[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN104326056A - Construction process for folding and connecting aluminum alloy/steel-glass fiber reinforced plastic composite ship - Google Patents

Construction process for folding and connecting aluminum alloy/steel-glass fiber reinforced plastic composite ship Download PDF

Info

Publication number
CN104326056A
CN104326056A CN201410595494.2A CN201410595494A CN104326056A CN 104326056 A CN104326056 A CN 104326056A CN 201410595494 A CN201410595494 A CN 201410595494A CN 104326056 A CN104326056 A CN 104326056A
Authority
CN
China
Prior art keywords
glass
steel
felt plastic
aluminum alloy
angle steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410595494.2A
Other languages
Chinese (zh)
Inventor
晏志清
何小惠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Jianglong Shipbuilding Co Ltd
Original Assignee
Guangdong Jianglong Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Jianglong Shipbuilding Co Ltd filed Critical Guangdong Jianglong Shipbuilding Co Ltd
Priority to CN201410595494.2A priority Critical patent/CN104326056A/en
Publication of CN104326056A publication Critical patent/CN104326056A/en
Pending legal-status Critical Current

Links

Landscapes

  • Building Environments (AREA)

Abstract

The invention discloses a construction process for folding and connecting an aluminum alloy/steel-glass fiber reinforced plastic composite ship, and aims to provide a construction process for folding and connecting an aluminum alloy/steel-glass fiber reinforced plastic composite ship, which has the advantages of simple process, convenience in construction, reliability in connection and good effect. The invention comprises the following steps: vertically welding one side of the angle aluminum/angle steel on the aluminum alloy/steel deck; polishing the contact surface of the angle aluminum/angle steel; installing the vertical bolt; the outer side of the glass fiber reinforced plastic side wall is connected with the outer side of the angle aluminum/angle steel through a glass fiber reinforced plastic plate; wrapping outer glass fiber reinforced plastics on the outer sides of the glass fiber reinforced plastic side wall, the angle aluminum/angle steel and the glass fiber reinforced plastic plate; plugging the gap between the glass fiber reinforced plastic and the contact surface of the angle aluminum/angle steel; and a gap is ground at the corner joint of the bottom of the outer glass fiber reinforced plastic and the aluminum alloy/steel deck, and then the gap is sealed and smoothed by sealant. The invention is applied to the technical field of composite ship closure connection construction.

Description

Aluminum alloy/steel-glass-felt plastic compound ship closes up the construction technology of connection
Technical field
The present invention relates to a kind of construction technology, particularly a kind of aluminum alloy/steel-glass-felt plastic compound ship closes up the construction technology of connection.
Background technology
The occasion of existing pleasure-boat ship application gets more and more, the occasions such as such as tourist industry, administrative reception, and manufacture field at current pleasure-boat ship, not only to pursue the rapidity of pleasure-boat ship itself and the aesthetic property of hull outward appearance and superstructure, more will ensure the safety performance of pleasure-boat ship itself.Existing common pleasure-boat ship is all adopt all aluminium alloy material to make, or adopts all-glass fibre reinforced plastic material to make, or adopts whole-steel material to make.All aluminium alloy ship due to aluminum alloy materials price costly, economy exists certain inferior position, and is difficult to process comparatively complicated shape, be unfavorable for the shape producing various grace, the requirement of out of reach luxury chain ships and light boats.Although glass-felt plastic has, quality is light, intensity is high, withstanding corrosion, be easy to be shaped, can flexible design, attractive in appearance and the features such as good economy performance of any surface finish, but also there is the impact resistance poor-performing of glass-felt plastic in all-glass fibre reinforced plastic ship, hard object often causes the local damage of glass-felt plastic after clashing into, its intensity is obviously declined, even at short notice endurance failure occurs; The elongation at fracture of glass-reinforced plastic material is very little, and plasticity is poor; Glass fiber reinforced plastic surface hardness is relatively low, is easy to be scratched by hard object, once be scratched, then moisture likely invades glass-felt plastic inside, and cause its intensity and elastic performance to decline, these factors make reduce the service life of all-glass fibre reinforced plastic ship, easily there is potential safety hazard.Although whole-steel ship steel have the features such as intensity is high, plasticity good, price of steel product is relatively low, but because steel are than great, the displacement of clean ship is high relatively, higher boats and ships are required for the speed of a ship or plane, required power will increase, cause oil consumption increase, operation cost increases, noxious gas emission increases, and, the appearance of steel superstructure cannot be accomplished with glass-felt plastic superstructure appearance bright and clean like that, graceful, smooth, and these factors make whole-steel ship be difficult to become requirement good looking appearance, pleasure-boat ship that the speed of a ship or plane is higher.
Certainly current pleasure-boat ship also has non-fully aluminum alloy materials or non-employing all-glass fibre reinforced plastic material or non-employing whole-steel to make, and such as hull adopts aluminum alloy/steel, and superstructure adopts glass-felt plastic.The advantage that this aluminum alloy/steel-glass-felt plastic compound ship compares existing all aluminium alloy ship or all-glass fibre reinforced plastic ship or whole-steel ship is mainly reflected in: the main body 1, for ships and light boats adopts steel, superstructure or deck house adopt the compound ship type of glass-felt plastic: (1) hull adopts steel material, and the ratio of steel is great, suitably can reduce the center of gravity of whole ships and light boats, keep the stability of ships and light boats navigation; (2) superstructure adopts glass steel material, and the proportion of glass-felt plastic is little, can alleviate hull weight, thus can improve the rapidity of navigation under same host power situation; (3) because the intensity of steel, rigidity, hardness ratio glass-felt plastic are high, glass fiber hull is afraid of to hit, not wear-resisting shortcoming to adopt steel hull to avoid; (4) because glass-felt plastic is easy to shaping, the superstructure that various any surface finish is attractive in appearance, profile is graceful is easily produced; (5) due to glass-felt plastic good corrosion resistance, the maintenance cost of superstructure can be greatly reduced.2, the main body for ships and light boats adopts aluminum alloy, and superstructure or deck house adopt the compound ship type of glass-felt plastic, compared with all aluminium alloy ship: (1) is easy to shaping due to glass-felt plastic, easily produce the superstructure that various any surface finish is attractive in appearance, profile is graceful; (2) it is low for comparing aluminum alloy due to the price of glass-felt plastic, so good economy performance.
Although aluminum alloy/steel-glass-felt plastic compound ship compares existing all aluminium alloy ship or all-glass fibre reinforced plastic ship or whole-steel gear suitable advantage, but due to aluminum alloy/Steel and Glass steel carry out connecting time, because both shrinkage percentages are different, toughness is different, in use elastic properties of materials uneven deformation is larger for both, if both adopt the form of splicing, connection is also unreliable, mode according to other connects, not only complex process, and have in work progress and be difficult to ensure that there is good water tightness and linking intensity, lower construction cost and stable structure.
Summary of the invention
Technical matters to be solved by this invention overcomes the deficiencies in the prior art, provides that a kind of technique is simple, construction technology that aluminum alloy/steel-glass-felt plastic compound ship that easy construction, connection are reliable, effective closes up connection.
The technical solution adopted in the present invention is: the present invention is the construction technology that a kind of aluminum alloy/steel-glass-felt plastic compound ship closes up connection, wherein aluminum alloy/steel-glass-felt plastic compound ship comprises the superstructure of glass steel material, the hull of the aluminum alloy below described superstructure/steel matter and for described superstructure being fixed on the connection structure on described hull, described connection structure comprises the aluminum corner brace/angle steel be connected with aluminum alloy/steel matter deck, the hardwood that the anti-limit of bottom surface and glass-felt plastic sidewall fits above, wrap the bag hardwood glass-felt plastic of described hardwood, vertical bolt and leveling screw or screw, the present invention includes following steps:
A. be vertically welded on by described aluminum corner brace/angle steel on described aluminum alloy/steel matter deck, will be fitted in above described anti-limit below described hardwood, described bag hardwood glass-felt plastic wraps described hardwood below described anti-limit;
B. the contact surface of described aluminum corner brace/angle steel is polished, until expose metal true qualities, and remove iron rust, foreign material, greasy dirt, paint and moisture, and with clean cloth, contact surface is wiped clean rear painting last layer resin, and in work progress, keep this layer of resin clean;
C., after described anti-limit and described aluminum corner brace/angle steel align, described vertical bolt is installed;
D. be connected by the outside of glass epoxy with described aluminum corner brace/angle steel at described glass-felt plastic side-wall outer side, the upper and lower two ends of described glass epoxy are connected with described glass-felt plastic sidewall with described aluminum corner brace/angle steel respectively by described leveling screw or screw, and described glass epoxy and described aluminum corner brace/angle steel, are coated with resin glue or structural adhesion between described glass-felt plastic sidewall;
E. outside described glass-felt plastic sidewall, described aluminum corner brace/angle steel and described glass epoxy, wrap up outer glass-felt plastic, the outside of described outer glass-felt plastic and described glass-felt plastic sidewall upper side wall maintain an equal level;
F. in board portion, carries out the shutoff of plug hair to the gap of described glass-felt plastic and described aluminum corner brace/angle steel contact surface, prevents moisture from entering; At cabin outside, grind a gap with corner connection place on described aluminum alloy/steel matter deck bottom described outer glass-felt plastic, then smooth with sealant shutoff.
Described vertical bolt and described leveling screw or screw will stagger installation, and when installing, described vertical bolt and described leveling screw or screw first should fill sealant, prevent moisture from being entered by screw gap.
When the length of described aluminum alloy/steel-glass-felt plastic compound ship is 25-35m, the diameter of described vertical bolt is 18-20mm, and the spacing between two described vertical bolts gets 100-120mm.
The screw bolt and nut of described vertical bolt and described leveling screw carries out spot welding, prevents from loosening after tightening between described bolt and described nut.
This construction technology also comprises the steps:
G, in board portion, all arrange reinforced rib (11) described aluminum corner brace/angle steel (2) and described glass-felt plastic sidewall (3);
H, the paint described aluminum alloy/steel matter deck being polished damage to be repaired.
The invention has the beneficial effects as follows: owing to present invention employs the construction technology of closing up connection, comprising following steps: described aluminum corner brace/angle steel is vertically welded on described aluminum alloy/steel matter deck, to be fitted in above described anti-limit below described hardwood, described bag hardwood glass-felt plastic wraps described hardwood below described anti-limit; The contact surface of described aluminum corner brace/angle steel is polished, until expose metal true qualities, and removes iron rust, foreign material, greasy dirt, paint and moisture, and with clean cloth, contact surface is wiped clean rear painting last layer resin, and in work progress, keep this layer of resin clean; After described anti-limit and described aluminum corner brace/angle steel align, described vertical bolt is installed; Be connected by the outside of glass epoxy with described aluminum corner brace/angle steel at described glass-felt plastic side-wall outer side, the upper and lower two ends of described glass epoxy are connected with described glass-felt plastic sidewall with described aluminum corner brace/angle steel respectively by described leveling screw or screw, and described glass epoxy and described aluminum corner brace/angle steel, are coated with resin glue or structural adhesion between described glass-felt plastic sidewall; Outside described glass-felt plastic sidewall, described aluminum corner brace/angle steel and described glass epoxy, wrap up outer glass-felt plastic, the outside of described outer glass-felt plastic and described glass-felt plastic sidewall upper side wall maintain an equal level; Portion in board, carries out the shutoff of plug hair to the gap of described glass-felt plastic and described aluminum corner brace/angle steel contact surface, prevents moisture from entering; At cabin outside, grind a gap with corner connection place on described aluminum alloy/steel matter deck bottom described outer glass-felt plastic, then smooth with sealant shutoff.So, present invention process is simple, easy construction, connection are reliable, effective, interstructural water tightness and linking intensity can be made more reliable by this construction technology, meet operating needs, and the ships and light boats of good looking appearance and long service life can be created well.
Accompanying drawing explanation
Fig. 1 is the connection structure schematic diagram of aluminum alloy/steel-glass-felt plastic compound ship.
Detailed description of the invention
In the present embodiment, the present invention is the construction technology that a kind of aluminum alloy/steel-glass-felt plastic compound ship closes up connection, wherein aluminum alloy/steel-glass-felt plastic compound ship comprises the superstructure of glass steel material, the hull of the aluminum alloy below described superstructure/steel matter and for described superstructure being fixed on the connection structure on described hull, as shown in Figure 1, described connection structure comprises the aluminum corner brace/angle steel 2 be connected with aluminum alloy/steel matter deck 1, the hardwood 5 that the anti-limit 4 of bottom surface and glass-felt plastic sidewall 3 fits above, wrap the bag hardwood glass-felt plastic 6 of described hardwood 5, vertical bolt 7 and leveling screw or screw 8, it is characterized in that: the construction technology that described aluminum alloy/steel-glass-felt plastic compound ship closes up connection comprises the steps:
A, be vertically welded on described aluminum alloy/steel matter deck 1 by described aluminum corner brace/angle steel 2, be fitted in above described anti-limit 4 below by described hardwood 5, described bag hardwood glass-felt plastic 6 wraps described hardwood 5 below described anti-limit 4;
B, the contact surface of described aluminum corner brace/angle steel 2 to be polished, until expose metal true qualities, and remove iron rust, foreign material, greasy dirt, paint and moisture, and with clean cloth, contact surface is wiped clean rear painting last layer resin, and in work progress, keep this layer of resin clean;
After c, described anti-limit 4 align with described aluminum corner brace/angle steel 2, described vertical bolt 7 is installed;
D, to be connected by the outside of glass epoxy 9 with described aluminum corner brace/angle steel 2 outside described glass-felt plastic sidewall 3, described glass epoxy about 9 two ends are connected with described glass-felt plastic sidewall 3 with described aluminum corner brace/angle steel 2 respectively by described leveling screw or screw 8, and described glass epoxy 9 and described aluminum corner brace/angle steel 2, are coated with resin glue or structural adhesion between described glass-felt plastic sidewall 3;
E, outside described glass-felt plastic sidewall 3, described aluminum corner brace/angle steel 2 and described glass epoxy 9, wrap up outer glass-felt plastic 10, the outside of described outer glass-felt plastic 10 and described glass-felt plastic sidewall 3 upper side wall are fair;
In the present embodiment, portion in board, carries out the shutoff of plug hair to described glass-felt plastic 6 with the gap of described aluminum corner brace/angle steel 2 contact surface, prevents moisture from entering; At cabin outside, grind a gap with corner connection place on described aluminum alloy/steel matter deck 1 bottom described outer glass-felt plastic 10, then smooth with sealant shutoff.
In the present embodiment, described vertical bolt 7 and described leveling screw or screw 8 will stagger installation, and when installing, described vertical bolt 7 and described leveling screw or screw 8 first should fill sealant, prevent moisture from being entered by screw gap.
In the present embodiment, when the length of described aluminum alloy/steel-glass-felt plastic compound ship is 35m, the diameter of described vertical bolt 7 is 20mm, and the spacing between two described vertical bolts 7 gets 100mm.
In the present embodiment, the screw bolt and nut of described vertical bolt 7 and described leveling screw carries out spot welding, prevents from loosening after tightening between described bolt and described nut.
In the present embodiment, this construction technology also comprises the steps:
G, in board portion, all arrange reinforced rib 11 at described aluminum corner brace/angle steel 2 and described glass-felt plastic sidewall 3;
H, the paint described aluminum alloy/steel matter deck being polished damage to be repaired.
The present invention is applied to the technical field that aluminum alloy/steel-glass-felt plastic compound ship closes up connection construction.
Although embodiments of the invention describe with practical solution, do not form the restriction to implication of the present invention, for those skilled in the art, according to this specification sheets to the amendment of its embodiment and and the combination of other schemes be all apparent.

Claims (8)

1. aluminum alloy/steel-glass-felt plastic compound ship closes up the construction technology of connection, wherein aluminum alloy/steel-glass-felt plastic compound ship comprises the superstructure of glass steel material, the hull of the aluminum alloy below described superstructure/steel matter and for described superstructure being fixed on the connection structure on described hull, described connection structure comprises the aluminum corner brace/angle steel (2) be connected with aluminum alloy/steel matter deck (1), the hardwood (5) that the anti-limit (4) of bottom surface and glass-felt plastic sidewall (3) fits above, wrap the bag hardwood glass-felt plastic (6) of described hardwood (5), vertical bolt (7) and leveling screw or screw (8), it is characterized in that: the construction technology that described aluminum alloy/steel-glass-felt plastic compound ship closes up connection comprises the steps:
A, described aluminum corner brace/angle steel (2) is vertically welded on described aluminum alloy/steel matter deck (1), be fitted in above described anti-limit (4) below by described hardwood (5), described bag hardwood glass-felt plastic (6) wraps described hardwood (5) below described anti-limit (4);
After b, described anti-limit (4) align with described aluminum corner brace/angle steel (2), described vertical bolt (7) is installed;
C, to be connected by the outside of glass epoxy (9) with described aluminum corner brace/angle steel (2) in described glass-felt plastic sidewall (3) outside, described glass epoxy (9) up and down two ends is connected with described glass-felt plastic sidewall (3) with described aluminum corner brace/angle steel (2) respectively by described leveling screw or screw (8), and described glass epoxy (9) and described aluminum corner brace/angle steel (2), is coated with resin glue or structural adhesion between described glass-felt plastic sidewall (3);
D, at described glass-felt plastic sidewall (3), described aluminum corner brace/angle steel (2) and described glass epoxy (9) the outside outer glass-felt plastic of parcel (10), the outside of described outer glass-felt plastic (10) and described glass-felt plastic sidewall (3) upper side wall are fair;
E, in board portion, carry out the shutoff of plug hair to described glass-felt plastic (6) and the gap of described aluminum corner brace/angle steel (2) contact surface, prevent moisture from entering.
2. aluminum alloy/steel according to claim 1-glass-felt plastic compound ship closes up the construction technology of connection, it is characterized in that: described vertical bolt (7) and described leveling screw or screw (8) will stagger installation, and when installing, described vertical bolt (7) and described leveling screw or screw (8) first should fill sealant, prevent moisture from being entered by screw gap.
3. aluminum alloy/steel according to claim 1-glass-felt plastic compound ship closes up the construction technology of connection, it is characterized in that: when the length of described aluminum alloy/steel-glass-felt plastic compound ship is 25-35m, the diameter of described vertical bolt (7) is 18-20mm, and the spacing between two described vertical bolts (7) gets 100-120mm.
4. aluminum alloy/the steel according to any one of claim 1-3-glass-felt plastic compound ship closes up the construction technology of connection, it is characterized in that: after the screw bolt and nut of described vertical bolt (7) and described leveling screw is tightened, between described bolt and described nut, carry out spot welding, prevent from loosening.
5. aluminum alloy/steel according to claim 1-glass-felt plastic compound ship closes up the construction technology of connection, it is characterized in that: this construction technology also comprises the steps: f, in board portion, reinforced rib (11) is all set described aluminum corner brace/angle steel (2) and described glass-felt plastic sidewall (3).
6. aluminum alloy/steel according to claim 5-glass-felt plastic compound ship closes up the construction technology of connection, it is characterized in that: this construction technology also comprises the steps: g, repairs the paint described aluminum alloy/steel matter deck (1) being polished damage.
7. aluminum alloy/steel according to claim 1-glass-felt plastic compound ship closes up the construction technology of connection, it is characterized in that: further comprising the steps of between a step and b step: the contact surface of described aluminum corner brace/angle steel (2) is polished, until expose metal true qualities, and remove iron rust, foreign material, greasy dirt, paint and moisture, and with clean cloth, contact surface is wiped clean rear painting last layer resin, and in work progress, keep this layer of resin clean.
8. aluminum alloy/steel according to claim 1-glass-felt plastic compound ship closes up the construction technology of connection, it is characterized in that: also comprise the steps: at cabin outside in step f, described outer glass-felt plastic (10) bottom grinds a gap with corner connection place on described aluminum alloy/steel matter deck (1), then smooths with sealant shutoff.
CN201410595494.2A 2014-10-30 2014-10-30 Construction process for folding and connecting aluminum alloy/steel-glass fiber reinforced plastic composite ship Pending CN104326056A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410595494.2A CN104326056A (en) 2014-10-30 2014-10-30 Construction process for folding and connecting aluminum alloy/steel-glass fiber reinforced plastic composite ship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410595494.2A CN104326056A (en) 2014-10-30 2014-10-30 Construction process for folding and connecting aluminum alloy/steel-glass fiber reinforced plastic composite ship

Publications (1)

Publication Number Publication Date
CN104326056A true CN104326056A (en) 2015-02-04

Family

ID=52400897

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410595494.2A Pending CN104326056A (en) 2014-10-30 2014-10-30 Construction process for folding and connecting aluminum alloy/steel-glass fiber reinforced plastic composite ship

Country Status (1)

Country Link
CN (1) CN104326056A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106627987A (en) * 2016-08-30 2017-05-10 江门市海星游艇制造有限公司 A connecting structure of glass-fibre-reinforced plastic decks and steel/aluminum alloy aggregate
CN108532443A (en) * 2018-06-08 2018-09-14 中国船舶重工集团应急预警与救援装备股份有限公司 A kind of fiberglass outside plate and the compound ribbon pontoon bridges babinet of steel structure
CN110329420A (en) * 2019-04-26 2019-10-15 武汉理工大学 The mechanical connecting structure and method of composite material superstructure and steel main hull

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61122090A (en) * 1984-11-20 1986-06-10 Mitsui Eng & Shipbuild Co Ltd Construction method of large steel structure on the sea
CN101570236A (en) * 2009-06-15 2009-11-04 太阳鸟游艇股份有限公司 Multi-mixture technique for building ships with composite materials
CN201390363Y (en) * 2009-04-09 2010-01-27 珠海江龙船舶制造有限公司 Excursion boat
CN202414091U (en) * 2011-12-30 2012-09-05 广东江龙船舶制造有限公司 Aluminum alloy-glass fiber reinforced plastic composite ship connecting structure
CN203681832U (en) * 2013-12-11 2014-07-02 珠海太阳鸟游艇制造有限公司 Novel steel and glass fiber reinforced plastic connecting mode

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61122090A (en) * 1984-11-20 1986-06-10 Mitsui Eng & Shipbuild Co Ltd Construction method of large steel structure on the sea
CN201390363Y (en) * 2009-04-09 2010-01-27 珠海江龙船舶制造有限公司 Excursion boat
CN101570236A (en) * 2009-06-15 2009-11-04 太阳鸟游艇股份有限公司 Multi-mixture technique for building ships with composite materials
CN202414091U (en) * 2011-12-30 2012-09-05 广东江龙船舶制造有限公司 Aluminum alloy-glass fiber reinforced plastic composite ship connecting structure
CN203681832U (en) * 2013-12-11 2014-07-02 珠海太阳鸟游艇制造有限公司 Novel steel and glass fiber reinforced plastic connecting mode

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106627987A (en) * 2016-08-30 2017-05-10 江门市海星游艇制造有限公司 A connecting structure of glass-fibre-reinforced plastic decks and steel/aluminum alloy aggregate
CN108532443A (en) * 2018-06-08 2018-09-14 中国船舶重工集团应急预警与救援装备股份有限公司 A kind of fiberglass outside plate and the compound ribbon pontoon bridges babinet of steel structure
CN110329420A (en) * 2019-04-26 2019-10-15 武汉理工大学 The mechanical connecting structure and method of composite material superstructure and steel main hull

Similar Documents

Publication Publication Date Title
CN103623987B (en) A kind of coating process of boats and ships
CN104326056A (en) Construction process for folding and connecting aluminum alloy/steel-glass fiber reinforced plastic composite ship
CN205499247U (en) Mixed ship connecting device of aluminium glass
CN202414091U (en) Aluminum alloy-glass fiber reinforced plastic composite ship connecting structure
CN104959294A (en) Ship coating process
CN209458400U (en) The protective device of internal expansion type flange sealing surface
CN1263976C (en) Method of reinforcing an existing metal structure, method of reinforcing pipes and method of addition of spur lines to pipelines
CN105416506A (en) Connecting structure of steel deck and fiberglass cabin surrounding wall
CN205524836U (en) Ship gangplank device
CN204341376U (en) A kind of rubber fender sealed type impingement plate structure
CN202830737U (en) Bridge hanging eaves plate component
CN212613485U (en) Wood grain aluminum veneer
CN105730612A (en) Glass fiber reinforced plastic ship bilge keel installation method
CN210375319U (en) Corrosion-resistant liquid level meter protective cover
CN203681832U (en) Novel steel and glass fiber reinforced plastic connecting mode
CN204250298U (en) Glass-reinforced plastic boat deck construction
CN205207674U (en) Aircraft subtracts heavy seal structure
CN205168803U (en) Antiskid deck
CN200940756Y (en) Polyethylene rubber tape jacket pipe
CN202595978U (en) Rear-cut type connection structure of connecting dry hanging stone curtain wall with back bolts
CN201292588Y (en) Closed-top angle connecting structure for aluminium veneer curtain wall
CN209241250U (en) A kind of deckhead of glass fibre reinforced plastic ship and the connection structure of wall
CN110841860A (en) Automatic coating device for ship
CN103921849A (en) Fender support made of composite materials
CN220055001U (en) Storage tank of steel lining glass flake

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 528462 Guangdong Province, Zhongshan city of God Bay Road No. 1 Makino Jianglong boat Technology Park

Applicant after: JIANGLONG SHIPBUILDING Co.,Ltd.

Address before: 528462 Guangdong Province, Zhongshan city of God Bay Road No. 1 Makino Jianglong boat Technology Park

Applicant before: Guangdong Jianglong boat Polytron Technologies Inc.

Address after: 528462 Guangdong Province, Zhongshan city of God Bay Road No. 1 Makino Jianglong boat Technology Park

Applicant after: Guangdong Jianglong boat Polytron Technologies Inc.

Address before: 528400 Guangdong Province, Zhongshan city of God Makino bamboo Bay Village Road No. 4

Applicant before: GUANGDONG JIANGLONG SHIPBUILDING Co.,Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: GUANGDONG JIANGLONG SHIPBUILDING CO., LTD. TO: GUANGDONG JIANGLONG SHIPBUILDING TECHNOLOGY CO., LTD.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150204