequent processing, to control pipe surface quality;
(3), annealing: introduced in continuous annealing furnace by pipe and anneal, and order control annealing temperature is 600 DEG C, annealing time is 70min, obtains the annealing pipe that annealing hardness (HV) is 210;
(4), cold rolling: it is cold rolling that pipe of annealing introduces pipe mill, and the reciprocal time of the headstock of pipe mill is 50 times/min, and the length of at every turn sending to of pipe is 6mm/ time, obtains rolled pipe;
(5), stress relief annealing: rolled pipe introduced heating in heating furnace and be incubated, come out of the stove with after stove cooling, obtain pipe of annealing, object is the intensity guaranteeing steel pipe, when annealing temperature is too high, processing strain recovers, can not obtain the effect of work hardening, annealing temperature is 550 DEG C, can obtain the effect of work hardening, in order to remove the strength variance of cold tube rolling, in the stove of cold tube rolling, the retention time is 10 minutes;
(6), pickling processes: annealing pipe is carried out pickling, removes the scale on surface, concentration of hydrochloric acid: 7%, pickling time: 35 minutes, then neutralization pond rolls, rolling number of times: 2 times, neutralizer pH value: 9, then roll through clear water reserviors, rolling number of times: 2 times;
(7), phosphorating treatment: the chemistry forming trbasic zinc phosphate on the surface of pipe generates overlay film, trbasic zinc phosphate concentration: 20%, Phosphating Solution temperature: 68 DEG C, phosphating time: 10 minutes, Phosphating Solution free acidity: 4, General Acidity in Phosphating Solution: 45;
(8), saponification process: form the lubricating film coateds such as metallic soap on overlay film, saponification temperature: 55 DEG C, saponification time: 8 minutes, saponification liquor pH value: 8;
(9), cold-drawn: will treat that cold-drawn pipe carries out cold-drawn processing, and obtain drawn tube, cold-drawing technology, mould chock plug and bore spacing: 3mm, pull out machine draft: 350t, and saponification pipe pulls out the front storage period: 72h;
(10), finished product heat treatment: the Technology for Heating Processing adopting tempering again after quenching, hardening heat is 800 DEG C, and hardening media is water, and temperature, at 550 DEG C, reduces the residual stress of drawn tube;
(11), thermal straightening process: be incubated 45 minutes in low-temp temper furnace, then carry out thermal straightening process, thermal straightening temperature 450 DEG C, obtain outer diameter tolerance :+0.5%, wall thickness tolerance: 8%, external diameter out-of-roundness: 0.3%, eccentricity: the Hi-precision cold-drawn tube of 6%.
After testing, institute's inspection project meets GB/T3639-2009 standard to the product that the present embodiment obtains, and product is qualified, meets the requirement of user to precision.
The contrast in technical performance of a kind of Hi-precision cold-drawn tube and conventional steel pipe
Embodiment two:
To prepare diameter for 114.8mm and the hole wall wall thickness 33Mn2V steel pipe that is 6.9mm, comprise the following steps:
(1), heating: 33Mn2V pipe is heated to 1380 DEG C in annular furnace, and the heat time is 5 hours, thus ensures that heating of pipe blank is even;
(2), bore a hole: heat pipe base perforated machine is bored a hole, the temperature of the hollow billet formed after perforation controls at 1350 DEG C, and order control punch eccentricity is 5%, visualize is carried out to pipe, use remove pipe surface burr, stick up skin, if pipe surface occurs or there is pit that significantly namely naked eyes are obvious, runs over and injure and crackle, then should reject, avoid flowing into subsequent processing, to control pipe surface quality;
(3), annealing: introduced in continuous annealing furnace by pipe and anneal, and order control annealing temperature is 700 DEG C, annealing time is 90min, obtains the annealing pipe that annealing hardness (HV) is 217;
(4), cold rolling: it is cold rolling that pipe of annealing introduces pipe mill, and the reciprocal time of the headstock of pipe mill is 60 times/min, and the length of at every turn sending to of pipe is 7mm/ time, obtains rolled pipe;
(5), stress relief annealing: rolled pipe introduced heating in heating furnace and be incubated, come out of the stove with after stove cooling, obtain pipe of annealing, object is the intensity guaranteeing steel pipe, when annealing temperature is too high, processing strain recovers, can not obtain the effect of work hardening, annealing temperature is 650 DEG C, can obtain the effect of work hardening, in order to remove the strength variance of cold tube rolling, in the stove of cold tube rolling, the retention time is 20 minutes;
(6), pickling processes: annealing pipe is carried out pickling, removes the scale on surface, concentration of hydrochloric acid: 19%, pickling time: 60 minutes, then neutralization pond rolls, rolling number of times: 3 times, neutralizer pH value: 10, then roll through clear water reserviors, rolling number of times: 3 times;
(7), phosphorating treatment: the chemistry forming trbasic zinc phosphate on the surface of pipe generates overlay film, trbasic zinc phosphate concentration: 30%, Phosphating Solution temperature: 75 DEG C, phosphating time: 20 minutes, Phosphating Solution free acidity: 7, General Acidity in Phosphating Solution: 75;
(8), saponification process: form the lubricating film coateds such as metallic soap on overlay film, saponification temperature: 75 DEG C, saponification time: 15 minutes, saponification liquor pH value: 9;
(9), cold-drawn: will treat that cold-drawn pipe carries out cold-drawn processing, and obtain drawn tube, cold-drawing technology, mould chock plug and bore spacing: 5mm, pull out machine draft: 450t, and saponification pipe pulls out the front storage period: 96h;
(10), finished product heat treatment: the Technology for Heating Processing adopting tempering again after quenching, hardening heat is 900 DEG C, and hardening media is water, and temperature, at 650 DEG C, reduces the residual stress of drawn tube;
(11), thermal straightening process: be incubated 60 minutes in low-temp temper furnace, then carry out thermal straightening process, thermal straightening temperature 480 DEG C, obtain outer diameter tolerance :+0.6%, wall thickness tolerance: 7%, external diameter out-of-roundness: 0.35%, eccentricity: the Hi-precision cold-drawn tube of 7%.
Embodiment three:
To prepare diameter for 114.4mm and the hole wall wall thickness 33Mn2V steel pipe that is 6.3mm, comprise the following steps:
(1), heating: 33Mn2V pipe is heated to 1350 DEG C in annular furnace, and the heat time is 4.5 hours, thus ensures that heating of pipe blank is even;
(2), bore a hole: heat pipe base perforated machine is bored a hole, the temperature of the hollow billet formed after perforation controls at 1300 DEG C, and order control punch eccentricity is 4.5%, visualize is carried out to pipe, use remove pipe surface burr, stick up skin, if pipe surface occurs or there is pit that significantly namely naked eyes are obvious, runs over and injure and crackle, then should reject, avoid flowing into subsequent processing, to control pipe surface quality;
(3), annealing: introduced in continuous annealing furnace by pipe and anneal, and order control annealing temperature is 650 DEG C, annealing time is 80min, obtains the annealing pipe that annealing hardness (HV) is 215;
(4), cold rolling: it is cold rolling that pipe of annealing introduces pipe mill, and the reciprocal time of the headstock of pipe mill is 55 times/min, and the length of at every turn sending to of pipe is 6.5mm/ time, obtains rolled pipe;
(5), stress relief annealing: rolled pipe introduced heating in heating furnace and be incubated, come out of the stove with after stove cooling, obtain pipe of annealing, object is the intensity guaranteeing steel pipe, when annealing temperature is too high, processing strain recovers, can not obtain the effect of work hardening, annealing temperature is 600 DEG C, can obtain the effect of work hardening, in order to remove the strength variance of cold tube rolling, in the stove of cold tube rolling, the retention time is 15 minutes;
(6), pickling processes: annealing pipe is carried out pickling, removes the scale on surface, concentration of hydrochloric acid: 15%, pickling time: 45 minutes, then neutralization pond rolling, rolling number of times: 2.5 times, neutralizer pH value: 9.5, then through clear water reserviors rolling, rolling number of times: 2.5 times;
(7), phosphorating treatment: the chemistry forming trbasic zinc phosphate on the surface of pipe generates overlay film, trbasic zinc phosphate concentration: 25%, Phosphating Solution temperature: 70 DEG C, phosphating time: 15 minutes, Phosphating Solution free acidity: 5, General Acidity in Phosphating Solution: 65;
(8), saponification process: form the lubricating film coateds such as metallic soap on overlay film, saponification temperature: 65 DEG C, saponification time: 12 minutes, saponification liquor pH value: 8.5;
(9), cold-drawn: will treat that cold-drawn pipe carries out cold-drawn processing, and obtain drawn tube, cold-drawing technology, mould chock plug and bore spacing: 4mm, pull out machine draft: 390t, and saponification pipe pulls out the front storage period: 84h;
(10), finished product heat treatment: the Technology for Heating Processing adopting tempering again after quenching, hardening heat is 850 DEG C, and hardening media is water, and temperature, at 600 DEG C, reduces the residual stress of drawn tube;
(11), thermal straightening process: be incubated 50 minutes in low-temp temper furnace, then carry out thermal straightening process, thermal straightening temperature 470 DEG C, obtain outer diameter tolerance :+0.55%, wall thickness tolerance: 6%, external diameter out-of-roundness: 0.25%, eccentricity: the Hi-precision cold-drawn tube of 7%.

Claims (1)

1. the manufacture method of a Hi-precision cold-drawn tube comprises the steps:
(1), heating: 33Mn2V pipe is heated to 1300 ~ 1380 DEG C in annular furnace, and the heat time is 4 ~ 5 hours, thus ensures that heating of pipe blank is even;
(2), bore a hole: heat pipe base perforated machine is bored a hole, the temperature of the hollow billet formed after perforation controls at 1250 ~ 1350 DEG C, and order control punch eccentricity and control pipe surface quality;
(3), annealing: introduced in continuous annealing furnace by pipe and anneal, and order control annealing temperature is 600 ~ 700 DEG C, annealing time is 70 ~ 90min, obtains the annealing pipe that annealing hardness (HV) is 210 ~ 217;
(4), cold rolling: it is cold rolling that pipe of annealing introduces pipe mill, and the reciprocal time of the headstock of pipe mill is 50 ~ 60 times/min, and the length of at every turn sending to of pipe is 6 ~ 7mm/ time, obtains rolled pipe;
(5), stress relief annealing: rolled pipe introduced heating in heating furnace and be incubated, come out of the stove with after stove cooling, obtain pipe of annealing, object is the intensity guaranteeing steel pipe, when annealing temperature is too high, processing strain recovers, can not obtain the effect of work hardening, annealing temperature is 550 ~ 650 DEG C, can obtain the effect of work hardening, in order to remove the strength variance of cold tube rolling, in the stove of cold tube rolling, the retention time is 10 ~ 20 minutes;
(6), pickling processes: annealing pipe is carried out pickling, removes the scale on surface, concentration of hydrochloric acid: 7 ~ 19%, pickling time: 35 ~ 60 minutes, then neutralization pond rolling, rolling number of times: 2 ~ 3 times, neutralizer pH value: 9 ~ 10, then through clear water reserviors rolling, rolling number of times: 2 ~ 3 times;
(7), phosphorating treatment: the chemistry forming trbasic zinc phosphate on the surface of pipe generates overlay film, trbasic zinc phosphate concentration: 20 ~ 30%, Phosphating Solution temperature: 68 ~ 75 DEG C, phosphating time: 10 ~ 20 minutes, Phosphating Solution free acidity: 4 ~ 7, General Acidity in Phosphating Solution: 45 ~ 75;
(8), saponification process: form the lubricating film coateds such as metallic soap on overlay film, saponification temperature: 55 ~ 75 DEG C, saponification time: 8 ~ 15 minutes, saponification liquor pH value: 8 ~ 9;
(9), cold-drawn: will treat that cold-drawn pipe carries out cold-drawn processing, and obtain drawn tube, cold-drawing technology, mould chock plug and bore spacing: 3 ~ 5mm, pull out machine draft: 350 ~ 450t, and saponification pipe pulls out the front storage period: 72 ~ 96h;
(10), finished product heat treatment: the Technology for Heating Processing adopting tempering again after quenching, hardening heat is 800 ~ 900 DEG C, and hardening media is water, and temperature, at 550 ~ 650 DEG C, reduces the residual stress of drawn tube;
(11), thermal straightening process: be incubated 45 ~ 60 minutes in low-temp temper furnace, carry out thermal straightening process again, thermal straightening temperature 450 ~ 480 DEG C, obtain outer diameter tolerance: be less than+1.0%, wall thickness tolerance: be less than 10%, external diameter out-of-roundness: be less than 0.4%, eccentricity: be less than the Hi-precision cold-drawn tube of 10%.
CN201310339378.XA 2013-07-31 2013-07-31 A method for manufacturing a high-precision cold-drawn steel pipe Pending CN104338779A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310339378.XA CN104338779A (en) 2013-07-31 2013-07-31 A method for manufacturing a high-precision cold-drawn steel pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310339378.XA CN104338779A (en) 2013-07-31 2013-07-31 A method for manufacturing a high-precision cold-drawn steel pipe

Publications (1)

Publication Number Publication Date
CN104338779A true CN104338779A (en) 2015-02-11

Family

ID=52495718

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310339378.XA Pending CN104338779A (en) 2013-07-31 2013-07-31 A method for manufacturing a high-precision cold-drawn steel pipe

Country Status (1)

Country Link
CN (1) CN104338779A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106734784A (en) * 2016-11-22 2017-05-31 青岛征和工业股份有限公司 The preparation method and silent chain of a kind of silent chain abnormity bearing pin
CN107377664A (en) * 2017-07-26 2017-11-24 繁昌县华特机械制造有限公司 A kind of processing technology of pipe with small pipe diameter thin-wall steel tube
CN109604370A (en) * 2018-10-30 2019-04-12 湖北新冶钢特种钢管有限公司 A kind of drill collar high-accuracy weldless steel tube and preparation method thereof
CN110788160A (en) * 2019-11-07 2020-02-14 鑫鹏源智能装备集团有限公司 Seamless steel tube production system and process
CN112108530A (en) * 2020-09-04 2020-12-22 江苏宏亿钢管有限公司 Manufacturing method of high-strength cold-drawn steel pipe
CN113059019A (en) * 2021-03-25 2021-07-02 江苏建中新材料科技有限公司 Acid-resistant heat exchanger steel pipe and preparation method thereof
CN113245369A (en) * 2021-05-19 2021-08-13 张家港保税区恒隆钢管有限公司 Manufacturing process of pipe for PMMA reactor
CN113245856A (en) * 2021-05-06 2021-08-13 张家港保税区恒隆钢管有限公司 Manufacturing process of U-shaped heat exchange tube
CN113245857A (en) * 2021-05-06 2021-08-13 张家港保税区恒隆钢管有限公司 Manufacturing process of heat exchange tube for seawater desalination evaporator

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106734784A (en) * 2016-11-22 2017-05-31 青岛征和工业股份有限公司 The preparation method and silent chain of a kind of silent chain abnormity bearing pin
CN107377664A (en) * 2017-07-26 2017-11-24 繁昌县华特机械制造有限公司 A kind of processing technology of pipe with small pipe diameter thin-wall steel tube
CN109604370A (en) * 2018-10-30 2019-04-12 湖北新冶钢特种钢管有限公司 A kind of drill collar high-accuracy weldless steel tube and preparation method thereof
CN110788160A (en) * 2019-11-07 2020-02-14 鑫鹏源智能装备集团有限公司 Seamless steel tube production system and process
CN112108530A (en) * 2020-09-04 2020-12-22 江苏宏亿钢管有限公司 Manufacturing method of high-strength cold-drawn steel pipe
CN113059019A (en) * 2021-03-25 2021-07-02 江苏建中新材料科技有限公司 Acid-resistant heat exchanger steel pipe and preparation method thereof
CN113245856A (en) * 2021-05-06 2021-08-13 张家港保税区恒隆钢管有限公司 Manufacturing process of U-shaped heat exchange tube
CN113245857A (en) * 2021-05-06 2021-08-13 张家港保税区恒隆钢管有限公司 Manufacturing process of heat exchange tube for seawater desalination evaporator
CN113245857B (en) * 2021-05-06 2023-03-14 张家港保税区恒隆钢管有限公司 Manufacturing process of heat exchange tube for seawater desalination evaporator
CN113245369A (en) * 2021-05-19 2021-08-13 张家港保税区恒隆钢管有限公司 Manufacturing process of pipe for PMMA reactor
CN113245369B (en) * 2021-05-19 2022-08-09 张家港保税区亚鑫精密制管有限公司 Manufacturing process of pipe for PMMA reactor

Similar Documents

Publication Publication Date Title
CN104338779A (en) A method for manufacturing a high-precision cold-drawn steel pipe
CN104338777A (en) Production method of cold-drawn precision seamless steel pipes
CN104338780A (en) Method for manufacturing high-strength cold-drawn steel tube
CN104551669A (en) Production method of cold-drawn high-precision seamless steel tube
CN104338781A (en) Method for manufacturing high-hardness cold-drawn steel tube
CN104492850B (en) A kind of production method of best bright finish steel pipe
CN104338778A (en) Method for manufacturing precise inner hole honing tube
CN104551667A (en) Cold-rolled high-hardness seamless steel pipe manufacturing method
CN103736734B (en) Hot rolling CPE unit prepares the technique of the super 13Cr seamless steel pipe of high-chromium alloy
CN105880934A (en) Manufacturing method for high-precision cold-drawn inner-hole honed pipe
CN105363825A (en) Manufacturing method of cold-drawn high-precision cylinder barrel pipe
CN102921763A (en) Seamless steel tube processing technology
CN105364412A (en) Manufacturing method of cold-drawn high-strength fine-boring rolled pipe
CN110899335A (en) Short-process manufacturing method of small-caliber marine titanium alloy seamless pipe
CN107755454A (en) A kind of manufacture method of high-strength corrosion-resisting drawn tube for marine settings engineering
CN104759834A (en) Hot-rolled high-strength oil pipe manufacturing method
CN107096806A (en) A kind of processing method of high-strength accurate steel pipe
CN102873126B (en) Manufacturing method of large-aperture thin-walled seamless steel tube for nuclear power plant
CN105880920A (en) Cold drawing precision honing tube manufacture method
CN104551540A (en) Production method of cold-drawn precise cylinder tube
CN104759888A (en) Manufacturing method of hot-rolled high-hardness petroleum pipe
CN104759832A (en) Manufacturing method of hot-rolled high-collapse-resistance petroleum pipe
CN203389982U (en) Special equipment for producing high-precision cold-drawn steel pipe
CN107649840A (en) A kind of production technology of jack adjustment threaded rod
CN203389980U (en) Special equipment for producing cold-drawn precise seamless steel pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150211